Monitoring of Streambank Erosion Processes: Hydraulic, Hydrologic and

Geotechnical Controls

Andrew Simon1 and Natasha Pollen2

1 USDA-ARS, National Sedimentation Laboratory2 Department of Geography, Kings College, London

National Sedimentation Laboratory

Page 2: Monitoring of Streambank Erosion Processes: Hydraulic

How Much Sediment Comes from Bank Failures?

•Widening rates of up to 100 m/yr

•Up to 90% of the sediment emanating from eroding channels

•Often, more than 50% of the sediment emanating from awatershed

•One 1.0-m failure along a 5-m high bank along a 100-m reach= 400 tonnes or about 26 dump trucks

National Sedimentation Laboratory

Page 3: Monitoring of Streambank Erosion Processes: Hydraulic

Little Blue River, Kansas

~ 631,000 tonnes eroded during 7 months

About 42,000 dump trucks

National Sedimentation Laboratory

Page 4: Monitoring of Streambank Erosion Processes: Hydraulic

Bank Retreat Processes

Vertical face

National Sedimentation Laboratory

Page 5: Monitoring of Streambank Erosion Processes: Hydraulic

Bank Retreat Processes

Toe erosion steepens bank

National Sedimentation Laboratory

Page 6: Monitoring of Streambank Erosion Processes: Hydraulic

Bank Retreat Processes

Tension crack develops

National Sedimentation Laboratory

Page 7: Monitoring of Streambank Erosion Processes: Hydraulic

Bank Retreat Processes

Infiltration raises pore-water pressure

National Sedimentation Laboratory

Page 8: Monitoring of Streambank Erosion Processes: Hydraulic

Bank Retreat Processes

Shearing starts

National Sedimentation Laboratory

Page 9: Monitoring of Streambank Erosion Processes: Hydraulic

Bank Retreat Processes

Bank failure occurs

National Sedimentation Laboratory

Page 10: Monitoring of Streambank Erosion Processes: Hydraulic

Bank Retreat Processes

Erosion removes the failed debris

National Sedimentation Laboratory

Page 11: Monitoring of Streambank Erosion Processes: Hydraulic

Bank Retreat Processes

Bank steepeningstarts again

National Sedimentation Laboratory

Page 12: Monitoring of Streambank Erosion Processes: Hydraulic

Bank Retreat Processes

Vertical face

National Sedimentation Laboratory

Page 13: Monitoring of Streambank Erosion Processes: Hydraulic

Bank stability is decreased by….

Soil moisture

toe erosion

National Sedimentation Laboratory

Page 14: Monitoring of Streambank Erosion Processes: Hydraulic

Bank stability is increased by….

toe protection

drainage

Vegetation –mechanical and hydrologic effects

National Sedimentation Laboratory

Page 15: Monitoring of Streambank Erosion Processes: Hydraulic

Fundamental Processes Behind Bank Stability

If we want to predict bank stability we need to quantify the underlying processes. These are:

• Bank shear strength (resistance to bank failure)• Bank toe erodibility (resistance to toe erosion)

National Sedimentation Laboratory

Page 16: Monitoring of Streambank Erosion Processes: Hydraulic

Bank Stability – The Factor of Safety

Resisting ForcesDriving Forces

If Fs is greater than 1, bank is stable. If Fs is less than 1 bank will fail. (We usually add a safety margin – Fs>1.3 is stable.)

Factor of Safety (Fs) ==

Resisting Forces Driving Forcessoil strength bank anglevegetation weight of bank matric suction water in bank

National Sedimentation Laboratory

Page 17: Monitoring of Streambank Erosion Processes: Hydraulic

Strength of Soil Materials• Effective cohesion (high in clays, moderate in

silts, absent in sands and gravels)• Friction (high in sands and gravels, low in clays)• Pore-water pressure – the most dynamic variable

τf = c’ + (σ-µw) tan φ’whereτf = shear strength (kPa); c’ = effective cohesion (kPa); σ = normal load (kPa); µw = pore-water pressure (kPa) and φ’ = effective friction angle (degrees).

