outdoor lighting report · 2020. 9. 2. · date: 27 may 2020 designer: kimberly bartlett project...

9
DATE: 27 May 2020 DESIGNER: Kimberly Bartlett PROJECT No: 70067793-WSP-XX-BR-CA-E-1301 PROJECT NAME: Brill Place Existing Lighting Installation. Lighting Calculation deemed to be in accordance with the requirements of BS 5489-1:2013 & BS EN 13201-2:2015 Class P2. Required Levels: Achieved Levels: Eav = 10.0 to 15.00 Eav = 13.39 Emin = 2.0 Emin = 2.69 MF: 0.84 x 0.93 = 0.78 0.84 x 0.86 = 0.72 Existing equipment: 6m & 8m columns complete with bracket arms and functional luminaires. Equipment optics assumed based on LB Camden online inventory. (opendata.camden.gov.uk/ Environment/Camden-Street-Lighting/dfq 3-8wzu) Outdoor Lighting Report Designer: ................................................................................ Checked: ................................................................................ Approved: ............................................................................... PREPARED BY: WSP Unit 9 The Chase John Tate Road Foxholes Business Park Hertford SG13 7NN \\uk.wspgroup.com\central data\projects\700677xx\70067793 - brill place\02 wip\li lighting\01 model\70067793-wsp-xx-br-ca-e-1301.rtma

Upload: others

Post on 26-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • DATE: 27 May 2020DESIGNER: Kimberly BartlettPROJECT No: 70067793-WSP-XX-BR-CA-E-1301PROJECT NAME: Brill Place

    Existing Lighting Installation. Lighting Calculation deemed to be inaccordance with the requirements of BS 5489-1:2013 & BS EN13201-2:2015 Class P2.

    Required Levels: Achieved Levels:Eav = 10.0 to 15.00 Eav = 13.39Emin = 2.0 Emin = 2.69

    MF: 0.84 x 0.93 = 0.78 0.84 x 0.86 = 0.72

    Existing equipment: 6m & 8m columns complete with bracket armsand functional luminaires. Equipment optics assumed based on LBCamden online inventory.(opendata.camden.gov.uk/ Environment/Camden-Street-Lighting/dfq3-8wzu)

    Outdoor Lighting Report

    Designer: ................................................................................

    Checked: ................................................................................

    Approved: ...............................................................................

    PREPARED BY: WSPUnit 9 The ChaseJohn Tate RoadFoxholes Business ParkHertfordSG13 7NN

    \\uk.wspgroup.com\central data\projects\700677xx\70067793 - brill place\02 wip\li lighting\01 model\70067793-wsp-xx-br-ca-e-1301.rtma

  • DATE: 27 May 2020 DESIGNER:PROJECT No: 70067793-WSP-XX-BR-CA-E-1301PROJECT NAME:

    Kimberly Bartlett Brill Place

    7462328218

    Layout ReportGeneral DataDimensions in Metres Angles in DegreesGrid Origin 529774.4m x 183043.7mArea 204.5m x 125.8mSample Spacing 1.49m x 1.50m

    Luminaires

    Luminaire X Data Supplier

    Type

    Lamp(s)

    LampFlux(klm)/Colour

    File Name

    Maintenance Factor

    Imax70,80,90(cd/klm)

    No. in Project

    Philips

    2685 CNN-E#

    1 MT 90 10450 2800 PGZ12

    10.45 2800 / 70

    Arc 2685 CNN E# 1 MT 90 10450 2800 PGZ12.ldt

    0.78

    447.0, 68.0, 1.0

    6

    Luminaire Y Data Supplier

    Type

    Lamp(s)

    LampFlux(klm)/Colour

    File Name

    Maintenance Factor

    Imax70,80,90(cd/klm)

    No. in Project

    Philips

    2685 CNN-G#

    1 MT 60 6800 2800 PGZ12

    6.80 2800 / 70

    Arc 2685 CNN G# 1 MT 60 6800 2800 PGZ12.ldt

    0.72

    509.0, 83.0, 1.0

    2

    Layout

    ID Type X Y Height Angle Tilt Cant Out-

    reach

    Target

    X

    Target

    Y

    Target

    Z

    7 X 529818.29 183076.74 8.00 303.00 0.00 0.00 1.50

    6 X 529835.51 183088.11 8.00 303.00 0.00 0.00 1.50

    5 X 529849.25 183098.46 8.00 302.00 0.00 0.00 1.50

    4 X 529869.62 183111.91 8.00 303.00 0.00 0.00 1.50

    3 X 529892.38 183126.94 8.00 303.00 0.00 0.00 1.50

    2 X 529917.63 183143.37 8.00 303.00 0.00 0.00 1.50

    7 Y 529827.55 183106.14 6.00 32.00 0.00 0.00 0.50

    8 Y 529821.27 183136.10 6.00 210.00 0.00 0.00 0.50

    2

  • DATE: 27 May 2020 DESIGNER:PROJECT No: 70067793-WSP-XX-BR-CA-E-1301PROJECT NAME:

    Kimberly Bartlett Brill Place

    7462328218

    Horizontal Illuminance (lux)Grid 1

    6.56.46.39.49.79.39.08.7

    12 1313 1312 12129.913 15 1717 1817 1715 13

    8.91215 18 2022 2322 2017 145.67.310 1417 21 2427 2624 2016 13 9.4

    4.96.38.411 1520 24 2728 2622 1814 11 8.14.14.75.67.09.413 1722 25 2624 2117 1411 8.66.64.8

