Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks associated with block cave underground mining, international metal price uncertainty, project power supply, and impacts on water resources used by herders (Satellite image of Oyu Tolgoi Mine, November 2015, http://landsatlook.usgs.gov ) Prepared for CEE Bankwatch Network Prague, Czech Republic www.bankwatch.org and OT Watch http://www.minewatch.mn/ January 10, 2016 Prepared by Paul Robinson [email protected] Research Director, Southwest Research and Information Center Albuquerque, New Mexico 87107 USA www.sric.org

Upload: others

Post on 09-Sep-2019

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

OyuTolgoiPhase2:Plans,IssuesandRisksAnOverviewofOyuTolgoiPhase2MiningPlansandsomeoftheissuesandrisks

associatedwithblockcaveundergroundmining,internationalmetalpriceuncertainty,projectpowersupply,andimpactsonwaterresourcesusedbyherders

(SatelliteimageofOyuTolgoiMine,November2015,http://landsatlook.usgs.gov)

Preparedfor

CEEBankwatchNetworkPrague,CzechRepublicwww.bankwatch.org

andOTWatch

http://www.minewatch.mn/

January10,2016

[email protected]

ResearchDirector,SouthwestResearchandInformationCenterAlbuquerque,NewMexico87107USA

www.sric.org

Page 2: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

1

TablesofContents

Introduction 2WhoownstheOyuTolgoi(OT)Mine? 3WherearetheplansforOTPhase2described? 3WhatisplannedintheOTPhase2mineexpansion? 4Whatactionsareneededtocompleteapprovalofthe

OTPhase2expansion? 14WhatisBlockCaveMining? 16WhichBlockCavemineshasRioTintooperatedorplanned? 18WhataretheenvironmentalImpactsofBlockCaveMining? 19HowlargeistheSubsidenceZoneattheOTHugoNorthLift1 30 undergroundminepredictedtoextend? WhatareSomeoftheMajorImpactsofOTPhase1and2on WaterResourcesUsedbyHerders? 36HowdoInternationalMetalMarketPricesaffectOyuTolgoiPhase242 DevelopmentandFundingPlanandTechnicalReports?Howmuchhaveinternationalmetalmarketpricesfallensince 43

theOTPhase2TechnicalReport(OTTR2014)wasreleased?Whataresomeoftheplansandissuesassociatedwithdeveloping46 apowersupplyforOTPhase2?ArealternativesourcesofpowerpossibleforOTPhase2?49SourcesCited 51BriefBiographyoftheAuthor 55

Page 3: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

2

IntroductionOyuTolgoi’sPhase2planstomine1.5billiontonsoforearedescribedasthe“ReserveCaseMine”intheOctober27,2014OyuTolgoiTechnicalReport(OTTR2014),themostdetaileddescriptionofOTPhase2publicallyavailable.OTTR2014waspreparedusingtheCanadianNationalInstrument43-101“StandardsofDisclosureforMineralProjects,”whichisrequiredforminingcompanieslistedonCanadianStockExchangessuchasTurquoiseHillResources(TRQ),66%ownerofOyuTolgoiLLC).(OTTR2014atP.i)The“ReserveCase”oretobeprocessedduringPhase2willcomefromtwosources:

1) theSouthernOyuTolgoi(SOT)openpitand2) ThedeeperHugoNorth“Lift1”ore,minedusingtheundergroundblockcaving

method.OthermineralresourcesidentifiedattheOyuTolgoisitebutnotproposedforthe“ReserveCase”mine-“Phase2”-aredescribedaspartofthelong-term“LifeofMineCase”(OTTR2014).“LifeofMineCase”depositsinclude:HugoNorth“Lift2”–anoredepositbeneath“Lift1”,theHugoSouth,andtheHerugadeposits.OTTR2014identifiesaseriesofdecisionoptionsrelatedtotheminingofthe“LifeofMineCase”depositsduringthenext10years,andbeyond,thatcouldleadtodevelopmentoftheseadditionaldeposits,includingextractionduringtheminingofthe“ReserveCase”oreintheopenpitandHugoNorthLift1in“Phase2”thatwouldbecompletedintheyear2055.DevelopmentandfinancingplansforminingtheOT“ReserveCase”oreisthesubjectoftheMay18,2015OyuTolgoiUndergroundMineDevelopmentandFinancingPlan(OTUMDFP2015)signedinDubaibyGovernmentofMongoliarepresentativesandOyuTolgoiLLC’scorporateowners.TheOTUMDFP2015addressesarangeofsubjectsincludingthecostofconstructionofOTPhase2,OTPhase2impactsontheMongolianeconomy,proposedschedulesforactionondevelopmentofafutureOTpowersupply,aninvestigationoftheeconomicviabilityofacoppersmeltertorefinethe30%copperconcentratecurrentlyproducedatOT,andtaxandfinancialaccountingconsiderations,amongothermatters.ThisreportsummarizestheminingactivityproposedbyOTinitsPhase2developmentplan,describestheblockcavingundergroundminingtechnologyplannedforthelargedeeporebodytobeminedinPhase2,environmentalimpactsandreclamationpotentialofblockcavemines,andissuesandrisksassociatedwithafutureOTpowersupply,internationalmetalmarketpriceuncertainties,andOTPhase1and2impactsonwaterresourcesandherdersandtheirlivelihoodintheregionsurroundingtheOTminelicensearea.

