Make-to-Stock
July 28, 2012 2
Table of Content
1 About this Document ....................................................................................................................... 3
1.1 Purpose .................................................................................................................................... 3
1.2 Reference System and Model Company .................................................................................... 3
2 Master and Organizational Data ...................................................................................................... 4
3 Business Process Tasks ................................................................................................................. 5
3.1 Make-to-Stock ........................................................................................................................... 5
3.1.1 Review Multi-Level BoM for Product P100401 ............................................................... 5
3.1.2 Create Forecast for Product P100401............................................................................ 6
3.1.3 Run MRP ...................................................................................................................... 6
3.1.4 Carry Out Load Leveling ................................................................................................ 8
3.1.5 Manual Capacity Adaptation ........................................................................................ 10
3.1.6 Release Production Proposal for Product P100109...................................................... 12
3.1.7 Review and Release Production Order for Product P100109 ....................................... 14
3.1.8 Confirm Production Tasks for Product P100109........................................................... 15
3.1.9 Review Production Order............................................................................................. 17
3.1.10 Check Journal Entry .................................................................................................... 17
3.1.11 Release Production Proposal for Product P100401...................................................... 18
3.1.12 Review and Release Production Order for Product P100401 ....................................... 19
3.1.13 Create Label ............................................................................................................... 21
3.1.14 Confirm Production Tasks for Product P100401........................................................... 22
3.1.15 Check Journal Entry .................................................................................................... 23
3.1.16 Overview of Product Planning Details .......................................................................... 24
3.2 Increase Inventory ................................................................................................................... 25
3.2.1 Check Available Stock ................................................................................................. 25
3.2.2 Create Purchase Order ............................................................................................... 26
3.2.3 Goods Receipt ............................................................................................................ 27
3.3 Connected Scenarios .............................................................................................................. 28
Make-to-Stock
July 28, 2012 3
1 About this Document
1.1 Purpose
The objective of this business scenario document is to give you hands-on experience of running the chosen business processes in a realistic business environment using the SAP Business ByDesign system. It allows you to quickly become familiar with this business scenario by guiding you through the steps that you need to carry out in the reference system.
To obtain a better understanding of the business processes that make up this scenario, also refer to the Scenario Outline for this scenario.
1.2 Reference System and Model Company
A reference system is a system that is preconfigured and loaded with fictitious users and sample data. The users and sample data are based on the model company Almika Inc.. By following the step-by-step instructions in this document, you can assume the identity of the Almika users and use the built-in sample
data to carry out each of the business process tasks. This hands-on experience will help you to understand the relevance and benefits of this business scenario.
To learn more about the model company that uses the business processes described in this document, read the Company Fact Sheet, which contains an overview of the reference
company, its organizational set up, employees and their different roles and work centers, as well as a comprehensive list of the master data used in your system.
You can find the Company Fact Sheet in the Help Center of your reference system. To access
this document, choose Help Help Center and open the link under the heading Company-Specific Help.
Make-to-Stock
July 28, 2012 4
2 Master and Organizational Data
Each SAP Business ByDesign Reference System contains essential master and organizational data, which
reflect the typical organizational structure of a mid-size company of a specific industry
allow you to run the industry specific processes using the appropriate master data, for example, materials, vendors or customers.
For this scenario, use the master data as described below.
If you want to run the scenario with customer and project-specific values, you can copy master data with certain characteristics from the sample entries in the table and adapt this data.
For an illustration of the organizational data as well as additional information (bill of material, logistics layout) about the reference company, refer to the Company Fact Sheet.
Master / Org. Data Type Name and Value Usage
Product P100401 Finished goods
P100109 1st level semi-finished goods
P100110 1st level semi-finished goods
P100515 Component
P100101 Component
Resource 100003 Resource used by producing product P100401
100001 Resource used by producing product P100109
Planning Area P1100
Logistics Area P1100 Logistic Area head internal warehouse
P1100-20 Logistic Area for warehouse in
internal warehouse
Supplier S100200
Make-to-Stock
July 28, 2012 5
3 Business Process Tasks
3.1 Make-to-Stock
3.1.1 Review Multi-Level BoM for Product P100401
What You Should Know
The Supply Planner gets an overview of the multi-level Bill of Material for product P100401.
