maine department of transportation page: 1...maine department of transportation page: 2 date: 090309...

14

Upload: others

Post on 14-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E
Page 2: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E
Page 3: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E

MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E CONTRACTOR :________________________________________________________________ ------------------------------------------------------------------------------- LINE| ITEM | APPROX. | UNIT PRICE | BID AMOUNT NO | DESCRIPTION | QUANTITY |----------------|-------------- | | AND UNITS | DOLLARS | CTS | DOLLARS |CTS ------------------------------------------------------------------------------- SECTION 0001 PROJECT ITEMS ------------------------------------------------------------------------------- |424.3332 LOW MODULAR | | | | | 0010|CRACKSEALER, APPLIED, | 600.000| | | | |INC. ROUTING |LB | | | | ------------------------------------------------------------------------------- |424.37 CRACK REPAIR | | | | | 0020| | 6000.000| | | | | |LF | | | | ------------------------------------------------------------------------------- |832.071 CONTRACTOR | | | | | 0030|ALLOWANCE CMP CHARGES |LUMP |LUMP | | | | | | | | | ------------------------------------------------------------------------------- |832.071 CONTRACTOR | | | | | 0040|ALLOWANCE FAIRPOINT |LUMP |LUMP | | | |COMMUNICATION CHARGES | | | | | ------------------------------------------------------------------------------- |DIV. 1 MOBILIZATION / | | | | | 0050|DEMOBILIZATION GENERAL |LUMP |LUMP | | | |CONDITIONS | | | | | ------------------------------------------------------------------------------- |DIV. 10 SPECIALTIES | | | | | 0060| |LUMP |LUMP | | | | | | | | | ------------------------------------------------------------------------------- |DIV. 11 EQUIPMENT | | | | | 0070| |LUMP |LUMP | | | | | | | | | ------------------------------------------------------------------------------- |DIV. 15 MECHANICAL | | | | | 0080| |LUMP |LUMP | | | | | | | | | ------------------------------------------------------------------------------- |DIV. 16 ELECTRICAL | | | | | 0090| |LUMP |LUMP | | | | | | | | | ------------------------------------------------------------------------------- |DIV. 2 SITE CONSTRUCTION | | | | | 0100| |LUMP |LUMP | | | | | | | | | -------------------------------------------------------------------------------

Page 4: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E

MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E CONTRACTOR :________________________________________________________________ ------------------------------------------------------------------------------- LINE| ITEM | APPROX. | UNIT PRICE | BID AMOUNT NO | DESCRIPTION | QUANTITY |----------------|-------------- | | AND UNITS | DOLLARS | CTS | DOLLARS |CTS ------------------------------------------------------------------------------- |DIV. 3 CONCRETE | | | | | 0110| |LUMP |LUMP | | | | | | | | | ------------------------------------------------------------------------------- |DIV. 5 METALS | | | | | 0120| |LUMP |LUMP | | | | | | | | | ------------------------------------------------------------------------------- |DIV. 6 WOOD & PLASTIC | | | | | 0130|CARPENTRY |LUMP |LUMP | | | | | | | | | ------------------------------------------------------------------------------- |DIV. 7 THERMAL & | | | | | 0140|MOISTURE PROTECTION |LUMP |LUMP | | | | | | | | | ------------------------------------------------------------------------------- |DIV. 8 DOORS & WINDOWS | | | | | 0150|GLASS |LUMP |LUMP | | | | | | | | | ------------------------------------------------------------------------------- |DIV. 9 FINISHES | | | | | 0160| |LUMP |LUMP | | | | | | | | | ------------------------------------------------------------------------------- | | | | SECTION 0001 TOTAL | | ------------------------------------------------------------------------------- | | | | TOTAL BID | | -------------------------------------------------------------------------------

Page 5: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E

General Decision Number: ME080002 03/06/2009 ME2 Superseded General Decision Number: ME20070002 State: Maine Construction Type: Building Counties: Aroostook, Franklin, Hancock, Kennebec, Knox, Lincoln, Oxford, Piscataquis, Sagadahoc, Somerset, Waldo, Washington and York Counties in Maine. Building Construction Projects (does not include single family homes and apartments up to and including 4 stories). Modification Number Publication Date 0 02/08/2008 1 04/04/2008 2 06/27/2008 3 10/03/2008 4 11/28/2008 5 12/19/2008 6 01/23/2009 7 01/30/2009 8 03/06/2009 BOIL0029-003 10/01/2008 Rates Fringes BOILERMAKER......................$ 30.19 8.96+26.6% ---------------------------------------------------------------- CARP1996-002 04/01/2007 Rates Fringes Carpenters: Millwright..................$ 21.00 11.93 ---------------------------------------------------------------- ELEC0490-002 06/01/2005 YORK COUNTY (Townships of Alfred, Lebanon, Sanford, Wells and area south thereof) Rates Fringes ELECTRICIAN......................$ 24.90 12.40 Teledata System Installer........$ 18.75 10.11 ---------------------------------------------------------------- ELEC0567-002 06/01/2008 AROOSTOOK COUNTY; FRANKLIN COUNTY: Entire County excluding Carthage, Perkins Plantation, Temple, Farmington, Industry Township and area south therof; LINCOLN COUNTY: Townships of Boothbay, Bristol, Edgecomb, Newcastle, Westport, Wiscasset; OXFORD COUNTY; PISCATAQUIS COUNTY: Entire county excluding Bernard, Bowerbank, Brownville, Greenville, Elliotsville, Lake

