mini frac schlumberger
DESCRIPTION
MinifracTRANSCRIPT
-
Wireline Mini-frac (Stress Testing)
Vinay K. Mishra, P. Eng.Reservoir Domain Champion NAOReservoir Domain Champion NAO
Schlumberger, Houston, Texas
6th International Symposium, Aug. 23-25, 2011
-
Applications of Mini-frac/Micro-frac/Stress Testing
Hydraulic Fracture Stimulation Fracture Confinement Critically Dependent Upon Stress Contrast Between Fracture Confinement Critically Dependent Upon Stress Contrast Between
Layers Fracture orientation
Cap rock integrity testCap rock integrity test SAGD Projects Underground gas storageg g g
Well Trajectory Design Input to Mechanical Earth ModelMud Weight Optimisation
-
Concept of Stress Testing
z
OverburdenStressObjectives:
F t O i t ti & Di ti
Max Hz Stress
Fracture Orientation & Direction Minimum In-situ stress
x
yMin Hz Stress Fracture
Solution:
Conventional CH Mini-Frac Operation.
Wireline OH Mini-Frac Operation. Logging derived Stress
Measurements.
-
Th f k f il ld b hi
Cap Rock Integrity
The consequences of a caprock failure could be catastrophic.
Fracture to Surface
Cap Rock P > m
Shear Failure Tensile Failure Reference: (Surface Steam Release of May 18, 2006 Joslyn Creek SAGD Thermal Operation, ERCB Staff Review and Analysis, February 11, 2010)
-
Sleeve Fracture prior to Mini-fracPacker Expands
Pumpout module
Wireline
Pressure gage P Downhole pump
Packer Expands
Packer
P
Inflate sealvalve
Interval sealvalve 1m
Software controlled in real time
Sleeve Fracture
P
valve 1m
Very stiff hydraulic system
C ti
Samplechamber
Continuous pressure records
chamber
-
A Wireline Conveyed Stress Tool
Pumpout module
Wireline
Pressure gage P Move tool to straddle
sleeve frac depth
Packer
g g
P
Inflate sealvalve
Interval sealvalve 1
p
Inflate packers
Packer
SlidingP
valve 1m
Injection between interval
gcoupling
Samplechamber
Fracture growth, closure reopening Hydraulic Fracture
chamber
-
Hydraulic Fracture Test ProcedureBreak Down, Growth, Closure, Reopen
PPressure
Minimum in-situ stress
Flow Time
Interval Pressure
FlowRate
Time
-
Wireline Mini-Frac Solution
Press Break-Down PressurePress PressureFrac Propagation Pressure
Re-Open Pressure
ISIP
Closure Pressure
FlowRate Time
-
Determination of Closure Pressure
Linear fit
Fracture closes
-
Fracture identification using Imaging Tools
Borehole imaging are useful tools for seeing fractures before mini-frac
Large vertical fractures may prevent packer seal
Small fractures assist or eliminate breakdown
I i t l d t l i di ti f
Before After
Imaging tools dont always see indications of mini frac
-
Case study 2
Wireline mini-frac in shaleObjective: Cap rock integrity test
Job details Sleeve frac performed 3 Leak off tests (LOT)
5 i j ti f ll ff 5 injection fall offs 2 flow back & BU
-
Interpreted Results Shale Formation mini-fracInterpreted Results Closure pressure determined Fracture initiation, fracture
growth pressure g p
-
Wireline Mini-frac Experiences Canada 2002-2011
> 120 SAGD Shale Cap Rocks
> 30 Gas Reservoir (Shale/siltstone)
> 5 fracture orientation
> 10 Oil Sands reservoir > 10 Oil Sands reservoir
Open Hole Gas Storage Shale Cap Rock
Cased Hole Gas Storage Shale Cap Rock
-
Conclusions
MDT Micro Frac provides Closure Pressure Closure Pressure
Far Field Stress Directions in conjunction with FMI Used as Calibration for Other Stress Measurements (sonic logs) It is a short interval measurement at a known depthIt is a short interval measurement at a known depth Mini-frac has been performed in Shale gas/cap rock / Sandstone / Carbonates reservoirs Job planning is important Job planning is important
-
References SPE 58086-PA, Title: Applications of Wireline Stress Measurements Authors Jean Desroches, A.L. Kurkjian, Schlumberger Oilfield
Services, Journal SPE Reservoir Evaluation & Engineering Volume Volume 2, Number 5 Date October 1999 SPE 25906-PA, Title: A New Wireline Tool for In-Situ Stress Measurements, Authors Thiercelin, M.J., Plumb, R.A., Desroches, Jean,
Schlumberger Cambridge Research; Bixenman, P.W., Jonas, J.K., Schlumberger Well Services; Davie, W.A.R., Schlumberger Evaluationand Production Services, Journal SPE Formation Evaluation Volume Volume 11, Number 1 Date March 1996
SPE 78486-MS, Title: An Advanced Method of Determining Insitu Reservoir Stresses: Wireline Conveyed Micro-Fracturing, Authors: A. Carnegie, Schlumberger; M. Thomas, M.S. Efnik, M. Hamawi, ADCO; M. Akbar, M. Burton, Schlumberger, International Petroleum Exhibition and Conference, 13-16 October 2002, Abu Dhabi, United Arab Emirates
SPE 127233-MS , Title: Advances in Wireline Conveyed In-situ Reservoir Stress Testing Measurements: Case Studies from the Sultanate of Oman Authors: Koksal Cig and Alyaqdhan Sulaiman Al Mandhari, Schlumberger, and Salem Mohammed El Msallati and Latifa Qobi,Petroleum Development Oman, Kuwait International Petroleum Conference and Exhibition, 14-16 December 2009, Kuwait City, Kuwait