Logon and Work Center Information
Logon ID (Role) SUPPLYPLANNER01P (Supply Planner / Richard Stone)
Work Center / View Planning and Production Master Data Production Bills of
Material
Procedure
Field Name Data to Enter Activity / Button / Comment
Production Bills Of Material view
Select the line item 100002 which reflects the product ID P100401.
Click Multi-Level Structure.
Multi-Level BoM Structure: 100002/VAR1 screen
Levels 2 Press Enter.
Click the Arrow beside every
product ID to check the assigned products. Or click Expand Expand All to
review the whole structure.
Click Close.
Make-to-Stock
July 28, 2012 6
3.1.2 Create Forecast for Product P100401
What You Should Know
The Supply Planner creates a forecast for product P100401. Using the forecast demand, you can plan the periodic demand.
Logon and Work Center Information
Logon ID (Role) SUPPLYPLANNER01P (Supply Planner / Richard Stone)
Work Center / View Supply Planning Common Tasks: Maintain Demand Forecast
Procedure
Field Name Data to Enter Activity / Button / Comment
Maintain Demand Forecast screen
Product ID P100401
Period Type Monthly
Planning Area ID P1100
Start Date < current date > Click Go.
< Enter 200 each month for the next six months including
the current month >
In the Forecast Planning Table.
Click Save and Close.
3.1.3 Run MRP
What You Should Know
The Supply Planner executes an MRP run for product P100401 to cover the demand forecast and to create dependant demand for the components and raw materials. The demands are passed through to all BoM levels. Multi-level supply planning ensures that the goods receipts for all required products are planned on time. The result of the planning run is displayed and the production proposals for the product are created.
Logon and Work Center Information
Logon ID (Role) SUPPLYPLANNER01P (Supply Planner / Richard Stone)
Work Center / View Supply Planning Products
Make-to-Stock
July 28, 2012 7
Procedure
Field Name Data to Enter Activity / Button / Comment
Products view
Show list Choose All Products by Selection.
Click Advanced.
Product ID P100401
Planning Area ID P1100 Click Go.
Select the line item reflecting product P100401 and click Open.
Review the product planning details for the product. The category Forecast allows you to
review the newly created demand forecasts.
Product Planning Details: P100401 / P1100 screen
Choose Run Planning Multi BoM Level.
Run Planning: Multi BoM Level screen
Click OK.
For every product of the Multi-Level BoM you receive the following information message:
Product P100xxx in planning area P1100 planned (with warnings).
Product Planning Details: P100401 / P1100 screen
Check the Supply and Demand List. Production proposals are generated to
cover the new demands.
Production proposals are generated to cover the new demands.
Click Add Product.
Add Product screen
Product ID P100109
Planning Area ID P1100 Click OK.
Repeat this step for the product IDs P100110, P100515, and P100101.
Product Planning Details: P100101/P1100 screen
Choose the Selected
Make-to-Stock
July 28, 2012 8
Field Name Data to Enter Activity / Button / Comment
Products tab.
Selected Products tab
Select the line item reflecting product P100110.
Click Show Product Planning Details.
Product Planning Details: P100110/P1100 screen
Choose the Supply and Demand tab.
Supply and Demand tab
Check if the forecasted demand is passed to all levels
of the Multi-Level BoM.
Click Save and Close.
Since you have run the MRP on a Multi-Level BoM level, production proposals are generated for product P100109 and – if necessary – purchase proposals are generated for product
P100110.
3.1.4 Carry Out Load Leveling
What You Should Know
To resolve overload issue, capacity load leveling is carried out to balance the capacity load and the capacity of a resource has been increased.
