TamilNadu Transmission Corporation Limited (A Subsidiary of TNEB Ltd) FORMAT-MTOA2 APPROVAL FOR MEDIUM TERM OPEN ACCESS (Issued by SLDC) Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019 Nodal SLDC Approval No. SLDC/MTOA/CPP/146/2019-2020 Date 02/05/19 1 Customer Application No. SAPPL/dated 30.03.19 Date 30/03/19 2 Period of Transaction 01/09/2019 TO 31/03/2022 3 Nature of customer Captive User 4 Customer Name PONNERI STEEL INDUSTRIES, HTSC No. 1499 5 Customer EDC Chennai North 6 Details of Transaction Party’s to Grid Injecting Entity Drawee Entity Name of the Entity Suryadev Alloys & Power Pvt Ltd PONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details of Injecting/Drawee connectivity with Intra-State System Injecting Entity Drawee Entity Name of Sub- Station Transmission Gummidipoondi N/A Distribution N/A Panjetty SS Voltage level Transmission 230 N/A Distribution N/A 11 Name of Licensee(Owner of S/S) TANTRANSCO TANGEDCO Intervening Intra-State Licensee N/A Intervening Inter-State Licensee N/A 8 Open Access Granted for: Period Requested Quantum at Injection end (MW) Approved Quantum at Injection end (MW) From To Peak Slots (18:00 to 22:00) hrs Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs Peak Slots (18:00 to 22:00) hrs Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs 01/09/19 31/03/22 3.657 3.657 3.657 3.657 9 Details of Non- Refundable Application Fee made TANTRANSCO collection A/C Head Instrument Details Amount (Rs.) Receipt No. Date 62.962 SBI collect 29/03/19 Rs.50000/-

Upload: others

Post on 27-Apr-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/146/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name PONNERI STEEL INDUSTRIES, HTSC No. 1499

5 Customer EDC Chennai North

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

PONNERI STEEL INDUSTRIES,

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Panjetty SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 3.657 3.657 3.657 3.657

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 2: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. PONNERI STEEL INDUSTRIES,,ANAND GARG, PARTNER,PONNERI STEEL INDUSTRIES, GNT

Road, Peravellore Village, Chinnambedu Post, Tiruvallur Dist. Pin - 601 206. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai North

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 3: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/147/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SRF LIMITED HTSC No. 1666

5 Customer EDC Chennai North

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SRF LIMITED

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Gummidpoondi SS

Voltage level

Transmission 230 N/A

Distribution N/A 110

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 4.096 4.096 4.096 4.096

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 4: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SRF LIMITED,SRF LIMITED, Plot No. 1, Sipcot Industrial Complex, Gummidipoondi - 601 201

2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi, Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201

Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai North

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 5: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/148/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SRF LIMITED HTSC No. 1263

5 Customer EDC Chennai North

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SRF LIMITED

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Manali SS

Voltage level

Transmission 230 N/A

Distribution N/A 110

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 8.192 8.192 8.192 8.192

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 6: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SRF LIMITED,SRF LIMITED, Manali Industrial Area, Manali, Chennai - 600 068

2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi, Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201

Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai North

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 7: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/149/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name AKSHARA INDUSTRIES LTD HTSC No. 1779

5 Customer EDC Chennai North

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

AKSHARA INDUSTRIES LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Gummidpoondi SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.567 0.567 0.567 0.567

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 8: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. AKSHARA INDUSTRIES LTD,AKSHARA INDUSTRIES LTD, No. 9, Eguvarpalayam Village,

Gummidipoondi - 601201 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai North

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 9: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/150/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name GBR METALS PVT LTD HTSC No. 1812

5 Customer EDC Chennai North

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

GBR METALS PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A DURAINALLUR SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 2.063 2.063 2.063 2.063

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 10: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. GBR METALS PVT LTD,295, GNT Road, Prevallur Village, Chinnambedu Post, Ponneri Taluk -

601 204 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai North

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 11: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/151/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name K L CONCAST PVT LTD HTSC No. 1914

5 Customer EDC Chennai North

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

K L CONCAST PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A SIPCOT SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 4.642 4.642 4.642 4.642

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 12: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. K L CONCAST PVT LTD,K L CONCAST PVT LTD, No.147/1, Madarpakkam Road,, Periya

Obulapuram,, Thiruvallur, Gummidipoondi,, Chennai-601201 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai North

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 13: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/152/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name K L CONCAST PVT LTD HTSC No. 1868

5 Customer EDC Chennai North

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

K L CONCAST PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A SIPCOT SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.135 1.135 1.135 1.135

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 14: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. K L CONCAST PVT LTD,K L CONCAST PVT LTD, No.147/1, Madarpakkam Road,, Periya

Obulapuram,, Thiruvallur, Gummidipoondi,, Chennai-601201 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai North

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 15: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/153/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name MIL STEEL AND POWER LTD HTSC No. 1875

5 Customer EDC Chennai North

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

MIL STEEL AND POWER LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Gumidipoondi SIPCOT SS - 4

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 2.299 2.299 2.299 2.299

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 16: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. MIL STEEL AND POWER LTD,MIL Steel and Power Ltd, Plot No.F14,SIPCOT Industrial

Complex, Gummidipoondi - 601 201 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai North

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 17: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/154/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name EICHER MOTORS LTD HTSC No. 1048

5 Customer EDC Chennai North

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

EICHER MOTORS LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A THIRUVOTTIYUR SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.149 1.149 1.149 1.149

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 18: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. EICHER MOTORS LTD,EICHER MOTORS LTD, Thiruvattur High Rd, Chennai - 600019

2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi, Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201

Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai North

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 19: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/155/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name EICHER MOTORS LTD HTSC No. 979

5 Customer EDC Chennai South

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

EICHER MOTORS LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A ORAGADUM SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 5.674 5.674 5.674 5.674

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 20: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. EICHER MOTORS LTD,EICHER MOTORS LTD, Plot No. 19/1, SIPCOT Industrial Growth

Ceter,Kanchipuram Dist - 602105 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai South

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai South

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 21: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/156/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name EICHER MOTORS LTD HTSC No. 1212

5 Customer EDC Chennai South

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

EICHER MOTORS LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A ORAGADUM SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 3.714 3.714 3.714 3.714

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 22: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. EICHER MOTORS LTD,EICHER MOTORS LTD, Vallam Vadagal Village, Sriprembadur Taluk,

Kanchipuram Dist - 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai South

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai South

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 23: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/157/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name APOLLO TYRES LTD HTSC No. 774

5 Customer EDC Chennai South

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

APOLLO TYRES LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A ORAGADUM SS

Voltage level

Transmission 230 N/A

Distribution N/A 110

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 15.359 15.359 15.359 15.359

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.100000/-

Page 24: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. APOLLO TYRES LTD,APOLLO TYRES LTD, Plot No. B - 25, SIPCOT Induatrial Growth Ceter,

Sriperumbadur - Singaperumal Koil State Highway, Oragadam 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai South

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai South

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 25: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/158/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SAKTHI STEEL INDUSTRIES LIMITED HTSC No. 324

5 Customer EDC Kanchipuram

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SAKTHI STEEL INDUSTRIES LIMITED

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Palayaseevaram SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 3.095 3.095 3.095 3.095

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 26: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SAKTHI STEEL INDUSTRIES LIMITED,SAKTHI STEEL INDUSTRIES LIMITED, 223, Amaravathy

Pattinam, Kattangualm Panchyat, Uthiramerur Taluk, Kanchipuram 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai South

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai South

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Kanchipuram

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 27: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/159/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name MCP STEEL AND ALLOYS (P) LTD HTSC No. 346

5 Customer EDC Palladam

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

MCP STEEL AND ALLOYS (P) LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A KARADIVAVI SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 2.063 2.063 2.063 2.063

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 28: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. MCP STEEL AND ALLOYS (P) LTD,MCP STEEL AND ALLOYS (P) LTD, SF No. 128-129,

Uliamarathupalayam Road, Sellakarachal Village, Sulur (TK), Palladamm Tirupur - 641 658 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Coimbatore

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Palladam

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Palladam

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 29: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/160/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name GANESHA RUBBER RECLAIMER HTSC No. 392

5 Customer EDC Palladam

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

GANESHA RUBBER RECLAIMER

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A RASATHIVALASU SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.183 0.183 0.183 0.183

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 30: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. GANESHA RUBBER RECLAIMER,GANESHA RUBBER RECLAIMER, 15/104, Veppampalayam

Village, Vellakoil 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Coimbatore

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Palladam

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Palladam

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 31: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/161/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SREE JEGATHGURU TEXTILES MILLS (P) LTD HTSC No. 422

5 Customer EDC Palladam

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SREE JEGATHGURU TEXTILES MILLS (P) LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Olapalayam SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 2.821 2.821 2.821 2.821

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 32: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SREE JEGATHGURU TEXTILES MILLS (P) LTD,SREE JEGATHGURU TEXTILES MILLS (P) LTD,

521/1, NH 67 Main Road, Olayapalayam, Kangeyam - 638 701 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Coimbatore

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Palladam

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Palladam

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 33: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/162/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SONAL VYAPAR PVT LTD HTSC No. 202

5 Customer EDC Salem

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SONAL VYAPAR PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A NETHIMEDU SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 2.068 2.068 2.068 2.068

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 34: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SONAL VYAPAR PVT LTD,SONAL VYAPAR PVT LTD, 110/2, Nattamangalam Main Road,

Maniyanoor, Salem - 10 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Salem

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Salem

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 35: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/163/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name MEENAKSHI AGRO AND FLOUR MILL PVT LTD HTSC No. 318

5 Customer EDC Salem

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

MEENAKSHI AGRO AND FLOUR MILL PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A KANDAMPATTI SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.365 0.365 0.365 0.365

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 36: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. MEENAKSHI AGRO AND FLOUR MILL PVT LTD,MEENAKSHI AGRO AND FLOUR MILL PVT LTD,

55/7, Chithar Kovil Road, Thirumalaigiri, Salem - 636 307 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Salem

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Salem

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 37: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/164/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name PERUMAL SPINNING MILLS PVT LTD HTSC No. 159

5 Customer EDC Salem

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

PERUMAL SPINNING MILLS PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Mettupatty SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.835 0.835 0.835 0.835

