Milestones, Module (M3)
Milestone Cost (Rs Millions)
2.504
2.371
#REF!
1.550
4.699
Finishing works #REF!
Total #REF!
Foundation (up to Plinth level) Excavation, PCC (1:4:8), RCC (1:2:4) in raft, Plinth beam, mild steel and BB work
Masonary up to roof level B.B.Masenory (1:6) as in S/S G.F, steel chowkat, steel windows, R.C.C.(1:2:4) as column, roof beams and mild steel. (without pouring of roof beams)
After laying slab-IR.C.C.(1:2:4) as roof slab, Earth filling under floor, Sand filling under floor, P.C.C.(1:4:8) as under floor, 2" flooring, marbel flooring , marbel skirting, plaster (1:4), plaster under soffit, roof beams, mild steel & 10 % of internal electrification.
Before laying slab-IIB.B.Masenory (1:6) as in S/S F.F, steel chowkat, Steel windows, R.C.C.(1:2:4) as roof beam,column (without pouring of roof beams).
After laying slab-IITruss roof, errection, CGI Sheet, PGI Sheet, Gable beams, mild steel & 10 % of internal electrification.
Milestones, Module (M3)
Percentage of total Cost
#REF!
#REF!
#REF!
#REF! 9.63
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Main Building
S.No Description Cost In Million Percentage %
1 Foundation 2.504 28.48
2 Before laying slab-I 2.371 26.97
3 After laying Slab-I #REF! #REF!
4 Before laying slab-II 1.550 17.64
5 After laying Slab-II 4.699 53.46
6 Finishing #REF! #REF!
#REF! #REF!
Remarks #REF! 2.79
1.62
1.53
1.52
1.61
4.44
13.51
#REF!
#REF!
#REF! #REF!
Steps for Mode of Payments
S.No. Description Quantity Unit Rate (Rs)
Foundation (up to Plinth level)
1 808.92 M3 105.10
2 P.C.C.(1:4:8) as in Foundation 163.68 M3 2890.30
3 R.C.C.(1:2:4) as in raft foundn. 160.85 M3 4699.95
4 R.C.C.(1:2:4) as column and Plinth Beam 23.53 M3 5261.50
5 S/Fab of mild steel bars deformed 9.36 T 82234.55
Total
Add 8% location factor
Add 5% Contingency
Grand Total
In Million
Masonary up to roof level
7 B.B.Masenory (1:6) as in S/S G.F 178.00 M3 3925.20
8 R.C.C.(1:2:4) as beam,column 22.64 M3 5261.50
9 S/Fab of mild steel bars deformed 2.67 T 82234.55
10 S/F of steel chowkat of 18 SWG as Specified 75.66 M2 1053.93
11 S/F of steel windows. 210.06 M2 4635.02
Total
Add 8% location factor
Add 5% Contingency
Grand Total
In Million
After laying slab-I
12 R.C.C.(1:2:4) as roof,beam,column slab 33.23 M3 5261.50
13 S/Fab of mild steel bars deformed 3.91 T 82234.55
14 Earth filling under floor 436.55 M3 104.55
15 Sand filling under floor. 59.59 M3 712.91
16 PCC (1:2:4) 2" Thick Under floor 1117.78 M2 338.08
17 Marbel Flooring 1" Thick 1116.30 M2 1494.14
18 Marbel skirting 915.11 M2 596.56
Excavation as in Foundation of bldg, bridge & other str. ordy. Soil.
19 1/2'' thick cement sand plaster (1:4) 2629.12 M2 123.61
20 1650.82 M2144.68
21 811.44 M21509.75
22 10% of Electrification
Total
Add 8% location factor
Add 5% Contingency
Grand Total
In Million
Before laying slab-II
23 B.B.Masenory (1:6) as in S/S F.F 130.24 M3 4109.91
24 R.C.C.(1:2:4) as roof,beam,column slab, linten 20.72 M3 5679.89
25 S/Fab of mild steel bars deformed 2.44 T 82234.55
26 S/F of steel chowkat of 18 SWG as specified 24.72 M2 1053.93
27 S/F Steel Window 105.11 M2 4635.02
Total
Add 8% location factor
Add 5% Contingency
Grand Total
In Million
After laying slab-II
28 Truss Roof 30.50 T 97,840.00
29 Errection 30.50 T 4,920.48
30 CGI Sheet, 703.53 M2 980.45
31 PGI Sheet 167.29 M2 1,130.14
32 RCC Gable Beam 5.66 M3 5680.25
33 S/Fab of mild steel bars deformed 0.67 T 82234.55
34 10% of Electrification
Total
3/8'' thick cement sand plaster under soffit of RCC roof. (1:3)
MS flat 1/2"x1/8" grill in windows of approved design including painting 3 coats, complete
Add 8% location factor
Add 5% Contingency
Grand Total
In Million
31 Finishing and Development works
Add 8% location factor
Add 5% Contingency
Grand Total
In Million
Steps for Mode of Payments
Amount (Rs)
85017.49
473084.30
755986.96
123809.86
769893.22
2207791.84
176623.35
2384415.18
119220.76
2503635.94
2.50
698685.60
119098.79
219254.51
79740.34
973632.30
2090411.55
167232.92
2257644.47
112882.22
2370526.69
2.37
174835.57
321862.95
45641.30 ###
42482.31
377899.06
1667908.48
545918.02
324985.52
238840.64
1225071.54
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! 0.24
#REF! #REF!