    4.44.85.56.57.91114 1821 23 2219 1512 9.27.36.04.83.75.25.35.55.96.67.69.11114 1718 18 1714 107.86.14.94.1

    6.86.96.96.97.38.09.010 1113 1414 14 129.67.05.34.23.59.69.89.69.49.39.29.39.810 11 1111 1111 10 8.96.75.03.9

    10 12 1314 1313 13 1312 1111 11 109.58.57.87.46.44.93.81114 16 1718 1818 17 1614 1211 10 9.38.06.85.85.24.5

    7.410 1316 19 2122 2322 20 1714 119.68.67.66.55.34.43.86.48.511 1519 22 2527 2624 20 1613 9.97.96.96.05.04.1

    4.95.77.29.613 1722 26 2828 2522 18 1411 8.46.45.34.53.85.15.76.58.11114 1924 26 2725 2117 14 119.17.05.14.13.42.9

    5.75.86.16.77.79.31216 2023 24 2319 1512 9.67.76.55.24.13.32.77.67.67.57.78.29.311 1317 1920 19 1814 118.16.55.44.53.83.2

    10 11 1110 1010 1011 12 1315 1616 15 1310 7.55.84.73.93.32.91314 15 1514 1414 1313 13 1313 1312 12 9.67.35.54.33.52.9

    1214 1718 19 1919 1918 1614 13 1211 9.58.88.47.15.54.33.42.710 12 1517 2022 24 2525 2320 1714 12 108.87.56.45.85.14.23.4

    1111 13 1720 2327 29 2928 2420 1613 9.98.26.95.84.94.23.73.21011 1213 15 1923 2730 31 2926 2218 1411 8.26.55.44.53.83.2

    9.711 1212 1315 17 2126 2930 29 2622 1815 129.36.75.24.23.53.01012 13 1415 1517 20 2326 2827 24 2016 1311 9.27.35.54.23.41315 17 1818 1921 23 2424 2422 18 1512 9.78.16.85.64.41619 21 2223 2424 24 2321 1917 14 118.77.26.15.14.3

    15 1922 25 2729 2826 23 2017 1513 9.98.06.55.44.69.51317 2126 29 3232 3025 20 1613 108.87.25.94.84.011 1419 2429 32 3330 2722 17 139.77.46.25.24.4

    9.812 1621 2630 31 2925 2117 13 107.75.64.53.814 1822 2627 26 2319 1512 9.47.55.84.416 1921 2222 21 1714 118.56.75.44.3

    1718 1817 16 1310.07.96.15.01414 1413 11 9.07.35.94.7

    10 9.48.97.96.55.46.55.95.44.74.74.1

    252525

    25

    2525

    25

    25

    25

    20

    20

    20

    2020

    20

    2020

    20

    2020

    1515

    15

    15

    15

    15

    15

    15

    15

    15

    15

    15

    15

    15

    15

    15

    1010

    10

    10

    10

    10

    10

    10

    10

    1010

    10

    10

    10

    10

    1010

    5.0

    5.0

    5.0

    5.0

    5.0

    5.0

    5.0

    5.0

    5.0

    5.0

    SC

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    SIGN

    BIN

    BIN

    BIN

    BIN

    PIPE

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POSTPOST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POSTPOSTPOST