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 38: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. PERUMAL SPINNING MILLS PVT LTD,PERUMAL SPINNING MILLS PVT LTD, Cuddalore Main

Road,Udayapatty Post Salem - 636 140 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Salem

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Salem

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 39: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/165/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SREE RANGARAJ STEEL AND ALLOYS (P) LTD HTSC No. 136

5 Customer EDC Salem

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SREE RANGARAJ STEEL AND ALLOYS (P) LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A NETHIMEDU SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 3.133 3.133 3.133 3.133

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 40: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SREE RANGARAJ STEEL AND ALLOYS (P) LTD,SREE RANGARAJ STEEL AND ALLOYS (P) LTD,

36/3-4, Trichy Main Road, Ammani Kondalampatty, Salem - 636010 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Salem

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Salem

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 41: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/166/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SRI VENKATESHWARA STEEL INDUSTRIES HTSC No. 84

5 Customer EDC Salem

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SRI VENKATESHWARA STEEL INDUSTRIES

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A NETHIMEDU SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.522 0.522 0.522 0.522

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 42: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SRI VENKATESHWARA STEEL INDUSTRIES,SRI VENKATESHWARA STEEL INDUSTRIES, 50-A,

Sakgagiri Main Road, Nethimedu, Salem - 636 002 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Salem

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Salem

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 43: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/167/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name ESWAR RUBBER PRODUCTS PVT LTD HTSC No. 238

5 Customer EDC Namakkal

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

ESWAR RUBBER PRODUCTS PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Mallur SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.522 0.522 0.522 0.522

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 44: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. ESWAR RUBBER PRODUCTS PVT LTD,ESWAR RUBBER PRODUCTS PVT LTD, Surya Towers,,

No.12, Maravaneri 2nd Cross,, Salem - 636 007. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Salem

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Namakkal

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 45: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/168/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name BALAJI RUBBER INDUSTRIES PVT LTD HTSC No. 317

5 Customer EDC Namakkal

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

BALAJI RUBBER INDUSTRIES PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Mallur SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.522 0.522 0.522 0.522

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 46: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. BALAJI RUBBER INDUSTRIES PVT LTD,BALAJI RUBBER INDUSTRIES PVT LTD, Surya Towers,,

No.12, Maravaneri 2nd Cross,, Salem - 636 007. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Salem

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Namakkal

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 47: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/169/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name NACHIAR SPINNING MILLS (P) LTD HTSC No. 96

5 Customer EDC Virudhunagar

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

NACHIAR SPINNING MILLS (P) LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Padikkasuvaithanpatti SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.358 1.358 1.358 1.358

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 48: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. NACHIAR SPINNING MILLS (P) LTD,NACHIAR SPINNING MILLS (P) LTD, Post Bag No.2,

No.547/15, Rajapalayam Road,, Chatrapatti - 626 102. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Tirunelveli

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Virudhnagar

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Virudhunagar

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Tirunelveli

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 49: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/170/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name JAYANACHIAR TEXTILE MILLS (P) LTD HTSC No. 195

5 Customer EDC Virudhunagar

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

JAYANACHIAR TEXTILE MILLS (P) LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Padikkasuvaithanpatti SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.731 0.731 0.731 0.731

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 50: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. JAYANACHIAR TEXTILE MILLS (P) LTD,JAYANACHIAR TEXTILE MILLS (P) LTD, Post Bag No.2,,

No.547/15, Rajapalayam Road,, Chatrapatti - 626 102. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Tirunelveli

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Virudhnagar

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Virudhunagar

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Tirunelveli

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 51: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/171/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name RAJALAKSHMI SPINNERS PVT LTD HTSC No. 91

5 Customer EDC Virudhunagar

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

RAJALAKSHMI SPINNERS PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Periyavallikulam SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.045 1.045 1.045 1.045

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 52: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. RAJALAKSHMI SPINNERS PVT LTD,RAJALAKSHMI SPINNERS PVT LTD, No.200, Ramamoorthy

Road,, 11/A1, A2 A.A.Road,, Virudhunagar - 626 001 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Tirunelveli

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Virudhnagar

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Virudhunagar

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Tirunelveli

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 53: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/172/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SILVER SPRING SPINNERS INDIA (P) LTD HTSC No. 174

5 Customer EDC Virudhunagar

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SILVER SPRING SPINNERS INDIA (P) LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A MALLIPUDUR SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.522 0.522 0.522 0.522

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 54: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SILVER SPRING SPINNERS INDIA (P) LTD,SILVER SPRING SPINNERS INDIA (P) LTD, S. No.

136/137, Malli & Mulli Kulam Village, SrivlliputhurTK, Virudhnagar - 626141 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Tirunelveli

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Virudhnagar

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Virudhunagar

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Tirunelveli

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 55: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/173/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SRI RAMMOHAN TEXTILES HTSC No. 203

5 Customer EDC Virudhunagar

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SRI RAMMOHAN TEXTILES

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Thottiapatti SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.757 0.757 0.757 0.757

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 56: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SRI RAMMOHAN TEXTILES,SRI RAMMOHAN TEXTILES, No.380/1, K.Thottiapatti Road,,

Rajapalayam - 626 110. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Tirunelveli

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Virudhnagar

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Virudhunagar

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Tirunelveli

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 57: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/174/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name RAGHUL SPINNING MILLS, PARTNER, P. DEVARAJ HTSC No. 295

5 Customer EDC Virudhunagar

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

RAGHUL SPINNING MILLS, PARTNER, P. DEVARAJ

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Thottiapatti SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.522 0.522 0.522 0.522

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 58: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. RAGHUL SPINNING MILLS, PARTNER, P. DEVARAJ,RAGHUL SPINNING MILLS, PARTNER, P.

DEVARAJ, No.3/191-A, Melapattam Karisalkulam,, Rajapalayam - 626 110. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Tirunelveli

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Virudhnagar

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Virudhunagar

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Tirunelveli

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 59: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/175/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SUGAPRIYA PAPER & BOARDS PVT LTD HTSC No. 147

5 Customer EDC Virudhunagar

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SUGAPRIYA PAPER & BOARDS PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A N Subbiahpuram SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.47 0.47 0.47 0.47

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 60: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SUGAPRIYA PAPER & BOARDS PVT LTD,SUGAPRIYA PAPER & BOARDS PVT LTD,

No.107/2,N.Subyayapuram,, Sattur Taluk., Virudhnagar (Dist) - 626 205. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Tirunelveli

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Virudhnagar

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Virudhunagar

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Tirunelveli

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 61: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/176/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name THE ARASAN ALUMINIUM INDUSTRIES (P) LTD HTSC No. 55

5 Customer EDC Virudhunagar

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

THE ARASAN ALUMINIUM INDUSTRIES (P) LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A GNPATTI SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.418 0.418 0.418 0.418

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 62: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. THE ARASAN ALUMINIUM INDUSTRIES (P) LTD,THE ARASAN ALUMINIUM INDUSTRIES (P)

LTD, No.1 - C/4, Thiruthangal Road,, Near Union Bank of India,, Sivakasi - 626 123. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Tirunelveli

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Virudhnagar

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Virudhunagar

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Tirunelveli

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 63: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/177/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SREE RAJASEKAR SPINNING MILLS PVT LTD HTSC No. 134

5 Customer EDC Virudhunagar

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SREE RAJASEKAR SPINNING MILLS PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Reddiapatti SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.836 0.836 0.836 0.836

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 64: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SREE RAJASEKAR SPINNING MILLS PVT LTD,SREE RAJASEKAR SPINNING MILLS PVT LTD,

751/1, Alangulam Road, S. Thiruvenkadapuram, R. Reddiapatti 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Tirunelveli

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Virudhnagar

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Virudhunagar

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Tirunelveli

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 65: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/178/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name THANGA PRATAPH SPINNING MILLS (P) LTD HTSC No. 143

5 Customer EDC Virudhunagar

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

THANGA PRATAPH SPINNING MILLS (P) LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Padikasuvaithanpatti SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.522 0.522 0.522 0.522

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 66: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. THANGA PRATAPH SPINNING MILLS (P) LTD,THANGA PRATAPH SPINNING MILLS (P) LTD,

1/128, Kothankulam, Srivilliputtur Road, Rajayapalayam - 626 117 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Tirunelveli

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Virudhnagar

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Virudhunagar

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Tirunelveli

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 67: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/179/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SUNDARAM BRAKE LININGS LTD HTSC No. 83

5 Customer EDC Virudhunagar

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SUNDARAM BRAKE LININGS LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Aviyur SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.679 0.679 0.679 0.679

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 68: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SUNDARAM BRAKE LININGS LTD,SUNDARAM BRAKE LININGS LTD, Plot No.AA-6, 6th

Avenue,, Auto Ancillary SEZ, Mahendira World City,, Chengalpet, Kanchipuram Dist, 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Tirunelveli

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Virudhnagar

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Virudhunagar

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Tirunelveli

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 69: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/180/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SUNDARAM BRAKE LININGS LTD HTSC No. 153

5 Customer EDC Virudhunagar

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SUNDARAM BRAKE LININGS LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Aviyur SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.522 0.522 0.522 0.522

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 70: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SUNDARAM BRAKE LININGS LTD,SUNDARAM BRAKE LININGS LTD, Plot No.AA-6, 6th

Avenue,, Auto Ancillary SEZ, Mahendira World City,, Chengalpet, Kanchipuram Dist, 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Tirunelveli

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Virudhnagar

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Virudhunagar

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Tirunelveli

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 71: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/181/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SUNDARAM BRAKE LININGS LTD HTSC No. 1282

5 Customer EDC Chennai West

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SUNDARAM BRAKE LININGS LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Padi 110 KVSS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.575 0.575 0.575 0.575

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 72: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SUNDARAM BRAKE LININGS LTD,SUNDARAM BRAKE LININGS LTD, Plot No.AA-6, 6th

Avenue,, Auto Ancillary SEZ, Mahendira World City,, Chengalpet, Kanchipuram Dist, 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai North

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai West

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai West

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 73: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/182/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name RK STEELS MANUFACTURING COMPANY PVT LTD HTSC No. 1788