National Sedimentation Laboratory

Page 18: Monitoring of Streambank Erosion Processes: Hydraulic

Measuring Soil Strength

• In-situ tests – Borehole shear test (BST)• Torvane shear (combines cohesion and

frictional strengths)• Laboratory test – shear box and triaxial cell

Advantages and Disadvantages

National Sedimentation Laboratory

Page 19: Monitoring of Streambank Erosion Processes: Hydraulic

Soil-Strength TestingShear Strength Envelope - Sand

c' = 0.5, φ' = 34 degrees

y = 0.684x + 0.5

01020304050607080

0 10 20 30 40 50 60 70 80 90 100 110

Normal Stress (KPa)

She

ar S

tress

at F

ailu

re

(KP

a)

Shear Strength Envelope - Clayc' = 12.5, φ' = 16 degrees

y = 0.296x + 12.5

0

10

20

30

40

50

0 10 20 30 40 50 60 70 80 90 100 110

Normal Stress (KPa)

She

ar S

tress

at F

ailu

re

(KP

a)

National Sedimentation Laboratory

Page 20: Monitoring of Streambank Erosion Processes: Hydraulic

Effects of Pore-Water Pressure

• Pore-water pressure reduces effective friction – weakens the soil

• Increases weight of bank• However, negative pore-water pressure

(matric suction) increases bank strength• Converting positive to negative pressure

(lowering water table) increases strength

National Sedimentation Laboratory

Page 21: Monitoring of Streambank Erosion Processes: Hydraulic

Measuring Pore-Water Pressure

• Measure directly using tensiometers and piezometers

• Infer from water table height

µw = h γw

where µw = pore water pressure (kPa); h = head of water (m); γw = unit weight water (kN/m3)

Page 22: Monitoring of Streambank Erosion Processes: Hydraulic

Converting Matric Suction to Apparent Cohesion

• Negative pore-water pressure does not directly translate to added cohesion

φb ranges from 0 to 20 degrees depending on soil type and moisture content and is equal to φ’ at saturation

φb is the rate of increase in shear strength with increasing matricsuction

Shea

r stre

ngth

(kPa

)

φb

Matric suction (kPa)

Page 23: Monitoring of Streambank Erosion Processes: Hydraulic

Incorporating Matric Suction as Apparent (total) Cohesion

ca= c’ + (µa - µw) tan φb

Where:ca = apparent (total) cohesionc’ = effective cohesion

(µa - µw) = suction on the failure planeφb = angle representing the relation

between the shear strength andmatric suction

National Sedimentation Laboratory

Page 24: Monitoring of Streambank Erosion Processes: Hydraulic

Incorporating Suction in a Strength Test

NORMAL STRESS, IN kPa0 10 20 30 40 50 60 70 80 90 100 110

SHEA

R S

TRES

S, IN

kPa

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75Unsaturated Shear Test, Goodwin Creek Bend, MS

ca = 22.7 kPaφ’ = 0.37 = 20.3o

r2 = 0.99Matric suction = 17kPa

Matric suction = 17kPaAt φ b of 14° this gives;17 x (tan 14) = 4.2 kPa added cohesionTherefore;

c’ = 22.7 – 4.2 = 18.5 kPa

Page 25: Monitoring of Streambank Erosion Processes: Hydraulic

Hydraulic Erosion Processes

Flowing water exerts a shear stress on the toe and bank; το is a function of water surface slope, hydraulic radius and unit weight.

το

Bed and bank material have resistance due to friction, cohesion and weight. A certain amount of shear stress, is required to overcome this (critical shear stress; τc).

τc

National Sedimentation Laboratory

Page 26: Monitoring of Streambank Erosion Processes: Hydraulic

Boundary Shear Stress

• Average shear stress τi on each soil layer

• Average erosion distance ∆Wi

soil

laye

r 1so

il la

yer 2

soil

laye

r 3lateral erosion and bankprofile after erosion

shear stress distribution

flow segments used to calculateshear stress on the three soil layers

iii

fii

PAR

SR

=

γ=τ

( ) tKW iciii ∆τ−τ=∆ ,

National Sedimentation Laboratory

Page 27: Monitoring of Streambank Erosion Processes: Hydraulic

Erosion Rate is a Function of Erodibility and Excess Shear Stress

ε = k (τo- τc)ε = erosion rate (m/s)

k = erodibility coefficient (m3/N-s)

τo = boundary shear stress (Pa)

τc = critical shear stress (Pa)

(τo-τc) = excess shear stress

Critical shear stress is the stress required to initiate erosion.