    IC

    IC

    IC

    STUMP

    STUMP

    BUSH

    DP

    DP

    G 0 .6 m

    G 0 .6 m

    G 0 .6 m

    S 12 .0m

    G 0 .9 m

    S 12 .0m

    G 0 .9 m

    G 0 .9 m

    G 0 .9 m

    S 12 .0m

    G 0 .9 m

    G 0 .9 m

    S 12 .0m G 0 .9 m

    G 0 .9 m

    G 0 .9 mG 0 .9 m

    S 12 .0m

    S 14 .0m

    G 1 .3 m

    G 1 .3 m

    S 12 .0m

    G 1 .3 m

    G 1 .3 m

    G 1 .3 m

    G 1 .6 m

    G 1 .6 m

    S 10 .0m

    S 16 .0m

    S 20 .0m

    S 14 .0m

    G 1 .6 m

    G 1 .9 m

    G 1 .9 m

    G 1 .9 m

    G 1 .9 m

    S 12 .0m

    G 2 .2 m

    MH

    MH

    MH

    MH

    MH MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    SC

    SC

    SC

    SC

    SC

    SC

    SC

    SC

    SC

    SC

    SC

    FH

    FH

    IC

    IC

    IC

    IC

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    SIGN

    SIGN

    SIGN

    BOLBOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    WM

    IC

    IC

    IC

    IC

    IC

    IC

    IC

    CATV

    CATVCATVCATV

    CATV

    CATV

    CATV

    WO

    WOWO

    WO

    WO

    GU

    GU

    GU

    GU

    TELTEL

    TELTEL

    TEL

    TEL

    TEL

    TELTEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    DP

    DP

    G 0 .3 m

    S 3.0 m

    S 4.0 m

    G 0 .3 m

    G 0 .3 m

    G 0 .3 m

    G 0 .3 m

    G 0 .6 m

    G 0 .6 m

    G 1 .3 m

    G 1 .3 m

    G 1 .6 m

    BOL

    S 4.0 m

    S 4.0 m

    S 3.0 m

    S 4.0 m

    S 3.0 m

    G 0 .3 m

    G 0 .3 m

    S 4.0 m

    S 14 .0m

    S 12 .0m

    G 1 .3 m

    G 1 .6 mS 14 .0m

    S 14 .0m

    S 16 .0m

    S 12 .0m

    S 12 .0m

    S 16 .0m

    S 8.0 m

    S 8.0 mG 0 .6 m

    S 5.0 mS 20 .0m

    S 6.0 m

    S 6.0 m

    G 0 .9 m

    S 12 .0m

    S 12 .0m

    S 16 .0m

    S 12 .0m

    S 12 .0m

    G 0 .9 m

    G 0 .9 m

    S 12 .0m

    S 8.0 m

    G 1 .3 m

    S 12 .0mS 12 .0m

    G 0 .9 m

    G 0 .6 m

    S 20 .0m

    S 14 .0m

    G 1 .6 m

    G 1 .6 m

    G 1 .6 m

    S 14 .0m

    S 15 .0m

    G 1 .6 m

    S 12 .0m

    S 12 .0m

    G 1 .9 m

    S 12 .0m

    S 12 .0m

    S 2.0 m

    MH

    MHMH

    GU

    IC

    SIGN

    SIGN

    SIGN

    BOL

    BOL

    BOL

    BOL

    BOL

    BOLBOL

    BOL

    BOL

    BOL

    BOLBOL

    BOL

    BOL

    BOL

    BOL

    BOLBOL

    BOL

    IC

    IC

    IC

    IC

    IC

    IC

    IC

    ICIC

    IC

    SV

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    Cycle Way

    Sculpture

    19.4m

    7X

    6X

    5X

    4X

    3X

    2X

    7Y

    8Y

    183169.49m

    183043.73m

    529774.41m 529978.88m

    Results Eav

    Emin

    Emax

    Emin/Emax

    Emin/Eav

    13.39

    2.69

    32.59

    0.08

    0.20

    3

  • DATE: 27 May 2020DESIGNER: Kimberly BartlettPROJECT No: 70067793-WSP-XX-BR-CA-E-1302PROJECT NAME: Brill Place

    Proposed Lighting Design. Lighting Calculation in accordance withthe requirements of BS 5489-1:2013 & BS EN 13201-2:2015 ClassP2.

    Required Levels: Achieved Levels:Eav = 10.0 to 15.00 Eav = 13.83Emin = 2.0 Emin = 2.77

    MF: L0.90 x F0.1 x 0.92 = 0.83 0.84 x 0.86 = 0.72

    Proposed equipment: 8m column in NAL temporary 750mm surfaceconcrete foundation complete with 1.25m bracket arm and ASDHighway Diamond MAXI 92LED 600mA M2 optic luminaire. Re-heading of existing column 3 withASD Highway Diamond MAXI92LED 600mA M2 optic luminaire.

    Outdoor Lighting Report

    Designer: ................................................................................

    Checked: ................................................................................

    Approved: ...............................................................................

    PREPARED BY: WSPUnit 9 The ChaseJohn Tate RoadFoxholes Business ParkHertfordSG13 7NN

    \\uk.wspgroup.com\central data\projects\700677xx\70067793 - brill place\02 wip\li lighting\01 model\70067793-wsp-xx-br-ca-e-1302.rtma

  • DATE: 27 May 2020 DESIGNER:PROJECT No: 70067793-WSP-XX-BR-CA-E-1302PROJECT NAME:

    Kimberly Bartlett Brill Place

    7462328218

    Layout ReportGeneral DataDimensions in Metres Angles in DegreesGrid Origin 529774.4m x 183043.7mArea 204.5m x 125.8mSample Spacing 1.49m x 1.50m

    Luminaires

    Luminaire A Data Supplier

    Type

    Lamp(s)

    LampFlux(klm)/Colour

    File Name

    Maintenance Factor

    Lum. Int. Class

    No. in Project

    ASD Lighting

    HWD6-#4LED09260-M2 Osram Rev 1

    4000K Osram LED

    16.72 4000/72

    HWD6-#4K09260-M2 (167w).ldt

    0.83

    None

    2

    Luminaire X Data Supplier

    Type

    Lamp(s)

    LampFlux(klm)/Colour

    File Name

    Maintenance Factor

    Lum. Int. Class

    No. in Project

    Philips

    2685 CNN-E#

    1 MT 90 10450 2800 PGZ12

    10.45 2800 / 70

    Arc 2685 CNN E# 1 MT 90 10450 2800 PGZ12.ldt

    0.78

    G3

    3

    Luminaire Y Data Supplier

    Type

    Lamp(s)

    LampFlux(klm)/Colour

    File Name

    Maintenance Factor

    Lum. Int. Class

    No. in Project

    Philips

    2685 CNN-G#

    1 MT 60 6800 2800 PGZ12

    6.80 2800 / 70

    Arc 2685 CNN G# 1 MT 60 6800 2800 PGZ12.ldt

    0.72

    G3

    2

    Layout

    ID Type X Y Height Angle Tilt Cant Out-

    reach

    Target

    X

    Target

    Y

    Target

    Z

    7 X 529818.29 183076.74 8.00 303.00 0.00 0.00 1.50

    6 X 529835.51 183088.11 8.00 303.00 0.00 0.00 1.50

    5 A 529854.45 183107.54 8.75 302.00 0.00 0.00 1.50

    3 A 529892.38 183126.94 8.00 303.00 0.00 0.00 1.50

    2 X 529917.63 183143.37 8.00 303.00 0.00 0.00 1.50

    7 Y 529827.55 183106.14 6.00 32.00 0.00 0.00 0.50

    8 Y 529821.27 183136.10 6.00 210.00 0.00 0.00 0.50

    2

  • DATE: 27 May 2020 DESIGNER:PROJECT No: 70067793-WSP-XX-BR-CA-E-1302PROJECT NAME:

    Kimberly Bartlett Brill Place

    7462328218

    Horizontal Illuminance (lux)Grid 1

    1212 121516 1616 15

    18 2022 2220 18161619 23 2729 2925 2117 16

    14 1924 29 3335 3227 2218 169.81217 2229 34 3737 3227 2118 15 12

    9.411 1418 2430 34 3533 2924 2017 14 128.19.110 12 1418 2326 30 3028 2420 1815 13 1213

    9.510 1111 12 1417 1922 23 2322 1918 1715 14 12138.18.79.810 1111 12 1415 1618 19 1918 1817 1614 12

    7.57.98.08.28.89.510 11 1214 1516 16 1616 1615 13117.67.27.17.07.17.37.88.79.49.91011 1212 12 1314 1412

    9.18.27.56.96.76.56.56.87.28.08.79.19.49.59.910 12 1212 119.69.08.27.56.86.46.36.46.67.17.88.48.89.310 1213 13 12

    1211 9.78.88.27.56.86.46.46.77.07.48.08.79.71113 1616 1416 1312 108.98.07.36.96.77.07.37.88.38.99.811 1316 18

    2421 17 1412 118.77.87.37.37.88.28.69.09.49.811 12 141529 2622 18 1413 118.47.67.88.79.710 10 1010 1111 12 1212

    30 3130 2621 17 1513 9.88.18.19.711 1312 11 1110 9.910.09.89.42730 2927 2420 16 1411 9.28.510 1314 1413 11 9.99.38.58.0

    19 22 2526 2523 2017 15 1311 9.610.012 1414 1311 9.78.37.36.51517 19 2121 2119 1615 14 1311 1011 12 1211 108.67.26.0

    1213 1315 16 1717 1616 1515 13 1211 9.89.89.78.87.76.55.24.612 11 1112 1414 15 1516 1514 1414 12 119.38.48.17.05.74.73.7

    1211 11 1111 1213 13 1313 1314 1312 10 8.57.16.55.84.63.52.81111 1111 11 1111 1111 11 1212 1312 119.57.76.15.44.94.03.1

    10 11 1212 1212 12 1211 1212 12 1212 1211 9.27.35.85.04.33.62.81112 13 1414 1413 13 1313 1415 16 1513 129.97.86.25.04.03.31315 16 1717 1717 17 1616 1719 18 1613 118.46.34.83.81618 20 2121 2221 20 1918 1919 17 1411 8.05.94.53.5

    15 1821 24 2627 2624 22 2118 1716 14 117.55.24.09.71317 2125 28 3030 2825 21 1916 1412 9.77.04.83.511 1419 2428 31 3129 2623 19 1613 108.46.44.5

    10.013 1621 2629 30 2825 2118 15 1310 7.55.54.114 1822 2527 26 2219 1513 11 8.97.05.216 1921 2222 20 1714 119.07.46.04.6

    1718 1817 15 139.98.06.45.31514 1413 11 8.97.25.94.7

    10 9.49.07.96.45.36.66.05.44.64.84.2

    15

    15

    1515

    15

    15

    15

    15 1515

    1515

    15

    15

    1515

    15

    15

    10

    10

    1010

    10

    1010

    10

    10

    10

    10

    10

    2.0

    2.02.0

    2.0

    2.0

    2.0

    2.0

    2.0

    2.0

    2.0

    SC

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    SIGN

    BIN

    BIN

    BIN

    BIN

    PIPE

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POSTPOST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POSTPOSTPOST