Page 4: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

3

WhoownstheOyuTolgoi(OT)Mine?TheOyuTolgoicopperandgoldproject(OyuTolgoi)isbeingdevelopedbytheOyuTolgoiLimitedLiabilityCorporation(OTLLC).OTLLCis66%ownedbyTurquoiseHillResourcesLtd(TRQ)and34%ownedbyErdenesOTLLC.RioTintoplc(RioTinto)maintainsacontrollinginterestinthroughitsownershipof51%ofTRQandisthemanageroftheOTproject.TheGovernmentofMongolia(GOM),throughErdenesOTLLC,owns34%ofOT.(OTUMDFP2015)WherearetheplansforOTPhase2described?OTPhase2miningplansaredescribedintheOyuTolgoiTechnicalReportreleasedOctober27,2014(OTTR2014),a547-pagereportpreparedusingtheCanadianNationalInstrument43-101StandardsofDisclosureforMineralProjects,amineralresourceestimationandreportingregulation.OnAugust,27,2015,OTannouncedithadsubmittedrevisionsoftheschedulesinitsMarch2015FeasibilityStudytotheMongolianMiningCouncilthat“align”withtheMay18,2015OTUndergroundMineDevelopmentandFinancingPlan(OTUMDFP2015)andtheOTTR2014.(TRQ8-2015)OyuTolgoihasnotmadetheMarch2015OTFeasibilityStudyavailabletoinvestorsorthepublic.ItisnotlistedinSEDAR.comrecordsofCanadiancorporationpublicfilingforOTalongwithpreviousNI43-101complianttechnicalreports,orontheOTorTRQwebsites.AsOT’sMarch2015FeasibilityStudyisnotavailablefromtheOTsiteorotherpubliclyavailablesources,thisReportreliesontheOTTR2014asthemostcurrentavailableversionOT’splansforPhase2.OTTR2014isavailableathttp://www.turquoisehill.com/i/pdf/2014-10-27_OyuTolgoiTechReport.pdfandhttp://www.turquoisehill.com/s/oyu_tolgoi.asp?ReportID=379189CompletionofanupdatetotheMarch2015OTFeasibilityStudyisoneoftheobligationsrequiredundertheOTUMDFPrequiredbeforefinalapprovalbytheBoardsofDirectorsoftheOTowners.

Page 5: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

4

WhatisplannedinOyuTolgoi’sPhase2mineexpansion?OTPhase2proposestheextractionandprocessingoforefromthecurrentlyoperatingSouthernOyuTolgoiopenpit(SOT)whilealsoconstructingandoperatinganundergroundmineusingtheblockcavingminingmethodtoextractorefromaportionoftheHugoNorthoredepositcalled“Lift1”throughtheyear2055.OTTR2014forecastsoverallmineproductionduringPhase2,calledthe“ReserveCase”inOTTR2014,continuingthrough2055.OTPhase2oreproductionisprojectedtobeaverageabout115,000tonsperday(tpd),equaltoabout40milliontonsperyear,duringthe2020–2039periodwhentheundergroundHugoNorthLift1blockcavemineisproposedtooperate.FutureOTexpansionthatarenotincludedinOTPhase2couldinvolveadditionalundergroundminingatHugoNorthLift2beneathLift1,andundergroundminingattheHugoSouthDepositandtheHerugaDeposits.OTopenpitoreproductionwouldfallfromthecurrent100,000tonsperdayto20,000tonsperdayduring2019–2039period,whentheHugoNorthLift1mineisprojectedtoproduce95,000tonsoreperday.ThisproposedmixofopenpitandundergroundoreiswouldkeepthecombinedtonnageofOToreprocessedtoabout115,000tonsperdaybetween2019whenNorthHugo“Lift1”undergroundorewouldbegintobeextracted,and2039whenoreextractionfromtheOTPhase2portionoftheHugoNorthundergroundminewouldbecompleted.OTPhase2plans,schedulesandresourceestimatesareshowninFigures1–9thatprovideFiguresfromOTTR2014andanAugust2015OTInvestorandAnalystSiteVisitPresentation(TRQ8-2015b)withannotationsandcommentarybytheauthor..