#REF!
535270.69
117714.59
200743.34
26054.40
487194.02
1366977.04
109358.16
1476335.21
73816.76
1550151.97
1.55
2984120.00
150074.64
689777.56
189056.88
32164.50
54847.91
44004.98
4144046.45
331523.72
4475570.17
223778.51
4699348.68
4.70
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
DETAIL COST ESTIMATEAdminstration , Examination Hall & 2 Class Room
GENERAL ABSTRACT OF COST.
M6
S.No. DESCRIPTION. AMOUNT.
1 Rs. 24401385
2 Rs. 5763283
3 INTERNAL ELECTRIFICATION. Rs. 1412826
TOTAL Rs. 31577494
ADD 10% Location Factor 3157749
G.TOTAL Rs. 34735243
Add 0.5% Contigency Rs. 173676
IN MILLIONS 34.909
MAIN BUILDING CIVIL WORK(G.F)Covered Area (2327.375) Sft
MAIN BUILDING CIVIL WORK(F.F)Covered Area (2327.375) Sft
PACKAGE NO:4; BOQ OF GGHS GANORAI
S.No. Description Quantity Unit Amount (Rs)
1 Excavation in foundation of building, bridges etc complete in ordinary soil (03-23-b) 808.92 M3 105.1 85017.49
2 (06-05-i) 163.68 M3 2890.3 473084.30
3 (06-06-b-03) 160.85 M3 4699.95 755986.96
4 (06-06-a-03) 247.93 M3 5261.5 1304483.70
5 (06-07-c) 57.98 T 82234.55 4767959.21
6 Pacca brick work in ground floor Cement, sand mortar 1:4 (07-05-a-03) 178.00 M3 3925.2 698685.60
7 .(03-16-b) 436.55 M3 104.55 45641.30
8 (10-03-a) 59.59 M3 712.91 42482.31
9 (10-15-e) 1117.78 M2 338.08 377899.06
10 (10-56-b) 1116.30 M2 1494.14 1667908.48
11 (10-41-b) 915.11 M2 596.56 545918.02
12 Cement plaster 1:4 upto 20' height 1/2" thick (11-09-b) 2629.12 M2 123.61 324985.52
13 (11-10-b) 1650.82 M2 144.68 238840.64
14 cement pointing in 1:2 to wall struck joints (11-18-b) 1668.22 M2 128.83 214916.78
15 S/F of steel chowkat of 18 SWG as Specified NSI 75.66 M2 1053.93 79740.34
16 (12-07-b) 75.66 M2 6971.16 527437.97
17 (25-39-b-05) 210.06 M2 4635.02 973632.30
18 (12-50) 811.44 M2 1509.75 1225071.54
19 Distempering New surface : Three coats (11-23-a-03) 4079.23 M2 42.04 171490.83
20 (13-38-a+13-38-b) 1473.42 M2 132.69 195508.10
21 (10-47) 343.95 M2 396.7 136444.97
22 S/F black board as specified: NSI 41.64 M2 600.67 25009.31
23 (25-37) 25.90 M 992.63 25710.57
24 (25-33) 74.18 M2 2379.47 176497.63
25 (13-06-c-01+13-06-c-02) 115.98 M2 184.74 21426.15
26 Plain Cement Concrete including placing, compacting, finishing & curing (1:3:6) (06-05-h) 15.75 M3 3477.21 54766.06
27 (12-22-a) 29.28 M2 10,262.79 300444.13
28 Chemical polishing of marble floor/Dado (10-50) 2031.41 M2 173.96 353384.08
29 (24-16-c-01) 260 M 136.16 35401.60
30 (24-16-c-02) 260 M 184.04 47822.79
31 (14-03-a) 11 No 1288.45 14172.95
32 (14-10-a) 11.00 No 1484 16324.00
33 Providing and Fixing CP pillar-cock, heavy type : 1/2" (14-21-b) 22.00 No 417.08 9175.76
34 Providing and Fixing CP bib-cock, heavy type : 1/2" (14-24-b) 26.00 No 343.27 8925.02
35 (14-31-a) 15.00 No 240.85 3612.75
36 Soakage Pit (6'dia x 15' deep) complete (23-11) 6.00 No 9917.15 59502.90
CSR 2009 Ref. No.
