nation building 2: overview of tasmanian government … · 2016. 4. 28. · and cycling route from...

33
NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT SUBMISSION SUBMISSION Norm McIlfatrick Norm McIlfatrick Department of Infrastructure, Energy and Resources

Upload: others

Post on 22-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT SUBMISSIONSUBMISSION

Norm McIlfatrickNorm McIlfatrickDepartment of Infrastructure, Energy and Resources

Page 2: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Overview of Nation Building 2• Australian Government’s key transport funding program for all states p g

• Overarching objective to improve productivity • 2014 15 to 2018 19• 2014-15 to 2018-19• Detailed submissions and economic analysis required f ffor all projects – challenge for Tasmania

• Two assessment processes:$1. Infrastructure Australia – projects over $100M

2. Department of Infrastructure and Transport – all th j tother projects

2

Page 3: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Key themes• Four themes, each with three sub-programmes:

1. Moving Freight: Interstate Freight, Local Freight, Heavy vehicle and rail freight productivity

2. Connecting People: Connecting Cities, Urban Living, Pinch Points

3. Safety: Black Spot, Roads to Recovery, Network Regeneration

4. Innovation: Smart Infrastructure, Planning and Research, Evaluation and Compliance

3

Page 4: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Tasmanian Government submission• $895 million• 22 submissions + 4 ‘concept’ submissionsInfrastructure Australia ($546M)Infrastructure Australia ($546M)• Focus on Burnie to Hobart freight corridor,

including:B k Hi h• Brooker Highway

• South Perth Bypass• New Bridgewater Bridge planningg g p g• Rail upgrades

DOIT ($349M)• All other projects, including:

• Midland Highway Safety package• Upgrades – Birralee Main RoadUpgrades Birralee Main Road,

Murchison Highway4

Page 5: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

1. Moving Freight• Focus on Burnie to Hobart corridor

• Major freight route by tonnage and volumes

• Connects major ports industrial andConnects major ports, industrial and population centres, Brighton Transport Hub

• $618M total bid:• Rail Revitalisation Package ($240M)• Illawarra Main Road: ($142M)• Perth to Breadalbane duplication ($72M)p ( )• Bagdad Upgrades/future planning

($35M)• New Bridgewater Bridge ($15M)New Bridgewater Bridge ($15M)• Brooker Highway (Elwick-Goodwood to

Howard Road) ($32M)• Birralee Main Road ($48M)

5

Birralee Main Road ($48M)• Murchison Highway ($34M)

Page 6: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Rail Revitalisation Program ($240M)

• Major submission from TasRail

• Concrete re-sleepering and relay life-expired rail track, focused mainly on the Burnie to Hobart lines ($197M)

• Relay life-expired rail on the Melba, Fingal and Derwent Valley lines

6

Page 7: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

1 9M t f f i ht/

Illawarra Main Road ($142M)• ~1.9M tonnes of freight/yr• Two projects:

1 South Perth Bypass ($84M)1. South Perth Bypass ($84M)2. General upgrades, Illawarra Main Road ($58M)

South Perth BypassSouth Perth Bypass• Bypass of southern Perth (Midland Highway to Illawarra Main

Road)Road)• Removes heavy vehicles from Perth for north-west/south freight

movementsIllawarra Main Road Upgrades• General upgrades west of bypass to Bass Highway

7

Page 8: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

South Perth Bypass

8

Page 9: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Perth to Breadalbane duplication ($72M)• 4 lanes between Perth and Breadalbane

• New roundabout north of Perth; new access arrangementsNew roundabout north of Perth; new access arrangements at Devon Hills

9

Page 10: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Bagdad Upgrades and Bagdad Bypass Planning ($35M)Interim upgrades ($24M)

g ( )

• Interim, short-term upgrades ahead of a Bagdad Bypass

• Improve safety of turning movements and accesses,Improve safety of turning movements and accesses, Bagdad to Mangalore

Final planning Bagdad Bypass ($11M)Final planning, Bagdad Bypass ($11M)

• Final planning and land acquisition to support future B d d BBagdad Bypass

10

Page 11: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Midland Highway - Bagdad Upgrades

11

Page 12: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

New Bridgewater Bridge ($15M)• Critical link in north-

south supply chain and in urban Hobart

• Initial planning complete • Additional funding to

fi li d i l ifinalise design, planning and environmental assessments etc.

