more beam (muons) from the ags ags rhic users group meeting edm workshop brookhaven national...

48
More beam (muons) from the AGS AGS RHIC Users Group Meeting EDM Workshop Brookhaven National Laboratory 7 June 2006 Phil Pile

Upload: wendy-jefferson

Post on 18-Jan-2018

221 views

Category:

Documents


0 download

DESCRIPTION

The experts BNL Hugh Brown – V1  /  Beam Line Design University of Illinois Peter Kammel Paul Debevec Sara Knaack They began studies over two years ago on how to improve Hugh Brown’s V1 beam line design.

TRANSCRIPT

More beam (muons) from the AGS AGS RHIC Users Group Meeting EDM Workshop Brookhaven National Laboratory 7 June 2006 Phil Pile Outline AGS Issues V1 Beam Line present limitations V1 Beam Line possible improvements To Do More beam from the AGS The experts BNL Hugh Brown V1 / Beam Line Design University of Illinois Peter Kammel Paul Debevec Sara Knaack They began studies over two years ago on how to improve Hugh Browns V1 beam line design. g-2 short history E821 (as run) Year Weeks HoursIntegrated Protons Remarks pulse-on-demand pulse-on-demand x st physics run pulse-on-demand x pulse-on-demand x x x TOTALS x E969 (my estimate) Commissioning x weeks with RHIC on AGS Total integrated protons (SEB+FEB), = 6.5 x 10 20 PROTON BEAMFY96 FY97 FY98/99FY2000 FY2001 FY2002 SEB SEBFEB (g-2)SEBFEB (g-2)FEB (g-2)FEB (g-2) SEB Beam Energy24 GeV24 GeV24 GeV24 GeV24 GeV24 GeV 24 GeV* 22 GeV* Peak Beam Intensity62 x ppp62 x ppp46 x ppp72 x ppp58 x ppp61 x ppp 63 x ppp 76 x ppp Total protons accelerated0.9 x x x x x x x x Spill Length/Cycle Time1.6 sec/3.6 sec1.6 sec/3.6 sec2.8 sec/5.1 sec2.4 sec/5.4 sec -> Duty Cycle44%44%55% 44% Spill Structure Modulation (peak-average) /average20%20%20%20% Average Availability /Best Week76% / 92%71% / 79%58 % / 67 %71% / 88%55 % / 83 %74 % / 87 %83 % / 88 %85 % / 97 % HEAVY ION BEAMAuAuFe (NASA)AuFe (NASA)Fe (NASA)Fe (NASA)Fe (NASA) Beam Energy /nucleon11 / 4 / 2 GeV11 / 8 / 6 GeV1.0 / 0.6 GeV11 GeV1.0 / 0.6 GeV1.0 GeV1.0 GeV1.0 GeV Peak Beam Intensity4 x 10 8 Au/p 17 x 10 8 Au/p 20 x 10 8 Fe/p 9 x 10 8 Au/bunch36 x 10 8 Fe/p17 x 10 8 Fe/p80 x 10 8 Fe/p49 x 10 8 Fe/p Spill Length/Cycle Time1.4 sec/3.6 sec1.5 sec/4.0 sec1.2 sec/3.0 sec0.9 sec/3.3 sec0.9 sec/3.3 sec0.9 sec/3.3 sec -> Duty Cycle39%38%40 %27%27%27% Spill Structure Modulation (peak-average) /average