Obtained from jet-test device

Page 28: Monitoring of Streambank Erosion Processes: Hydraulic

Measuring Bank and Toe Erosion Threshold and Erodibility

• Jet-test device scours a hole in the bank or toe and measures the shear stress and erosion rate

• From this we calculate critical (threshold) shear stress and erodibility coefficient, k

Measuring bank erodibility with the non-vertical jet test device

Page 29: Monitoring of Streambank Erosion Processes: Hydraulic

From Relation between Shear Stress and Erosion We Can Calculate τc and ε

Eros

ion

Rat

e, c

m3 /s

ec

τc

Shear Stress, Pa

National Sedimentation Laboratory

Page 30: Monitoring of Streambank Erosion Processes: Hydraulic

ErodibilityErodibility, m3/N-s

k = x τcy = 0.1 τc

-0.5

Where; τc = critical shear stress (Pa), x, y = empirical constants

CRITICAL SHEAR STRESS, IN Pa

0.01 0.1 1 10 100 1000

ERO

DIB

ILIT

Y C

OEF

FIC

IEN

T (k

), IN

cm

3 /N-s

0.0001

0.001

0.01

0.1

1

10

k = 0.09 τc -0.48

Page 31: Monitoring of Streambank Erosion Processes: Hydraulic

Effects of Vegetation on Bank Stability

Stabilizing * * Increased strength * * Canopy interceptionEffects due to roots * * Transpiration

Destabilizing * * Surcharge * * Increased infiltrationEffects rate and capacity

Mechanical Hydrologic

National Sedimentation Laboratory

Page 32: Monitoring of Streambank Erosion Processes: Hydraulic

Testing for Root Strength

TIME, IN MINUTES1605.40 1605.45 1605.50 1605.55 1605.60 1605.65 1605.70

TE

NSI

LE

ST

RE

NG

TH

, IN

ME

GA

PASC

AL

S

0

1

2

3

4

5

DIS

PLA

CE

ME

NT

, IN

CE

NT

IME

TE

RS

0

1

2

3

4

5

6

7

8

9

10

Root diameter at rupture = 0.75 cm

Tensile strength

Displacement

Root tensile strength tester

National Sedimentation Laboratory

Page 33: Monitoring of Streambank Erosion Processes: Hydraulic

Root Strength: Species Comparison

National Sedimentation LaboratoryROOT DIAMETER, IN MILLIMETERS

0 2 4 6 8 10 12 14 16 18

TE

NSI

LE

ST

RE

NG

TH

, IN

ME

GA

PASC

AL

S

0

20

40

60

80

River BirchEastern SycamoreSweetgumBlack WillowGamma grassSwitch grassCottonwoodPineOregon AshDouglas SpireaHimalayan Blackberry

Page 34: Monitoring of Streambank Erosion Processes: Hydraulic

Bank-Stability Model• 2-D wedge-failure model• Incorporates both positive

and negative pore-water pressures

• Simulates confining pressures from stage

• Incorporates layers of different strength and characteristics

• Calculates toe erosion• Inputs:

γs, c’, φ’, φb , h, uw, τc, S

Confining pressure

Tensiometers(pore pressure)

shear surface

12/29/97 01/05/98 01/12/98 01/19/98 01/26/98 02/02/98

FAC

TOR

OF

SAFE

TY

0.9

1.0

1.1

1.2

1.3

1.4

1.5

1.6

RIV

ERST

AG

EIN

MET

ERS

AB

OV

E

80

81

82

83

84

85

BFactor of safety

Effect of confining pressure

Bank failures

Stage WA

TER

LEV

EL, M

National Sedimentation Laboratory

Page 35: Monitoring of Streambank Erosion Processes: Hydraulic

Bank Stability and Toe Erosion ModelBank Stability and Toe Erosion ModelStatic Version 3.4

Latest version available at:

Bank Stability Model

The Channel Bank Stability Model is a wedge-based limit equilibrium modelthat calculates Factor of Safety (Fs ) for multi-layer river and streambanks.It can easily be adapted to incorporate the effects of geotextiles or other bank stabilization measures that affect soil strength.