Logon and Work Center Information
Logon ID (Role) SUPPLYPLANNER01P (Supply Planner / Richard Stone)
Work Center / View Supply Planning Resource Load
Procedure
Field Name Data to Enter Activity / Button / Comment
Resource Load view
Show list Choose All Resource Loads By Selection.
Click Advanced.
Make-to-Stock
July 28, 2012 9
Field Name Data to Enter Activity / Button / Comment
Resource ID 100003 Click Go.
Select the line item reflecting resource 100003.
Check the actual load situation under Details: Resource-
100003 / P1100 Load Graph.
Click Open.
Resource Planning Details: 100003 / P1100 screen
Planning buckets with an overload are indicated with a red light in the Exception column. You
can click the Open Exception List to get more details.
Click Run Load Leveling.
Input Parameters for Run Load Leveling screen
Start Date As proposed
End Date Start Date + 1 month Exception should fall in this period. If not, please adjust the Start Date and End Date.
Resource Utilization % 100 Click OK.
Resource Planning Details: 100003 / P1100 screen
Check the Exception column.
The overload situations should be resolved. You can click Load Graph to get a graphical
overview of the changed capacity and load situation.
Click Save and Close.
If the overload situation is not resolved, please follow next steps and run load leveling again.
Resource Load view
Click the link to the Resource 100003.
Equipment Resource Overview: 100003 screen
Click View All.
Operating Times tab Standard Operating Times tab Operating Hours tab
Click Add Row under Operating Hours.
Start Time 17:00
End Time 18:00
Make-to-Stock
July 28, 2012 10
Field Name Data to Enter Activity / Button / Comment
Operating Times tab Downtime and Additional Time tab
Click Add Row under Additional Times.
Reason Code Peak Time
Start Date < Saturday following the chosen planning bucket date >
09:00
End Date < Sunday following the chosen
planning bucket date >
9:00
Time Type Resource Specific Overtime
Click Save and Close.
The daily capacity has been increased due to the additional shift. The capacity on one
weekend has been increased due to the Peak Time.
3.1.5 Manual Capacity Adaptation
What You Should Know
The Supply Planner monitors an overload exception on a resource and reschedules the production proposals to an alternative source of supply.
Logon and Work Center Information
Logon ID (Role) SUPPLYPLANNER01P (Supply Planner / Richard Stone)
Work Center / View Supply Planning Resource Load
Procedure
Field Name Data to Enter Activity / Button / Comment
Resource Load view
Show list Choose All Resource Loads
By Selection.
Click Advanced.
Resource ID 100001 Click Go.
Select the line item reflecting
Make-to-Stock
July 28, 2012 11
Field Name Data to Enter Activity / Button / Comment
resource 100001.
Check the actual load situation under Details: Resource-
100001 / P1100 Load Graph.
Make a note of the first day with a capacity demand.
Click Open.
If there is already a line item indicating an exception, you can select it, skip the next steps and continue with next Resource Planning Details: 100001 / P1100 view.
Resource Planning Details: 100001 / P1100 screen
Click the link to the Resource 100001.
Equipment Resource Overview: 100001 screen
Click View All.
Operating Times tab Downtime and Additional Time tab
Click Add Row under Downtimes.
Reason Code Maintenance
Start Date < Start date = day you noted +
1 >
Skip weekend.
12:00
End Date < End date = day you noted +2 >
Skip weekend.
13:00
Time Type Resource Specific Downtime
Click Save and Close.
Click Close.
Resource Load view
Click Refresh.
Select the resource ID 100001
and click Open.
Resource Planning Details: 100001 /P1100 screen
Planning buckets with an overload are indicated with a red light in the Exception column.
Select a line item that shows
Make-to-Stock
July 28, 2012 12
Field Name Data to Enter Activity / Button / Comment
an overload exception and check the provided details on the Details: Operation List
tab page.
Select the first production proposal.
Choose Actions Change Source of Supply.
Change Source of Supply for Document XXX screen
Select the alternative source of supply (the one with NO green check mark of Current field).