Page 6: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

5

Figure1-OyuTolgoiandSurroundingLicenses–ProjectLocation

Page 7: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

6

Figure2-LocationandDepthofOyuTolgoiDeposits

Page 8: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

7

Figure3–OTPhase2RestartMilestones

Page 9: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

8

Figure4–OTPhase2ProbableDevelopmentSchedule

Page 10: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

9

Figure5–OTPhase2Medium-TermTimeline–2015–2026++

Page 11: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

10

Figure6–OTPhase2OreDescriptionandProductionSequence

Page 12: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

11

Figure7–OTMultipleDevelopmentOptionsbeyondPhase2

Page 13: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

12

Figure8–LocationofOTPhase2andOT“LifeofMineCase”depositsthatmaybeminedinadditiontothePhase2oredepositsinthefuture

Page 14: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

13

Figure9–“HugoNorthLift1MineDesignProject”and“Isometric[View]ofMineDesign”

Page 15: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

14

WhatactionsareneededtocompleteapprovaloftheOTPhase2expansion?TheMay18,2015OTUMDFPAgreementbetweentheGovernmentofMongoliaanditspartnersinOTLLC(OTUMDFP2015)identifiesaseriesofstepsneededtocompleteapprovalofOTPhase2.Thesteps“requiredbeforetheaspirationslistedinthatagreementcanbegintoberealized,”atsection4.7onp.6,include:

“[The]PartieswishtoproceedexpeditiouslywiththeconstructionoftheUndergroundStage.However,thePartiesagreethatconstructionofUndergroundStagewillcommenceonlyafter:

(a)OTLLChassatisfiedtherequirementstoobtainthirdpartyprojectfinancetofundtheUndergroundStage(the“UGProjectFinance”);and

(b)TheUndergroundStageisapprovedbyeachoftheBoardsofRioTinto,TRQandOTLLC”

Atsection5.5.a.atp.6,theMay2015GOM-OTAgreementsays,

“UptoUSD$6billionofexternalfundingwillberaisedthroughthirdpartyprojectfinancing(includingUGProjectFinance)andotherbankfinance,productoff-takearrangementsorotherformsoffinancing.”

OnDecember14,2015,TurquoiseHillResources(TRQ)announcedthatthesigningofa,“USD4.4billionprojectfinancingfacility”.(TRQ12-2015).ThefacilityprovidesloansthroughagroupofinternationalfinancialinstitutionsandexportcreditagenciesrepresentingthegovernmentsofCanada,theUnitedStatesandAustralia,alongwith15commercialbanks.The$4.4billionprojectfinancefacilityOT’sownerssignedprovidesasetoffourloanswithpaybacktermsof12–15years.TheloansagreedtobyOTLLCandthelendershaveadebtcapacityof$6.0billionforOyuTolgoi,providingtheoptionforanadditional$1.6billion.

FuturestepstocompletetheloanprocesssummarizedbyTRQinitsDecember14,2015releaseare:

“TurquoiseHill,RioTintoandOyuTolgoiwillnowcontinuetoworktowardscompletingthe2015feasibilitystudy,includingtheupdatedcapitalestimateandsecuringallnecessarypermitsforthedevelopmentoftheundergroundmine.“OncethesestepshavebeencompletedandsubjecttotheboardsofTurquoiseHill,RioTintoandOyuTolgoiapprovingaformal‘noticetoproceed’,thefull$4.4billionfacilitywillbedrawndownbyOyuTolgoisubjecttosatisfactionofcertainconditionsprecedenttypicalforafinancingofthisnature.”

TheMay2015OTUMDFPAgreementatsection5.2acknowledgesthat,“ApprovalofUGProjectFinanceisadecisionfortheBoardsofRioTinto,TRQandOTLLCandtheShareholdersofOTLLC.OyuTolgoiBoardapprovalofUGProjectFinanceisrequiredbythelendersundertheProjectFinancetobeunanimous.”

Page 16: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

15

TheOTUMDFPatP.3identifiestheCapitalCostofOTPhase2as$6.7billionUSD,including$4.7billioninundergrounddevelopmentcapital,$1.5billioninsustainingand$0.6billionUSDinValueAddedTax(VAT)andDutiesonCapital.TheOTUMDFP2015andOTTR2014donotincludeplansforeitherasupplementaloranewEnvironmentalandSocialImpactAssessment(ESIA)forOTPhase2.OTTR2014,atp.446says,“The[2012OT]ESIAaddressesaprojectwitha27-yeardesignlife.”OTPhase2isprojectedfora40-yeardesignlifefromfeasibilitystudiesandfinancialin2016through2055.OTTR2014,says,

“ItisanticipatedthattheProjectwillcontinueinoperationwellafterthatdate[of2055],possiblyathigherproductionrates.Suchplansarestillatanearlystage,sowhiletheyarereferredtointheESIA,theyarenotevaluatedintheESIAbecauseofthelimitedamountofinformationavailable.

“Similarly,anumberoffuturedevelopmentsofproject-associatedfacilitiesarestillunderevaluation,andnocleardecisionhasyetbeenmadeastothepreferredapproachtobeadoptedbytheProject,”includingarailroadlineandapowersupply.