Rate (Rs)
Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:4:8)
RCC in raft foundation slab, base slab of column & ret, wall etc, not including in 06-06. Type C(1:2:4)
RCC in roof slab, beam, column & other structural members, insitu or precast. Type C (1:2:4)
Supply & fabricate M.S. reinforcement for cement concrete, (Hot rolled deformed bars Grade 40)
Filling, watering and ramming earth under floor with earth excavated from outside lead upto 50m
Provide, lay, water & ram clean coarse sand under floor / brick paving, complete
Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels : 2" thick
Provide & lay marble fine dressed stone flooring on surface in white cement complete: 1" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)
Provide & lay marble fine dressed and polished stone dado or skirting in white cement complete : 1/2" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)
Cement plaster 3/8" thick under soffit of RCC roof slabs only upto 20' height : (1:3)of RCC slab only (1:3)
First class deodar wood wrought joinery in doors and windows etc. complete : 1-3/4" thick
Providing and Fixing steel windows with openable glazed panels With 22 SWG wire gauze : Glass pane 5mm
MS flat 1/2"x1/8" grill in windows of approved design including painting 3 coats, complete
Preparing surface & painting with snowcem / weathershield paint : First coat + Preparing surface & painting with snowcem / weathershield paint : 2nd & subsequent coats
Burnt brick (1st class) pavement on edge grouted with sand including preparation of bed
Providing and Fixing stair railing of 2.5" i/d GI pipe, welded with 5/8"x5/8" MS bars 2'-9" high, fixed in each step
Providing and Fixing terrace railing of 2" i/d conduit pipe 16 SWG welded with 5/8"x5/8" sq bar 2.75' high complete
Prepare & Paint new surface, doors & windows Priming coat + Prepare & Paint new surface, doors & windows Each subsequent coat of paint
Provide & fix deodar wood almirah 9"-12" depth including boxing with back, shelves, shutters etc
Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 1/2" i/d
Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 3/4" i/d.
Providing and Fixing glazed earthen ware WC squatting type with built-in foot rests : White
P & F earthern ware low down flushing Providing and Fixing glazed earthen ware low down flushing cistern 3 gallons capacity : White
Providing and Fixing CI floor trap including CI grating & concrete chamber all round : 4"x2"
S.No. Description Quantity Unit Amount (Rs)CSR 2009 Ref. No.
Rate (Rs)
37 Constn. Of Main Hole. NSI 10.00 No 1000 10000.00
S.No. Description Quantity Unit Amount (Rs)CSR 2009 Ref. No.
Rate (Rs)
38 Septic Tank (int.Size: 7'x2'x5') complete (23-10) 7.00 No 10154.55 71081.85
39 10-38-a 33.46 m2 789.2 26404.46
40 14-34-b-01 10.97 m 1,202.14 13190.20
41 14-36-b 8.00 Each 426.6 3412.80
42 14-05-a-01 3.00 Each 1611.05 4833.15
43 14-27 3.00 Each 1933.21 5799.63
44 Spraying anti-termite liquid mixed with water in the ratio 1:40 (26-15) 538.08 M2 13.16 7081.14
45 69.08 M3 5680.25 392391.67
46 130.24 M3 4109.91 535274.68
47 (12-53-a-04) 48.51 M2 3661.62 177625.19
48 NSI 537.45 M2 1200.00 644940.00
49 (25-10) 30.50 T 97,840.00 2984120.00
50 Erection and fitting in position iron trusses, staging of water tanks, etc (25-11) 30.50 T 4,920.48 150074.64
51 (09-13-b) 703.53 M2 980.45 689775.99
52 (09-24-a) 167.29 M2 1,130.14 189061.12
53 (06-05-f) 32.61 M3 4156.42 135540.86
54 (09-05) 46.79 M2 529.52 24778.19
55 (09-19-a) 34.14 M 1053.54 35963.57
56 09-20- 16.00 each 500.35 8005.60
57 (24-16-c-08) 20.00 M 765.77 15315.40
58 (24-16-c-03) 304.00 M 245.48 74625.92
59 (24-33) 0.74 M2 4,497.10 3343.57
60 (10-21-a) 16.18 M2 625.03 10113.04
61 Mosaic dado or skirting complete as per specs Using grey cement : 1/2" thick (10-40-a-02) 20.81 M2 590.39 12286.26
62 NSI 2.00 Job 12000.00 24000.00
63 (07-07-a-03) 44.51 M3 3636.38 161845.68
64 (25-47-b) 6.51 M2 4036.66 26260.80
65 White washing: New surface : Three coats (11-25-a-03) 389.59 M2 19.14 7456.77
66 (23-02-b) 45.11 M 413.36 18645.93
67 Levelling dressing & making lawn including demolishing &Sign Board Lumpsum 1.00 Job 500000 500000.00
68 Instalation of sign board including painting and lettering Lumpsum 1.00 Job 20000 20000.00
69 (15-50) 540 No 867.02 468190.80
70 (15-51) 114 No 432.59 49315.26
71 Supply and Erection button holder/angle holder Bakelite large size (15-22-a) 200 No 34.59 6918.00
72 (15-61-a) 188 No 784.9 147561.20
73 (15-26-a) 64 No 304.33 19477.12
74 Supply and Erection single phase imported auto circuit (15-71-d) 76 No 322.48 24508.48
Glazed tile 1/4" thick dado jointed in white cementcomplete : White Plain tiles
Providing and fitting CI soil pipe with : Cement caulkedjoint : 4" dia
Providing and Fixing CI specials, such as tees, bends etc Cement caulked joint
Providing and Fixing glazed earthen ware WHB completeSize 22"x16" : White with pedestal
Providing and Fixing CP mixing valve for WHB, sink orshower
RCC in roof slab, beam, column & other structural members, insitu or precast. Type C (1:2:4) + Add extra labour for RCC in 2nd & subsequent storeys
(06-06-a-03) + (06-06-e)
Pacca brick work in ground floor Cement, sand mortar 1:4 + Add extra on item No.07-05 for brick work in First floor
(07-05-a-03) +07-06-a)
Supply and Fixing aluminium door/window, Economy model Fixed louver in 2" frameP/F 10mm Lasani wood ceiling with 1 coat of priming & 2 finishing coats of distermper (ICI pant) on both sides, complete with aluminum strips, GI wires as per drawing and specification Fabrication of heavy steel work with angle, tees, sheet iron etc for making trusses, girders etc i/c red oxide
Supply & fix corrugated GI sheet with GI bolts, nuts, limpet etc. complete : 22 BWG powder coated.