5 Customer EDC Chennai West

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

RK STEELS MANUFACTURING COMPANY PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A NAPALAYAM SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.731 0.731 0.731 0.731

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 74: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. RK STEELS MANUFACTURING COMPANY PVT LTD,RK STEELS MANUFACTURING COMPANY

PVT LTD, 138 & 139, Vichoor Vilage, Ponneri Taluk, Cheennai 600103 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai West

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chennai West

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 75: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/183/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name INDUS TMT INDUSTRIES LTD HTSC No. 336

5 Customer EDC Krishnagiri

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

INDUS TMT INDUSTRIES LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Kempatty SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.547 1.547 1.547 1.547

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 76: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. INDUS TMT INDUSTRIES LTD,INDUS TMT INDUSTRIES LTD, Uliveeranapalli,, Thally Road,,

Hosur - 635 114. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Vellore

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Krishnagiri

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Krishnagiri

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 77: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/184/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SSF PLASTICS INDIA Pvt LTD HTSC No. 220

5 Customer EDC Krishnagiri

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SSF PLASTICS INDIA Pvt LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Zuvadi SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.567 1.567 1.567 1.567

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 78: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SSF PLASTICS INDIA Pvt LTD,SSF PLASTPRO LIMITED, Plot No.52, SIPCOT Industrial Complex,,

Hosur,, Krishnagiri Dist-635126 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Vellore

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Krishnagiri

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Krishnagiri

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 79: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/185/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SONAL IRONS INDUSTRY PVT LTD HTSC No. 535

5 Customer EDC Krishnagiri

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SONAL IRONS INDUSTRY PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Suguna Fedder SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.032 1.032 1.032 1.032

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 80: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SONAL IRONS INDUSTRY PVT LTD,SONAL IRONS INDUSTRY PVT LTD, No. 267/1B,2A,2B,

Kothajogur, Komaranapalli, Denkanikottai, Hosur - 635 114 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Vellore

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Krishnagiri

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Krishnagiri

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 81: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/186/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SONAL IRONS INDUSTRY PVT LTD HTSC No. 354

5 Customer EDC Krishnagiri

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SONAL IRONS INDUSTRY PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Kempatty SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.522 0.522 0.522 0.522

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 82: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SONAL IRONS INDUSTRY PVT LTD,SRI SRI RUKMANI ROLLING MILL PVT LTD, No. 267/268,

Kothajogur, Komaranapalli, Denkanikottai, Hosur - 635 114 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Vellore

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Krishnagiri

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Krishnagiri

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 83: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/187/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name MEENAKSHI UDYOG (INDIA) PVT LTD HTSC No. 302

5 Customer EDC Krishnagiri

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

MEENAKSHI UDYOG (INDIA) PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Kempatty SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 4.126 4.126 4.126 4.126

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 84: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. MEENAKSHI UDYOG (INDIA) PVT LTD,MEENAKSHI UDYOG (INDIA) PVT LTD, No.3, 2nd Floor,

Alsa Mall,, Egmore,, Chennai - 600 008. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Vellore

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Krishnagiri

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Krishnagiri

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 85: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/188/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name EXIDE INDUSTRIES LIMITED HTSC No. 216

5 Customer EDC Krishnagiri

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

EXIDE INDUSTRIES LIMITED

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Bagalur SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 3.61 3.61 3.61 3.61

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 86: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. EXIDE INDUSTRIES LIMITED,EXIDE INDUSTRIES LIMITED, No. 246, Chichurakunapalli Village,

Sevagnapalli Panchyath, Hosur Taluk, Krishnagiri TK 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Vellore

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Krishnagiri

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Krishnagiri

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 87: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/189/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SAKTHI AUTO ANCILLARY PVT LTD HTSC No. 228

5 Customer EDC Coimbatore North

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SAKTHI AUTO ANCILLARY PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Keeranatham SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 3.61 3.61 3.61 3.61

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 88: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SAKTHI AUTO ANCILLARY PVT LTD,SAKTHI AUTO ANCILLARY PVT LTD, Idigarai Road,, NGGO

Colony,, Coimbatore - 641 022. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Coimbatore

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Coimbatore

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Coimbatore North

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 89: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/190/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name J S AUTO CAST FOUNDRY INDIA PVT LTD HTSC No. 329

5 Customer EDC Coimbatore North

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

J S AUTO CAST FOUNDRY INDIA PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Kovilpalayam SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 3.916 3.916 3.916 3.916

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 90: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. J S AUTO CAST FOUNDRY INDIA PVT LTD,J S AUTO CAST FOUNDRY INDIA PVT LTD, SF-165/1,

Sembagounden Pudur,, Kuppe Palayam,, Coimbatore - 641 107. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Coimbatore

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Coimbatore

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Coimbatore North

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 91: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/191/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name KLRF LIMITED, UNIT ELTEX SUPER CASTINGS, HTSC No. 396

5 Customer EDC Coimbatore North

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

KLRF LIMITED, UNIT ELTEX SUPER CASTINGS,

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A P.N.Palayam SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.566 1.566 1.566 1.566

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 92: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. KLRF LIMITED, UNIT ELTEX SUPER CASTINGS,,KLRF LIMITED, UNIT ELTEX SUPER CASTINGS,

SRKV Post, Periyanaickenpalayam, Coimbatore - 641 020 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Coimbatore

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Coimbatore

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Coimbatore North

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 93: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/192/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name ARUPADAI ARULMURUGAN SPINNER PVT LTD HTSC No. 316

5 Customer EDC Mettur

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

ARUPADAI ARULMURUGAN SPINNER PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Sankari SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.731 0.731 0.731 0.731

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 94: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. ARUPADAI ARULMURUGAN SPINNER PVT LTD,ARUPADAI ARULMURUGAN SPINNER PVT

LTD, SF No.15/1-A - Aathikattur,, Veppadi Tiruchengode Taluk,, Anangur Post - 637 304., Namakkal Dist.

2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi, Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201

Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Erode

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Mettur

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 95: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/193/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name ALAND SPINNERS PVT LTD HTSC No. 356

5 Customer EDC Mettur

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

ALAND SPINNERS PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Sankari SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.627 0.627 0.627 0.627

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 96: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. ALAND SPINNERS PVT LTD,ALAND SPINNERS PVT LTD, SF No. 191/1-B, Karattangkadu

Thottam, Makkaripalyam, Sowthapuram po, Veppadai - 638 008 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Erode

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Mettur

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 97: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/194/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name THANGAVELU FABRICS PVT LTD HTSC No. 240

5 Customer EDC Mettur

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

THANGAVELU FABRICS PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Veppadai SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.418 0.418 0.418 0.418

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 98: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. THANGAVELU FABRICS PVT LTD,THANGAVELU FABRICS PVT LTD, SF No. 278/3, Poolakattur,

Agaraharam PO, Pallipalayam, Erode - 638183 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Erode

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Mettur

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 99: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/195/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name MOTHI SPINNER PVT LTD HTSC No. 373

5 Customer EDC Mettur

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

MOTHI SPINNER PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Uppalayam SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.305 1.305 1.305 1.305

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 100: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. MOTHI SPINNER PVT LTD,MOTHI SPINNER PVT LTD, Athikattor, Anangur Main Road,

Anangur PO, Kumarapalayam TK, Namakkal DIST. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Erode

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Mettur

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 101: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/196/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SICGILSOL GASES PVT. LTD HTSC No. 114

5 Customer EDC Thanjavur

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SICGILSOL GASES PVT. LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Thanjavur SS

Voltage level

Transmission 230 N/A

Distribution N/A 110

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 2.867 2.867 2.867 2.867

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 102: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SICGILSOL GASES PVT. LTD,SICGILSOL GASES PVT. LTD, SF No.29, Trichy-Tanjore Main Road,,

Pudukkudi,, Tanjore-613402 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Trichy

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Trichy

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Thanjavur

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Madurai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 103: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/197/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name V.V. IRON & STEEL COMPANY (P) LTD HTSC No. 262

5 Customer EDC Tucticorin

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

V.V. IRON & STEEL COMPANY (P) LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Vagaikulam SS

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.547 1.547 1.547 1.547

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 104: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. V.V. IRON & STEEL COMPANY (P) LTD,V.V. IRON & STEEL COMPANY (P) LTD, Visco Industrial

Estate, Thanooth Village, Anaiyapparanallur PO, Tutcorin - 628 851 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Tirunelveli

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Tirunelveli

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Tucticorin

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Madurai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 105: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/198/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SUNDARAM BRAKE LININGS LTD HTSC No. 826

5 Customer EDC Chengalpettu

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SUNDARAM BRAKE LININGS LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Veerapuram SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.522 0.522 0.522 0.522

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 106: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SUNDARAM BRAKE LININGS LTD,SUNDARAM BRAKE LININGS LTD, Plot No.AA-6, 6th

Avenue,, Auto Ancillary SEZ, Mahendira World City,, Chengalpet, Kanchipuram Dist, 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Chennai South

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Chennai

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Chengalpettu

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Chennai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 107: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/199/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name

C.R TEXTILE MILLS, AMIT PARASRAMPURI PARTNER

HTSC No. 150

5 Customer EDC Namakkal

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

C.R TEXTILE MILLS, AMIT PARASRAMPURI PARTNER

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Rasipuram SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.418 0.418 0.418 0.418

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 108: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. C.R TEXTILE MILLS, AMIT PARASRAMPURI PARTNER,C.R TEXTILE MILLS, AMIT

PARASRAMPURI PARTNER, Attayampatty Road,, Athanur - 636301., Rasipuram T.K., Namakkal Dist.