The model accounts for the strength of up to five soil layers, the effect of pore-water pressure (both positive and negative (matric suction)) and soil reinforcement and surcharge due to vegetation.

Input the bank coordinates (Input Geometry) and run the geometry macro to set up the bank profile, then input your soil types, vegetation cover and water table or pore-water pressures (Bank Model Step 2 and Bank Model Data) to find theFactor of Safety.

The bank is said to be 'stable' if Fs is greater than 1.3, to provide a safetymargin for uncertain or variable data. Banks with a Fs value between 1.0 and 1.3 are said to be 'conditionally stable', i.e. stable but with little safety margin. Slopes with an Fs value less than 1.0 are unstable.

This version of the model assumes hydrostatic conditions below the water table, and a linear interpolation of matric suction above the water table (unless the user's own pore-water pressure data are used).

The model can either use estimated input data where no field data are availableor as a first pass solution, or can be set to run using your own data. Your own data can be added to white boxes. Don't change values in yellow boxes - they are output.

In addition to this static model there is also a dynamic version that uses a time series of pore-water pressure values to calculate Fs .

http://msa.ars.usda.gov/ms/oxford/nsl/cwp_unit/bank.html

National Sedimentation Laboratory

Page 36: Monitoring of Streambank Erosion Processes: Hydraulic

Initial InputsInput bank geometry and flow conditionsWork through all 3 sections then hit the "Run Bank Geometry Macro" button. 1) Select EITHER Option A or Option B for Bank Profile and enter the data in the relevant box- cells in the alternative option are ignored in the simulation and may be left blank if desired.2) Enter bank material layer thicknesses (if bank is all one material it helps to divide it into several layers).3) If bank is submerged then select the appropriate channel flow elevation to include confining pressureand calculate erosion amount; otherwise set to an elevation below the bank toe.You can check to ensure bank profile is correct on either Toe Model Step 2 or Bank Model Step 2.

Option A - Draw a detailed bank Option B - Enter a bank height and angle, profile using the boxes below the model will generate a bank profile

Point Station Elevation(m) (m) 5.0 a) Input bank height (m)

A 72.0 b) Input bank angle (o)

B 1.0 c) Input bank toe length (m)

C 25.0 d) Input bank toe angle (o)

D Either input shear surface angle;

E 60.0 Input shear surface angle

F Or check box and have the model calculate

G shear surface angle from soil friction

H angle and bank angle

I

J 30.0 Input mean soil friction angle

K - shear emergence 2.00 Need to know the shear surface angle?

Shear surface angle 50.00 Input mean bank angle

Input mean soil friction angle 2. Bank layer thickness (m)

Bank layer thickness

Elevation of layer base 0.0

(m) (m)

Layer 1 1.00 4.00 3. Channel flow parameters

Layer 2 1.00 3.00 2.50 Input elevation of flow (m)

Layer 3 1.00 2.00 0.003 Input slope of channel (m/m)

Layer 4 1.00 1.00 20 Input duration of flow (hrs)

Layer 5 1.00 0.00

Recommended shear surface angle

Para

llel l

ayer

s, s

tarti

ng fr

om p

oint

B

Select which component you wish to use first. You will be automatically redirected to the relevant worksheet

after hitting the Run Bank Geometry Macro button

Calculate shear surface angle from soil friction

A - bank top: place beyond start of shear surface

B - bank edgeC-F - breaks of slope on bank (if no breaks of slope place as intermediary points)G - top of bank toeH - break of slope on bank toe (if no break of slope then insert as intermediary point)I - base of bank toeJ - end point (typically mid point of channel)K- elevation of point where shear surface emerges on the bank (anywhere between B and G)

Notes: Shear surface must enter bank top between points A and B.Bank profile may overhang.Point K must not be on a horizontal section - the elevation of this point must be unique or an error message will display.

