  • 8/7/2019 MDOT 5-YearPlan

    1/19

    Kirk T. Steud le, Michigan Department of Transportation Direc tor

    St a t e Transpor t a t ion Com m ission

    November 18, 2010

  • 8/7/2019 MDOT 5-YearPlan

    2/19

    Present a t ion Objec t ives

    Review revenues available to support theprogram

    Identify MDOTs investment strategies and

    funding issues

    Provide overview of each programs objectives

    Obtain Transportation Commission agreement

    to post draft to website and seek public inputand comment

  • 8/7/2019 MDOT 5-YearPlan

    3/19

    Five-Year Transpor t at ion ProgramK ey Messages

    Five-Year Program includes all modes:Highway, Passenger Transportation, Rail

    Freight, Ports and Aviation

    Continues to focus on system preservation and

    safety

    Document streamlined to provide focus on keymessages

  • 8/7/2019 MDOT 5-YearPlan

    4/19

    Five-Year Transpor t at ion ProgramK ey Messages

    State revenues continue to decline

    No additional state funding appears in sight

    Highway Program able to match all availablefederal aid in FY 2011 due to one-time budgetadjustments, but significant shortfall begins in

    FY 2012. No highway category is completelycut

    Consequences of reduced investment areidentified in the Five-Year Program

  • 8/7/2019 MDOT 5-YearPlan

    5/19

    2011-2015 Transportation Program

    INVESTMENTS

    Anticipated Investment = $6.1 Billion

    Highw ay

    $4.074BAviation

    $659.6M

    Bus/Marine/Rail

    $1.378B

  • 8/7/2019 MDOT 5-YearPlan

    6/19

    Highw ay Program

    Presenter- Denise Jackson

  • 8/7/2019 MDOT 5-YearPlan

    7/19

    Revenue Assum pt ionsHighw ay Program

    Federal Revenue Assumptions

    No Federal Reauthorization Bill- operating underContinuing Resolution

    2011 Revenue assumed same as 2010, then 3.2%annual growth from 2012-2015

    $4.1 billion in federal funding would be available forthe trunkline program, if state match funds areavailable

  • 8/7/2019 MDOT 5-YearPlan

    8/19

    Revenue Assum pt ionsHighw ay Program

    State Revenue Assumptions Revenue based on Department of Treasurys

    Michigan Transportation Fund estimate

    Assumes flat to less than 1% growth on average for

    FY 2011-2015

    Total state revenue is estimated at $2.2 billion forcapital outlay, routine maintenance, and debt service

    Includes bond proceeds to support the Blue Water BridgePlaza Project

  • 8/7/2019 MDOT 5-YearPlan

    9/19

    Inab i l i t y t o Mat c h Federal A id Highw ay Program

  • 8/7/2019 MDOT 5-YearPlan

    10/19

    Inves t m ent St rat egy Highw ay Program

    Inves t m ent St rat egy Highw ay Program

    Highway Program- (Annual/Avg)FY 2011 FY 2012-2015

    Repair & Rebuild Roads $493 M $111 M

    Repair & Rebuild Bridges $250 M $69 M

    Capacity Improvements/ $135 M $50 MNew Roads

    Safety and System Operations $131 M $64 M Safety $17 M $10 M Congestion Mitigation $42 M $7 M

    and Air Quality ITS $14 M $3 M Operations $18 M $5 M

    Other $94 M $48 M

    Routine Maintenance $275 M $275 M

    TOTAL $1.378 B $677 M

  • 8/7/2019 MDOT 5-YearPlan

    11/19

    Highw ay Program Im pac t s Pavem ent and Br idge Preservat ion

    Pavement

    Over 180 projects (over 325 miles) either delayed or

    removed from this Five-Year Program. Nearly 700 miles of preventive maintenance work

    annually, removed or delayed.

    Bridges Approximately 300 bridges will not receive repairs from

    the Bridge Replacement and Rehabilitation Program.

    Approximately 300 bridges will not be sufficientlymaintained with preventive maintenance work. Eachyear, more susceptible to becoming structurally deficient.