Page 1 of 5

3/9/2009http://www.wdol.gov/wdol/scafiles/davisbacon/ME2.dvb

Page 6: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E

View, Squaw, Williamsburg Townships and areas south thereof; SAGADAHOC COUNTY: Entire county south of Bowdoin and Bowdoinham Townships; SOMERSET COUNTY: Entire county west of the Kennebec River and north of Starks Townships; YORK COUNTY: Entire county excluding Alfred, Lebanon, Sanford and Wells Township and area south thereof. Rates Fringes Electricians:....................$ 27.33 12.87 Teledata Technician.........$ 19.00 8.73 ---------------------------------------------------------------- * ELEC1253-002 12/01/2008 FRANKLIN COUNTY: Townships of Carthage, Chesterville, Farmington, Industry, Jay, Perkins Pl., New Sharon, Temple, Washington Pl., Wilton; HANCOCK COUNTY; KENNEBEC COUNTY; KNOX COUNTY; LINCOLN COUNTY; PISCATAQUIS COUNTY: Townships of Abbott, Atkinson, Bernard, Blanchard, Bowerbank, Brownville, Dover/Foxcroft, Elliotsville, Greenfield, Guildford, Kingsbury, Little Squaw, Medford, Milo, Monson, Orneville, Parkman, Sangerville, Sebec, Shirley, Squaw, Wellington, Williamsburg, Willimantic; SAGADAHOC COUNTY: Townships of Bowdoin, Bowdoinham, Richmond; SOMERSET COUNTY: Townships of Athens, Bald Mt., Bingham, Brighton Place, Canaan, Carratunk, Cornville, East Moxie, Fairfield, Harmony, Hartland, Indian Pond, Madison, Mayfield, Mercer, Moxie Gore, Norridgewock, Palmyra, Pittsfield, Ripley, Skowhegan, Sonon, Squaretown, Starks, St. Albans, The Forks; WALDO COUNTY; WASHINGTON COUNTY Rates Fringes Electricians:....................$ 26.07 12.06 Teledata Technicians........$ 19.00 8.73 ---------------------------------------------------------------- ENGI0004-006 12/01/2008 Rates Fringes Power equipment operators: GROUP I.....................$ 28.13 20.01 GROUP II....................$ 28.02 20.01 Group I: Backhoes, Cranes, Excavators, Loaders, Pile Drivers Group II: Bulldozers, Rollers ---------------------------------------------------------------- IRON0496-001 03/16/2008 Rates Fringes Ironworkers: Structural and Reinforcing..$ 21.15 16.65 ---------------------------------------------------------------- PLUM0716-001 01/13/2009 Rates Fringes PIPEFITTER (including HVAC

Page 2 of 5

3/9/2009http://www.wdol.gov/wdol/scafiles/davisbacon/ME2.dvb

Page 7: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E

work)............................$ 24.00 12.96 ---------------------------------------------------------------- SHEE0017-009 07/01/2006 Rates Fringes SHEETMETAL WORKER................$ 18.965 16.49 ---------------------------------------------------------------- SUME2000-002 10/24/2000 Rates Fringes BRICKLAYER.......................$ 14.39 Carpenters: (including acoustical ceiling installation, drywall hanging and batt insulation installation)....................$ 14.09 3.47 Cement Mason/Finisher............$ 12.24 1.48 DRYWALL FINISHER/TAPER...........$ 14.42 Elevator Constructor.............$ 17.63 3.18 Laborers: (including general laborers and brick mason tenders).........................$ 10.59 4.61 Painters: Brush, Roller...............$ 11.03 PLASTERER........................$ 14.02 PLUMBER..........................$ 12.59 1.91 ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 11.97 1.32 SPRINKLER FITTER.................$ 13.56 2.65 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

