over 40 years alongside major engineering - castim · pdf file · 2015-07-23over 40...
TRANSCRIPT
1
Over 40 years alongside major engineering
companies
Since 1972
Company background Our Products Our Market and Customers Ca.S.T.Im 2000 - Main Data and Facilities,
Process Control and Quality Pedigree
COMPANY OVERVIEW
2
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
The company, originally established as a manufacturer of metallic carpentry in 1972, gained, over the years, Engineering andManufacturing experience that led to become today one of the leading manufacturer of components for the Petrochemical, Refiningand Power Generation Industry.Thanks to a constant and continuous efforts as well as cooperation with leading domestic and foreign Engineering Firms, thecompany offers its customers competence and experience to manufacture products such as:
Pipe Supports and Spring Hangers Shell & Tube Heat Exchangers Atmospheric and Pressure Vessels Chemicals Dosing Units for Refining, Petrochemical and Power Gen. Industry Water Demineralization and Water treatment Units
In 2000, further to a change in the corporate structure, Ca.S.T.Im.2000 S.r.l. was established, keeping all the know-how, technologyand expertise of the existing company, as well as the original mission to operate with the same commitment and dedication thathave always characterized the company.We believe that responsive and accessible customer support is what makes the difference between simply providing the product and provide solutions.
Ca.S.T.Im.2000 stands for Reliability Credibility
Technologies Applications Services
Achieved through
COMPANY BACKGROUND
3
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
OUR PRODUCTS
SHELL & TUBES HEAT EXCHANGERS PIPE SUPPORTS & SPRING HANGERS
ATMOSPHERIC and PRESSURE VESSELS PROCESS UNITS 4
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
Ca.S.T.Im2000 manufacture a comprehensive range of Standard and Special Pipe Supports for the power generation, petrochemical and process industries. Spring Supports are used for supporting piping and related components which are subject to thermal expansion, consequently movements. For minor vertical travels the Variable Load Support is normally used, whereas the Constant Load Support is used for greater thermal expansion movements. Both types of Spring Supports are manufactured in standard carbon steel, but low temperature and stainless steel materials are also available for special
environmental conditions. A wide range of surface protection coatings is also available.
THE RANGE OF PIPE SUPPORTS AND ANCILLARIES AVAILABLE:
Spring Hangers :
Pre-Insulated pipe supports: Cryogenic shoes Hot shoes
PIPE SUPPORTS AND ANCILLARIES
Constant Load Spring Hanger
Variable Load Spring Hanger
5
Variable Spring support
Constant Spring support
Cryogenic pipe support
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
Roll support
Rigid Struts
THE RANGE OF PIPE SUPPORTS AND ANCILLARIES
AVAILABLE:
Pipe Hanger Hardware: Pipe Clamps Turnbuckles Tie-Rods Forged Steel Clevis Forged Eye Nuts U-Bolts
Dynamic Components:
Snubbers Sway Brace Rigid Struts Dynamic Collars
Slide Plate (Bearing)
Engineered Products
Pipe Roller support
Double load VariableSpring Hanger
Long travel multi springhanger for furnaces
Special Installations
Sliding Plates
6
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
HOT DEEP GALVANIZED VARIABLE LOAD SPRING SUPPORT
VARIABLE LOAD SPRING SUPPORT WITH DOUBLE LOAD SETTING VERSION
FEW SPECIAL SPRING HANGER and SUPPORT
SOLUTIONS
7
VARIABLE SPRING HANGER FOR CATALYST TUBES
“DYNAMIC ” SUPPORT COLLAR
ACUSTIC ATTENUATION PADS
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
SHELL & TUBE HEAT EXCHANGERSCa.S.T.Im 2000 manufacture shell and tube heat exchangers inaccordance with international codes as TEMA, ASTM straighthorizontal tube type, TEMA mod. CEN type, ASME “U” Stamp, aswell as BEU, AEL and so forth.
8
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
ATMOSPHERIC AND PRESSURE VESSELSCa.S.T.Im 2000 manufacture atmosphericand pressure vessels in accordance withASME “U” stamp , ASTM, PED.
9
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
CHEMICAL INJECTION UNITThis plant doses chemical reagents into themain process cycle of each section withcombined cycle in thermal power plant.Ammonia, Diluted deoxygenating solution,preserving and concentrated reagents andphosphate.