Click Assign.
Resource Planning Details: 100001 / P1100 screen
Click Save.
Click Close.
Resource Load view
Click Refresh.
Make sure that the overload exception disappears.
3.1.6 Release Production Proposal for Product P100109
What You Should Know
The production of the cylinder P100109 is a prerequisite for the production of the gas boiler P100401. The Supply Planner releases the production proposals with the automatic creation of production requests and production orders. The production proposal is released and a production order is created.
Logon and Work Center Information
Logon ID (Role) SUPPLYPLANNER01P (Supply Planner / Richard Stone)
Work Center / View Supply Control Process Production Proposals
Make-to-Stock
July 28, 2012 13
Procedure
Field Name Data to Enter Activity / Button / Comment
Process Production Proposals view
Show list Choose All Proposals by Selection.
Click Advanced.
Product ID P100109
Planning Area ID P1100 Click Go.
Select the line item which is
firmed.
Click Edit.
Production Proposals: XXX screen
Click Open Material Flow.
Material Flow for Reference Document: Production Proposal XXX screen
The Material Flow illustrates which production proposal of the Product ID P100401 is the
trigger for the actual production proposal of the product P100109.
Click Close.
Production Proposals: XXX screen
Click Release.
Monitor Production Requests view
Show list Choose All Requests By Selection.
and Find Enter the <production proposal ID> that you have
released before.
Click Go.
Select the line item reflecting the related production request ID.
Click View.
On the General tab page, you can see that the Status is now set to Production Order
Creation Started.
Document Flow tab
Check if a production order is created. Make a note of the
production order ID.
Make-to-Stock
July 28, 2012 14
Field Name Data to Enter Activity / Button / Comment
Click Close.
The production proposal is converted to a production request.
3.1.7 Review and Release Production Order for Product P100109
What You Should Know
The Production Planner releases production orders to the shop floor.
Logon and Work Center Information
Logon ID (Role) PRODUCTIONPLANNER01P (Production Planner /
Samantha Wolfe)
Work Center / View Production Control Production Orders – By Order Header
Procedure
Field Name Data to Enter Activity / Button / Comment
Production Orders view
Show list Choose All Production Orders.
and Find Enter the <production order ID> that you have noted
before.
Click Go.
Select the appropriate line
item.
Click Edit.
Production Order: XXX screen General tab
Review the related business objects such as the Production Request ID or the Released Execution Model.
Order Structure tab
Review the production order details.
Document Flow tab
Review the document flow of the production order.
Make-to-Stock
July 28, 2012 15
Field Name Data to Enter Activity / Button / Comment
Click Stock and Demand Overview.
Stock and Demand Overview screen
Check if there is enough stock on hand for the components
P100110 and P100515.
Click OK to close the window.
Production Order: XXX screen
Click Release.
Click Close.
3.1.8 Confirm Production Tasks for Product P100109
What You Should Know
After finishing the production, the Production Operator confirms the production tasks. All production tasks are executed and the product P100109 is produced.
Logon and Work Center Information
Logon ID (Role) PRODUCTION02P (Production Operator / Michael Peacock)
Work Center / View Execution My Task Folders
Procedure
Field Name Data to Enter Activity / Button / Comment
My Task Folders view
Select the line item reflecting 100005 - Production Tasks.
Click Open Task List.
Task Folder: 100005 Production Tasks screen
Select the line items reflecting your production order ID.
Make-to-Stock
July 28, 2012 16
Field Name Data to Enter Activity / Button / Comment
There are two line items for your production order. The quantity of the tasks is determined by the production model through the task generation method, for example, ‘Operations including
Reporting Points‘, and the operations / activities.
For one task the Start Feasibility is green, for the other task the Start Feasibility is red. Select the line items reflecting your tasks and under Details, choose the Sequence tab. It
shows which of the two tasks is the Predecessor and which the Successor.
Select the line item where the Start Feasibility is green for
your production order ID.
Click Confirm.
