Metro Kapsul Smart Public Transportation System Prof. Mulyo Widodo Kartidjo Institut Teknologi Bandung Proses Sertifikasi Produk Industri

Upload: others

Post on 04-Dec-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Metro Kapsul Smart Public Transportation System

Prof. Mulyo Widodo Kartidjo

Institut Teknologi Bandung

Proses Sertifikasi Produk Industri

Page 2: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

A lot of big cities was not designed in the beginning for having a good public transportation system.

Most of the system was planned on the existing road, therefore by the increasing number of private

vehicles on the road the traffic become heavily congested.

Jakarta - Indonesia Ho Chi Min City - Vietnam

Latar Belakang

Page 3: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Angkutan Kota - Bogor Busway TransJakarta - Jakarta

Latar Belakang

Page 4: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Turning Radius

15 meter

Slope Maximum

8 %

Suitable for already

crowded cities

Flexible Ridership

Elevated

Track

2,000 – 12,000

passenger/hour

Relatively low

cost of

investment

Can be as a Feeder

or Main Line

Latar Belakang

Page 5: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

The cost structure of

Monorail or Light Rail

system, mostly

dominated by the

construction cost of

Elevated Guide way

Structure, consist of

Track Girder, Column and

Foundation.

To make the construction

cost of that elevated

guide way structure

cheaper, the load on that

elevated guide way

should be made lighter.

Latar Belakang

Page 6: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

In order to be able to reduce the construction cost of Elevated Track, the

load on the elevated track has to be made lighter.

It can be done by controlling the trains outside stations, only 1 (one) train

can be put on one track girder, therefore the load on the track girder can be

made lighter.

(International Patent PCT/SG2015/050370)

(Indonesia Patent ID P000201405996)

Latar Belakang

Page 7: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Proses Pengembangan Produk Industri

Page 8: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Proses Pengembangan Produk Industri

Page 9: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Proses Pengembangan Produk Industri

Page 10: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Proses Sertifikasi Produk Industri

Homologation (from the verb homologate, meaning "to approve or confirm

officially") is the process of certifying or approving a product to indicate that it

meets regulatory standards and specifications, such as safety and technical

requirements.

Page 11: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Standard

Pengujian

Metode

Pengujian

Pengujian

Sertifikasi

Otoritas Pelaksana Produk

Proses Sertifikasi Produk Industri

Klasifikasi

Produk

Kementerian

Perhubungan

BPPT

B2TKS Metro Kapsul

Kementerian

Perhubungan

BPPT

B2TKS

ITB FTMD

Page 12: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Pengujian Beban Statis Body Metro Kapsul

Pengujian Lelah Struktur Bagian Bawah Metro Kapsul

Simulasi Crashworthiness

Pengujian Performance

Pengujian Sistem Kontrol & Signalling

Tikungan

Braking

Maksimum Kecepatan

Maksimum Tanjakan

Proses Sertifikasi Produk Industri

Proses Sertifikasi Produk Metro Kapsul

1

2

3

4

5

Page 13: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Metoda pengujian uji statis pembebanan yang dilakukan untuk Metro Kapsul disusun bersama

antara beberapa fihak yaitu:

• Kementerian Perhubungan melalui Direktorat Jendral Perkeretaapian

• BPPT melalui B2TKS ( Balai Besar Teknologi Kekuatan Struktur)

• ITB melalui FTMD (Fakultas Teknik Mesin & Dirgantara)

Dokumen uji statis pembebanan dimaksudkan untuk memenuhi Peraturan Menteri No.13

Tahun 2011 Pasal 12 ayat 2 (f) dan Peraturan Menteri 175 Tahun 2015 (PM 175) dengan

beberapa penyesuaian

Penyesuaian dilakukan dengan mengkombinasikan dan mengadopsi aturan yang tercantum

pada PM 175 Tahun 2015 dan standar JIS E7105 tentang metode uji statis badan kereta.