    IC

    IC

    IC

    STUMP

    STUMP

    BUSH

    DP

    DP

    G 0 .6 m

    G 0 .6 m

    G 0 .6 m

    S 12 .0m

    G 0 .9 m

    S 12 .0m

    G 0 .9 m

    G 0 .9 m

    G 0 .9 m

    S 12 .0m

    G 0 .9 m

    G 0 .9 m

    S 12 .0m G 0 .9 m

    G 0 .9 m

    G 0 .9 mG 0 .9 m

    S 12 .0m

    S 14 .0m

    G 1 .3 m

    G 1 .3 m

    S 12 .0m

    G 1 .3 m

    G 1 .3 m

    G 1 .3 m

    G 1 .6 m

    G 1 .6 m

    S 10 .0m

    S 16 .0m

    S 20 .0m

    S 14 .0m

    G 1 .6 m

    G 1 .9 m

    G 1 .9 m

    G 1 .9 m

    G 1 .9 m

    S 12 .0m

    G 2 .2 m

    MH

    MH

    MH

    MH

    MH MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    SC

    SC

    SC

    SC

    SC

    SC

    SC

    SC

    SC

    SC

    SC

    FH

    FH

    IC

    IC

    IC

    IC

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    SIGN

    SIGN

    SIGN

    BOLBOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    WM

    IC

    IC

    IC

    IC

    IC

    IC

    IC

    CATV

    CATVCATVCATV

    CATV

    CATV

    CATV

    WO

    WOWO

    WO

    WO

    GU

    GU

    GU

    GU

    TELTEL

    TELTEL

    TEL

    TEL

    TEL

    TELTEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    DP

    DP

    G 0 .3 m

    S 3.0 m

    S 4.0 m

    G 0 .3 m

    G 0 .3 m

    G 0 .3 m

    G 0 .3 m

    G 0 .6 m

    G 0 .6 m

    G 1 .3 m

    G 1 .3 m

    G 1 .6 m

    BOL

    S 4.0 m

    S 4.0 m

    S 3.0 m

    S 4.0 m

    S 3.0 m

    G 0 .3 m

    G 0 .3 m

    S 4.0 m

    S 14 .0m

    S 12 .0m

    G 1 .3 m

    G 1 .6 mS 14 .0m

    S 14 .0m

    S 16 .0m

    S 12 .0m

    S 12 .0m

    S 16 .0m

    S 8.0 m

    S 8.0 mG 0 .6 m

    S 5.0 mS 20 .0m

    S 6.0 m

    S 6.0 m

    G 0 .9 m

    S 12 .0m

    S 12 .0m

    S 16 .0m

    S 12 .0m

    S 12 .0m

    G 0 .9 m

    G 0 .9 m

    S 12 .0m

    S 8.0 m

    G 1 .3 m

    S 12 .0mS 12 .0m

    G 0 .9 m

    G 0 .6 m

    S 20 .0m

    S 14 .0m

    G 1 .6 m

    G 1 .6 m

    G 1 .6 m

    S 14 .0m

    S 15 .0m

    G 1 .6 m

    S 12 .0m

    S 12 .0m

    G 1 .9 m

    S 12 .0m

    S 12 .0m

    S 2.0 m

    MH

    MHMH

    GU

    IC

    SIGN

    SIGN

    SIGN

    BOL

    BOL

    BOL

    BOL

    BOL

    BOLBOL

    BOL

    BOL

    BOL

    BOLBOL

    BOL

    BOL

    BOL

    BOL

    BOLBOL

    BOL

    IC

    IC

    IC

    IC

    IC

    IC

    IC

    ICIC

    IC

    SV

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    Cycle Way

    Sculpture

    19.4m

    7X

    6X

    5A

    3A

    2X

    7Y

    8Y

    183169.49m

    183043.73m

    529774.41m 529978.88m

    Results Eav

    Emin

    Emax

    Emin/Emax

    Emin/Eav

    13.83

    2.77

    37.05

    0.07

    0.20

    3

  • SC

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    SIGN

    BIN

    BIN

    BIN

    BIN

    PIPE

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    P

    O

    S

    T

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    POST

    ELEC

    IC

    IC

    IC

    IC

    STUMP

    STUMP

    STUMP

    BUSH

    DP

    DP

    G 0.3m

    G 0.6m

    G 0.6m

    G 0.6m

    S 12.0m

    G 0.9m

    G 0.9m

    G 0.9m

    G 0.9m

    S 12.0m

    G 0.9m

    G 0.9m

    G 0.9m

    S 10.0m

    G 0.9m

    G 0.9m

    S 12.0m

    G 0.9m

    G 0.9m

    S 12.0m

    G 0.9m

    G 0.9m

    G 0.9m

    G 0.9m

    S 12.0m

    S 14.0m

    S 14.0m

    G 1.3m

    G 1.3m

    S 12.0m

    G 1.3m

    G 1.3m

    G 1.3m

    G 1.6m

    G 1.6m

    G 1.6m

    G 1.6m

    S 10.0m

    S 16.0m

    S 20.0m

    S 14.0m

    G 1.6m

    G 1.9m

    G 1.9m

    G 1.9m

    G 1.9m

    S 12.0m

    G 2.2m

    MH

    MH

    MH

    MH

    MHMH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    MH

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    SC

    SC

    SC

    SC

    SC

    SC

    SC

    SC

    FH

    FH

    IC

    IC

    IC

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    LP

    SIGN

    SIGN

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    WM

    IC

    IC

    IC

    IC

    IC

    IC

    IC

    CATV

    CATV

    CATV

    CATV

    CATV

    CATV

    WO

    WO

    WO

    WO

    WO

    GU

    GU

    GU

    GU

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    TEL

    DP

    DP

    G 0.3m

    S 3.0m

    S 4.0m

    G 0.3m

    G 0.6m

    G 1.6m

    S 3.0m

    G 0.3m

    G 0.3m

    S 4.0m

    S 15.0m

    S 15.0m

    G 1.3m

    S 14.0m

    S 12.0m

    G 1.3m

    G 1.6m

    S 14.0m

    S 14.0m

    S 16.0m

    S 12.0m

    S 12.0m

    S 16.0m

    S 8.0m

    S 8.0m

    G 0.6m

    S 5.0m

    S 20.0m

    S 6.0m

    S 6.0m

    G 0.9m

    S 12.0m

    S 12.0m

    S 16.0m

    S 4.0m

    S 15.0m

    S 14.0m

    S 14.0m

    S 12.0m

    G 1.3m

    S 12.0m

    G 0.9m

    S 12.0m

    S 12.0m

    G 0.9m

    S 10.0m

    G 0.9m

    S 12.0m

    S 8.0m

    G 1.3m

    S 12.0m

    S 12.0m

    G 0.9m

    G 0.6m

    S 20.0m

    S 14.0m

    G 1.6m

    G 1.6m

    G 1.6m

    S 14.0m

    S 15.0m

    G 1.6m

    S 12.0m

    S 12.0m

    G 1.9m

    S 2.0m

    MH

    MH

    MH

    GU

    SIGN

    SIGN

    SIGN

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    BOL

    IC

    IC

    IC

    IC

    IC

    IC

    IC

    SV

    GU

    GU

    GU

    GU

    GU

    GU

    GU

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    PFL

    Sculpture

    N

    E

    V

    I

    L

    L

    E

    C

    L

    O

    S

    E

    M

    I

    D

    L

    A

    N

    D

    R

    O

    A

    D

    EC03

    DNOX/T12

    COLUMN

    NC05

    PRIV/T8

    COLUMN

    EC04

    DNOD

    COLUMN

    EC05

    DNOD

    COLUMN

    S3 - FOR REVIEW

    wsp.com

    WSP House, 70 Chancery Lane, London, WC2A 1AF, UK

    T+ 44 (0) 207 314 5000, F+ 44 (0) 207 314 5111

    DO NOT SCALE

    APPROVED:

    DRAWING No:

    PROJECT No:

    SCALE @ A3:

    TITLE:

    PROJECT:

    DESIGNED:

    CHECKED:

    DATE:

    REV:

    ARCHITECT:

    CLIENT:

    DRAWING STATUS:

    File

    n

    am

    e \\U

    K.W

    SP

    GR

    OU

    P.C

    OM

    \C

    EN

    TR

    AL

    D

    AT

    A\P

    RO

    JE

    CT

    S\7

    00

    67

    7X

    X\7

    00

    67

    79

    3 - B

    RIL

    L P

    LA

    CE

    \0

    2 W

    IP

    \L

    I L

    IG

    HT

    IN

    G\0

    2 D

    RA

    WIN

    G\7

    00

    67

    79

    3-W

    SP

    -X

    X-B

    R-D

    R-E

    -1

    30

    1.D

    WG

    , p

    rin

    te

    d o

    n 2

    9 M

    ay 2

    02

    0 1

    3:1

    1:2

    6, b

    y B

    artle

    tt, K

    im

    be

    rly

    DRAWN:

    WSP UK Ltd

    c

    70067793

    70067793-WSP-XX-BR-DR-E-1301 P01

    BRILL PLACE

    LBS PROPERTIES LTD

    1:500 PT PJB

    KB May 20KB

    TEMPORARY HIGHWAY LIGHTING WORKS

    DURING BASEMENT WORKS PHASE

    Reproduced from the Ordnance Survey map

    with the permission of the Controller of Her

    Majesty's Stationery Office. Licence no.

    100048755. Crown copyright reserved.

    RHINO BARRIERS FOR PIT LANE

    2.4m SOLID HOARDING

    TREE PROTECTION (FENCING)

    EXISTING 8m COLUMN AND LUMINAIRE TO BE

    REMOVED TO CONTRACTORS OFF SITE RECYCLING

    FACILITY.

    EXISTING COLUMN TO REMAIN. EXISTING

    LUMINAIRE TO BE REMOVED TO CONTRACTORS OFF

    SITE RECYCLING FACILITY AND REPLACED WITH

    TYPE A LANTERN.

    PROPOSED 8m TEMPORARY ROAD LIGHTING

    COLUMN WITH TYPE A ASD HIGHWAY DIAMOND MIDI

    LUMINAIRE COMPLETE WITH 7 PIN NEMA SOCKET.

    OUTREACH BRACKET ARM: 1.25m

    LAMP: 92LED 600mA 4000K 16.72klm

    OPTIC SETTING: M2

    CONTROL GEAR: INTEGRAL ELECTRONIC

    ISOLATION: SECONDARY ISOLATOR FITTED WITH

    BS88 FUSE

    SWITCHING: LB CAMDEN SPECIFICATION

    FOUNDATIONS: NAL 750mm TEMPORARY

    CONCRETE FOUNDATION.

    KEY:

    EXISTING COLUMN TO REMAIN IN SITU.

    ELECTRICAL SUPPLY ABBREVIATIONS.

    NC - NEW COLUMN

    EC - EXISTING COLUMN

    DNO - DISTRIBUTION NETWORK OPERATOR

    DNOD - PERMANENT DISCONNECTION

    DNOX - NO DNO WORKS REQUIRED

    PRIV - PRIVATE SUPPLY

    NOTES:

    1. CONTRACTOR TO LIAISE WITH DISTRIBUTION

    NETWORK OPERATOR PRIOR TO

    COMMENCEMENT OF WORKS.

    2. CURRENT STATS DRAWING TO BE OBTAINED BY

    CONTRACTOR PRIOR TO COMMENCEMENT OF

    WORKS.

    3. ALL EXISTING EQUIPMENT TO BE MADE

    ELECTRICALLY SAFE PRIOR TO

    COMMENCEMENT OF WORKS.

    4. ALL ELECTRICAL WORKS TO BE CARRIED OUT IN

    ACCORDANCE WITH BS7671 IET WIRING

    REGULATIONS.

    5. RE-USE OF EXISTING COLUMN 3 IS SUBJECT TO

    SATISFACTORY STRUCTURAL TESTING

    RESULTS. SHOULD THESE RESULTS NOT BE

    SATISFACTORY, APPROVAL SHOULD BE

    SOUGHT FROM LB CAMDEN FOR A REDUCTION

    IN LIGHTING LEVELS THROUGH USE OF THE

    EXISTING LUMINAIRE.

    6. ELECTRICAL SUPPLY DESIGN TO BE

    UNDERTAKEN BY OTHERS.

    7. INSTALLATION AND MAINTENANCE DETAILS FOR

    THE TEMPORARY CONCRETE BLOCK

    FOUNDATION ARE TO BE SOUGHT FROM THE

    MANUFACTURER PRIOR TO COMMENCEMENT

    OF WORKS:

    BEN PARSONS - NAL LTD

    WEIR LANE, WORCESTER, WR2 4AY.