Task Details: XXX Reporting Point screen
Click Confirm as Planned.
Make sure that the Confirmation Finished flag is set.
Review the Output Products, Input Products, and the
Activities.
Choose Change Status Finish.
Input Parameters for Finish screen
Click OK.
Task Details: XXX Reporting Point screen
Click Close.
Task Folder: 100005 Production Tasks screen
Click Refresh.
Select the line item reflecting the successor task for your
production order ID.
Repeat the above-mentioned
confirmation steps.
The input products P100110, P100515 and the only output product P100109 are in the second task. The input product quantity corresponds to the confirmed quantity. The operation IDs are maintained in the production model. The confirmed durations of the operations correspond to
the confirmed quantity.
Make-to-Stock
July 28, 2012 17
3.1.9 Review Production Order
What You Should Know
The Production Planner reviews the production order confirmations.
Logon and Work Center Information
Logon ID (Role) PRODUCTIONPLANNER01P (Production Planner / Samantha Wolfe)
Work Center / View Production Control Production Orders
Procedure
Field Name Data to Enter Activity / Button / Comment
Production Order view
Show list Choose All Production Orders.
Select the line item reflecting the production order ID you
noted down before.
Click Edit.
Production Order: XXX screen Execution Monitor tab
Review all confirmations executed for this production
order.
3.1.10 Check Journal Entry
What You Should Know
Fully integrated and automated financial accounting is one of the key capabilities of the system. Provided that the financial master data has been correctly defined and the required fine tuning settings for account determination have been adjusted, journal entries will be posted automatically. Authorized users can check and monitor these postings any time, for example the completeness and details of the financial postings including the complete document flow.
Logon and Work Center Information
Logon ID (Role) FINANCIAL02 (Accountant / Iris Green)
Work Center / View General Ledger Journal Entries Journal Entries
Make-to-Stock
July 28, 2012 18
Procedure
Field Name Data to Enter Activity / Button / Comment
Journal Entries view
Show list Today’s Postings As an alternative, you can choose Last 3 Days’
Postings or All Postings.
Group By list Journal Entry Type Click Go.
Click Advanced to limit your search criteria to the
documents you want to check.
Related Source Document ID
Enter the previously created production order ID
Related Source Document Type
96 - Production Lot Click Go.
Click View to see the details of
the posting.
Select the Document Flow
tab to view the complete
document history.
Click Close.
3.1.11 Release Production Proposal for Product P100401
What You Should Know
After the production of the cylinder P100109, the production of the gas boiler P100401 can start. The Supply Planner releases the production proposal with automatic creation of production requests, production orders, and production tasks.
Logon and Work Center Information
Logon ID (Role) SUPPLYPLANNER01P (Supply Planner / Richard Stone)
Work Center / View Supply Control Process Production Proposals
Procedure
Field Name Data to Enter Activity / Button / Comment
Process Production Proposals view
Show list Choose All Proposals by Selection.
Make-to-Stock
July 28, 2012 19
Field Name Data to Enter Activity / Button / Comment
Click Advanced.
Product ID P100401
Planning Area ID P1100 Click Go.
Select the line item reflecting the closest production proposal ID and make a note
of it.
Click Release.
Monitor Production Requests view
Show list Choose All Requests By Selection.
and Find Enter the <production proposal ID> that you have
released before.
Click Go.
Select the line item reflecting the related production request
ID.
Click View.
Document Flow tab
Check if a production order is created. Make a note of the
production order ID.
Click Close.
3.1.12 Review and Release Production Order for Product P100401
What You Should Know
The Production Planner releases production orders to the shop floor.
Logon and Work Center Information
Logon ID (Role) PRODUCTIONPLANNER01P (Production Planner / Samantha Wolfe)
Work Center / View Production Control Production Orders – By Order Header
Make-to-Stock
July 28, 2012 20
Procedure
Field Name Data to Enter Activity / Button / Comment
Production Orders view
Show list Choose All Production Orders.
And Find Enter the <production order ID> that you have noted
before.
