CASE STUDY BACKGROUND Orea Resources LLP successfully tendered for the contract to recover redundant wheeled bins in part of a local authority area in the north west of England. Orea successfully completed the project within the specified period and to budget. THE PROCESS • Orea teams followed closely the council’s recycling crews • Empty bins loaded into 7.5t and 18t vehicles depending on area covered • Vehicles returned to central bulking point for unloading • Bins stockpiled and dismantled • Wheels and axles removed using wheel presses developed by JA Innovate Ltd • Dismantled bins loaded on to trailers and sent for recycling – 1,100 at a time THE REQUIREMENT • To gather in redundant wheeled bins from up to 47,000 households in a 150 square mile area • Orea teams had to shadow two council recycling collection crews Bins had to be recovered in a six week period •Bins had to be recycled THE RESULT • Over 25,000 bins recovered, dismantled and dispatched for recycling within the contract period • 150 tonnes of plastic generated for recycling • 25 tonnes of metal recycled • New approach to wheel removal used significantly reducing health and safety risks compared to traditional method CONTACT Paul Morgan E: [email protected] T: 07540 170877 Search for Orea Resources LLP on

Upload: paulemorgan

Post on 15-Apr-2017

121 views

Category:

Documents


1 download

TRANSCRIPT

CASE STUDY

BACKGROUND

Orea Resources LLP successfu l ly tendered for the contract to recover redundant wheeled bins in part of a local authori ty area in the north west of England. Orea successfully completed the project within the specified period and to budget.

THE PROCESS

• Orea teams followed closely the council’s recycling crews

• Empty bins loaded into 7.5t and 18t vehicles depending on area covered

• Vehicles returned to central bulking point for unloading

• Bins stockpiled and dismantled

• Wheels and axles removed using wheel presses developed by JA Innovate Ltd

• Dismantled bins loaded on to trailers and sent for recycling – 1,100 at a time

THE REQUIREMENT

• To gather in redundant wheeled bins from up to 47,000 households in a 150 square mile area

• Orea teams had to shadow two council recycling collection crews

• Bins had to be recovered in a six week period

•Bins had to be recycled

THE RESULT

• Over 25,000 bins recovered, dismantled and dispatched for recycling within the contract period

• 150 tonnes of plastic generated for recycling

• 25 tonnes of metal recycled

• New approach to wheel removal used significantly reducing health and safety risks compared to traditional method

CONTACT

Paul Morgan E: [email protected] T: 07540 170877 Search for Orea Resources LLP on