OTPhase2plansprovidethat,

“certainotheractivitiesandfacilitiesareexpectedtobedevelopedovertime,eitheraspartoforinsupportoftheproject,whichdonotconstitutepartoftheProjectforthepurposesoftheESIA.Theseinclude:• Projectexpansiontosupportanincreaseinorethroughputfrom100–160ktpd.• Long-termProjectpowersupply.UnderthetermsoftheIA,OTLLCwillsource

electricityfromwithinMongoliawithinfouryearsofthecommencementofProjectoperations.OTLLCmaydevelopacoal-firedpowerplantwithintheOyuTolgoiMineLicenceAreatoprovidetherequiredpowerfromMongoliansources.

WhiletheimpactsandmanagementofthesefutureProjectelementsarenotdirectlyaddressedintheESIA,theyareconsideredinthecumulativeimpactassessment.”(OTTR2014,P.445)

Page 17: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

16

WhatisBlockCaveMining?The2005OyuTolgoiIntegratedDevelopmentPlan(IDP)ExecutiveSummarydescribestheblockcaveundergroundminingmethodthatwillbeusedinOTPhase2toextractorefromtheHugoNorthLift1undergroundmineas:

“[A]safe,proven,andhighlyproductivemethodforextractingbulkoretonnagesfromundergroundmines.Itinvolvesundercuttingpartoftheorebodyacrossaplanarea,causingtheoverlyingrocktocollapse.Thecollapseoftheore,or“cave,”is“bydesign”andisaccomplishedinadeliberate,controlled,andpredictablemanner.Initially,theoreisundercutandinducedtocavebyblasting.Thereafter,theblastedorefallsintoanarrayofdrawpointsbeneaththeinitialcaveareaandisremovedbyload-haul-dump(LHD)equipment.Asbrokenoreisremoved,thepilewithinthecaveslumps,creatingavoid,whichinturnpromotesfurthercaving.”(IDPES2005)“Blockcavingisexpectedtoresultinsurfacesubsidence.Topreservetheintegrityofthemineshaftsandprincipalinfrastructure,theshaftsandinfrastructurewillbegroupedtogetherina“farm”approximately1,500mduewestofthecentrelineoftheresource.”(IDPES2005P.47)(Emphasisadded)

TheSMEMiningEngineeringHandbook2011(SME2011)describesBlockCavingas,

“[A]massminingsystemthatusestheactionofgravitytofractureablockofunsupportedore,allowingittobeextractedthroughpreconstructeddrawpoints.Byremovingarelativelythinhorizontallayeratthebaseoftheorecolumnsusingstandardminingmethods,theverticalsupportoftheorecolumnaboveisremovedandtheorethencavesbygravity.Asbrokenoreisremovedfromtheorecolumn,theoverlyingorecontinuestobreakandcavebygravity.”

“Althoughsomerelativelysmallerblockcaveorebodiesarecavedandminedasasingleproductionblock,mostexistingandplannedblockcaveminesuseeitherofthefollowing:

•Anextendedblockcavingsystemthatdividesthedepositintodiscreteproductionblocks;or•Asinglecavefront(orseriesoffronts,or“panels”)advancingforward

throughtheorebody,continuallyopeningupnewproductionareasastheearliercavedareasbecomeexhausted.

“Theblockcavingmethodtypicallyallowsforrelativelylargevolumesofproductionaftertheminehasbeendevelopedandproductionramp-uphasbeenachieved.Thepreproductiondevelopmentperiodcanbesignificant(typically5–10years,dependingonthelengthoftimetoachievetheinitialaccess).Theup-frontcapitalrequiredpriortoanyreturnoninvestmentisveryhighbecausemuchoftheproductionlevelsandinfrastructuremustbeinplacebeforecavingcanbegin.“Aftertheminehasreacheditssustainedmaximumproductionrate,theoperating

Page 18: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

17

costtendstobeverylowwithminimaladditionalinfrastructurerequiredtomaintainthehighproductionvolumes.Blockcavingisgenerallytheleastexpensiveofallundergroundminingmethods,andcaninsomecasescompetewithopen-pitminingincost.”(SME2011atP.1356)

NorevisionofOyuTolgoi’s2012EnvironmentalandSocialImpactAssessment(ESIA2012)isproposedtoaddressOT“Phase2”asdefinedbythe“ReserveCase”inOTTR2014.TheProjectDescriptionportionoftheESIA2012providesan“OverviewofBlockCaving”thatsays,An“OverviewofBlockCaving”isprovidedintheOTESIA2012-ProjectDescription(A4),atP.21of77:

“Blockcavingisahigh-tonnageundergroundbulkminingmethodgenerallyappliedtolargehomogeneousoredeposits.Ideally,theoretobecavedshouldbestructurallyweak,andthewasteoverburdenshouldbeweakenoughtocollapseovertheorewithoutinducementastheoreisextracted.