• Also land acquisition

12

Page 13: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Brooker Highway upgrades ($37M)• One of Tasmania’s

highest tonnage (2.7M t i 2012) dtonnes in 2012) and highest volume roads

• Focus on key sections• Focus on key sections where capacity constrained:1. Elwick-Goodwood to

Howard Roads2 D i Hi h2. Domain Highway

Interchange

13

Page 14: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Brooker Highway upgrades ($37M)Elwick/Goodwood Roads to Howard Road ($32M)

• Layout and proximity of junctions creates capacity and ffi i t i tefficiency constraints

• $32M to:• consolidate existing intersection at Goodwood and

Elwick Roadsl H d R d d b t ith i l• replace Howard Road roundabout with signals

Domain Highway Interchange ($5M)T ffi i t i t ith i ti t t• Traffic queuing; constraints with existing structure

• $5M to investigate upgrade options

14

Page 15: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Elwick/Goodwood to Howard Road upgrade

15

Page 16: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Birralee Main Road ($48M) and Murchison Highway ($34M) upgrades

Birralee Main Road• Upgrades to ensure HPV compliance through to

g y ( ) pg

• Upgrades to ensure HPV compliance through to Frankford Road intersection

• Key link in the north-west/north-east freight route• Key link in the north-west/north-east freight route Murchison Highway• Key route for mining freight and passenger movements• Key route for mining freight and passenger movements

to/from West Coast• Extend existing upgrades north toward Cradle MountainExtend existing upgrades north toward Cradle Mountain

Development Road – focus on safety and HPV compliance

16

Page 17: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

• Passenger-related projects

2. Connecting People ($91.5M)Passenger related projects

• Includes public transport and active transport for the first time

• Key projects:• Main Road Transit Corridor and Greater Hobart Transit Corridor Planning

($5M)• Connecting Universities to their Communities ($30M)• Tasman Highway – Tasman Bridge Eastern Approaches Upgrade ($46M)• Tasman Highway – Tasman Bridge Eastern Approaches Upgrade ($46M)• Tasman Highway/Holyman Avenue Roundabout Upgrade ($8M)• Real-time Passenger Information ($2.5M)

• Lower-cost projects, generally higher BCRs (over 1)

17

Page 18: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Main Road Transit Corridor and Greater Hobart Transit Corridor Planning ($5M)• Tasmanian Urban Passenger Transport Framework identifies the

importance of developing key public transport corridors.

• Transit corridors seek to co-ordinate public and active transport planning,with land-use planning decisions

• The Tasmanian Government has commenced the first of its TransitThe Tasmanian Government has commenced the first of its TransitCorridor projects, focusing on the Main Road Corridor from Glenorchy toHobart

$• Main Road corridor: $3M delivery

• Planning for other corridors: $2M

O i i l d H b CBD R /Sh li H b CBD• Options include: Hobart CBD to Rosny/Shoreline; Hobart CBD toSouthern Suburbs (Kingston, South Hobart); Hobart CBD to SandyBay (UTAS)

18

Page 19: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Main Road Transit Corridor and Greater Hobart Transit Corridor Planning ($5M)

• Main Road Infrastructure delivery: y• Planning and delivery of short-term

bus priority measures.

• Planning and delivery of bus stop optimisation and upgrades.

Planning for medium term bus• Planning for medium-term bus priority measures in Hobart CBD.

• Estimated Cost of work:$3 million

• BCR: 1.74

19.

Page 20: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Connecting Universities to Communities ($29.9M)• Proposal covers active transport projects in Hobart,

Launceston and Burnie

• Objectives include to:

o Create more sustainable communities by supportingo Create more sustainable communities by supporting the uptake of active transport.

o Support a healthy active student population ando Support a healthy, active student population, and ensure accessibility.

• Hobart: estimated cost $23 3M• Hobart: estimated cost $23.3M

• Total BCR of 1.1

20

Page 21: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Connecting Universities to Communities –Hobart cycling paths and walkwaysy g p y

21

Page 22: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Tasman Highway – Tasman Bridge, eastern approaches ($46M)pp ( )• Tasmania’s highest volume road section• Upgrades to improve access and safety on the pg p y

eastern approaches to the Tasman Bridge• Two stages:

1. Focus on Lindisfarne entry/exit2. Resolve current merging arrangements,

heading west from Rosnyheading west from Rosny

22.

Page 23: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Tasman Highway – Tasman Bridge, eastern approaches ($46M)• Stage 1 and 2 improvements

.

23

Page 24: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Tasman Highway – Holyman Avenue Roundabout ($8M)( )• Upgrade of Holyman Avenue roundabout to cater for

higher traffic volumes and improved accessg p

24

Page 25: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Real Time Passenger Information ($2.5M)M t G d i t d d i• Metro Greencard introduced in 2008.

GPS bl d ti k ti t• GPS-enabled ticketing system

• System records in real-time, but no mobile transmission

• RTPI will enhance information for both passengers and Metro

• Proposal includes fixed signage and mobile applications.

