NVF 2. sep. 2015

Digital construction - the road towards BIM.

Page 2: NVF 2. sep. 2015 Digital construction - the road towards BIM

Agenda• Digital Construction in The Danish Road Directorate

• Storstøms bridge

2.

Page 3: NVF 2. sep. 2015 Digital construction - the road towards BIM

Working method

Traditional tender

3d design is flattened in to 2d drawings in the tender documents. Surveyors uses many resources on markings. The field supervisors keep track of construction process’.

Digital construction

Data saved in one digital model. The contractor can use models for planning and construction. Navigation is based on the model combined with GPS-coordinates. The field supervisors can access model data and do their job in the field.

Digital

Road model

Design

Construction

Tender model

Supervision

Road model

Traditional tenderSupervision

Design

2d cad

Drawing files

Construction

Tender documents

Page 4: NVF 2. sep. 2015 Digital construction - the road towards BIM

PreparationThe Danish Road Directorate has worked with an internal project for “Digital Construction”. The Danish Road Directorate

Page 5: NVF 2. sep. 2015 Digital construction - the road towards BIM

Digital processThe road model is the center of information. Current versions of data is stored here and there are access for all project members.

Different kinds of extractions can be made from the model.

DATA-MODEL

Drawings

Reports

Visualization

Road

Drainage

Terrain

Equipment

Soil drilling

Setting out data

Bridge

Rainwater basins

Page 6: NVF 2. sep. 2015 Digital construction - the road towards BIM

1:1 pilot projectTechnology

• Software

• Hardware

• Network

Policy

• Contractual

• National recommendations

• Preparatory

Process

• Leadership

• Workflows

• Products

Policy

Design

Access to data

Process

Technology

Page 7: NVF 2. sep. 2015 Digital construction - the road towards BIM

TechnologyFunction created with Microstation Customize –”VD Theme”

Dicsipline models are registrered in the database-table MAPS.

Page 8: NVF 2. sep. 2015 Digital construction - the road towards BIM

TechnologyAll discipline models are saved in one location.

Dicsipline models can be accessed through a number of different platforms and applications such as:

• MicroStation

• Bentley Navigator

• GIS4Mobile (iPad app)

• WWW.

• Etc…

Registrations in the field made by field suporvisors in GIS4Mobile can be accessed in our CAD-programs.

iPad application – GIS4Mobile

Bentley Navigator

Registrations of conditions made with GIS4Mobileby field supervisors

Registrations made with GIS4Mobileaccessed in Bentley Navigator

Page 9: NVF 2. sep. 2015 Digital construction - the road towards BIM

PolicyICT = Information and Communications Technology

Delivery specifications

Document describing requirements for suppliers of digital deliveries. Links to the model standard

Model standard

Homepage describing the content and appearance of model data. Home of information about data for all project participants.

ICT – communication specification

Document describing Common basis for all communication. Links to the model standard

ICT – Technical CAD-specification

Document describing how the data should be structured. Links to the model standard

Delivery specifications

Model standard

ICT – communication specification

ICT – Technical CAD-specification

Page 10: NVF 2. sep. 2015 Digital construction - the road towards BIM

Why?• Reuse of information

• Better design material

• Coordination between disciplines

• Clash detection

• Significantly reduction of drawings in tender documents

• Save time during construction and optimize machine time

• Enable digital calculations for the contractor

• Better design material to reduce downtime for the contractors machinery

Page 11: NVF 2. sep. 2015 Digital construction - the road towards BIM

BIM is the next level• BIM is:

• Building

• Information

• Model

• 4D time

• 5D price

ObjectPrice Time-consuming for instalation”I am an electric light bulb”

ObjectPrice pr running meterTime-consuming for instalation”I am a waterpipe”

Page 12: NVF 2. sep. 2015 Digital construction - the road towards BIM

The Storstøms brigde and BIM

Page 13: NVF 2. sep. 2015 Digital construction - the road towards BIM

Storstrøms bridge Old bridge will be replaced by a new bridge

Old bridge would not be able to bear the weight of the trains in the future

Page 14: NVF 2. sep. 2015 Digital construction - the road towards BIM

Storstrøms bridgeBudget 4,2 bil. dkk kr.

Two tracks for highspeed trains for 200 km/h

Two lanes for cars for 80 km/h

Bidirectional bicycle path

Page 15: NVF 2. sep. 2015 Digital construction - the road towards BIM

ICT-requirements for the Storstrøms bridge• ICT = Information and

Communications Technology

• A great chance for BIM way of thinking

• BIM in operation and maintenance

• 4D simulation

Page 16: NVF 2. sep. 2015 Digital construction - the road towards BIM

BIMRequirements for a very detailed 3D model of the bridge

Requirements for a database to O&M

Page 17: NVF 2. sep. 2015 Digital construction - the road towards BIM

Our dream when it comes to O&M• Physical inspection is

ekstensive

• Automotion with drones could help a lot

• Photo recognition Automatic rapport generation

Page 18: NVF 2. sep. 2015 Digital construction - the road towards BIM

Requirements for the database to O&MItem

Geographical placement

Manufactor

Data sheet

Picture

3D modeldatabase for O&M Acces to 3D model with O&M information

Item Safety barrier

Geographical placement X:12345 Y:67890

Manufactor Contractor

Data sheet Link

Picture