Freight Transportation Advisory Committee (FTAC) Presentation # 3

FEASIBILITY STUDY SITE

Truck Parking & Park-and-Ride Lot

Today’s Agenda

Introductions

Presentation

Feedback Session

Next Steps

2

Site Location

Site Location

3

System Goals

Support Regional Freight Movement

Support Non-motorized Transportation

Support Future Transit Plans

Improve Safety

4

Main Challenges

Connections to the Project Site

Connections to SR 836 and the HEFT

5

Presenter
Presentation Notes
We need to talk potential managed lanes connections, Issues with our proposed connection to MDX facilities,

HEFT Upcoming Improvements

HEFT

NW 25

th Street

Dolphin Mall

Project Site

NW 12

th Street

SR 836

6

Presenter
Presentation Notes
·         Slide 6:  Design Year/Construction Year dates not included per comment o   Attached is the project worksheet from the Draft Final FY 2016-2020 TIP on the MPO website, scheduled to be approved on May 21 o   Calls for the project to be a Design/Build o   Funding shows the bulk of expenditures in FY 2017-2018 o   Suggest a note reading:   Note:  Improvements proposed as a design build project with design and construction occurring over FY 2017-18 to FY 2019-2020.   Carlos:  do you concur? o   There is a note that this project needs to be included in the current LRTP by amendment

MDX Future Connection Plans

Nw 1

27th

ave

nue

SR 836

HEFT

Nw 12th STREET

Project Site Project Site

Project Site

7

Alternatives Presented Last Time

1 2

8

Conceptual Layouts

Truck Wash

10,000 S.F. Building

Diesel Fuel Pumps

1,000 S.F. Maintenance Facility

Car Fuel Pumps

Truck Parking Area

Truck Parking

2

4

1

6

5 3

1

2

3

4

5

6

Platform Area

Disabled Parking Area

Short-term Parking Area

Long-term Parking Area

Lounge Building

1

2

3

4

5

Park & Ride

1

2

3

4

4

5

7

Tandem Truck Parking Area 7 9

Alternative 3

HEFT

NW 25th Street

Dolphin Mall

9

Future NW 122

nd Avenue

SR 836 NW 12th Street

2

4

1

7

6

5

8

1

3

10

2

3

4

5

6

7

8

9

10

Park and Ride

Truck Parking

Tandem Truck Parking

Direct Tandem Truck Parking connections to and from the HEFT

Southbound HEFT to Westbound SR 836 direct connection

Eastbound SR 836 to Northbound HEFT direct connection

SR 836 Eastbound off-ramp to access Park and Ride

Exclusive Bus Only lane on Eastbound NW 12th Street for buses to access the on-ramp to Southbound HEFT and Eastbound SR 836

Exclusive Bus Only access into Dolphin Mall

Exclusive Bus Only lane for buses to access Westbound NW 12th Street

10

Alternative 4

HEFT

NW 25th Street

Dolphin Mall

9

Future NW 122

nd Avenue

SR 836 NW 12th Street

2

4

1 7

6

5

8

1

3

10

2

3

4

5

6

7

8

9

10

Park and Ride

Truck Parking

Tandem Truck Parking

Direct Tandem Truck Parking connections to and from the HEFT

Southbound HEFT to Westbound SR 836 direct connection

Eastbound SR 836 to Northbound HEFT direct connection

SR 836 Eastbound off-ramp to access Park and Ride

Exclusive Bus Only lane on Eastbound NW 12th Street for buses to access the on-ramp to Southbound HEFT and Eastbound SR 836

Exclusive Bus Only access into Dolphin Mall

Exclusive Bus Only lane for buses to access Westbound NW 12th Street

11

Next Steps

Prepare Final Recommendations and Documents