2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi, Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201

Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Salem

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Namakkal

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 109: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/200/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name VISHNU LAKSHMI MILLS (P) LTD HTSC No. 181

5 Customer EDC Coimbatore Metro

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

VISHNU LAKSHMI MILLS (P) LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Sullur SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.045 1.045 1.045 1.045

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 110: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. VISHNU LAKSHMI MILLS (P) LTD,VISHNU LAKSHMI MILLS (P) LTD, Post Box No.7,, Trichy

Road, Sulur,, Coimbatore - 641 402. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Coimbatore

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Coimbatore

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Coimbatore Metro

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 111: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/201/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name EASTMAN SPINNING MILLS PVT LTD HTSC No. 181

5 Customer EDC Dindigul

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

EASTMAN SPINNING MILLS PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Ranganathapuram SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 2.141 2.141 2.141 2.141

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 112: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. EASTMAN SPINNING MILLS PVT LTD,EASTMAN SPINNING MILLS PVT LTD, New No.10,12

Kumara Nagar (South), Tiruppur - 641 603. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Madurai

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Dindugul

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Dindigul

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Madurai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 113: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/202/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name EASTMAN SPINNING MILLS PVT LTD HTSC No. 257

5 Customer EDC Dindigul

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

EASTMAN SPINNING MILLS PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Ranganathapuram SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 2.402 2.402 2.402 2.402

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 114: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. EASTMAN SPINNING MILLS PVT LTD,EASTMAN SPINNING MILLS PVT LTD, New No.10,12

Kumara Nagar (South), Tiruppur - 641 603. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Madurai

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Dindugul

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Dindigul

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Madurai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 115: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/203/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 02.04.19 Date 02/04/19

2 Period of Transaction 01/10/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name DINDIGUL STEEL ROLLING MILLS (P) LTD HTSC No. 196

5 Customer EDC Dindigul

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

DINDIGUL STEEL ROLLING MILLS (P) LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Tamaraipadi SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/10/19 31/03/22 1.88 1.88 1.88 1.88

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 02/04/19 Rs.50000/-

Page 116: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. DINDIGUL STEEL ROLLING MILLS (P) LTD,DINDIGUL STEEL ROLLING MILL (P) LTD SF No. 414/1

Old Karur Rd, Kulathur PO, Dindigul 624 005 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Madurai

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Dindugul

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Dindigul

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Madurai

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 117: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/204/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name INDIA DYEING MILLS (P) LTD HTSC No. 69

5 Customer EDC Erode

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

INDIA DYEING MILLS (P) LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Samayasangili SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 2.611 2.611 2.611 2.611

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 118: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. INDIA DYEING MILLS (P) LTD,INDIA DYEING MILLS (P) LTD, SF No.36,38,39, S.P. Agraharam,

Bhavani Main Road, Erode – 638 005. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Salem

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Erode

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 119: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/205/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name GMB TEXTILES MILLS INDIA LIMITED HTSC No. 217

5 Customer EDC Erode

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

GMB TEXTILES MILLS INDIA LIMITED

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Elumathur SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 0.783 0.783 0.783 0.783

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 120: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. GMB TEXTILES MILLS INDIA LIMITED,GMB TEXTILES MILLS INDIA LIMITED, S.F No.109/2,

Padipparai,, Thottipalayam,, Elumathur (Post),, Erode - 638 104. 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Salem

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Erode

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 121: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/206/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name JAYASAKTHI CASTING INDIA PVT LTD HTSC No. 433

5 Customer EDC Erode

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

JAYASAKTHI CASTING INDIA PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Periyandipalayam

Voltage level

Transmission 230 N/A

Distribution N/A 33

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 2.579 2.579 2.579 2.579

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 122: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. JAYASAKTHI CASTING INDIA PVT LTD,JAYASAKTHI CASTING INDIA PVT LTD, Sf No. 3/1,

2&3A, Pudupalayam, Theppmpalayam, Chennimalai, Perundurai, Erode 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Salem

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Erode

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 123: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/207/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SRI BALAMBIKA TEXTILE MILLS (P) LTD HTSC No. 93

5 Customer EDC Gobi

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SRI BALAMBIKA TEXTILE MILLS (P) LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Shenbagpudur SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.672 1.672 1.672 1.672

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 124: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SRI BALAMBIKA TEXTILE MILLS (P) LTD,SRI BALAMBIKA TEXTILE MILLS (P) LTD, SF No . 156 /

158, Sathy - Covai Main Road, Vinnapalli Sathy TK, Erode - 638 402 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Gobi

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Gobi

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 125: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/208/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name RANGER COTTON MILLS (INDIA) PVT LTD HTSC No. 119

5 Customer EDC Gobi

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

RANGER COTTON MILLS (INDIA) PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Getticheviyur SS

Voltage level

Transmission 230 N/A

Distribution N/A 11

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.045 1.045 1.045 1.045

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 126: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. RANGER COTTON MILLS (INDIA) PVT LTD,RANGER COTTON MILLS (INDIA) PVT LTD, 4/159,

Santhipalayam Village, Getticheviyur PO, Gobi TK - 638 110 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Salem

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Gobi

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 127: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/209/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 02.04.19 Date 02/04/19

2 Period of Transaction 01/10/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name KMP SPINNERS PVT LTD HTSC No. 301

5 Customer EDC Mettur

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

KMP SPINNERS PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A Veppadai SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/10/19 31/03/22 0.731 0.731 0.731 0.731

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 02/04/19 Rs.50000/-

Page 128: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. KMP SPINNERS PVT LTD,KMP SPINNERS PVT LTD, SF No. 299/7, Chinnapalayam,

Elandhakuttai PO, Veppadai, Erode 638 008 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Erode

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Mettur

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 129: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/210/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 02.04.19 Date 02/04/19

2 Period of Transaction 01/10/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SANTHI PROCESSING UNIT PVT LTD HTSC No. 357

5 Customer EDC Mettur

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SANTHI PROCESSING UNIT PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A SPB Colony SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/10/19 31/03/22 0.522 0.522 0.522 0.522

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 02/04/19 Rs.50000/-

Page 130: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SANTHI PROCESSING UNIT PVT LTD,SANTHI PROCESSING UNIT PVT LTD, 120/5, T.

Goundampalayam, Kadachanallur PO, Trichengode TK Namakkal 638 008 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Erode

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Mettur

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 131: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

FORMAT-MTOA2

APPROVAL FOR MEDIUM – TERM OPEN ACCESS (Issued by SLDC)

Ref : CE/GO/SE/OA&CO/EE/ABT/AEE-3/ABT/F.Suryadev/R.0/D.1983/19, dt.22.03.2019

Nodal SLDC Approval No.

SLDC/MTOA/CPP/211/2019-2020 Date 02/05/19

1 Customer Application No.

SAPPL/dated 30.03.19 Date 30/03/19

2 Period of Transaction 01/09/2019 TO 31/03/2022

3 Nature of customer Captive User

4 Customer Name SANTHI PROCESSING UNIT PVT LTD HTSC No. 370

5 Customer EDC Mettur

6 Details of Transaction Party’s to Grid

Injecting Entity Drawee Entity

Name of the Entity Suryadev Alloys & Power Pvt Ltd

SANTHI PROCESSING UNIT PVT LTD

Status of Entity CGP Captive User

Utility in which it is embedded TANTRANSCO TANGEDCO

7 Details of Injecting/Drawee connectivity with Intra-State System

Injecting Entity Drawee Entity

Name of Sub-Station

Transmission Gummidipoondi N/A

Distribution N/A SPB Colony SS

Voltage level

Transmission 230 N/A

Distribution N/A 22

Name of Licensee(Owner of S/S)

TANTRANSCO TANGEDCO

Intervening Intra-State Licensee

N/A

Intervening Inter-State Licensee

N/A

8 Open Access Granted for:

Period Requested Quantum at Injection end (MW)

Approved Quantum at Injection end (MW)

From To Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00 to 24:00)hrs

Peak Slots (18:00 to 22:00) hrs

Non-Peak Slots (00:00 to 18:00 & 22:00

to 24:00)hrs

01/09/19 31/03/22 1.044 1.044 1.044 1.044

9 Details of Non- Refundable Application Fee made

TANTRANSCO collection A/C Head

Instrument Details

Amount (Rs.) Receipt No. Date

62.962 SBI collect 29/03/19 Rs.50000/-

Page 132: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

10) The approved transaction shall be incorporated in day – ahead scheduling in accordance with the provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014.

11) The approval is subject to provisions of TNERC Grid Connectivity and Intra State Open Access Regulations-2014 terms & conditions as per MTOA agreement III&IV and any other relevant Regulation/Order/Code as amended and applicable from time to time.

12) The generator shall execute Medium-term open access agreement in FORMAT-MTOA-III and captive user shall execute Medium-term open access agreement in FORMAT-MTOA-IV with SE/EDC concerned before commencement of the open access transactions.The FORMAT-MTOA-III & IV shall be downloaded from http://tnebldc.org/openaccess/ CAPTIVE Approval.

13) The open access charges shall be collected from Generator at SE/EDC concerned instead of SLDC, until TANTRANSCO become full-fledged entity with sufficient staff and infrastructures.

To 1. SANTHI PROCESSING UNIT PVT LTD,SANTHI PROCESSING UNIT PVT LTD, 120/5, T.

Goundampalayam, Kadachanallur PO, Trichengode TK Namakkal 638 008 2. SURYADEV ALLOYS AND POWER PRIVATE LIMITED, No.298/2, New Gummidipoondi,

Gummidipoondi Taluk, Tiruvallur Dist, Chennai - 601201 Copy Submitted To

The Chief Engineer/ Grid Operation /Chennai,

The Chief Financial Controller /Revenue/TANGEDCO

The Chief Financial Controller /Revenue/TANTRANSCO

The Chief Engineer/Distribution/Erode

Copy to

The Financial Controller/Cost/TANGEDCO

The Superintending Engineer/Operation/Erode

The Superintending Engineer/EDC/Chennai North

The Superintending Engineer/EDC/Mettur

The Superintending Engineer /LD&GO/Chennai

Executive Engineer/LD/Erode

Place : Chennai Date : 02/05/19 Sd…….02/05/19

Superintending Engineer/OA&CO

Page 133: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

Medium Term Open Access Agreement MTOA III

(To be executed between STU / Distribution Licensee and CGP

holder for generation from other than NCES)

This agreement made at __________________ on this _______day

of_____________Two thousand __________ between M/s.__________________

(Name of the Captive Generating Plant and address) hereinafter called “the CGP

holder” which expression shall wherever the context so permits means and

includes the successors in interest,executors, administrators and assigns

represented by Thiru.________________________________ as Party of the First

part

and

M/s________________________(Name of the State Transmission Utility

/Distribution Licensee) ______________________________________having its its

office at ___________________________hereinafter called “the STU/Distribution

Licensee” which expression shall wherever the context so permits means and

includes the successors in interest, administrators and assigns represented by the

_____________________________________________(Designation of the

STU/Distribution Licensee‟s officer) as Party of the Second part;

WHEREAS this agreement is for the parallel operation of the CGP holder‟s

Captive Generating Plant and wheeling of energy (Power) from such Captive

Generating Plant to the destination of his use through the Transmission /Distribution

network of the STU/Distribution Licensee;

WHEREAS the CGP holder has sent to the STU/Distribution Licensee, his

proposal to wheel the energy generated from his Captive Generating Plant having

capacity of __________MW installed at ________________village

_______________taluk in _________________district / commissioned / to be

commissioned on or about ____________through the STU/Distribution Licensee‟s

Transmission/Distribution network to his captive use bearing HT service Numbers

____ (HT Tariff._________) of ______________________ in ________________

Distribution Circle;

Page 134: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

WHEREAS the CGP holder has paid the open access registration fee,

agreement fee and other fees as notified / ordered by the Tamil Nadu Electricity

Regulatory Commission, hereinafter called “the Commission”;

AND WHEREAS the STU/Distribution Licensee has accepted the proposal of

the CGP holder for wheeling of energy from the Captive Generating Plant to

destination of his own use through the STU/Distribution Licensee‟s

Transmission/Distribution networks as per Lr. No.

