outages
DESCRIPTION
Outages. Outages. We have not been able to consolidate our outage postings to one OASIS site as planned We are working to address posting accuracy and outage path limits on the OATI OASIS - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/1.jpg)
Outages
![Page 2: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/2.jpg)
Outages• We have not been able to consolidate our
outage postings to one OASIS site as planned• We are working to address posting accuracy
and outage path limits on the OATI OASIS• While we work out the issues with OATI, the
legacy OASIS system is the system of record for outages on PacifiCorp’s transmission system
2
![Page 3: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/3.jpg)
Outage Postings on OASIS
Information on outages on PacifiCorp’s transmission system can be found here
on the OATI OASIS web site.
Information on outages on PacifiCorp’s transmission system can be found here
on the OATI OASIS web site.
3
![Page 4: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/4.jpg)
Outages Postings on OASIS• From the outage folder on the OATI OASIS
web page you can access information on current and future outages.
• Outage information can be accessed by using 3 links on the OATI OASIS web page:– Legacy OASIS outages– PPW Outages– Outage Planning Process
4
![Page 5: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/5.jpg)
Outage Posting on OASIS
Outages posted on the PacifiCorp Legacy OASIS
in the Legacy OASIS format.
Outages posted on the PacifiCorp Legacy OASIS
in the Legacy OASIS format.
Outages posted on the PacifiCorp OATI OASIS
in the OATI format.
Outages posted on the PacifiCorp OATI OASIS
in the OATI format.
Project management construction outages
and information.
Project management construction outages
and information.
5
![Page 6: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/6.jpg)
Outage Postings on OASIS• The system of record for outages is the Legacy
OASIS outage postings. • OATI OASIS outage postings are the same outages
as the in the legacy postings but due to issues we are having with the OATI formatting may not be accurate or confusing. Please refer to the Legacy OASIS postings.
• If you have questions concerning posted outages call Dean Pace at (503)251-5180
6
![Page 7: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/7.jpg)
Legacy Outage Postings
Line or equipmentLine or equipment
Path(s) impacted
and amount
de-rated.
Path(s) impacted
and amount
de-rated.
Path(s) impacted by outage
Path(s) impacted by outage
Path restrictions, notes and other outage information
Path restrictions, notes and other outage information
Reason for outage or work to be done.
Reason for outage or work to be done.
7
![Page 8: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/8.jpg)
OATI OASIS Postings
Line or equipmentLine or equipment
Path rating
change.
Path rating
change.
Path(s) impacted by outage
Path(s) impacted by outage Path restriction notes and other outage
information Path restriction notes and other outage
information
8
![Page 9: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/9.jpg)
Changes to OATI OASIS Postings• The ability to post all outages on OASIS• This will allow posting outages that do not affect paths.
• All Prescheduled and forced outages will be posted identically in all formats.
• Post outage dates and de-rates for the entire outage whether the outage is the most restrictive outage on the posted path.• This will reduce the number of dates and times of the outage which can
cause confusion.
• OATI software to determine which outage is most restrictive and reduce TTC accordingly.
9
![Page 10: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/10.jpg)
Outage Planning Process• Project Management will post construction
project outage plans weekly in the Outage Planning Process folder.
• Construction project outages affecting paths and generation are scheduled and posted on the Legacy, OATI outage and in the area subfolders of the Outage Planning Process folder.
10
![Page 11: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/11.jpg)
Outage Planning Process• Outages that do not affect path or generation
are scheduled and posted in the area subfolders of the Outage Planning Process folder.
• Information in these reports will contain, new outages, reasons for outages, and reasons for outage scheduling changes.
11
![Page 12: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/12.jpg)
Outage Planning Process
Click here to access information concerning outages related to major transmission projects
Click here to access information concerning outages related to major transmission projects
Selecting these links will access project management
outage reports and information.
Selecting these links will access project management
outage reports and information.
12
![Page 13: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/13.jpg)
Outage Planning Process• Example of a Outage Planning Process report.
13
![Page 14: Outages](https://reader034.vdocument.in/reader034/viewer/2022042718/568157df550346895dc55d74/html5/thumbnails/14.jpg)
Questions?????
14