Click Go.
Select the appropriate line item.
Click Edit.
Production Order: XXX screen General tab
Review the related business objects such as the Production Request ID or the
Released Execution Model.
Order Structure tab
Review the production order details.
Document Flow tab
Review the document flow of
the production order.
Click Stock and Demand Overview.
Stock and Demand Overview screen
Check if there is enough stock on hand for the components
P100101 and P100109.
Click OK to close the window.
Production Order: XXX screen
Click Release.
Click Close.
Make-to-Stock
July 28, 2012 21
3.1.13 Create Label
What You Should Know
The Production Planner creates labels for the output product. On the serialized product labels where there is one label per product, it is possible to capture the serial number identification.
Logon and Work Center Information
Logon ID (Role) PRODUCTIONPLANNER01P (Production Planner / Samantha Wolfe)
Work Center / View Production Control Production Orders – By Order Header
Procedure
Field Name Data to Enter Activity / Button / Comment
Production Orders view
Show list Choose All Production Orders.
and Find Enter the <production order ID> that you have noted
before.
Click Go.
Click New Labels.
New Labels screen
Label Type Select Serialized Product.
The Quantity on Label field is automatically set to 1ea. And the Number of Labels field is
calculated to 200 if the produced quantity is 200ea.
General tab
Comment on Label Released by Samantha Wolfe
Serial Number tab
Next Serial Number &+20100811_{001} Press Enter.
Click Create Serial Numbers.
Click Save. The system
generates the label IDs.
Make a note of the label IDs.
Click Close.
Common Tasks view
Click Labels.
Make-to-Stock
July 28, 2012 22
Field Name Data to Enter Activity / Button / Comment
Labels screen
Show list Choose All Labels By Selection.
Product ID P100401
Created On < current date > Click Go.
Select the appropriate line item.
Click View.
Label Overview screen
Choose Preview
Check the Serial Number and
if the note is added.
Click Close.
Click Close.
3.1.14 Confirm Production Tasks for Product P100401
What You Should Know
After finishing the production, the Production Operator confirms the production tasks. All production tasks are executed and the product P100401 is produced.
Logon and Work Center Information
Logon ID (Role) PRODUCTION02P (Production Operator / Michael Peacock)
Work Center / View Execution My Task Folders
Procedure
Field Name Data to Enter Activity / Button / Comment
My Task Folders view
Select the line item reflecting 100005 - Production Tasks.
Click Open Task List.
Task Folder: 100005 Production Tasks screen
Select the line items reflecting
your production order ID.
Make-to-Stock
July 28, 2012 23
Field Name Data to Enter Activity / Button / Comment
Click Confirm.
Task Details: XXX screen Assigned Labels tab
Select the Label ID you want
to assign. Use the Shift key to
select the first and last rows.
Click Assign and Add Quantity.
Choose Change Status Finish.
Input Parameters for Finish screen
Click OK.
Task Details: XXX screen
Click Close.
Task Folder: 100005 Production Tasks screen
Click Refresh.
3.1.15 Check Journal Entry
What You Should Know
Fully integrated and automated financial accounting is one of the key capabilities of the system. Provided that the financial master data has been correctly defined and the required fine tuning settings for account determination have been adjusted, journal entries will be posted automatically. Authorized users can check and monitor these postings any time, for example the completeness and details of the financial postings including the complete document flow.
Logon and Work Center Information
Logon ID (Role) FINANCIAL02 (Accountant / Iris Green)
Work Center / View General Ledger Journal Entries Journal Entries
Procedure
Field Name Data to Enter Activity / Button / Comment
Journal Entries view
Show list Today’s Postings As an alternative, you can choose Last 3 Days’
Postings or All Postings.
Make-to-Stock
July 28, 2012 24
Field Name Data to Enter Activity / Button / Comment
Group By list Journal Entry Type Click Go.
Click Advanced to limit your search criteria to the
documents you want to check.