• BCR: 1.1

25

Page 26: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

3. Safety ($150M)• Includes Black Spot, Roads to Recovery and

Maintenance (road and rail)

• Narrow definition under NB2 – many safety-related projects submitted under other themesp j

• Two key projects:

• Midland Highway Safety Package

• Huon Highway-Summerleas Road upgrades

26

Page 27: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

• Series of targeted safetyMidland Highway Safety Package ($128M)

Series of targeted safety upgrades:

• Major junctions: $15 3MMajor junctions: $15.3M

• Streetscaping: $15.2M

• Rail realignment, Conara: $22M

• Realignment/upgrades, key sections: $32.3M

• Minor junctions: $42.9M

• Consistent with Midland Highway g yPartnership Agreement

27

Page 28: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

Huon Highway-Summerleas Road junction upgrade ($22M)• Grade-separation of key junction to improve safety

g ( )

28

Page 29: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

• Includes ‘smart infrastructure’ planning and research:4. Innovation ($35.7M)

Includes smart infrastructure , planning and research:

• Smart infrastructureU b I t lli t T t S t H b t t i f i bl d• Urban Intelligent Transport Systems, Hobart: extension of variable speed messaging to the Brooker Highway and Southern Outlet, SMS travellerinformation and improvements to traffic management systems ($19M)

• Planning• Bass Highway (Latrobe to Deloraine) Planning: Identification of priority projects

to improve efficiency and safety on the Highway between Latrobe and Deloraineto improve efficiency and safety on the Highway between Latrobe and Deloraine($5M)

• Domain Highway Planning: investigation of options to upgrade the Domain Highway Interchange and review opportunities to improve efficiency and safetyHighway Interchange and review opportunities to improve efficiency and safety on the Highway connecting to the Tasman Bridge ($5M)

29

Page 30: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

• Planning contInnovation ($35.7M)

Planning cont.• South Arm Highway Planning: investigation of infrastructure and non-

infrastructure solutions to improve connectivity and modal choice on the South Arm Highway to Rokeby ($5M)Arm Highway to Rokeby ($5M)

• Hobart Central Bus Interchange Design: planning and options development for a redesign of the existing Hobart Central Bus Interchange to address identified i ith th t d i ’ it d it t ib ti t t lissues with the current design’s amenity and its contribution to travel delays/unreliability in the broader system ($1M)

• Research to guide investment:esea c to gu de est e t• Greater Hobart Household Travel Survey: undertake a second survey of Hobart

households to track trips types and mode choices ($350K)

• Tasmanian Freight Model: development of a model to enable analysis of the impact of potential policy interventions on the freight network ($350K)

30

Page 31: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

‘Concept’ only projects• Provided as part of Tasmania’s overall submission but in p

concept form only:• NB2 programs to which the projects relate, commence in 2013• Further work to undertake before full submission can be made

• Projects are:M i St t Cl E t i f i ti S th O tl t b l• Macquarie Street Clearway: Extension of existing Southern Outlet bus lane and peak-hour Macquarie Street clearway

• Latrobe to Devonport Cycleway: Planning and delivery of a new active transport link between Latrobe and Devonport

• Sandy Bay Walking and Cycling project: Staged development of a walking and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve.

• Launceston Passenger Transport Network Planning: Progress key initiatives coming out of the Northern Integrated Transport Plan, Greater Launceston

31

g g p ,Passenger Transport Plan and Launceston traffic modelling projects.

Page 32: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

• Announcements in May as part of 2013/14 federal budgetNext steps and further information

Announcements in May as part of 2013/14 federal budget

• Funding commences 2014/15

• ‘Competitive sub-programs’:• Liveable Cities and Active Transport; Heavy Vehicle and Rail FreightLiveable Cities and Active Transport; Heavy Vehicle and Rail Freight

Productivity; Pinch Points (low-cost congestion measures); Network Regeneration – Upgrade and Improvement (e.g. heavy vehicle rest areas, boom gates)g )

• Annual funding allocation throughout NB2

• Initial allocation likely to be announced May 2013• Initial allocation likely to be announced May 2013

• ‘All submissions on DIER’s website:http://www.dier.tas.gov.au/publications/nation_building_2

32

Page 33: NATION BUILDING 2: OVERVIEW OF TASMANIAN GOVERNMENT … · 2016. 4. 28. · and cycling route from Marieville Esplanade south to municipal boundary at Cartwright Reserve. • Launceston

For further information please contact:For further information, please contact:Di GeeDirector, Infrastructure PlanningDepartment of Infrastructure Energy and ResourcesDepartment of Infrastructure, Energy and [email protected] 4867