“Blockcavinginvolvesexcavationofnaturalsupportfrombeneaththeore,causingthestructureoftheorebodytofailandcollapseintotheexcavatedvoidundertheforceofgravityandlocalgeo-mechanicalstresses.Thebrokenoreisthenpulledoutfromunderthecavedsectionthroughadrawpointarrangement,subsequentlyremovingsupportfromoreandoverburdenatincreasingheightabovetheinitialexcavation,andeventuallyextendingthecaveupwardtothesurface.“Theattractiveaspectofblockcavingisthatonlyarelativelysmallportionoftheoremustbedrilledandblastedpriortoextraction.Oncethecaveinitiates,productioncontinueswithoutfurtherprimarydrillingandblastinguntiltheorecolumnaboveisexhausted.“Theblockcaveminingsequencebeginswithaccessandinfrastructuredevelopment,followedbyexcavationoftheextractionlevel,andundercuttingtheore.Thesequenceculminatesinsteady-stateproductionfromindividualdrawpoints.“Oreinthecolumnisdilutedbymaterialinadjacentcolumnsandultimatelybyoverburdenandadjacentwasterock.Whenthecolumndrawdowniscompleteanddrawpointgradedropsbelowaminimumvalue,thedrawpointisabandoned.Greatcareistakeninestablishinguniformdrawpracticesthroughouttheminetomaximisedrawpointlifeandminimisedilutionandstressloadingfromundergroundworkings.“Blockcavingisacapital-intensiveminingmethod,requiringsignificantinvestmentearlyintheminelifeforinfrastructureandprimarydevelopment.Onceinplace,themethod’shighup-frontcostsareoffsetbyhighproductionratesandlowoperatingcosts(relativetootherundergroundmethods)overaconsiderablelengthoftime,resultinginalowoverallcostpertonne.Blockcaveminingisamongtheleastcostlyofallundergroundminingmethodspertonneoforeextracted.

Page 19: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

18

“Blockcavinghasanumberofpositiveattributesincludingnowasterockstorageonthesurfaceandnolargeopenpits.Oneconsequenceofblockcavemining,however,isthepotentialforsurfacesubsidenceorsettling.Surfacesubsidenceiscausedasthematerialabovetheorebodygraduallymovesdownwardtoreplacetheorethathasbeenmined”.

WhichBlockCavemineshasRioTintooperatedorplanned? FiveexistingandproposedblockcaveminesareorhavebeenownedinwholeorinpartbyRioTinto,currentmajorityowneroftheOyuTolgoi,LLC.Theseinclude:Closed-Palaboracoppermine,LimpopoProvince,SouthAfrica–57%RioTinto,26%public,17%Anglo-American;currentlyclosed.See,forexample,“PalaboraMineClosureFactSheet”athttp://www.palabora.com/documents/factsheet_closure.pdfOperating-Northparkescopperandgoldmine,CentralNewSouthWales,Australia–formerly80%ChinaMolybdenumCo.,Ltd.(acquiredfromRioTintoin2013),20%Sumitomo;See,forexample,http://www.geovia.com/sites/default/files/Australian_Journal_Mining_Jan2008_LR.pdf-DeepOreZone(DOZ)blockcavemine,GrasbergMine,Papua,Indonesia–40%RioTinto,60%PTFreeportIndonesia;See,forexample,GrasbergBlockCave”,athttp://www.infomine.com/publications/docs/InternationalMining/Chadwick2010k.pdf)Planned-HugoDummettNorthandSouthdeposits,OyuTolgoigoldandcopperproject,SouthGobiRegion,Mongolia;and-ResolutionCopperproject,Superior,Arizona,US-55%RioTinto,45%BHPBilliton.See,forexample,“UndergroundMining”athttp://resolutioncopper.com/the-project/underground-mining/)

Page 20: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

19

WhataretheenvironmentalImpactsofBlockCaveMining?Large-scalepermanentsurfacesubsidenceabovetheextractionzoneistheprimarylong-termenvironmentaldamageresultingfromblockcavemines. Thesurfacecollapse,subsidenceandfracturingofthelandsurfaceabovethemineresultingfromextractionoforeusingtheblockcaveminingmethodsleadstoenvironmentaldamagethatisnotamenabletotopographicorbiologicalreclamationtoestablishproductivepost-mininglandusesbecausethedamagedlandsurfaceaffectedbytheblockcave-inducedsubsidenceisphysicallyunstable.Asdescribedin“OreBodyAccess,”MiningMagazine,03May2011says:

“Oneoftheprimarydisadvantagesofblockcavingisthatitremovesmuchofthesupportingrockfromunderneaththeoverburden,whichoftenleadstosubsidenceofthesurface.Cavinginducedsubsidencemayendangermineinfrastructureandisamajorconcernforoperationalsafety.”Changestosurfacelandformsbroughtaboutbysubsidencecanbedramaticandmayleadtoapronouncedenvironmentalimpact.Therefore,theabilitytopredictsubsidencehasbecomeincreasinglyimportantforoperationalhazardandenvironmentalimpactassessments.”(emphasisadded)(MiningMag.2011)