Flat sheet roof with GI plain sheets, including batten rolls, screws, clips etc : 22 BWG
Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:2:4)
Single layer of tiles 10"x5"x1.25" laid over 4" earth and 1" mud plaster on top of RC roof slab
Cast iron rain water down pipe fixed in position excluding heads & shoes : 4" dia
Heads for cast iron rain water down pipe fixed in place including cost of clamp holdfast and painting
Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 3" i/d
Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 1" i/d
Supplying and Fixing MS manhole cover of 0.25" thick sheet & angle iron frame 2"x2"x0.25" with lock complete
1.375" thick mosaic flooring, including rubbing and polishing complete : Using grey cement
Provision of painted M.S/G.I Flag post in 3'' dia and 20 feet in length with Pakistani flage, rope & PCC 1:2:4) plateform complete in all respect as decided by the Site Engineer.
Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:4
Supplying and Fixing 18 SWG MS Sheet Gate with angle iron frame (2"x2"x3/16") with side window, lock, painting etc
Providing and Laying non-reinforced concrete pipe, moulded with cement concrete 1:1.5:3 complete : 6" i/d
Wiring of light/fan/call-bell point in 3/0.029 PVC insulated bare cable in PVC pipe recessed
Wiring of 2/3-pin 5-Amp. plug point in 3/0.029 PVC insulated bare cable in PVC pipe recessed
Supply and Erection fluorescent tube light fitting including 4' rod, choke, starter, flexible wire etc : Single
Supply and Erection circuit breaker (imported) on sahl wood board complete : 2/5/15 Amp.
S.No. Description Quantity Unit Amount (Rs)CSR 2009 Ref. No.
Rate (Rs)
75 Supply and Erection girder clamp hook, 5/8" dia.for (15-71-d) 104 No 63.13 6565.52
76 (15-68-c) 104 No 2191.13 227877.52
77 (15-41) 10 No 3515.66 35156.60
78 W/O main sub main double cover
i (15-05-a) 1950 M 28.65 55867.50
ii (15-05-c) 3000 M 42.47 127410.00
iii (15-05-e) 950 M 82.85 78707.50
79 (15-70-c) 10 No 5724.77 57247.70
80 (15-15) 53 No 53.81 2851.93
81 (15-75-b) 8 No 10057.1 80456.80
82 15-69-a 3 Each 1,571.40 4714.20
83 NSI 1 Job 20,000.00 20000.00
Total 24401385
Add: 1.1 26841523.00
Add: 20% Premium 32209827.00
Add________% Above/Below/AT Par
Contractor
Supply and Erection best quality AC ceiling fan complete with GI rod, canopy, blades & regulator : 56" sweep
Earthing of iron clad/aluminium switches etc with GI wire #8 SWG in GI pipe 0.5" dia
Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 3/0.029"
Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 7/0.029"
Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 7/0.044"
Supply and Erection transpower auto circuit breaker 3-phase, 400V fungus moisture proofing : 100 Amp.
Supply and Erection wall/pole type bracket with double cover water tight reflector, flexible wire & brass holder
Supply and Erection cubical type factory fabricated floor/wall mounting steel main board comp. : Recessed
Supply and Erection best quality exhaust fan complete withshutter & regulator : 12"sweep
Providing & Fixing Lightning Arrester and Earthing complete in all respect as specified.