__________________________________________on the terms and conditions

hereinafter mentioned.

NOW THESE PRESENTS WITNESSETH AND THE PARTIES HEREBY AGREE

AS FOLLOWS:

TERMS AND CONDITIONS.-

1. Definitions.-

In this agreement, -

(a) “Force Majeure” means any event which is beyond the control of the parties

to

this agreement which they could not foresee or with a reasonable amount of

diligence could not have foreseen or which could not be prevented and which

substantially affect the performance of either party such as but not limited to -

(i) natural disasters (earthquakes, hurricane, floods);

(ii) wars, riots or Civil Commotions and other upheavals;

(iii) grid / distribution system‟s failure not attributable to parties

hereto;

(b) “Inter connection point” means the Captive Generating Plant‟s switchyard at

which point the interconnection is established between the Captive Generating

Plant and the grid / distribution system;

(c) “Interface line” means the electric line between the interconnection point and

the nearest point at which the electric line could technically be connected to

the

existing grid or distribution system; and

Page 135: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

(d) „Meter‟ means a „Meter‟ as defined in the Central Electricity Authority

(Installation and Operation of Meters) Regulations, 2006 as amended

from time to time.

2. Interfacing and evacuation facilities.-

(a) The CGP holder agrees to interface his Captive Generating Plant with the

STU/Distribution Licensee‟s Transmission/Distribution network through ---------

-------- lines and shall bear the entire cost of interfacing Including the cost of

lines, switch gear, metering, protection and other arrangements from the

point of generation to the STU/Distribution Licensee‟s nearest technically

feasible interconnection point;

(b) It is further agreed that the works of interconnecting the Captive Generating

Plant up to the interconnection point shall be executed under Deposit

Contribution Work (DCW) by the STU/Distribution Licensee;

(c) The CGP holder and the STU/Distribution Licensee shall comply with the

contained in Central Electricity Authority (Technical Standards for

interconnecting to the Grid) Regulations, 2007 which includes the following

namely;

(i) Connection Agreement;

(ii) Site responsibility schedule;

(iii) Access at Connection site;

(iv) Site Common Drawings;

(v) Safety;

(vi) Protection System and Co-ordination; and

(vii) Inspection, Test, Calibration and Maintenance prior to

connection

(d) The CGP holder agrees to comply with the safety measures contained in

section

53 of the Electricity Act, 2003 (Act 36 of 2003);

(e) Both the parties shall comply with the provisions contained in the Indian

Electricity Grid Code, Tamil Nadu Electricity Grid Code, the Electricity Act,

2003, other Codes and Regulations issued by the Commission / Central

Electricity Authority and amendments issued thereon, from time to time; and

(f) Both the parties shall comply with the guidelines issued by the Government of

India / Government of Tamil Nadu, from time to time.

Page 136: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

3. Operation and Maintenance.-

(a) The CGP holder agrees that the starting current of the Generator shall not

exceed the full load current of the machine and also agrees to provide the

necessary current limiting devices like thyristor during the starting.

(b) The CGP holder agrees to minimize drawal of reactive power from the

STU/

Distribution Licensee‟s Transmission/Distribution network at an

interconnection

Point as per the provisions of the Tamil Nadu Electricity Grid Code and

Indian

Electricity Grid Code, as the case may be.

(c) The CGP holder agrees to provide suitable automatic safety devices so

that the

Generator shall isolate automatically when the grid supply fails.

(d) The CGP holder agrees to maintain the Generator and the equipment including

the

transformer, switch gear protection equipments and other allied equipments at

his cost to the satisfaction of the authorized officer of the STU/Distribution

Licensee.

(e) The changing of the rupturing capacity of the switch gear and setting of the

relays,

if any, shall be subject to the approval of the authorized officer of the

STU/Distribution Licensee.

(f) The interfacing lines shall be maintained by the STU/Distribution Licensee at

their

cost.

(g) There shall be no fluctuations or disturbances to the

Transmission/Distribution

network or other consumers connected to the network due to

paralleling

of the Generators. The CGP holder shall provide at his cost adequate

protection as

required by the STU/Distribution Licensee to facilitate safe parallel

operation of the

Page 137: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

Captive Generating Plant with Transmission/Distribution network and to

prevent

disturbances to the grid.

(g) The CGP holder agrees that the STU/Distribution Licensee shall not be

responsible

for any damage to his Captive Generating Plant resulting from parallel

operation with the Transmission/Distribution network and that the

STU/Distribution Licensee shall not be liable to pay any compensation for any

such damage.

(h) The Captive Generating Plant shall be maintained effectively and operated by

competent and qualified personnel.

(i) In case of unsymmetrical fault on HV bus, the CGP holder shall share the fault

current according to impedance of the circuit. To meet such contingency and for

safe operation of the Captive Generating Plant, the CGP holder shall provide the

following scheme of protection,namely,-

(i) Separate overload relays on each phase and earth fault relays

shall be installed by the CGP holder. Under no circumstances,

these relays shall be by-passed;

(ii) With suitable Current Transformer and relay connections, the

load sharing by the CGP holder and STU/Distribution Licensee

shall be limited to their rated capacity;

(iii) Adequate indication and control metering for proper paralleling

of the Captive Generating Plant on the HV bus shall be made

available; and

(iv) Protection co-ordination shall be done by the STU/Distribution

Licensee in consultation with the Regional Power Committee /

State Transmission Utility and relays and the protection system

shall be maintained as per site responsibility schedule;

(k) Grid availability shall be subject to the restriction and control as per the

orders

of the State Load Dispatch Centre and as per Tamil Nadu Electricity Grid

Code;

Page 138: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

(l) The CGP holder shall supply the committed power to his captive use at

the ex-bus

periphery of the captive generating plant, inclusive of the transmission

loss; and

(m) The captive user can avail power from the captive generating plant

subject to

the Restriction and Control measures imposed / approved by

the Commission from time to time.

4. Metering Arrangements. –

(a) The metering arrangements with facilities to record export and import of energy

shall be provided in accordance with the Central Electricity Authority (Installation

and Operation of Meters) Regulations, 2006, Tamil Nadu Electricity Regulatory

Commission‟s Intra State Open Access Regulations, Tamil Nadu Electricity

Distribution Code and Indian Electricity Grid Code / Tamil Nadu Electricity Grid

Code in consultation with Distribution Licensee. The periodicity of testing,

checking, calibration etc., will be governed by the Regulations issued by the

Central Electricity Authority / Commission in this regard;

(b) Main and Check Meters shall have facility to communicate its reading to State

Load Dispatch Centre / Distribution Control Centre on real time basis or

otherwise, as may be specified by the Commission.Meter reading shall be taken

as per the procedure devised by the STU/Distribution Licensee;

(c) The STU/Distribution Licensee may provide Check Meters of the same

specifications

as that of Main Meters;

(d) The CGP holder can have a standby meter of the same specification, tested and

sealed by the STU/Distribution Licensee;

(e) The Main and Check Meters shall be tested for accuracy as per the Central

Electricity

Authority (Installation and Operation of Meters) Regulations, 2006. The meters

may be tested using NABL accredited mobile laboratory or at any accredited

laboratory in the presence of parties involved. Both parties shall seal Main and

Check meters.

Defective meter shall be replaced immediately;

Page 139: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

(f) Reading of Main and Check meters shall be taken periodically at appointed day

and hour by authorized officer of STU/Distribution Licensee in the presence of the

CGP holder or his representative;

(g) Check meter readings shall be considered when Main Meters are found to be

defective or stopped. Provided that if difference between the readings of main

and check meter vis-à-vis main meter reading exceeds twice the percentage error

applicable to relevant class, both meters shall be tested and the one found

defective shall be immediately replaced and reading of other will be considered;

(h) If during test or calibration, both the main meter and the check meter are found

to

have errors beyond permissible limits, the bill shall be revised for the previous 3

(Three) months or for the exact period if known and agreed upon by both the

parties, by applying correction as determined by the STU/Distribution Licensee to

the consumption registered by the meter with lesser error;

(i) The CGP holder shall check the healthiness of meters (due to blowing of the P.T.

fuses or due to any other causes) by superficially checking indicator lamps or by

taking readings as frequently as possible. If both the main meter and the check

meter fail to record energy either due to the blowing of the P.T. fuses or due to

any other causes, the energy imported /exported may be arrived at based on the

standby meter, if available, or by mutual agreement of the parties involved; and

(j) The interface meters may be Special Energy meters (ABT compliant energy

meters)

with appropriate communication facilities to be connected with SLDC /

Distribution Control Centre.

5. Adjustment of Energy Generated and Wheeled. –

(a) The minimum limit of load for sale through open access by the CGP holder shall be

governed by the Intra State Open Access Regulations.When the Captive

Generating Plant is synchronized with the Transmission/Distribution network, the

CGP holder shall be liable to pay to the Distribution Licensee for the net energy

consumed during the billing month at the applicable rate. The net energy

consumption shall be adjusted

on unit-to-unit basis as detailed below: -

(i) Peak generation shall be adjusted against peak consumption;

(ii) Normal generation shall be adjusted against normal consu

mption;

Page 140: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

(iii) Off peak generation shall be adjusted against off peak

Consumption.