Surfacesubsidencecratersareatypicalfeatureatblockcaveminesaroundtheworld.Thirtyoftheundergroundblockcavingminesaroundtheworldaresummarizedin“Characterizationandempiricalanalysisofblockcavinginducedsurfacesubsidenceandmacrodeformations,”Woo,K.,etal,ROCKENG09:Proceedingsofthe3rdCANUSRockMechanicsSymposium,Toronto,May2009,(Woo2009)at:http://www.geogroup.utoronto.ca/rockeng09/proceedings/innerFrames/PDF/Session19/4044%20PAPER.pdf.Woo2009identifiesthreezonesofsurfaceimpactfromblockcaving,aninner“CavedZone,”asurrounding“FracturedZone”anda“Subsidence”zonesurroundingtheinnerzoneofgreatersurfacedeformation.Figures10–17demonstrateblockcavingminingimpactstothelandsurfaceaboveandsurroundingtheoreextractionzone,including:

- a“cavedzone”directlyabovetheblockcavingminingarea,wherethesurfacecollapsesintothevoidbelowthesurfacefromwhichorehasbeenextracted;

- a“fracturedzone”overtheareaaroundthe“cavedzone”affectedbythecollapseovertheorebodywhere“tensioncracks”developatthesurfaceandbelowthesurface;and

- a“continuoussubsidencezone”affectedbysurfacedisruptionandinstability.

Page 21: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

20

Figure10–(IncludedinFigure12)“Definitionofblockcavingsubsidencezonesandits

quantificationwithrespecttoanglesex-tendingfromtheundercut”(Woo2009)TheillustrationofblockcavingfromWoo2009issimilartotheillustrationofblockcavinginOyuTolgoi’sIDOP2012showninFigure11.

Page 22: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

21

Figure11–(IncludedinFigure12)“DefinitionofSubsidenceZone(afterMMT–PermissionfromRioTinto)”fromOyuTolgoiIDOP2012,P.325,-Figure16.22

Figure12–22showtheblockcaveminingmethodproposedbyOTandtheassociatedcollapseandsubsidencezonesfromOTTR2014andothersourcesidentifiedintheFigureswithannotationsandcommentarybytheauthor.

Page 23: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

22

Figure12–“DefinitionofSubsidenceZones”

Page 24: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

23

Figure13–BlockCavingandSubsidence–“MostProbablePredictionofSubsidencefortheResolutionCopperMine,aRioTinto-BHPBillitonprojectinArizona,USA

Page 25: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

24

Figure14–IllustrationsofOTPhase2“OreFlow”and“CaveMonitoring,”andSurfaceSubsidencepredictionatRT-BHPResolutionCopperMine.

Page 26: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

25

Figure15–OTHugoNorthLift1SubsidenceZonepredictionsfrom2010and2012

Page 27: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

26

Figure16–ComparisonofOTPhase2SubsidenceAreapredictedin2012andCentralUlaanbaatar.

Page 28: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

27

Figure17–OverlayofOTPhase2SubsidenceZonepredictedin2012onCentralUlaanbaatar.

Page 29: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

28

Thesurfacesubsidenceresultingfromblockcaveminingleavesapermanentholeinthegroundabovetheminewherethesurfacecollapsesintothemine,aringofcontinuoussubsidencearoundtheedgeofthecollapsezone,andringoffracturelandaroundtheedgeofthecontinuoussubsidencezone.Reclamationtoreestablishtopographicallystablelandscapewithsustainablevegetationisnotpossibleatblockcaveundergroundminesasthelandsurfaceabovetheblockcavemineisphysicallyunstableandunsafeforoperationofreclamationequipment,andforpeopleandanimalsenteringthefracturedrockorsubsidencezone.Theextentofthe“cavedzone”isdefinedbya“caveangle”or“angleofbreak”illustratedinFigures10,11and12.Theextentofthefracturezoneisdefinedbyan“angleoffractureinitiation,”andtheextentofthecontinuoussubsidencezoneisdefinedbyan“angleofsubsidence.”Woo2009includes,inadditiontoanoverviewoftheblockcavingminingmethod,descriptionsandillustrationsoftheopencavezoneandsurroundingsubsidencezoneatoperatingminesat30blockcaveminesaroundtheworld,includingimagesofcollapseandsubsidencezoneat18blockcavingmines.Figure18below(Woo2009,Figure5),showssatelliteimageryofsurfacesubsidenceatblockcavemineswheretopographicconditionshaveasmallimpactonthestructureofthecollapsezone.

Page 30: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

29

Figure18–“Macrodeformationpatternsobservedinwhichtopographiceffectsareminor”

atblockcavemines(Woo2009)TheshapeofthesubsidencezonesintheFigureshow–the“macrodeformationpatterns”–asidentifiedinWoo2009are:TypeA=circular,TypeB=elliptical,TypeC1=irregularwithscarps,butwithoutadistinctcollapsezone,andTypeC2=irregularwithadistinctcollapse

structure/gloryhole“wheretopopographiceffectsareminor.”

NoscaleisprovidedfortheimagesinWoo2009.