Related Source
Document ID Enter the previously created
<production order ID>
Related Source Document Type
96 - Production Lot Click Go.
Click View to see the details of
the posting.
Select the Document Flow tab to view the complete
document history.
Click Close.
3.1.16 Overview of Product Planning Details
What You Should Know
The Supply Planner gets an overview of the product planning details after the production.
Logon and Work Center Information
Logon ID (Role) SUPPLYPLANNER01P (Supply Planner / Richard Stone)
Work Center / View Supply Planning Products
Procedure
Field Name Data to Enter Activity / Button / Comment
Products view
Show list Choose All Products by
Selection.
Click Advanced.
Product ID P100401
Planning Area ID P1100 Click Go.
Select the line item reflecting product P100401 and click Open.
Make-to-Stock
July 28, 2012 25
Field Name Data to Enter Activity / Button / Comment
Product Planning Details: P100401 / P1100 screen Supply and Demand tab
Ensure that the available stock has increased by 200 ea compared to the beginning of
the scenario.
Click Add Product.
Add Product screen
Product ID P100109
Planning Area ID P1100 Click OK.
Repeat this step for Product IDs P100110, P100515 and P100101.
Product Planning Details: P100401 / P1100 screen Selected Products tab
Select the line item reflecting product P100110.
Click Show Product Planning Details.
Supply and Demand tab
Check the available stock.
Click Save and Close.
The available stock of the components P100110, P100515 and P100101 has decreased. The
available stock of P100109 has not changed.
3.2 Increase Inventory
3.2.1 Check Available Stock
What You Should Know
The Warehouse Manager checks the available stock.
Logon and Work Center Information
Logon ID (Role) WAREHOUSE01P (Warehouse Manager / Luther Loblanski)
Work Center / View Internal Logistics Common Tasks: Stock Overivew
Make-to-Stock
July 28, 2012 26
Procedure
Field Name Data to Enter Activity / Button / Comment
Stock Overview screen
Planning Area ID P1100 Click Go.
Under Stock Details, review the data provided in the On-Hand Stock field related to the products in different logistics areas. For example, as compared to the required stock in chapter
3.1.3.
Click Close.
3.2.2 Create Purchase Order
What You Should Know
The Buyer creates purchase orders.
Logon and Work Center Information
Logon ID (Role) PURCHASE02 (Buyer / Bill Warner)
Work Center / View Purchase Requests and Orders Common Tasks: New Purchase Order
Procedure
Field Name Data to Enter Activity / Button / Comment
New Purchase Order screen
Product ID Requested product, for example, P100110
Ship-To/Service-Location P1100
Quantity Requested quantity
Click Assign Source of Supply.
Select a source of supply.
Click Assign.
If no source of supply could be determined, you must manually choose a Gross Price and a
Supplier ID, for example, S100200.
Make-to-Stock
July 28, 2012 27
Field Name Data to Enter Activity / Button / Comment
If you want to purchase further products, repeat the above steps for the requested products.
Click Order.
Make a note of the purchase order.
3.2.3 Goods Receipt
What You Should Know
The Supply Planner posts the goods receipt for a purchase order.
Logon and Work Center Information
Logon ID (Role) SUPPLYPLANNER01P (Supply Planner / Richard Stone)
Work Center / View Inbound Logistics Purchase Orders
Procedure
Field Name Data to Enter Activity / Button / Comment
Purchase Orders view
Show list Choose All Purchase Orders by Selection.
Click Go.
Click the Display Filter Row
icon.
Purchase Order ID Enter the previously created <purchase order ID>.
Press Enter.
Select the line item reflecting the appropriate purchase order.
Click Post Goods Receipt.
Create Inbound Delivery and Goods Receipt screen
Delivery Notification ID Enter the <delivery notification
ID> of the supplier, for example, 90816.
Make sure that the Target Logistics Area ID is P1100-20.
Click Propose Quantities.
Make-to-Stock
July 28, 2012 28
Field Name Data to Enter Activity / Button / Comment
Click Save and Close.