    PHONE: 01905 427 100. FAX: 01905 427 030

    EMAIL: [email protected]

    - EQUIPMENT TYPE

    - MAINTENANCE NUMBER

    - CONNECTION TYPE, ACTION REQUIRED/

    TERMINATION TYPE

    PROPOSED EQUIPMENT ATTRIBUTE BOX:

    COLUMN

    NC00

    DNOC/T12

    INDICATES A RESIDUAL RISK REQUIRING A

    COMPULSORY ACTION

    INDICATES A RESIDUAL RISK FOR INFORMATION

    INDICATES A RESIDUAL RISK REQUIRING A

    PROHIBITIVE ACTION

    INDICATES A RESIDUAL RISK AS A WARNING

    HEALTH AND SAFETY SYMBOLS LEGEND

    STATUTORY UNDERTAKERS PLANS NOT AVAILABLE AT

    TIME OF DESIGN. CONTRACTOR TO ENSURE AVAILABILITY

    OF CURRENT STATS PRIOR TO COMMENCEMENT OF

    WORKS

    PRIVATE CABLE NETWORK TO BE DESIGNED BY OTHERS.

    ELECTRICAL DESIGN REQUIRES EARLY CONTRACTOR

    INVOLVEMENT PRIOR TO COMMENCEMENT OF WORKS, TO

    CONFIRM ORIGIN AND ROUTE OF ELECTRICAL SUPPLIES.

  • LANTERN & BRACKET LOCATION SCHEDULE

    GENERAL BRACKET LANTERN LAMP

    SWITCHING SUPPLY

    CO-ORDINATES

    MISCELLANEOUS

    SCHEME

    REF

    MANUFACTURER

    /REF

    MATERIAL

    MOUNTING

    HEIGHT

    COLUMN

    SECTION /

    TYPE

    FOUNDATION DETAIL TYPE COLOUR PROJECTION INCLINATION MANUFACTURER

    CATEGORY NO /

    NAME

    OPTIC SETTING CONTROL GEAR TILT TYPE

    WATTAGE/

    klm

    EASTING NORTHING

    EC03 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING ASD

    HIGHWAY

    DIAMOND MIDI

    M2

    INTEGRAL

    ELECTRONIC DALI

    92 LED

    600mA

    4000K CCT

    167W

    (16.72klm)

    SWITCHED TO LB

    CAMDEN

    SPECIFICATION

    DNOX/T12 EXISTING EXISTING

    TO BE INSTALLED AS PER

    CONTRACT DRAWINGS

    NC05 TBC

    TUBULAR

    STEEL

    8m

    TUBULAR

    STEEL

    NAL TEMPORARY 750mm

    CONCRETE BLOCK

    FOUNDATION

    SINGLE N/A 1.25m N/A ASD

    HIGHWAY

    DIAMOND MIDI

    M2

    INTEGRAL

    ELECTRONIC DALI

    92 LED

    600mA

    4000K CCT

    167W

    (16.72klm)

    SWITCHED TO LB

    CAMDEN

    SPECIFICATION

    PRIV/T8 529854.416 183107.560

    TO BE INSTALLED AS PER

    CONTRACT DRAWINGS

    S3 - FOR REVIEW

    wsp.com

    WSP House, 70 Chancery Lane, London, WC2A 1AF, UK

    T+ 44 (0) 207 314 5000, F+ 44 (0) 207 314 5111

    DO NOT SCALE

    APPROVED:

    DRAWING No:

    PROJECT No:

    SCALE @ A3:

    TITLE:

    PROJECT:

    DESIGNED:

    CHECKED:

    DATE:

    REV:

    ARCHITECT:

    CLIENT:

    DRAWING STATUS:

    File

    n

    am

    e C

    :\U

    SE

    RS

    \U

    KK

    CB

    00

    2\O

    NE

    DR

    IV

    E - W

    SP

    O

    36

    5\B

    RIL

    L P

    LA

    CE

    \7

    00

    67

    79

    3-W

    SP

    -X

    X-B

    R-D

    R-E

    -1

    40

    1.D

    WG

    , p

    rin

    te

    d o

    n 2

    8 M

    ay 2

    02

    0 1

    3:0

    5:1

    3, b

    y B

    artle

    tt, K

    im

    be

    rly

    DRAWN:

    WSP UK Ltd

    c

    70067793

    70067793-WSP-XX-BR-DR-E-1401 P01

    BRILL PLACE

    LBS PROPERTIES LTD

    Custom PT PJB

    KB May 20KB

    TEMPORARY HIGHWAY LIGHTING WORKS

    COLUMN SCHEDULE & TERMINATION DETAILS

    DURING BASEMENT WORKS PHASE

    Reproduced from the Ordnance Survey map

    with the permission of the Controller of Her

    Majesty's Stationery Office. Licence no.

    100048755. Crown copyright reserved.

    ELECTRICAL SUPPLY ABBREVIATIONS.

    NC - NEW COLUMN

    EC - EXISTING COLUMN

    DNO - DISTRIBUTION NETWORK OPERATOR

    DNOD - PERMANENT DISCONNECTION

    DNOX - NO DNO WORKS REQUIRED

    PRIV - PRIVATE SUPPLY

    NOTES:

    1. CONTRACTOR TO LIAISE WITH DISTRIBUTION NETWORK

    OPERATOR PRIOR TO COMMENCEMENT OF WORKS.

    2. ALL EXISTING EQUIPMENT TO BE MADE ELECTRICALLY

    SAFE PRIOR TO COMMENCEMENT OF WORKS.

    3. ALL ELECTRICAL WORKS TO BE CARRIED OUT IN

    ACCORDANCE WITH BS7671 IET WIRING REGULATIONS.