Page 31: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

30

HowlargeistheSubsidenceZoneattheOTHugoNorthLift1undergroundminepredictedtoextend?SurfacesubsidencezonepredictionmapsfortheHugoNorthLift1blockcaveminehavebeenincludedintheOTIntegratedDevelopmentPlansfrom2005,2010and2012.Theprojectedextentofthelandarealikelytobeaffectedbythecaved,fracturedandsubsidencezoneattheHugoNorthminesiteincreasedsubstantiallyintheIDOP2012fromthatprojectedinIDP2010.TheIDP2010projectionofthecaved,fractureandsubsidencezonesabovetheHugoNorthLift1undergroundminebelowshowsthe“shaftfarm”area–thesiteshaft2–outsidetheprojectedcontinuoussubsidencezone.

Figure19-(AlsoinFigure15)“ProjectedSubsidenceZone”(IDP2010,P.373(Figure

23.89.8)InthisFigure,thegridlinesarespaced500metersapart.TheprojectedHugoNorthminesubsidencezonepresentedinIDOP2012,showninFigure20below,hasexpandedmore500meterstothewestresultinginthe“CavedZone”includingthe“ShaftFarm”areatheShaft2siteandotherinfrastructurefeatureswellinsidetheinnerring–theprojected“cavedzone”ofthesubsidencezone–inadditiontoShaft1.

Page 32: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

31

Figure20–(AlsoinFigures15-17)ProjectedSubsidenceZonefromIDOP2012:“TheprojectionshowninFigure16.33merelyillustratestheextentofsurfaceareathatthegeneralizedsubsidenceprojectionsencompass.Furtherstudyisrequiredtomore

accuratelypredictactualcavepropagation.”(IDOP2012,p.358).InthisFigure,thegridlinesarespaced1,000metersapart.

Propagationofthe“CavedZone”toincludetheShaftFarmArea–theShaft2,Shaft1andotherinfrastructurefeaturesisalsoillustratedintheProjectDescriptionportionoftheESIA2012,asshowninFigure21,below.

Page 33: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

32

Figure21–“ProjectedBlockCaveSubsidenceZone,”(ESIA2012-ProjectDescriptionFigure4-10p.23of77)

OyuTolgoi’sIDP2010acknowledgedtheseverityoftheimpactofthecavedzoneonShaft1noting,

“Thesubsidencezonefromtheextractionleveltothesurfaceisprojectedat60o,perSRK’sRecommendation[Figure3inthisreport](Figure23.8.8).Allplannedinfrastructureisoutsidethiszone,exceptforShaftNo.1.ShaftNo.1islocatedinsidethe60osubsidenceareaattheedgeof65osubsidenceline.ItisassumedthatShaftNo.1willbestrippedofallconveyancesoncefullproductionisachievedandwillbeusedforventilationonly.”

OyuTolgoi’sIDOP2012illustrationoftheprojectcaved,fractured,andsubsidencezones(Figure20inthisReport),showsthattheextentofthe60osubsidenceareahasexpandedtoincludeShaftNo.2andmostoftheShaftFarmarea.The60osubsidencelineindicatedinIDOP2012isapproximately500meterswestofthelocationofthe60osubsidencelineinIDP2010,engulfingtheShaftNo.2site.NeithertheIDOP2012northeESIA2012addressconsequencesoftheprojectedcave,fractureandsubsidencezonesonshaftNo.2,ortheotherinfrastructureidentifiedaswithintheprojectedsubsidencezone.WhiletheIDP2010assertedthatallinfrastructureotherthanShaftNo.1weretobelocatedoutsidethe60oangleofsubsidencezonetopreventimpactsfromcaving,fracturingandsubsidence,manyOTminefacilitiesareshownwithinthe60oangleofsubsidenceshownforthemineintheIDOP2012.TheseminefeaturesincludeShaftNo.2,andthe“ShaftFarm,”amongotherinfrastructure.Thelackof

Page 34: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

33

attentiontotheimpactsofsubsidenceonareaswithinthe60osubsidenceangleasprojectedinIDOP2012appearstobeasignificantdefectinESIA2012.WhileOTTR2014providesadiscussionofblockcaveminingontheHugoNorthLift1,itdoesnotprovideafigureorotherinformationthatillustratesthefullprojectedsubsidencezonefromtheOTPhase2,the“ReserveCase”mine.OTTR2014says,