(iv) Peak and normal generation may be adjusted against lower slot

consumption at the request of CGP holder

As and when the Commission implements the Intra-State

ABT, the adjustment of energy is subject to the Intra-State ABT regulation in force.

6. Charges. –

(a) Transmission and Wheeling charges. - Transmission and Wheeling charges shall be

payable by the CGP holder as per the order of the Commission for the time being

in force;

(b) Losses to be paid in kind. - The CGP holder agrees to compensate the average loss

from the point of injection to the point of drawal as per the order of the

Commission for the time being in force;

(c) Scheduling and System operation Charges - These charges shall be payable as per

the

order of the Commission for the time being in force;

(d) Grid availability /Grid Support Charges. -

(i) In case of outage of generator, the power drawn by the Captive

Generating

Plant for start up and other purpose shall be charged at the rate

fixed in the

Commission‟s order for the time being in force;

(ii) When the scheduled generation is not maintained by the CGP holder

and when

the drawal by the captive user from the Transmission/Distribution

network is

more than the generation in the Captive generation plant, the

charges shall be

levied as per the order of the Commission for the time being in

force;

(d) Power Factor disincentive. - Power factor disincentive shall be as per the Tariff

Page 141: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

Order for the time being in force based on the gross energy and applicable

demand

charges. The average power factor recorded will be the reference for

calculation of

power factor disincentive;

(e) Reactive energy charges. - Reactive Power Charges is recoverable as per the

regulation / Code /order in force;

(f) Peak hour extra charges and off-peak hour rebate. - Peak hour extra charges and

And off peak hour rebate shall be on net energy consumption after deducting

generation in CGP plant during the respective peak hour block and off-peak hour

block; and

(g) Any additional charges that may be approved by the Commission at a later date

shall

Shall also be levied, with retrospective effect or from the date as approved by the

commission.

(h) The bank guarantee of Rs. 2000/- (Rupees two thousand only) per MW or part

there of the total power to be transmitted submitted by the open access

customer along with the application, shall be valid and subsisting till

operationalisation of medium term open access.

(i) The bank guarantee may be encashed by the nodal agency,

(i) If the MTOA application is withdrawn by the applicant or

(ii) The medium-term open access rights are relinquished prior to the

operationalisation of such rights.

(k) The existing procedure will be followed for collection of application fee and all

other

charges until procurement of necessary software to implement the accounting

procedure as per the provisions of Regulation of ISOA 2014.

7. Billing. -

(a) The distribution licensee shall raise bills for the net energy consumed by the

captive

user after adjusting the wheeled energy, where the consumption by the captive

user is more than the generation of the CGP holder at the rate as per TNERC

orders and regulation for the time being in force.

Page 142: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

(b) The distribution licensee shall raise bills on the CGP holder for the charges

payable

towards startup power and power drawn for other purpose, wheeling charges,

excess demand & excess energy charges, etc, as per the order / regulations of

the Commission for the time being in force; and

(c) The STU shall raise bills on the CGP holder for the charges payable towards

transmission charges, scheduling and system operation charges, etc. as per the

order / regulations of the Commission for the time being in force.

(d) In case the open access customer fails to make any payment due to

TRANSCO/TANGEDCO within the specified due dates, wheeling/energy

adjustment will not be made and action will be taken to withdraw the Open

Access granted.

(e) In case a person, to whom open access has already been allowed, is declared

insolvent or is having outstanding dues for more than two months billing of

transmission or distribution Licensee, he shall not be eligible for open access

from the day he is adjudged as insolvent or failed to clear the amount

outstanding for more than two months billing.

8. Payment of Security Deposit. -

The captive user drawing the power from CGP holder shall pay to the

distribution

licensee a security deposit for the net energy supplied by the distribution

licensee as

specified by the Commission in its orders /regulations for the time being

in force.

9. Standard Terms and Conditions

a. The Generator shall give necessary day ahead schedule of the generation and

wheeling quantum to HT consumers, concerned SE‟s Distribution Circles of HT

consumers & Generator and SLDC.

b. The company shall not declare their capacity over and above the approved

quantum for open access for specified purpose. If they declare their capacity

above the open access quantum, it will not be accounted.

c. The company has to back down/shutdown their generation/Generator as per

SLDC instructions for which no compensation is eligible and it is the responsibility of

the generator to intimate their HT consumers and concerned SE/EDCs regarding

Page 143: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

their outage of plant or lesser supply of committed power by giving due schedules.

Accordingly the HT consumers shall reduce their drawal.

d. The Wheeled power scheduled at ex-periphery of the Generator shall be subjected

to deduction of TANTRANSCO‟s/TANGEDCO‟s Transmission and distribution losses

stipulated in TNERC Orders.

e. The generation over and above the committed power by the generator will not be

accounted. The generator shall not inject power into grid without any contracted

agreement and necessary open access approval.

f. If the HT consumer does not draw the committed power due to any reasons, the

generator / HT consumer will not be compensated by TANGEDCO.

g. Load shedding in view of grid security is inevitable and hence lesser (non) drawal

due to load shedding or feeder tripping on protection and break down shall not be

compensated.

h. The billing and energy accounting shall be done on monthly basis. Based on the

Open access approvals and schedules, the concerned SE/EDC of the generator shall

allocate slot wise , HT consumer wise energy to the concerned SE/EDC of the HT

consumers. Accordingly the energy shall be adjusted slot wise on first charge basis

from their monthly consumption.

i. Issues related to Energy accounting towards generation, their own use, the HT

consumers use, Penal measures and any other disputes arising in the above shall be

sorted out and resolved at EDC and Regional level.

j. In case of violation of any terms and conditions and/or non-payment of any of the

charges payable, the open access approval will automatically terminated and for

restoration, TNERC have to be approached.

k. The TANTRANSCO reserves the rights to withdraw the concurrence to operate the

company‟s generator set in parallel with grid if any of the condition is violated or for

any valid reason.

l. These conditions are in addition to other conditions as stipulated in TNERC

regulations and orders in force.

m. The company shall adhere to the various provisions of Electricity Act 2003,

Electricity Rules 2005, Grid connectivity and Intra-state Open Access regulations

2014 and prevailing TNERC Orders and their amendments issued from time to time.

n. The generator shall not claim any compensation for any difficulties arising in due

to outage, breakdown of the transmission system and for constraints in the grid.

o. In case the generator happens to be a captive power plant this approval does not

absolve the generator from maintaining their CPP status. The generator is

Page 144: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

responsible to ensure the minimum percentage of their CPP consumption towards

complying with Elecy. Rules. 2005.

p. If the open access is for supplying power to TANGECO, the transmission losses and

transmission charges payable to TANTRANSCO will be as per the terms of PPA in

Tender executed with TANGEDCO for the supply of power to TANGEDCO.

q. The permitted open access customer (Generator) shall furnish an undertaking to the

effect that the company will strictly adhere the terms and conditions specified and

indemnify TANGEDCO/TANTRANSCO for any loss or damage suffered by it by

allowing wheeling under open access.

r. The company should not inject any power into the grid beyond approved open

access period. If injected without OA approval it will not be accounted for billing.

10 . Applicability of the Acts, Regulations and Guidelines. -

The parties shall be bound by the provisions contained in the Electricity Act,

2003, Regulations, notifications, orders and subsequent amendments, if any,

made there under From time to time by the Commission and the guidelines

sued by the Government of India/ Government of Tamil Nadu, as the case

may be.

11. Agreement Period. –

(a) The tenure of this agreement shall be

_____________(years/months/days/hours) calculated from the date

of this agreement and thereafter the tenure may be extended based

on the mutual agreement between the STU/Distribution Licensee and

the CGP Holder consistent with the Commission‟s Intra-State Open Access

Regulations. The classification of the terms (Long term, Short term, etc.) is as

per the Commission‟s Intra State Open Access Regulations; andThe parties to the

agreement may at any time renegotiate the existing agreement mutually within the

framework of the relevant regulations, codes and orders of the Commission in force.

12. Settlement of Disputes. -

If any dispute or difference of any kind whatsoever arises between the

parties to this agreement, it shall, in the first instance, be settled amicably ,by the

parties, failing which either party may approach the Commission for the adjudication

of such disputes under section 86 (1) (f) of the Electricity Act, 2003;

13 . Force Majeure. -

Page 145: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

Both the parties shall ensure compliance of the terms and conditions of this

agreement.

However, no party shall be liable for any claim for any loss or damage whatsoever

arising out of failure to carry out the terms of this agreement to the extent that

such failure is due to force majeure. But any party claiming the benefit of this

clause shall satisfy the other party of the existence of such an event(s);

In witness whereof Thiru._______________________ acting for and on behalf

of ____________________ (CGP holder) and

_____________________ Authorized Officer of the STU/Distribution

Licensee acting for and on behalf of the STU/Distribution Licensee have

hereunto set their hands on the day, month and year hereinabove first

mentioned.

In the presence of witnesses: Signature

1) CGP holder

2) Common seal

In the presence of witnesses: Signature

1) Authorized Office of the STU/Distribution Licensee

2)

Medium Term Open Access Agreement MTOA IV

(To be executed between STU/Distribution Licensee and open access customer )

This agreement made at __________________ on this _______day

Page 146: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

of_____________Two thousand __________ between M/s.__________________

(Name of the open access consumer) hereinafter called the consumer”, which

expression shall wherever the context so permits mean sand includes the

successors in interest, executors, administrators and assigns represented by

Thiru.________________________________ as Party of the First part

and

M/s________________________(Name of the STU / Distribution

Licensee)___________________________________________________________

___________having its office at ___________________________hereinafter

called “the STU/Distribution Licensee”, which expression shall wherever the

context so permits means and includes the successors in interest, administrator

and assigns represented by

the_____________________________________________ (Designation of the

STU/Distribution Licensee‟s officer) as Party of the Second part;

WHEREAS the consumer proposes to wheel the energy (Power)

from___________________________(Name and address of the Generating Plant)

hereinafter called “the Generating Plant” to the destination of consumption

through the Transmission / Distribution network of the STU/Distribution Licensee;

WHEREAS the consumer has sent to the STU/Distribution Licensee, his

proposal to wheel the energy generated from the Generating Plant having

capacity of __________MW installed at

________________village_______________taluk in _________________district /

commissioned / to be commissioned on or about ____________through the STU/

Distribution Licensee‟s Transmission/Distribution network to his use bearing HT

service ------ Numbers ____ (HT Tariff._________) of

______________________in_________________ Distribution Circle;

WHEREAS the consumer has paid the open access registration fee,

agreement fee and other fees as notified / ordered by the Tamil Nadu Electricity

Regulatory Commission hereinafter called “the Commission”;

AND

WHEREAS the STU/Distribution Licensee has accepted the proposal of

the consumer for wheeling of energy from the Generating Plant to his destination

use through the STU/Distribution Licensee‟s Transmission/Distribution networks

Page 147: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

as per LTOA approval No. Lr.