Page 17
GROUND FLOOR CIVIL WORK
S. No Description No. Length (ft) Width (ft) Depth/Ht (ft) Quantity
1 Excavation in foundation of building.
Main Building
F6 8 5.50 5.50 5.00 1210.00
F2 4 8.00 8.00 5.00 1280.00
F3 8 9.50 9.50 5.00 3610.00
F4 4 9.50 9.50 5.00 1805.00
Walls 1 160.00 1.50 1.00 240.00
Total Qty in CFt 8145.00
Qty in CM 230.61
2 P.C.C (1:4:8) as in foundation.
F1 8 5.50 5.50 0.25 60.50
F2 4 8.00 8.00 0.25 64.00
F3 8 9.50 9.50 0.25 180.50
F4 4 9.50 9.50 0.25 90.25
Walls 1 160.00 1.50 0.25 60.00
Total Qty in CFt 455.25
Qty in CM 12.89
3 R.C.C (1:2:4) as in Raft foundation.
F1 8 5.50 5.50 1.25 302.50
F2 4 8.00 8.00 1.25 320.00
F3 8 9.50 9.50 1.25 902.50
F4 4 9.50 9.50 1.25 451.25
Total Qty in CFt 1976.25
Qty in CM 55.95
4 Fabrication of Steel
1.50% of item No-3 1976 7.35
Qty in Ton 2204 6.59
5
CF1 8 1.00 1.00 4.75 38.00
CF2 4 1.00 1.00 4.75 19.00
R C C (1:2:4) as in lintle /bressumer etc.(Plinth Beam )
Page 18
S. No Description No. Length (ft) Width (ft) Depth/Ht (ft) Quantity
CF3 8 1.00 1.00 4.75 38.00
CF4 4 1.00 1.00 4.75 19.00
Plinth Beam
PB1 3 87.75 1.00 1.5 394.88
PB1 5 26.75 1.00 1.5 200.63
PB2 2 26.75 1.00 2 107.00
PB1 1 9.75 1.00 1.5 14.63
Total Qty in CFt 831.13
Qty in CM 23.53
6 Fabrication of steel
1.50 % of item No-5 831 7.35
Qty in Ton 2204 2.77
7 B. B work (1:4) as in super structure.
Long wall Back Side 1 87.75 0.750 9.50 625.22
Long wall Front Side 1 78.75 0.750 9.50 561.09
Cross wall 6 16.00 0.750 9.50 684.00
Cross wall (Bath Rooms) 1 16.00 0.375 10.50 63.00
do… 2 5.00 0.375 10.50 39.38
Total Qty in CFt 1972.69
Qty in CM 55.85
8
Roof beams.
B1 3 87.75 1.00 1.00 263.25
B1 6 26.75 1.00 1.00 160.50
B1 1 9.75 1.00 1.00 9.75
B2 2 26.75 1.00 1.50 80.25
Slab 1 87.75 26.75 0.50 1173.66
Columns 24 1.00 1.00 9.50 228.00
W/Ch 7 10.000 2.50 0.33 57.75
Total Qty in CFt 1973.16
Qty in CM 55.87
9 Fabrication of steel
R C C (1:2:4) as in lintle /bressumer etc.Lintle
Page 19
S. No Description No. Length (ft) Width (ft) Depth/Ht (ft) Quantity
1.50% of item No-8 1973 7.35
Qty in Ton 2204 6.58
10 Earth filling under floor
Class Room 3 25.00 16.00 2.50 3000.00
Stair 1 16.75 9.00 2.50 376.88
Ver 1 87.75 9.00 2.50 1974.38
Total Qty in CFt 5351.25
Qty in CM 151.51
11 Sand filling under floor.
Class Room 3 25.00 16.00 0.33 396.00
Stair 1 16.75 9.00 0.33 49.75
Ver 1 87.75 9.00 0.33 260.62
Total Qty in CFt 706.37
Qty in CM 20.00
12 P C C (1:4:8) under floor
Class Room 3 25.00 16.00 0.33 396.00
Stair 1 16.75 9.00 0.33 49.75
Ver 1 87.75 9.00 0.33 260.62
Under Plinth Beams (PB1) 3 87.75 1.50 0.33 130.31
do… 5 26.75 1.50 0.33 66.21
PB2 2 26.75 1.50 0.33 26.48
Under Plinth Beams (PB1) 2 9.75 1.50 0.33 9.65
Total Qty in CFt 939.02
Qty in CM 26.59
13 PCC (1:2:4) 2" Thick Under floor
Class Room 3 25.00 16.00 1200.00
Stair 1 9.00 16.75 150.75
Ver 1 87.75 9.00 789.75
Total Qty in SFt 2140.50
Qty in SM 198.93
14 Marbel Flooring 1" Thick
Class Room 3 25.00 16.00 1200.00
Page 20
S. No Description No. Length (ft) Width (ft) Depth/Ht (ft) Quantity
Stair 1 9.00 16.75 150.75
Ver 1 87.75 9.00 789.75
Total Qty in SFt 2140.50
Qty in SM 198.93
15 Marbel Skirting
Class Room 2 87.75 3.00 526.50
do.. 2 78.75 3.00 472.50
do.. 12 16.00 3.00 576.00
Column 8 4.00 3.00 96.00
Total Qty in SFt 1671.00
Qty in SM 155.30
16 1/2'' thick cement sand plaster (1:4)
1 87.75 10.50 921.38
2 78.75 10.50 1653.75
10 16.00 10.50 1680.00
Bath 2 16.00 10.50 336.00
do.. 4 5.00 10.50 210.00
col 8 4.00 10.50 336.00
Total Qty in SFt 5137.13
Qty in SM 477.43
17
1 87.75 26.75 2347.31
1 9.00 19.50 175.50
14 10.00 2.50 350.00
Total Qty in SFt 2872.81
Qty in SM 266.99
18
1 87.75 10.50 921.38
1 78.75 10.50 826.88
2 18.00 10.50 378.00
Column 8 4.00 10.50 336.00
Total Qty in SFt 2462.25
3/8'' thick cement sand plaster under soffit of RCC roof. (1:3)
