SUBMITTAL NUMBER: 12321302.00 OCPS CLAY SPRINGS ES SUBMITTAL ASSIGNMENT MEMO SUBMITTAL DETAILS: REVIEWERS: SUBJECT: MANUFACTURED CASEWORK - SAMPLES DATE RFI RECIEVED: Jan 07, 2015 DISCIPLINE: Architecture PRIMARY: DEVON TULLY [email protected] RICK DUNN [email protected] RHODES+BRITO ARCHITECTS INC. PHN: (407) 648-7288 FAX: RHODES+BRITO ARCHITECTS INC. PHN: (407) 648-7288 FAX: (407) 648-7289 SECONDARY: PRIORITY STATUS: 2-STANDARD REVIEWER DUE DATE: 1/19/2015 SPECIFICATION REF: 12 32 13 DWG REF. NONE DWG TITLE: REVIEW STATUS: THIS SUBMITTAL IS ISSUED TO YOU FOR YOUR REVIEW. PLEASE RESPOND AND RETURN...WITH THIS COMPLETED SAM TRANSMITTAL...TO MICHELE BUDAY-URDANETA NO LATER THAN: 1/19/2015. PLEASE COMPLETE REVIEW STATUS AT RIGHT SUBMITTAL CONTENTS: NO OF ITEMS: ITEM DESCRIPTION (please print) THIS SUBMITTAL WAS REVIEWED BY : RE-SUBMIT WITH ITEMS NOT REVIEWED REJECTED REVISE AND RESUBMIT FURNISHED AS MARKED REVIEWED COMMENTS: 7 SAMPLE(S) cc: OWNER : CALVIN WOOLFOLK 6501 MAGIC WAY, BLDG. 200 ORLANDO, FL, 32809 R+B FILE: : 13017-0001.X6 CONTR/CM: : WILLIAMS COMPANY : BRAD KUBIN 2301 SILVER STAR RD.

Upload: others

Post on 10-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OCPS CLAY SPRINGS ES SUBMITTAL ASSIGNMENT MEMO€¦ · ocps clay springs es submittal assignment memo submittal details: reviewers: subject: manufactured casework - samples date rfi

SUBMITTAL NUMBER: 12321302.00

OCPS CLAY SPRINGS ES SUBMITTAL ASSIGNMENT MEMO

SUBMITTAL DETAILS: REVIEWERS:

SUBJECT: MANUFACTURED CASEWORK -

SAMPLES

DATE RFI RECIEVED: Jan 07, 2015

DISCIPLINE: Architecture

PRIMARY: DEVON TULLY

[email protected]

RICK DUNN

[email protected]

RHODES+BRITO ARCHITECTS INC.

PHN: (407) 648-7288FAX:

RHODES+BRITO ARCHITECTS INC.

PHN: (407) 648-7288

FAX: (407) 648-7289

SECONDARY:

PRIORITY STATUS: 2-STANDARD

REVIEWER DUE DATE: 1/19/2015

SPECIFICATION REF: 12 32 13

DWG REF. NONE

DWG TITLE:

REVIEW STATUS:

THIS SUBMITTAL IS ISSUED TO YOU FOR YOUR REVIEW. PLEASE RESPOND AND RETURN...WITH THIS COMPLETED SAM TRANSMITTAL...TO MICHELE BUDAY-URDANETA NO LATER THAN: 1/19/2015. PLEASE COMPLETE REVIEW STATUS AT RIGHT

SUBMITTAL CONTENTS:

NO OF ITEMS: ITEM DESCRIPTION

(please print)THIS SUBMITTAL WAS REVIEWED BY :

RE-SUBMIT WITH ITEMS

NOT REVIEWED

REJECTED

REVISE AND RESUBMIT

FURNISHED AS MARKED

REVIEWED

COMMENTS:

7 SAMPLE(S)

cc:

OWNER : CALVIN WOOLFOLK

6501 MAGIC WAY, BLDG. 200

ORLANDO, FL, 32809

R+B FILE: : 13017-0001.X6CONTR/CM: : WILLIAMS COMPANY

: BRAD KUBIN

2301 SILVER STAR RD.

Page 2: OCPS CLAY SPRINGS ES SUBMITTAL ASSIGNMENT MEMO€¦ · ocps clay springs es submittal assignment memo submittal details: reviewers: subject: manufactured casework - samples date rfi

Submittal Approval Form

PROJECT: CLAY SPRINGS ELEMENTARY SCHOOL

DATE: __________________________ ______

SUBCONTRACTOR NAME: __

SUBCONTRATOR ADDRESS: ______________________________ ____

NUMBER AND TITLE OF SPECIFICATION SECTION:

Contractor’s Submittal Stamp Architect/ Engineer’s Submittal Stamp

c REVIEWED c REJECTED

c REVISE AND c FURNISHED AS

RESUBMIT CORRECTED

Corrections or comments made on the shop drawings

during this review do not relieve Subcontractor/Supplier

from compliance with requirements of the drawings and

specifications. This check is only for review of the

general conformance with the design of the project and

general compliance with the information given in the

contract documents. The Subcontractor/Supplier is

responsible for: Confirming and correlating all quantities

and dimensions; selecting fabrication processes and

techniques of construction.

WILLIAMS COMPANY BUILDING DIVISION

Date:

Trent Bonnett

Project Manager

SUBMITTAL REVIEW STAMP

Rhodes+Brito Architects, Inc.

Reviewed Submit Specified Items

Furnish as Marked Rejected

Revise and Resubmit Not Reviewed

This review is only for general conformance with the design concept and the information given in the Contract Documents. Corrections or comments made on shop drawings do not relieve the Contractor from compliance with the requirements of the plans and specifications. The Contractor is responsible for dimensions to be confirmed and correlated at the jobsite, methods, techniques, sequences, and procedures of construction; coordination of Work with other trades and performing all Work in a safe and satisfactory manner.

By: Date: Devon Tully 01/08/15

Page 3: OCPS CLAY SPRINGS ES SUBMITTAL ASSIGNMENT MEMO€¦ · ocps clay springs es submittal assignment memo submittal details: reviewers: subject: manufactured casework - samples date rfi
Page 4: OCPS CLAY SPRINGS ES SUBMITTAL ASSIGNMENT MEMO€¦ · ocps clay springs es submittal assignment memo submittal details: reviewers: subject: manufactured casework - samples date rfi

PL-1PL-2

PL-3

PL-4

PL-5

PL-6