J

A

C-F

I

G

Station (m)

Ele

vatio

n (m

)

B

H

K - shear surface emergence

shear surface angle

Definition of points used in bank profile

Top Layer

BottomLayer

a

Toe material

d

c

Bed material

b

Layer 1

Layer 2

Layer 3

Layer 4

Layer 5

Bank material

Option A Option B

Bank Stability component

Run Bank Geometry Macro

National Sedimentation Laboratory

Page 37: Monitoring of Streambank Erosion Processes: Hydraulic

Initial Stability Conditions

Select material types, vegetation cover and water table depth below bank top(or select "own data" and add values in 'Bank Model Data' worksheet)

Bank top Reach LengthLayer 1 Layer 2 Layer 3 Layer 4 Layer 5 vegetation cover (age) (m)

100Constituent

Vegetation safety margin concentration (kg/kg)50 0.001

Water table depth (m) below bank top2.50

Own Pore Pressures kPa

Pore Pressure From Water Table

Layer 1 -19.62

Layer 2 -9.81

Layer 3 0.00

Layer 4 9.81

Layer 5 19.62

Factor of Safety

1.28 Conditionally stable

60.0 Shear surface angle used Failure width 1.16 mFailure volume 264 m3

Sediment loading 467369 kgConstituent load 467 kg

Gravel Angular sand Rounded sand Silt Stiff clay

Gravel Angular sand Rounded sand Silt Stiff clay

Gravel Angular sand Rounded sand Silt Stiff clay

Gravel Angular sand Rounded sand Silt Stiff clay

Gravel Angular sand Rounded sand Silt Stiff clay

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

6.00

0.00 1.00 2.00 3.00 4.00 5.00 6.00

STATION (M)

ELE

VA

TIO

N (M

)

bank profile

base of layer 1

base of layer 2

base of layer 3

base of layer 4

failure plane

water surface

water table

Use water table

Input own pore pressures (kPa)

None

Export Coordinates back into model

National Sedimentation Laboratory

Page 38: Monitoring of Streambank Erosion Processes: Hydraulic

Toe Erosion: 2.5 m flow, 20hrs.Input bank materialsSpecify the erodibility of the different materials. Use the drop down boxes to select material type or select "Enter own data" and add valuesin the 'Bank Model Data' worksheet. If you select a material, the values shown in the 'Toe Model Data' worksheet will be used. Once youare satisfied that you have completed all necessary inputs, hit the "Run Shear Stress Macro" button (Center Right of this page).

Bank Material Bank Toe Material Bed materialLayer 1 Layer 2 Layer 3 Layer 4 Layer 5

0.10 0.10 0.10 5.00 0.10 0.10 248.83

0.316 0.316 0.316 0.045 0.316 0.316 0.006

Bank Protection

Input bank protection

Bank Toe Protection

Input toe protection

Average applied boundary shear stress 7.76 PaMaximum Lateral Retreat 29.07 cm

Mean Eroded Area - Bank 0.06 m2

Mean Eroded Area - Bank Toe 0.02 m2

Mean Eroded Area - Bed 0.00 m2

Mean Eroded Area - Total 0.08 m2

Erodible cohesive Fixed bed

No protection

No protection

Erodible cohesive Erodible cohesive Erodible cohesive Moderate cohesive Erodible cohesive

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

6.00

0.00 1.00 2.00 3.00 4.00 5.00 6.00STATION (M)

ELEV

ATI

ON

(M)

Base of layer 1

Base of layer 2

Base of layer 3

Base of layer 4

Base of layer 5

Eroded Profile

Water Surface

Initial Profile

Export Coordinates back into model

National Sedimentation Laboratory

Page 39: Monitoring of Streambank Erosion Processes: Hydraulic

Toe Erosion: 2.5 m flow, 20hrs.Input bank materialsSpecify the erodibility of the different materials. Use the drop down boxes to select material type or select "Enter own data" and add valuesin the 'Bank Model Data' worksheet. If you select a material, the values shown in the 'Toe Model Data' worksheet will be used. Once youare satisfied that you have completed all necessary inputs, hit the "Run Shear Stress Macro" button (Center Right of this page).