Page 3 of 5

3/9/2009http://www.wdol.gov/wdol/scafiles/davisbacon/ME2.dvb

Page 8: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E

---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================

Page 4 of 5

3/9/2009http://www.wdol.gov/wdol/scafiles/davisbacon/ME2.dvb

Page 9: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E

END OF GENERAL DECISION

Page 5 of 5

3/9/2009http://www.wdol.gov/wdol/scafiles/davisbacon/ME2.dvb

Page 10: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E

General Decision Number: ME080009 07/25/2008 ME9 Superseded General Decision Number: ME20070009 State: Maine Construction Type: Highway Counties: Aroostook, Franklin, Hancock, Kennebec, Knox, Lincoln, Oxford, Piscataquis, Sagadahoc, Somerset, Waldo and York Counties in Maine. HIGHWAY CONSTRUCTION PROJECTS excluding major bridging (for example: bascule, suspension and spandrel arch bridges; those bridging waters presently navigating or to be navigatable; and those involving marine construction in any degree); tunnels, building structures in rest area projects and railroad construction. Modification Number Publication Date 0 02/08/2008 1 06/06/2008 2 07/25/2008 ENGI0004-015 04/01/2008 Rates Fringes Power equipment operators: Pavers......................$ 18.22 8.50 Rollers.....................$ 18.22 8.50 ---------------------------------------------------------------- * SUME2000-008 10/24/2000 Rates Fringes CARPENTER........................$ 11.60 1.51 Ironworkers: Structural..................$ 12.03 1.58 Laborers: Drillers....................$ 10.00 2.50 Flaggers....................$ 6.55 Guardrail Installers........$ 7.92 Landscape...................$ 7.87 .16 Line Stripper...............$ 8.69 .23 Pipelayers..................$ 9.21 2.31 Rakers......................$ 9.00 1.51 Sign Erectors...............$ 10.00 Unskilled...................$ 8.66 1.38 Wheelman....................$ 8.50 .43 Power equipment operators: Backhoes....................$ 11.87 2.05 Bulldozers..................$ 12.33 2.88 Cranes......................$ 14.06 1.75 Excavators..................$ 12.38 2.48

Page 1 of 3

3/9/2009http://www.wdol.gov/wdol/scafiles/davisbacon/ME9.dvb

Page 11: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E

Graders.....................$ 13.06 3.73 Loaders.....................$ 11.41 2.87 Mechanics...................$ 13.18 2.57 Truck drivers: Dump........................$ 9.35 3.10 Tri axle....................$ 8.70 1.18 Two axle....................$ 8.56 2.19 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request

Page 2 of 3

3/9/2009http://www.wdol.gov/wdol/scafiles/davisbacon/ME9.dvb

Page 12: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E

review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION

Page 3 of 3

3/9/2009http://www.wdol.gov/wdol/scafiles/davisbacon/ME9.dvb

Page 13: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E

ALLOWANCES 01210 - 2 YORK WEIGH STATION YORK, MAINE PIN NO. 11623.00

A. Coordinate with Allied Engineering, MaineDOT Resident and CMP for location of the Electrical Services.

1.4 SUBMITTALS

A. Submit invoices or delivery slips to show actual expenses and/or quantities of materials delivered to the site for use in fulfillment of each allowance.

1.5 UNUSED MATERIALS

A. Return unused materials purchased under an allowance to manufacturer or supplier for credit to Owner, after installation has been completed and accepted.

1. If requested by Engineer, prepare unused material for storage by Owner when it is not economically practical to return the material for credit. If directed by Architect, deliver unused material to Owner's storage space. Otherwise, disposal of unused material is Contractor's responsibility.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged or defective products to manufacturer for replacement.

3.2 PREPARATION

A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.

3.3 SCHEDULE OF ALLOWANCES

A. Allowance No. 1 – $20,000: Include CMP service entrance construction cost as specified in Division 16 Section "16000 basic electrical requirements" , Part 1 1.4, (B).

B. Allowance No. 2 - $10,000: Include Fairpoint Communications cost as specified in division 16 section 16740 – TELECOMUNICATIONS , Part 1 1.2 (B)

END OF SECTION 01210

Page 14: MAINE DEPARTMENT OF TRANSPORTATION PAGE: 1...MAINE DEPARTMENT OF TRANSPORTATION PAGE: 2 DATE: 090309 SCHEDULE OF ITEMS REVISED: CONTRACT ID: 011623.00 PROJECT(S): IM-1162(300)E

ALLOWANCES 01210 - 1 YORK WEIGH STATION YORK, MAINE PIN NO. 11623.00

SECTION 01210 - ALLOWANCES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. If the Contractor discovers any ambiguity, error, omission, conflict, or discrepancy, Special Provision Section 101.3.6 Priority of Contract Documents shall control.

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

2. State of Maine Department of Transportation, “Standard Specifications,” Revision 2002, apply to this Section.

3. State of Maine Department of Transportation Standard Details revised 2002 4. State of Maine Department of Transportation Best Management Practices for Erosion and

Sediment control the “table of contents” of the latest version is dated 1/19/00. Any supplements to any of the above specifications and or standards issued prior to issuance of this specification.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements governing allowances.

1. Certain materials and equipment are specified in the Contract Documents by allowances. In some cases, these allowances include installation. Allowances have been established in lieu of additional requirements and to defer selection of actual materials and equipment to a later date when additional information is available for evaluation. If necessary, additional requirements will be issued by Change Order. Allowance amount shall not include overhead and profit but shall include taxes, freight and delivery to the Project site.

B. Types of allowances include the following:

1. Lump-sum allowances.

C. Related Sections include the following: 1. Division 16 SECTION 16000 –BASIC ELECTRICAL REQUIREMENTS for electrical

service entrance requirements. 2. Division 16 Section 16740 – TELECOMMUNICATIONS for telephone Service

requirements

1.3 SELECTION AND PURCHASE