Cement pointing in (1:3) to wall struck joints with Surkhi pointing
Page 21
S. No Description No. Length (ft) Width (ft) Depth/Ht (ft) Quantity
Qty in SM 228.83
19
Room doors (D1) 1 4.00 9.50 38.00
do.. (D2) 3 3.00 9.50 85.50
Bath doors (D3) 3 2.50 7.00 52.50
Total Qty in SFt 176.00
Qty in SM 16.36
20
Room doors (D1) 1 4.00 9.50 38.00
do.. (D2) 3 3.00 9.50 85.50
Bath doors (D3) 3 2.50 7.00 52.50
Total Qty in SFt 176.00
Qty in SM 16.36
21 S/F of steel grill.
W1 8 6.00 6.50 312.00
W2 4 3.00 6.50 78.00
V 3 2.25 3.00 20.25
Total Qty in SFt 410.25
Qty in SM 38.13
22 Distempering 3 coats. New surface
Qty in M2 744.42
23
As per item No-18 228.83
24 B B (1st class ) Pavement on Edge
1 87.75 3.00 263.25
2 26.75 3.00 160.50
1 87.75 8.00 702.00
Qty in SFt 1125.75
Qty in SM 104.62
25 PCC (1:4:8) as under pavement
As per qty of item No. 24 1125.75 0.5
Qty in CFt 562.88
S/F of steel sheet Chowkat of 18 SWG as specified
S/F of Deodar Wood Joiunery 3/4" thick .
Preparing surface & Painting with snowcem/ weathershield paint 3 coats.
Page 22
S. No Description No. Length (ft) Width (ft) Depth/Ht (ft) Quantity
Qty in CM 15.94
26 S/F Black Board.
1 8.00 4.00 32.00
Total Qty in SFt 32.00
Qty in SM 2.97
27
1 21.00 21.00
Total Qty in RFt 21.00
Qty in M 6.40
28 M/F Terrace railing 2" i/d conduit pipe
Main Building 1 87.75 1.5 131.63
Qty in M2 12.23
29 S/F Steel Window
W1 8 6.00 6.5 312.00
W2 4 3.00 6.5 78.00
V 3 2.25 3 20.25
Total Qty in SFt 410.25
Qty in SM 38.13
30 Painting to new surface wood work
Qty as item no. 20 x 2 32.71
31 PCC (1:3:6)
Verandah Steps 1 63.00 3.00 0.5 94.50
do 1 63.00 2.00 0.5 63.00
do 1 63.00 1.00 0.5 31.50
Total Qty in CFt 189.00
Qty in M3 5.35
32 S/F Cupboard
1 5.00 7.00 35.00
Total Qty in SFt 35.00
Qty in SM 3.25
33
Qty as item no. 14 + 15 354.23
S/F Stair Railling of 2.5" i/d G I Pipe welded with 5/8"x5/8' MS bars 2'9" high .
Chemical polishing of marble floor/Dado
Page 23
S. No Description No. Length (ft) Width (ft) Depth/Ht (ft) Quantity
34 Glazed tiles over walls
3 20.00 6 360.00
Total Qty in SFt 360.00
Qty in SM 33.46
35 S/F CI pipe 4" dia .(for sewerage)
3.00 12.00 36.00
Qty in RFt 36.00
Qty in RM 10.97
36 S/F CI Special
8.00 8.00
Qty in Nos 8.00
37 P & F GI pipe 1/2'' dia
Qty in M 60
38 S/F of G I Pipe 3/4" dia .
Qty in M 20
39
in foot rests. White
Qty in Nos 3
40
Qty in Nos 3
41 3 3
42 3 3
43
Qty in Nos 6
44 P & F CP bib cock 1/2''dia.
Qty in Nos 6
45 P & F CI floor trap
Qty in Nos 3
46
Qty in Nos 2
47 Constn. Of ManHole.
Qty in Nos 2
P & F of glazed earthen ware WC squating type with built
P & F earthern ware low down flushing cistern 3 gallons.
Providing and Fixing glazed earthen ware WHB completeProviding and Fixing CP mixing valve for WHB, sink orP & F CP piller cock /stop cock 1/2''dia.