Bank Material Bank Toe Material Bed materialLayer 1 Layer 2 Layer 3 Layer 4 Layer 5

0.10 0.10 0.10 5.00 0.10 0.10 248.83

0.316 0.316 0.316 0.045 0.316 0.316 0.006

Bank Protection

Input bank protection

Bank Toe Protection

Input toe protection

Average applied boundary shear stress 22.03 PaMaximum Lateral Retreat 46.99 cm

Mean Eroded Area - Bank 0.13 m2

Mean Eroded Area - Bank Toe 0.00 m2

Mean Eroded Area - Bed 0.00 m2

Mean Eroded Area - Total 0.13 m2

Erodible cohesive Fixed bed

No protection

No protection

Erodible cohesive Erodible cohesive Erodible cohesive Moderate cohesive Erodible cohesive

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

6.00

0.00 1.00 2.00 3.00 4.00 5.00 6.00STATION (M)

ELE

VA

TIO

N (M

)

Base of layer 1

Base of layer 2

Base of layer 3

Base of layer 4

Base of layer 5

Eroded Profile

Water Surface

Initial Profile

Export Coordinates back into model

National Sedimentation Laboratory

Page 40: Monitoring of Streambank Erosion Processes: Hydraulic

Select material types, vegetation cover and water table depth below bank top(or select "own data" and add values in 'Bank Model Data' worksheet)

Bank top Reach LengthLayer 1 Layer 2 Layer 3 Layer 4 Layer 5 vegetation cover (age) (m)

100Constituent

Vegetation safety margin concentration (kg/kg)50 0.001

Water table depth (m) below bank top2.00

Own Pore Pressures kPa

Pore Pressure From Water Table

Layer 1 -14.72

Layer 2 -4.91

Layer 3 4.91

Layer 4 14.72

Layer 5 24.57

Factor of Safety

0.95 Unstable

60.0 Shear surface angle used Failure width 1.06 mFailure volume 190 m3

Sediment loading 338446 kgConstituent load 338 kg

Gravel Angular sand Rounded sand Silt Stiff clay

Gravel Angular sand Rounded sand Silt Stiff clay

Gravel Angular sand Rounded sand Silt Stiff clay

Gravel Angular sand Rounded sand Silt Stiff clay

Gravel Angular sand Rounded sand Silt Stiff clay

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

6.00

0.00 1.00 2.00 3.00 4.00 5.00 6.00

STATION (M)

ELE

VA

TIO

N (M

)

bank profile

base of layer 1

base of layer 2

base of layer 3

base of layer 4

failure plane

water surface

water table

Use water table

Input own pore pressures (kPa)

None

Export Coordinates back into model

Unstable Following Toe Erosion

National Sedimentation Laboratory

Page 41: Monitoring of Streambank Erosion Processes: Hydraulic

Addition of Bank-Top VegetationSelect material types, vegetation cover and water table depth below bank top(or select "own data" and add values in 'Bank Model Data' worksheet)

Bank top Reach LengthLayer 1 Layer 2 Layer 3 Layer 4 Layer 5 vegetation cover (age) (m)

100Constituent

Vegetation safety margin concentration (kg/kg)66 0.001

Water table depth (m) below bank top2.00

Own Pore Pressures kPa

Pore Pressure From Water Table

Layer 1 -14.72

Layer 2 -4.91

Layer 3 4.91

Layer 4 14.72

Layer 5 24.57

Factor of Safety

1.12 Conditionally stable

60.0 Shear surface angle used Failure width 1.06 mFailure volume 190 m3

Sediment loading 344156 kgConstituent load 344 kg

Gravel Angular sand Rounded sand Silt Stiff clay

Gravel Angular sand Rounded sand Silt Stiff clay

Gravel Angular sand Rounded sand Silt Stiff clay

Gravel Angular sand Rounded sand Silt Stiff clay

Gravel Angular sand Rounded sand Silt Stiff clay

-1.00

0.00

1.00

2.00

3.00

4.00

5.00

6.00

0.00 1.00 2.00 3.00 4.00 5.00 6.00

STATION (M)

ELE

VA

TIO

N (M

)

bank profile

base of layer 1

base of layer 2

base of layer 3

base of layer 4

failure plane

water surface

water table

Use water table

Input own pore pressures (kPa)

Sycamore (7 yrs)

Export Coordinates back into model

National Sedimentation Laboratory