Pengujian Beban Statis Body Metro Kapsul 1

Page 14: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Tabel 7.2 Nilai defleksi hasil pengujian

Pengujian Beban Statis Body Metro Kapsul 1

Page 15: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Tujuan dilakukan pengujian lelah pada struktur bagian bawah, adalah:

a. Memperoleh metode pembebanan lelah pada komponen-komponen struktur

bagian bawah Metro kapsul berdasarkan standar BS EN 13749:2011.

b. Memperoleh fatigue Life dari komponen-komponen struktur bagian bawah

Metrokapsul, untuk keperluan internal perusahaan.

Pengujian Lelah Struktur Bagian Bawah Metro Kapsul 2

Page 16: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

BS EN 15227:2008

Pada standar ini, metro kapsul termasuk dalam kategori C-II yang merupakan kategori

untuk kendaraan perkotaan di rel tanpa ada interaksi dengan lalu lintas.

Simulasi dilakukan dengan menggunakan software LS-Dyna

Simulasi Crashworthiness 3

PENUMPANG

Page 17: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Pengujian Beban Statis Body Metro Kapsul

Pengujian Lelah Struktur Bagian Bawah Metro Kapsul

Simulasi Crashworthiness

Pengujian Performance

Pengujian Sistem Kontrol & Signalling

Tikungan

Braking

Maksimum Kecepatan

Maksimum Tanjakan

Proses Sertifikasi Produk Industri

Proses Sertifikasi Produk Metro Kapsul

1

2

3

4

5

Page 18: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Pengujian Sistem Kontrol & Signalling 5

Proses Sertifikasi Produk Industri

Konsep Operasional Metro Kapsul

Page 19: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Pengujian Sistem Kontrol & Signalling 5

Proses Sertifikasi Produk Industri

Konsep Operasional Platooning

Page 20: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Pengujian Sistem Kontrol & Signalling 5

Proses Sertifikasi Produk Industri

Sistem Sensor pada Driverless Car

Page 21: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Pengujian Sistem Kontrol & Signalling 5

Proses Sertifikasi Produk Industri

Konsep Head Way Calculation - Siemens

Page 22: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

For the follower train, they have to follow the rules as follows:

Rule #1 If the distance to the front train is more than 4 Sub-Block, increase the speed until the distance to the front train is equal

to 4 Sub-Block.

Rule #2 If the distance to the front train is equal to 4 Sub-Block, keep the speed

Rule #3 If the distance to the front train is less than 4 Sub-Blocks, reduce the speed until the distance is equal to 4 Sub-Block.

Rule #4 If the distance to the front train is equal to 3 Sub-Block, start a normal braking until the distance is equal to 4 Sub-Block.

Rule #5 If the distance to the front train is equal to 2 Sub-Block, continue to apply normal braking until the distance to the front

train is equal to 4 Sub-Block.

Rule #6 If the distance to the front train is equal to 1 Sub-Block, apply an emergency braking until the distance to the front train

is equal to 2 Sub-Block, and back to Rule #5

Rule #7 If the distance to the front train cannot be made up to 2 Sub-Block, continue applying emergency braking until the train

stop.

Pengujian Sistem Kontrol & Signalling 5

Proses Sertifikasi Produk Industri

At operational speed of 60 km/hour

Normal breaking distance: 117 m Emergency breaking distance: 37 m

Page 23: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Standard

Pengujian

Metode

Pengujian

Pengujian

Sertifikasi

Otoritas Pelaksana Produk

Proses Sertifikasi Produk Industri

Klasifikasi

Produk

Kementerian

Perhubungan

BPPT

B2TKS Metro Kapsul

Kementerian Perhubungan

BPPT B2TKS

ITB FTMD

Page 24: Metro Kapsul - LPiK ITB | LEMBAGA PENGEMBANGAN INOVASI … · 2020. 3. 2. · For the follower train, they have to follow the rules as follows: Rule #1 If the distance to the front

Terima kasih