Constn. Of Soakage pit.(6' dia & 15' deep)
Page 24
S. No Description No. Length (ft) Width (ft) Depth/Ht (ft) Quantity
48 Constn. Of Septic Tank size (7x2x5)
Qty in Nos 1
49
Qty as item no. 13 198.93
Qty in SM 198.93
Spraying anti-termite liquid mixed with water in the ratio 1:40
ABSTRACT OF COST (CIVIL WORK) 1st FLOOR (BOQ)
S.No. Description CSR 2009 Ref. No. Quantity. Unit Rate (Rs) Amount (Rs)
1 69.08 M3 5680.25 392406.85
3 130.24 M3 4109.91 535270.69
13 (12-53-a-04) 48.51 M2 3661.62 177636.21
17 NSI 537.45 M2 1,200.00 644939.78
21 (25-10) 30.50 T 97,840.00 2984120.00
22 Erection and fitting in position iron trusses, staging of water tanks, etc (25-11) 30.50 T 4,920.48 150074.64
23 (09-13-b) 703.53 M2 980.45 689777.56
24 (09-24-a) 167.29 M2 1,130.14 189056.88
Total 5763283
RCC in roof slab, beam, column & other structural members, insitu or precast. Type C (1:2:4) + Add extra labour for RCC in 2nd & subsequent storeys
(06-06-a-03) + (06-06-e)
Pacca brick work in ground floor Cement, sand mortar 1:4 + Add extra on item No.07-05 for brick work in First floor
(07-05-a-03) +07-06-a)
Supply and Fixing aluminium door/window, Economy model Fixed louver in 2" frame
P/F 10mm Lasani wood ceiling with 1 coat of priming & 2 finishing coats of distermper (ICI pant) on both sides, complete with aluminum strips, GI wires as per drawing and specification
Fabrication of heavy steel work with angle, tees, sheet iron etc for making trusses, girders etc i/c red oxide
Supply & fix corrugated GI sheet with GI bolts, nuts, limpet etc. complete : 22 BWG powder coated.
Flat sheet roof with GI plain sheets, including batten rolls, screws, clips etc : 22 BWG
Page 26
FIRST FLOOR CIVIL WORK
S. No Description No. Length (ft) Width (ft) Depth/Ht (ft) Quantity
1 B. B work (1:4) as in super structure.
Long wall Back Side 1 87.75 0.750 9.50 625.22
Long wall Front Side 1 50.37 0.750 9.50 358.89
Cross wall 4 16.00 0.750 9.50 456.00
do.. 2 9.00 0.750 9.50 128.25
Total Qty in CFt 1568.36
Qty in CM 44.40
2 R C C (1:2:4) as in lintle /bressumer etc.Lintle
Roof beams.
B1 3 87.75 1.00 1.00 263.25
B2 2 26.75 1.00 1.50 80.25
B1 6 26.75 1.00 1.00 160.50
Columns 24 1.00 1.00 9.50 228.00
Total Qty in CFt 732.00
Qty in CM 20.72
3 Fabrication of steel
732 7.35 2.44
2204
4 PCC (1:2:4) 2" Thick Under floor
Class Room /hall 1 75.75 16.00 1212.00
Stair 1 9.00 16.75 150.75
Ver 1 87.75 9.00 789.75
Total Qty in SFt 2152.50
Qty in SM 200.05
5 Marbel Flooring 1" Thick
Class Room /hall 1 75.75 16.00 1212.00
Stair 1 9.00 16.75 150.75
Ver 1 87.75 9.00 789.75
Total Qty in SFt 2152.50
Qty in SM 200.05
6 Marbel Skirting
Class Room 2 87.75 3.00 526.50
do.. 4 26.50 3.00 318.00
do.. 2 16.00 3.00 96.00
1.50% of item No-2Qty in Ton
Page 27
S. No Description No. Length (ft) Width (ft) Depth/Ht (ft) Quantity
Column 8 4.00 3.00 96.00
Total Qty in SFt 1036.50
Qty in SM 96.33
7 1/2'' thick cement sand plaster (1:4)
2 87.75 10.50 1842.75
4 26.50 10.50 1113.00
2 16.00 10.50 336.00
8 4.00 10.50 336.00
Total Qty in SFt 3627.75
Qty in SM 337.15
8
1 87.75 26.75 2347.31
1 9.00 19.50 175.50
11 10.00 2.50 275.00
Total Qty in SFt 2797.81
Qty in SM 260.02
9
1 87.75 10.50 921.38
1 27 10.50 283.50
1 51 10.50 535.50
2 18.00 10.50 378.00
Column 8 4.00 10.50 336.00
Total Qty in SFt 2454.38
Qty in SM 228.10
10 S/F of steel sheet Chowkat of 18 SWG as specified
2 4.00 9.50 76.00
Total Qty in SFt 76.00
Qty in SM 7.06
11 S/F of Deodar Wood Joiunery 3/4" thick .
2 4.00 9.50 76.00
Total Qty in SFt 76.00
Qty in SM 7.06
12 S/F of steel grill.
W1 12 6.00 6.50 468.00
Total Qty in SFt 468.00
Qty in SM 43.49
3/8'' thick cement sand plaster under soffit of RCC roof. (1:3)