DEMINERALIZATION UNITThe plant is suitable for the treatment ofindustrial waters having specific chemical-physical design features and delivers therequested capacity of demineralized water
Ca.S.T.Im 2000 register a wideexperience in the design andmanufacture of skid mounted Chemicalinjection and Demineralization units
COOLING SYSTEM for “BLOW DOWN” WATER
CHEMICAL INJECTION SKID FOR BOILER WATER
SUPPLY UNIT 10
CHEMICAL DOSING UNITHOT WATER PRODUCTION UNIT
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
11
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
12
Castim2000 srl has sales offices and agents around the world. These offices will be pleased to help with any commercial and
technical matters.
HEADQUARTER AND REGIONAL SALES CONTACTS :
BrazilVenezuelaColumbia
Equador
FranceSpainUKBeneluxRomaniaRussia
UAEKuwait
S. Arabia
IndiaMalaysiaSingapore
Korea
Ca.S.T.Im 2000 S.r.l. Headquarter Regione Mombello 612040 VEZZA D'ALBA (CN) ITALYMr. Dario Vico – Technical DirectorTel. +39 0173 65137Fax +39 0173 [email protected]
Ca.S.T.Im 2000 srl SALES NETWORK SALES Division Office in ROMEVia Sacco Pastore 2300141 ROMA - RM ITALYTel. +39 06 86207672Sig. Renato Porcelli – Sales Mgr.+39 335 [email protected]
TRADE OFFICE IN MILANMr. Marco Gentile – Area Sales Mgr.+39 335 [email protected]
SALES Back OfficeMrs. Rossella Sugliano – Inside Sales Rep.Tel. +39 0173 [email protected]
EXPORT SALES (Head office)Mr. Ernesto Cerrato –Exp. Area Mgr.Mobile +39 388 [email protected]
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
13
LUMMUS HEAT TRANSFER TEC.
OUR MAIN CUSTOMERS
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
14
FUNCTIONAL CHARTBoard of Directors
Managing Director
General Manager
ADMIN Manager
HR Admin
Finance
General Ledger
Engineering Mgr.
UTI- Eng.
Plants & Vessels
ON-SITE
SERVICE
UTS - Eng.
Pipe Supports
Purchasing
Manager
Purchasing
Plants & Vessels
Purchasing
Pipe Supports
Sales
Manager
Domestic
Sales Mgr.
Regional
Area Mgrs
Export Mgr.
Sales
Net-work
Back office
Rep.
Production MGR
Production
Plants & Vessels
Production Pipe Supports
Project Management
HSE Mgr Quality Mgr.
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
PRODUCTION FACILITIES
PRESSURE VESSELS and PACKAGE PRODUCTS
Headquarter & Manufacturing Plant in Vezza d’Alba (CN)4980 Sqmt
Manuf.Area Total Area
15200 Sqmt
CANOVE Manufacturing Plant in CANOVE di Govone (CN)
PIPE SUPPORTS and SPRING HANGERS3000 Sqmt 10000 Sqmt
15
TOTAL NUMBER OF EMPLOYEES 50-100
TURNOVER (LAST 3 YEARS) 2011 10.300 K€
2012 9.600 K€
2013 10.500 K€
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
SNAP SHOT OF THE VESSELS &
HEAT EXCHANGERS FABRICATION in
VEZZA d’ALBA (CN)
16
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
17
WELDING DEPT. - WELDING ON
AUTOMATIC POSITIONERS
WARE HOUSE
HOT MOLDING DEPT. AUTOMATIC PAINTING LINE
SNAP SHOT OF THE PIPE SUPPORTS &
SPRING HANGERS FABRICATION at
CANOVE di GOVONE(CN)
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
18
Max size through the plant Diam. 4500 mm Width 20.000 mm Weight 35 Tons
TESTS CARRIED OUT IN HOUSE : DYE PENETRANTS MAGNETIC PARTICLES THICKNESS TEST MATERIAL HARDWARE
RADIOGRAFIC TESTS (X AND GAMMA RAYS), ULTRASONIC TESTS AND THE TECHNOLOGICAL TESTS ARE CARRIED OUT BY EXTERNALQUALIFIED COMPANIES AND LABORATORIES.
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
Our engineers are responsible for Technical Support, Pipe Support Design, Heat Exchangers , Vessels and Package Engineering and Product Development. A team of experienced engineers are available to carry out Stress Analysis
Automated drawings per typesupports
Technical Proposals Detailed lists of materials Automated drawing revisions
19
2D/3D CAD design – A net of 3 latest release AUTOCAD work station with Mechanical Desktop and Inventor 3D and 3 PCs are used to provide:
A net of 3 PC equipped with: Thermal Design Calculation to HEI std. Mechanical design software STEMEC (by Sant’ Ambrogio) Mechanical Calculation software to ASME VIII div 1&2,
EN13445, VSR, TEMA, WRC, ZICK ( by Sant’ Ambrogio)and 4 latest release Autocad work station with MechanicalDesktop and Inventor 3D
Preliminary mechanical design Thermal Design Calculation Technical Proposals Mechanical Calculation Construction Drawings
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
Our engineers are responsible for Technical Support,Pipe Support Design and Product Development.A team of experienced engineers are available tocarry out Stress Analysis and Site Inspection Surveys.