No.________________________________________________on the terms and

conditions hereinafter mentioned.

NOW THESE PRESENTS WITNESSETH AND THE PARTIES HEREBY

AGREE AS FOLLOWS:

TERMS AND CONDITIONS.-

1. Definitions.-

In this agreement, -

(a) “Force Majeure” means any event which is beyond the control of the

parties to this agreement which they could not foresee or with a

reasonable amount of diligence could not have foreseen or which could

not be prevented and which substantially affect the performance of either

party such as but not limited to -

(i) natural disasters (earthquakes, hurricane, floods);

(ii) wars, riots or Civil Commotions and other upheavals;

(iii) grid / Transmission system‟s failure not attributable to parties

hereto;

(b) “Inter connection point” means the Generating Plant‟s switchyard at

which point the interconnection is established between the Generating

Plant and the Transmission system;

(c) “Interface line” means the electric line between the interconnection

point and the nearest point at which the electric line could technically be

connected to the existing Transmission system; and

(d) „Meter‟ means a „Meter‟ as defined in the Central Electricity Authority

(Installation and Operation of Meters) Regulations, 2006 as amended from

time to time.

2. Connectivity to the Grid. –

a) The open access customer/ generator and the Transmission/Distribution

Licensee shall comply with the provisions contained in Central Electricity

Authority (Technical Standards for Interconnecting to the Grid)

Regulations, 2007 which includes the following namely;

(i) Connection Agreement;

Page 148: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

(ii) Site responsibility schedule;

(iii) Access at Connection site;

(iv) Site Common Drawings;

(v) Safety;

(vi) Protection System and Co-ordination; and

(vii) Inspection, Test, Calibration and Maintenance prior to

Connection.

b). Both the parties agrees to comply with the safety measures

contained in section 53 of the Electricity Act, 2003 (Act 36 of 2003);

c) both the parties shall comply with the provisions contained in the

Indian Electricity Grid Code, Tamil Nadu Electricity Grid Code, the

Electricity Act, 2003, other Codes and Regulations issued by the

Commission / Central Electricity Authority and amendments issued

thereon, from time to time; and

d) Both the parties shall comply with the guidelines issued by the

Government of India / Government of Tamil Nadu, from time to

time.

3. Operation and Maintenance. -

(a) The consumer agrees that the drawal demand from the

Transmission/distribution network shall not exceed his sanctioned demand.

(b) The consumer agrees to minimize drawal of reactive power from the

STU/Distribution Licensee‟s Transmission/Distribution network at an

interconnection point as per the provisions of the Tamil Nadu Electricity Grid Code

and the Indian Electricity Grid Code, as the case may be.

(c) The consumer agrees to maintain the equipments at his premises including

the transformer, switch gear and protection equipments another allied

equipments at his cost to the satisfaction of the authorized officer of the

STU/Distribution Licensee.

Page 149: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

(d) The changing of the rupturing capacity of the switch gear and settings of the

relays, if any, shall be subject to the approval of the authorized officer of the

STU/Distribution Licensee..

(e) The sub-station at the consumer premises shall be maintained effectively and

operated by competent and qualified personnel.

(f) Grid availability shall be subject to the restriction and control as per the orders

of the State Load Dispatch Centre and as per Tamil Nadu Electricity Grid Code

(g) The consumer can avail the power from the Generating Plant subject to the

Restriction and Control measures imposed / approved by the Commission from

time to time.

4. Metering Arrangements.:

(a) The metering arrangements with facilities to record export and import of

energy shall be provided in accordance with the Central Electricity Authority

(Installation and Operation of Meters) Regulations, 2006,Tamil Nadu Electricity

Regulatory Commission‟s Intra State Open Access Regulations, Tamil Nadu

Electricity Distribution Code and Indian Electricity Grid Code / Tamil Nadu

Electricity Grid Code in consultation with STU/Distribution Licensee. The

periodicity of testing, checking, calibration etc., will be governed by the

Regulations issued by the Central Electricity Authority / Commission in this regard;

(b) Main and Check Meters shall have facility to communicate its reading to State

Load Dispatch Centre / Distribution Control Centre on real-time basis or

otherwise, as may be specified by the Commission. Meter reading shall be taken

as per the procedure devised by the STU/Distribution Licensee;

(c) The STU/Distribution Licensee may provide Check Meters of the same

specifications as that of Main Meters.

(d) The consumer can have a standby meter of the same specification, tested and

sealed by the STU/Distribution Licensee.

(e) The Main and Check Meters shall be tested for accuracy as per the Central

Electricity Authority (Installation and Operation of Meters)Regulations, 2006. The

meters may be tested using NABL accredited mobile laboratory or at any

accredited laboratory in the presence of parties involved. Both parties shall seal

Main and Check meters. Defective meter shall be replaced immediately.

Page 150: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

(f) Reading of Main and Check meters shall be taken periodically at appointed day

and hour by authorized officer of the STU/Distribution Licensee in the presence of

the consumer or his representative.

(g) Check meter readings shall be considered when Main Meters are found to be

defective or stopped. Provided that, if difference between the readings of main

and check meter vis-à-vis main meter reading exceeds twice the percentage error

applicable to relevant class, both meters shall be tested and the one found

defective shall be immediately replaced and reading of other will be considered.

(h) If during test or calibration, both the main meter and the check meter are

found to have errors beyond permissible limits, the bill shall be revised for the

previous Three months or for the exact period if known and agreed upon by both

the parties, by applying correction as determined by the STU/Distribution Licensee

to the consumption registered by the meter with lesser error.

(i) The consumer shall check the healthiness of meters (due to blowing of the P.T.

fuses or due to any other causes) by superficially checking indicator lamps or by

taking readings as frequently as possible. If both the main meter and the check

meter fail to record energy either due to the blowing of the P.T. fuses or due to

any other causes, the energy imported /exported may be arrived at based on the

standby meter, if available, or by mutual agreement of the parties involved.

(j) The interface meters may be Special Energy meters (ABT compliant energy

meters) with appropriate communication facilities to be connected with SLDC /

Distribution Control Centre.

5. Adjustment of Energy Generated and Wheeled.:

(a) The minimum limit of load for purchase through open access by the consumer

shall be governed by the Intra State Open Access Regulations. The net energy

consumption shall be adjusted on unit-to unit basis as detailed below. -(i) Peak

generation shall be adjusted against peak consumption;(ii) Normal generation

shall be adjusted against normal consumption;(iii) Off peak generation shall be

adjusted against off peak consumption. (iv) Peak and normal generation may be

adjusted against lower slot consumption at the request of CGP holder.b) As and

when the Commission implements the Intra-State ABT, the adjustment of energy

is subject to the Intra-State ABT regulations and prevailing TNERC inforce.

6. Charges.:

Page 151: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

(a) Transmission and Wheeling charges. - Transmission and Wheeling charges

shall be payable by the Consumer as per the order of the Commission for the time

being in force.

(b) Losses to be paid in kind. - The consumer agrees to compensate the average

loss from the point of injection to the point of drawal as per the order of the

Commission for the time being in force.

(c) Scheduling and System operation Charges. - These charges shall be payable

as per the order of the Commission for the time being in force.

(d) Cross Subsidy Surcharge. & Additional subsidy charges: The cross subsidy

surcharge shall be payable by the consumer as per the order of the Commission

for the time being in force.

(e) Grid availability /Grid Support Charges.

(i) In case of outage of generator, the power drawn by the consumer for back up

and other purpose shall be charged at the rate fixed in the Commission‟s order for

the time being in force.

(ii) When the scheduled generation is not maintained by the Generating Plant and

when the drawal by the consumer from the Transmission/Distribution network is

more than the generation from the Generating Plant, the charges shall be levied

as per the order of the Commission for the time being in force.

(iii) In case of deviation between the schedule and the actual injection or drawal

in respect of an open access customer, settlement will be made as per the

provisions of Regulation ISOAR 2014.

(f) Reactive energy charges. - Reactive Power Charges is recoverable as per the

regulation / Code /order in force.

(g) Any additional charges that may be approved by the Commission at a later

date shall also be levied, with retrospective effect or from the date as approved

by the Commission.

(h) The bank guarantee of Rs. 2000/- (Rupees two thousand only) per MW or

part there of the total power to be transmitted submitted by the open

access customer along with the application, shall be valid and subsisting till

operationalisation of medium term open access.

(i)The bank guarantee may be encashed by the nodal agency,

(iii) If the MTOA application is withdrawn by the applicant or

Page 152: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

(iv) The medium-term open access rights are relinquished prior to the

operationalisation of such rights.

(k).The existing procedure will be followed for collection of application fee and all

other charges until procurement of necessary software to implement the

accounting procedure as per the provisions of Regulation of ISOA 2014.

7. Billing. -

(a) The distribution licensee shall raise bills for the net energy consumed by the

consumer after adjusting the wheeled energy, where the consumption by the

consumer is more than the generation from the Generating Plant at the rate as

per TNERC order and regulations in force.

(b) The distribution licensee shall raise bills on the consumer for the charges

payable for back up power and power drawn for other purpose, wheeling charges,

excess demand & excess energy charges, etc, as per the order / regulations of

the Commission for the time being in force.