The complete process of creating a supplier invoice is covered in the business scenario document Procure-to-Pay (Stock). The process of paying a supplier invoice is covered in the business scenario document Cash and Liquidity Management – Processing Payable and Payment.
3.3 Connected Scenarios
For Increasing Inventory the subsequent step of creating a supplier invoice is documented in the business scenario document Procure-to-Pay (Stock). The subsequent step of paying a supplier invoice is documented in the business scenario document Cash and Liquidity Management (Processing Payables and Payments). Those steps are typically done for a batch of invoices and payments and not
for one specific payment or invoice.
Make-to-Stock
July 28, 2012 29
Icons
Caution
Example
Tip
Note
User ID and User Role
Work Center and Work Center View
Copyright © 2012 SAP AG. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information conta ined herein may be
changed without prior notice.
Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.
Microsoft, Windows, Excel, Outlook, PowerPoint, Silverlight, and Visual Studio are registered trademarks of Microsoft Corporation.
IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, z10, z/VM, z/OS, OS/390, zEnterprise, PowerVM, Power Architecture,
Power Systems, POWER7, POWER6+, POWER6, POWER, PowerHA, pureScale, PowerPC, BladeCenter, System Storage, Storwize, XIV, GPFS, HACMP, RETAIN, DB2 Connec t, RACF, Redbooks, OS/2, AIX, Intelligent Miner, WebSphere, Tivoli, Informix, and Smarter Planet are trademarks or registered trademarks of IBM Corporation.
Linux is the registered trademark of Linus Torvalds in the United States and other countries.
Adobe, the Adobe logo, Acrobat, PostScript, and Reader are trademarks or registered trademarks of Adobe Systems Incorporated in the United States and other countries.
Oracle and Java are registered trademarks of Oracle and its affiliates.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems Inc.
HTML, XML, XHTML, and W3C are trademarks or registered trademarks of W3C® , World Wide Web Consortium, Massachusetts Institute of Technology.
Apple, App Store, iBooks, iPad, iPhone, iPhoto, iPod, iTunes, Multi-Touch, Objective-C, Retina, Safari, Siri, and Xcode are trademarks or registered trademarks of Apple Inc.
IOS is a registered trademark of Cisco Systems Inc.
RIM, BlackBerry, BBM, BlackBerry Curve, BlackBerry Bold, BlackBerry Pearl, BlackBerry Torch, BlackBerry Storm, BlackBerry Storm2, BlackBerry PlayBook, and BlackBerry App World
are trademarks or registered trademarks of Research in Motion Limited.
Google App Engine, Google Apps, Google Checkout, Google Data API, Google Maps, Google Mobile Ads, Google Mobile Updater, Google Mobile, Google Store, Google Sync, Google
Updater, Google Voice, Google Mail, Gmail, YouTube, Dalvik and Android are trademarks or registered trademarks of Google Inc.
INTERMEC is a registered trademark of Intermec Technologies Corporation.
Wi-Fi is a registered trademark of Wi-Fi Alliance.
Bluetooth is a registered trademark of Bluetooth SIG Inc.
Motorola is a registered trademark of Motorola Trademark Holdings LLC.
Computop is a registered trademark of Computop Wirtschaftsinformatik GmbH.
SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP BusinessObjects Explorer, StreamWork, SAP HANA, and other SAP products and services mentioned herein as well as
their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.
Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services
mentioned herein as well as their respective logos are trademarks or registered trademarks of Business Objects Software Ltd. Business Objects is an SAP company.
Sybase and Adaptive Server, iAnywhere, Sybase 365, SQL Anywhere, and other Sybase products and services mentioned herein as well as their respective logos are trademarks or
registered trademarks of Sybase Inc. Sybase is an SAP company.
Crossgate, m@gic EDDY, B2B 360° , and B2B 360° Services are registered trademarks of Crossgate AG in Germany and other countries. Crossgate is an SAP company.
All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.
These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing here in should be construed as constituting an additional
warranty.