  • 8/7/2019 MDOT 5-YearPlan

    12/19

    Preserv ing t he Highw ay Syst emHow Long Wi l l t he Pavem ent Last ?

    Historic and Projected RSL Pavement Condition

    Current Strategy vs Match All Federal Aid Strategy

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

    Year

    %Good/F

    air

    Historic Current Match All Federal Aid Goal

  • 8/7/2019 MDOT 5-YearPlan

    13/19

    Preserv ing t he Highw ay Syst emHow Long Wi l l t he Pavem ent Last ?

    Historic and Projected Network Remaining Service Life

    0

    2

    4

    6

    8

    10

    12

    1996 2002 2007 2012 2015

    Year

    RemainingServiceLifeofNetwork

  • 8/7/2019 MDOT 5-YearPlan

    14/19

    Preserv ing t he Highw ay Syst emWhat Does t he Dr iver Perc eive?

    Historic and Projected Sufficiency Pavement Surface Condition

    Current Strategy vs Match All Federal Aid Strategy

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019Year

    %

    Good/Fair

    Historic Sufficiency Surface Condition Current Match All Federal Aid

  • 8/7/2019 MDOT 5-YearPlan

    15/19

    Preserv ing t he Highw ay Syst emHow Com for t ab le is t he Dr iver s Ride?

    Michigan Pavement Ride Quality

    75

    80

    85

    90

    95

    2001

    2002

    2003

    2004

    2005

    2006

    2007

    2008

    2009

    Years

    PercentGoodandFair

    (b

    asedonroadb

    edmileage)

    IRI

  • 8/7/2019 MDOT 5-YearPlan

    16/19

    Preserv ing t he Highw ay Syst emBr idge Condi t ion

    Will not meet the combined bridge condition goal

    of 92.5% Good or Fair under current fundinglevels

    Bridge Condition Forecast System

    MDOT - Freeway and Non-Freeway Bridges

    70.00%

    75.00%

    80.00%

    85.00%

    90.00%

    95.00%

    100.00%

    1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

    Year

    PercentB

    ridges

    in

    Fairor

    Goo

    d

    Condition

    Actual Match All Federal-Aid Current Funding Level

    Hi h P I

  • 8/7/2019 MDOT 5-YearPlan

    17/19

    Highw ay Program Im pac t s Safet y & Sys t em Opera t ions

    Safety

    Several projects will be delayed that would have

    addressed fatalities and severe injuries The Safety Work Authorization program will be

    eliminated

    Congestion Management and Air Quality $2M shortfall in operation budget of MITS Center

    Increased risk if having to implement costlyprescriptive measures

    Intelligent Transportation System

    Elimination of the entire capital program at MDOT forITS deployment activities

  • 8/7/2019 MDOT 5-YearPlan

    18/19

    Highw ay Program Im pac t s Ex panding t he Highw ay Syst em

    Less than 10% of MDOTs Highway ProgramInvestments will go towards expanding the system.

    The projects anticipated to move forward include:

    The Blue Water Bridge project is a major portion of the

    capacity program, supported by toll revenue. Project will improve overall crossing efficiency, safety and

    security of entry, and I-94/I-69 corridor leading to the plaza.

    M-231- Bridge over the Grand River in Ottawa Countyin 2011.

    US-131- New bridge over the St. Joseph River, in St.

    Joseph County in 2013.

    Hi h P I

  • 8/7/2019 MDOT 5-YearPlan

    19/19

    Highw ay Program Im pac t s Support ing Ec onom ic Oppor t un i t ies

    Effect on Employment of the Five-Year Highway

    Program 2011-2015

    15,840

    8,0518,813

    7,2477,709

    $624

    $778

    $673

    $621

    $1,378

    0

    2,000

    4,000

    6,000

    8,000

    10,000

    12,000

    14,000

    16,000

    18,000

    Year

    NumberofJobs

    $0

    $200

    $400

    $600

    $800

    $1,000

    $1,200

    $1,400

    $1,600

    $1,800

    Investment(millions)

    Jobs Investment (millions)