(c) The STU/SLDC shall raise bills on the consumer for the charges payable

towards transmission charges, scheduling and system operation charges, etc. as

per the order / regulations of the Commission for the time being in force.

(d) In case the open access customer fails to make any payment due to

TANTRANSCO/TANGEDCO within the specified due dates, wheeling/energy

adjustment will not be made and action will be taken to withdraw the Open

Access granted.

(e) In case a person, to whom open access has already been allowed, is declared

insolvent or is having outstanding dues for more than two months billing of

transmission or distribution Licensee, he shall not be eligible for open access from

the day he is adjudged as insolvent or failed to clear the amount outstanding for

more than two months billing.

(f) As and when Intrastate ABT is implemented, billing will be carried out as per

TNERC,

Intrastate ABT regulations.

8. Payment of Security Deposit. -

The consumer drawing power from the Generating Plant shall pay to the

distribution licensee a security deposit for the net energy supplied by the

Page 153: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

distribution licensee as specified by the Commission in its orders /regulations for

the time being in force.

9. Standard Terms and Conditions.

s. The quantum of power to be purchased by the HT consumer both inter state

(collective transaction and bilateral transaction) and intra state open access

transactions together shall not exceed their sanctioned demand at any time.

t. The HT Consumers can use the purchased power only up to their sanctioned

demand.

u. The company have to pay the applicable charges as per prevailing TNERC Orders

and regulations in force.

v. Any additional charges that may be approved by TNERC at a later date and any

waived charges by TANTRANSCO/TANGEDCO shall also be leviable, with

retrospective effect or from the date as approved by TNERC or

TANTRANSCO/TANGEDCO respectively.

w. The Generator shall give necessary day ahead schedule of the generation and

wheeling quantum to HT consumers, concerned SE‟s Distribution Circles of HT

consumers & Generator and SLDC.

x. The HT consumer shall draw the power according to their schedule only.

y. The company has to backdown/shutdown their generation/Generator as per SLDC

instructions for which no compensation is eligible and it is the responsibility of the

generator to intimate their HT consumers and concerned SE/EDCs regarding their

outage of plant or lesser supply of committed power by giving due schedules.

Accordingly the HT consumers shall reduce their drawal.

z. The Wheeled power scheduled at ex-periphery of the Generator shall be subjected

to deduction of TANTRANSCO‟s/TANGEDCO‟s Transmission and distribution losses

stipulated in TNERC Orders.

aa. If the HT consumer does not draw the committed power due to any reasons, the

generator / HT consumer will not be compensated by TANGEDCO.

bb. In order to maintain grid security lesser/(non) drawal due to Demand side

management feeder tripping on protection break down and grid constraint shall not

be compensated.

cc. The billing and energy accounting shall be done on monthly basis. Based on the

Open access approvals and schedules,the concerned SE/EDC of the generator shall

allocate slot wise , HT consumer wise energy to the concerned SE/EDC of the HT

consumers. Accordingly the energy shall be adjusted slot wise on first charge basis

from their monthly consumption.

Page 154: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

dd. Issues related to Energy accounting towards generation, their own use, the HT

consumers use, Penal measures and any other disputes arising in the above shall be

sorted out and resolved at EDC and Regional level.

ee. In case of violation of any terms and conditions and/or non-payment of any of the

charges payable, the open access approval will automatically terminated and for

restoration, TNERC have to be approached.

ff. These conditions are in addition to other conditions as stipulated in TNERC

regulations and orders in force.

gg. The consumer shall adhere to the various provisions of Electricity Act 2003,

Electricity Rules 2005, Grid connectivity and Intra-state Open Access regulations

2014 and prevailing TNERC Orders and their amendments issued from time to time.

hh. In case the consumer is a Captive user, it is the responsibility of the consumer to

ensure the minimum percentage of their Captive consumption towards complying

with Elecy. Rules. 2005.

ii. The permitted open access customer shall furnish an undertaking to the effect that

the company will strictly adhere the terms and conditions specified and indemnify

TANGEDCO/TANTRANSCO for any loss or damage suffered by it by allowing

wheeling under open access.

jj. If the consumer draws power from the grid beyond approved open access period,

necessary penal measures shall be applicable as per prevailing TNERC regulations

and orders.

10. Applicability of the Acts, Regulations and Guidelines. -

The parties shall be bound by the provisions contained in the

Electricity Act, 2003, Regulations, notifications, orders and subsequent

amendments, if any, made there under from time to time by the Commission

and the guidelines issued by the Government of India /Government of Tamil

Nadu, as the case may be;

11. Agreement Period. -

(a) The tenure of this agreement shall be

_____________(years/months/days/hours) calculated from the date of this

agreement and thereafter the tenure may be extended for further periods

based on the mutual agreement between the STU/Distribution Licensee and the

consumer consistent with the Commission‟s Intra-State Open Access

regulations. The classification of the terms (Long term, Short-term, etc.) is as

per the Commission‟s Intra State Open Access Regulations.

Page 155: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

(b) The parties to the agreement may at any time renegotiate the existing

agreement

mutually within the framework of the relevant regulations, codes and

orders of the

Commission in force.

(c) The relinquishment of open access shall be as per the provisions of TNERC

Grid connectivity and Intra State open access regulations 2014 and subsequent

amendments thereon.

12. Settlement of Disputes. -

If any dispute or difference of any kind whatsoever arises between

the parties to this agreement, it shall, in the first instance, be settled amicably,

by the parties, failing which either party may approach the Commission for the

adjudication of such disputes under section 86 (1) (f) of the Electricity Act,

2003.

13. Force Majeure. -

Both the parties shall ensure compliance of the terms and conditions

of this agreement. However, no party shall be liable for any claim for any loss

or damage whatsoever arising out of failure to carry out the terms of this

agreement to the extent that such failure is due to force majeure. But any party

claiming the benefit of this clause shall satisfy the other party of the existence

of such an event(s);In witness whereof Thiru._______________________

acting for and on behalf of ____________________ (consumer) and

_____________________Authorized Officer of the STU/Distribution Licensee

acting for and on behalf of the STU/Distribution Licensee have hereunto set

their hands on the day, month and year hereinabove first mentioned.

In the presence of witnesses: Signature

Consumer

Common seal

Page 156: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

In the presence of witnesses:

Signature

1. Open Access

Customer

2.

Seal

In the presence of witnesses:

Signature

1. Authorized Officer of

the

2. STU/Distribution

Licensee

Annexure

Standard Terms and Conditions.

1. The quantum of power to be purchased by the HT consumer both inter state

(collective transaction and bilateral transaction) and intra state open access

transactions together shall not exceed their sanctioned demand at any time.

2. The HT Consumers can use the purchased power only up to their sanctioned

demand.

3. The company have to pay the applicable charges as per prevailing TNERC Orders

and regulations in force.

4. Any additional charges that may be approved by TNERC at a later date and any

waived charges by TANTRANSCO/TANGEDCO shall also be leviable, with

retrospective effect or from the date as approved by TNERC or

TANTRANSCO/TANGEDCO respectively.

5. The Generator shall give necessary day ahead schedule of the generation and

wheeling quantum to HT consumers, concerned SE‟s Distribution Circles of HT

consumers & Generator and SLDC.

6. The HT consumer shall draw the power according to their schedule only.

7. The company shall have to backdown/shutdown their generation/Generator as per

SLDC instructions for which they are not eligible for any compensation and it is the

responsibility of the generator to intimate their HT consumers and concerned

Page 157: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

SE/EDCs regarding their outage of plant or lesser/Nil supply of committed power by

giving due schedules. Accordingly the HT consumers shall reduce their drawal.

8. The Wheeled power scheduled at ex-periphery of the Generator shall be subjected

to deduction of TANTRANSCO‟s/TANGEDCO‟s Transmission and distribution losses

stipulated in TNERC Orders.

9. If the HT consumer does not draw the committed power due to any reasons, the

generator / HT consumer will not be compensated by TANGEDCO.

10. Lesser/nil drawal due to Demand side management in order to maintain grid

security, feeder tripping on protection break down and grid constraint shall not be

compensated.

11. The billing and energy accounting shall be done on monthly basis. Based on the

Open access approvals and schedules, the concerned SE/EDC of the generator shall

allocate slot wise , HT consumer wise energy to the concerned SE/EDC of the HT

consumers. Accordingly the energy shall be adjusted slot wise on first charge basis

from their monthly consumption.

12. Issues related to Energy accounting towards generation, their own use, the HT

consumers use, Penal measures and any other disputes arising in the above shall

be sorted out and resolved at EDC and Regional level.

13. In case of violation of any terms and conditions and/or non-payment of any of the

charges payable, the open access approval will automatically get terminated and

for restoration, TNERC have to be approached.

14. The consumer shall adhere to the various provisions of Electricity Act 2003,

Electricity Rules 2005, Grid connectivity and Intra-state Open Access regulations

2014 and prevailing TNERC Orders and their amendments issued from time to time.

15. In case the consumer is a Captive user, it is the responsibility of the consumer to

ensure the minimum percentage of their Captive consumption towards complying

with Elecy. Rules. 2005.

16. At any point of time if the generator fails to maintain the CGP status and the

consumer is proved to be the non captive user of that CGP, then the power

availed as captive user during the entire period of open access transaction will

be treated as third party transaction and will attract cross subsidy surcharge.

17. The permitted open access customer shall furnish an undertaking to the effect that

the company will strictly adhere to the terms and conditions specified and

indemnify TANGEDCO/TANTRANSCO for any loss or damage suffered by it by

allowing wheeling under open access.

Page 158: Note Continuedtnebldc.org/CPPMTOA/CPP MTOA/Suryadev MTOA.pdfPONNERI STEEL INDUSTRIES, Status of Entity CGP Captive User Utility in which it is embedded TANTRANSCO TANGEDCO 7 Details

TamilNadu Transmission Corporation Limited

(A Subsidiary of TNEB Ltd)

18. If the consumer draws power from the grid beyond approved open access period,

necessary penal measures shall be applicable as per prevailing TNERC regulations

and orders.

19. These conditions are in addition to the other conditions as stipulated in TNERC

regulations and orders in force.

20. For open access transaction less than 1 MW, this approval is subject to the

directions from TNERC on the G.O. (Ms) No.37 dt 17.04.18

Sd/----------