Cement pointing in (1:3) to wall struck joints with Surkhi pointing
Page 28
S. No Description No. Length (ft) Width (ft) Depth/Ht (ft) Quantity
13 Distempering 3 coats. New surface
Qty in M2 As per item No-(7+8) 597.17
14
As per item No-9 228.10
15 S/F Black Board.
2 8.00 4.00 64.00
Total Qty in SFt 64.00
Qty in SM 5.95
17 M/F Terrace railing 2" i/d conduit pipe
Main Building 1 47.00 1.5 70.50
1 47.00 2.5 117.50
Total Qty in SFt 188.00
Qty in SM 17.47
18 S/F Steel Window
12 6.00 6.50 468.00
Total Qty in SFt 468.00
Qty in SM 43.49
19 Painting to new surface wood work
Qty as item no. 11 x 2 14.13
20 S/F Cupboard
3 5.00 7.00 105.00
Total Qty in SFt 105.00
Qty in SM 9.76
21 S/F of Aluminum fixed Louvers
Total Qty in SFt 12 6.00 3 216.00
Qty in SM 20.07
22 P/F 10mm Lasani wood Ceiling Complete
Class Rooms 1 25.00 16.00 400.00
hall 1 51.37 25.00 1284.25
Stairs 1 16.00 9.00 144.00
Ver 1 35.44 9.00 318.96
Total Qty in SFt 2147.21
Qty in SM 199.55
23 Chemical polishing of marble floor/Dado
Qty as item no. 5 + 6 296.38
Preparing surface & Painting with snowcem/ weathershield paint 3 coats.
Page 29
S. No Description No. Length (ft) Width (ft) Depth/Ht (ft) Quantity
24
Truss total weight 11.30
Qty in Ton 11.30
25
Truss total weight 11.30
Qty in Ton 11.30
26
Truss total Quantity 2790.00
Qty in M2 259.29
27
3 87.00 2.00 522.00
2 30.50 2.00 122.00
Total Qty in SFt 644.00
Qty in SM 59.85
28 R C C (1:2:4) as in lintle /bressumer etc.Lintle
Gable Beam 200.00
Total Qty in CFt 200.00
Qty in CM 5.66
29 Fabrication of steel
200 7.35 0.67
2204
Fabrication of heavy steel work with angle, tees, sheet iron etc for making trusses, girders etc
Erection and fitting in position iron trusses, staging of water tanks, etc
Supply & fix corrugated GI sheet with GI bolts, nuts, limpet etc. complete : 22 BWG
Flat sheet roof with GI plain sheets, including batten rolls, screws, clips etc : 22 BWG
1.50% of item No-31Qty in Ton
Package No:8;BOQ Of GGHS Ganorai (Internal Electrification) S.No Description of item CSR 2009 Ref. No. Qty Unit Rate Amount
1 (15-50) 540 No 867.02 468190.80
2 (15-51) 114 No 432.59 49315.26
3 (15-22-a) 200 No 34.59 6918.00
4 (15-61-a) 188 No 784.9 147561.20
5 (15-26-a) 64 No 304.33 19477.12
6 (15-71-d) 76 No 322.48 24508.48
7 (15-71-d) 104 No 63.13 6565.52
8 (15-68-c) 104 No 2191.13 227877.52
9 (15-41) 10 No 3515.66 35156.60
10 W/O main sub main double cover
(15-05-a) 1950 M 28.65 55867.50
(15-05-c) 3000 M 42.47 127410.00
(15-05-e) 950 M 82.85 78707.50
11 (15-70-c) 10 No 5724.77 57247.70
12 (15-15) 53 No 53.81 2851.93
13 (15-75-b) 8 No 10057.1 80456.80
14 15-69-a 3 Each 1,571.40 4714.20
15 NSI 1 Job 20,000.00 20000.00
1412826.13
Wiring of light/fan/call-bell point in 3/0.029 PVC insulated bare cable in PVC pipe recessed
Wiring of 2/3-pin 5-Amp. plug point in 3/0.029 PVC insulated bare cable in PVC pipe recessed
Supply and Erection button holder/angle holder Bakelite large size
Supply and Erection fluorescent tube light fitting including 4' rod, choke, starter, flexible wire etc : Single
Supply and Erection circuit breaker (imported) on sahl wood board complete : 2/5/15 Amp.
Supply and Erection single phase imported auto circuit
Supply and Erection girder clamp hook, 5/8" dia.for
Supply and Erection best quality AC ceiling fan complete with GI rod, canopy, blades & regulator : 56" sweep
Earthing of iron clad/aluminium switches etc with GI wire #8 SWG in GI pipe 0.5" dia
Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 3/0.029"
Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 7/0.029"
Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 7/0.044"
Supply and Erection transpower auto circuit breaker 3-phase, 400V fungus moisture proofing : 100 Amp.
Supply and Erection wall/pole type bracket with double cover water tight reflector, flexible wire & brass holder
Supply and Erection cubical type factory fabricated floor/wall mounting steel main board comp. : Recessed
Supply and Erection best quality exhaust fan complete withshutter & regulator : 12"sweep
Providing & Fixing Lightning Arrester and Earthing complete in all respect as specified.