2D/3D CAD design - A net of 3 latest release AUTOCAD work stations equipped with MECHANICAL DESKTOP and INVENTOR 3D is used to provide :
Automated drawings of standard component type supports using local calculations andindustrial tables of standards.
Automated drawings with detailed lists of materials, job instructions and material specificationsas applicable.
Automated drawing revisions to incorporate minor design changes and have a quick responsefor major design revisions as well.
The majority of the customer normally carry out stress analysis as a part of their engineering work, Ca.S.T.Im 2000 srl can provide Pipe Stress Analysis service, if required, on an ad-hoc basis .
SPRING HANGERS & SUPPORTS ENGINEERING
20
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
21
PROPOSAL MANAGEMENT
HEAT EXCHANGERS
1 - Customer technical specification analysis a. Condition Case Design
b. Operating conditions to be ensured
2 - Thermal Design Calculation according to HEI standards
3 - Preventive mechanical design of the heat exchanger through software called STEMEC (by Sant’Ambrogio)
4 – Technical proposal complete of:a. Thermal data sheet
b. Layout drawingc. Technical Description
5 – Economical Proposal
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
22
HEAT EXCHANGERS
PROPOSAL MANAGEMENT - From Customer technical specification:
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
23
PROPOSAL MANAGEMENT - To Thermal data sheet and layout drawing
HEAT EXCHANGERS
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
24
PROJECT MANAGEMENT
HEAT EXCHANGERS
1 - Designa. Mechanical Calculation according to ASME VIII div 1/div 2, EN13445, VSR, TEMA, WRC, ZICK. (software Sant’Ambrogio)
b. 2D/3D Autocad Construction Drawingsc. Quality Documents (ITP, WPS,PQR)
2 – Purchase Material
4 – Hydrostatic or Pneumatic Test
5 – Shipping
6 – On site supervision during commissioning
3 – Fabrication
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
25
PROJECT MANAGEMENTFrom Calculation Design
HEAT EXCHANGERS
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
26
PROJECT MANAGEMENTTo Construction and erection Supervision
HEAT EXCHANGERS
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
To meet the increased demand for service requests and technology, Ca.S.T.Im 2000 srl offer a comprehensive assistance service in a number of areas involving pipe supports and piping, along with a series of inspection techniques.
Check supporting points on site through the verification of technical documentation like data sheets, plans of theplant and calculations of stress analysis of the plant/pipeline in possession of the customer.
Inspection of pipe supports including regular and periodic inspection along with trouble-shooting of uniqueproblems associated with operating occurrences.
Propose improving actions after the inspection, like load regulation on site, repainting on site or at our factory,partial or total replacement of the support and relevant ancillary.
Propose improving actions/changes that imply particular specific actions that will be executed after previouswritten approval of the plant manager.
Integrity analysis and inspection of the piping systems. Provide a detailed written assessment for preliminary findings and recommendations Management of pipe support systems including supervision during installation, training, and associated service. Submit a technical report at the end of the site survey.
27
ON-SITE SERVICE
SCOPE OF ASSISTANCE
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
Quality, manufacturing, &process control systems
‘BUREAU VERITAS - ISO/EN 9001-2008 -
28
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
29
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIES
29
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIES
CERTIFICATION PEDEGREE
29
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972
THANK YOU FOR THE ATTENTION
30
The available advantages to the customer at Ca.S.T.Im2000 srl :
Certainty of expert performance by experienced specialists Optimized process of the whole project from Purchase Order through to delivery based on the
principle of “ all critical under the house roof" Superior engineering service and computerized documentation. Highly skilled personnel available for any service necessary
HEADOFFICE & MANUFACTURING UNITRegione Mombello 612040 VEZZA D'ALBA - CN ITALYTel. +39 0173 65137Fax +39 0173 [email protected]
CANOVE MANUFACTURING UNIT Via A. de Gasperi, 2/C
12040 GOVONE - CN Tel. +39 0173 240129
Mob. +39 342 5009371
SALES DIVISION - ROMEVia Sacco Pastore 23
00141 ROMA - RM ITALYTel. +39 06 86207672
Mob.: +39 335 268581
OVER 40 YEARS ALONGSIDE MAJOR ENGINEERING COMPANIESSince 1972