    4. ELECTRICAL SUPPLY DESIGN TO BE UNDERTAKEN BY

    OTHERS.

    5. INSTALLATION AND MAINTENANCE DETAILS FOR THE

    TEMPORARY CONCRETE BLOCK FOUNDATION ARE TO BE

    SOUGHT FROM THE MANUFACTURER PRIOR TO

    COMMENCEMENT OF WORKS.

  • Project No 70067793 Project Name

    Ref Risk Category*

    & Phase where appropriate,

    e.g. location/environment,

    construction, operation, maintenance,

    alteration/demolition

    Work Element/Location

    (where appropriate)

    Hazard or Risk Issue Identified Risk Management

    Owner

    Design ERIc Action Required

    (e.g. hazard elimination/risk mitigation action, information to

    be provided to others)

    Significant Temporary Works

    Requirements/Management Arrangements and/or

    any Special Erection/Installation Sequences or

    Requirements

    Design Action Status/Final Resolution Notes

    (e.g. traceability of ERIc action, communication of

    significant residual risk, critical design criteria, etc. )

    Significant

    Residual Risk§

    Date Logged/

    Reviewed

    Raised By

    001 Construction, maintenance,

    demolition

    Lantern installation Working at height - 'topping out' columns with

    lanterns

    Contractor removal of columns not possible, raise and lower columns

    not appropriate for temporary installation. Standard

    columns and MEWP access only reasonable solution for

    scheme.

    none Closed. Working at height for this type of work is

    standard procedure for contractors working on street

    lighting columns. Risk is mitigated through trained

    and competent MEWP operators, clipping on, use of

    lanyards and torqued helmets.

    No 28/05/2020 K Bartlett

    002 Location All Potential disruption/nuisance affecting the genetic

    research facility, The Crick Institute on adjacent site

    Lead Designer Reduce construction activities likely to disrupt operation of

    facility, designing positions on the oppostie side othe road

    only.

    Initial design review carried out with design team.

    Further regular design reviews planned to review

    issues. No outstanding issues currently to be

    addressed

    No 28/05/2020 K Bartlett

    003 Working adjacent to live traffic location works are on public highway, adjacent to live traffic

    and construction vehicles at all times.

    Contractor road closure ideal scenario however not possible due to

    emergency routes, proximity to St Pancras International

    station and live construction site.

    Pit Lane in use and full site hoarding. Closed. Risk already mitigated in contractors design

    and highway pit lane design by others.

    No 28/05/2020 K Bartlett

    004 Construction, maintenance,

    demolition

    Column installation risk of electrocution whilst connecting temporary

    supply to temporary column.

    Electrical Engineer Electrical design undertaken by others and managed by the

    contractor. Reasonable risk mitigration provided on dwgs

    stating design to be to BS7671 and liaison with DNO required

    prior to commnecmenet of works.

    Early contractor involvement required by electrical

    designer to verify source of supply for temporary

    lighting. Earthing electrodes may be required for

    the temporary installation.

    Closed. Notes provided on dwgs. No 28/05/2020 K Bartlett

    005 Construction, maintenance,

    demolition

    Temporary foundation Risk of damage to foundation, crushing injuries during

    install and removal

    Contractor contractor to work with the foundation supplier and meet all

    requiredment laid down by same. Note and contact details

    for foundation manufacturer provided on 1301 dwg.

    none Closed. Notes provided on dwgs. No 28/05/2020 K Bartlett

    Issue 3.0Copy rows then insert above this line to ensure formula are copied

    BMS: Project Delivery

    T446: Design Risk Management Schedule Brill Place

    Guidance Notes (see guidance notes page for more details)Design risk management should be an integral part of the overall design development and designers should think of it in terms of considering constructability, maintainability, etc. Designers only need to document their consideration of risks in this simple risk register format. There is no requirement for quantative design risk assessments to be carried out/documented and these should be avoided

    * Risks should be considered in a logical sequence relating to the location/operational environment, constructability/installability, operability (normal/emergency), maintainability (inc routine cleaning, replacement, etc.), and alteration/decommissioning/dismantling/demolition, and should be categorised against those headings,

    CIRIA guidance documents C755, C756, C686, C607 etc. provide a useful checklist and detailed guidance on the identification of risks to be considered during design and how those risks might be addressed - see detailed guidance notes for more details§ Significant residual risks are those which are unusual, not obvious, difficult to manage, or where critical design assumptions apply. The documentation by designers of residual risks that cover well-known and understood hazards should be avoided.

    T446 Design Risk Management Schedule Page 1 of 1

    2020-05-29T11:08:46+0100Bartlett, KimberlyDESIGNER

    2020-05-29T14:20:57+0100Tearse, PeterChecker

    2020-06-01T12:13:50+0100Batchelor, Paul (UKPJB004)Approved

    2020-05-29T11:18:04+0100Bartlett, KimberlyDESIGNER

    2020-05-29T14:19:48+0100Tearse, PeterChecker

    2020-06-01T12:15:43+0100Batchelor, Paul (UKPJB004)Approved

    2020-05-29T13:14:52+0100Bartlett, KimberlyDESIGNER

    2020-05-29T14:23:55+0100Tearse, PeterChecker

    2020-06-01T12:36:36+0100Batchelor, Paul (UKPJB004)Approved

    2020-05-28T13:06:26+0100Bartlett, KimberlyDESIGNER

    2020-05-29T14:24:37+0100Tearse, PeterChecker

    2020-06-01T12:38:39+0100Batchelor, Paul (UKPJB004)Approved