“Thepredictedfracturelimits(determinedasthepointofhavinganotableimpactonkeyinfrastructuresuchashoistingshafts)bytheendofminingHugoNorthLift1areshownbytheredoutlineinFigure16.13.Afencewillbeconstructed100moutsidethisredoutlinetorestrictaccess.Thesubsidenceanglesarepredictedtobenearlyverticalatthenorthernandsouthernlimitsofthecave,whereconfinementishighest,andareapproximately55°intheeastandwest,whereconfinementislowest.Allshaftsandpermanentinfrastructureareplannedtobesituatedoutsidethepredictedfracturelimits.“Shaft1isclosesttothefracturelimits.Shaft1willbeusedasahoistingshaftuntiltheShaft2loadoutandprimarycrusherarecommissionedbyearly2019.ThereaftertheprimaryfunctionofShaft1isforintakeventilation.Thisprovidesadditionalcontingencyagainstanunexpectedlylargercavesubsidencedamagearea,asabaldconcretelinedshaftcanwithstandhighergroundmovementthanashaftreliantontheclosetolerancesofoperatinghoistinginfrastructure.”Constructingafence100metersoutsidethesubsidencezone–“theredline”inFigure22below–istheonlyreclamationmeasure,otherthanmonitoringtheextentofsubsidence,identifiedinOTTR2014.

Figure22belowisareproductionofFigure16.31inOTTR2014.NoscaleisprovidedfortheFigureinOTTR2014toallowcomparisonwiththeIDOP2012andESIA2012FiguresillustratingOT’sprojectedsubsidencezone.TheOTTR2014Figureappearstoprojectamuchsmallersubsidencezonethan2012IDOPbasedonthelocationofthe“ShaftFarm”inthelowerleftofFigure22.NoanalysisisprovidedorcitedfortherevisionoftheOTPhase2subsidencezoneinOTTR2014fromthatprojectedintheIDOP2012orESIA2012.

Page 35: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

34

Figure22 – “Figure16.31SubsidencePredictionsfromModeling”OTTR2014,p.310

AsisclearfromacomparisonofthesubsidencezoneillustrationsfromIDOP2012andOTTR2014,thefullextentofthesubsidencezoneisnotshownineitherofthedocuments.As2014OTTRhassolittledetailaboutblockcavingmethodsorconsequencesandnoESIAupdateassociatedwithit,the2012ESIAandsupplementremainthesoleavailableenvironmentalimpactassessmentforOyuTolgoi’sopenandundergroundmineplans.IntheESIA2012,aneightsquarekilometer – 8km2 – caved,fracturedandsubsidencezoneispredictedtodevelopedaboveOyuTolgoi’sHugoNorthUndergroundBlockCavingMine.ESIA2012,initsdiscussionofthe“NatureoftheImpact”ofproposedOyuTolgoimine,in“SECTIONC:IMPACTASSESSMENTCHAPTERC4:TOPOGRAPHY,LANDSCAPE,GEOLOGY&TOPSOILS(“ESIA2012C4”,filename:ESIA_OT_C4_Topography_EN.pdf)projectsthefullareaoftheprojectedcaved,fracturedandsubsidencezoneabovetheHugoNorthmineisprojectedasmorethan8squarekilometers.ESIA2012–C4atP.10of18states,

“[T]heremovaloforethroughtheblockcavingislikelytoresultinasubsidence

Page 36: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

35

zonelaterintheminelifeasthecavingpropagatestothesurface.Initialestimatesarethatthissubsidencezonewillcoveranareaofover8km2andbecharacterisedbyadepressionsurroundedbyacircularcliff-likefeaturewithanoverallcliffheightinexcessof20m,whichmightbemanifestasasingleclifformultiplesmallercliffs.Dependingonthenatureofthesurfacemanifestationofthisfeature,theimpactwillbeontopographyandlandscape;andalsoonhydrogeologyandhydrology(seeESIA2012SectionC5),andpotentiallypresentapotentialcommunitysafetyissueifcliffsareunstableonceherdersareallowedbackintotheareafollowingmineclosureandrestoration.”

TheESIA2012addsthat,

“thefullextentofthesubsidencezoneisprojectedtomorethanthreetimesthesizeoftheopenpitmineplannedatthesite,projectedtobetwosquarekilometers(2km2)”,atESIA2012,C4p.10.

Figure17showstheextentofOTPhase2undergroundblockcavingmineandassociatedcollapseandsubsidencezonebasedonthe2012IDOP“ProjectedSubsidenceArea,”byoverlayingtheprojectedOTPhase2subsidencezoneonanGoogleEarthimagesatelliteimageofcentralUlaanbaatar.OTTR2014doesnotidentifyspecificeffortstocontinueinvestigationstodelineatetheOTPhasecollapseandsubsidencezonethatwouldrespondtotherecognitioninIDOP2012atP.358that“furtherstudyisrequiredtomoreaccuratelypredictactualcavepropagation.”NosupplementalornewESIAisproposedbyOTtoaddresstheblockcavemineplannedinOTTR2014.

Page 37: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

36

WhatareSomeoftheMajorImpactsofOTPhase1and2onWaterResourcesUsedbyHerders?IssuesrelatedtotheimpactsofOToperationsonwaterresourcesusedbytheherderfamiliessurroundingthemineareahavebeenidentifiedin“IndependentEnvironmentalPanel(IEP)Report–ExecutiveSummary”developedfromtheinvestigationofKhanbogdSoumherdcomplaintsfiledtotheInternationalFinanceCorporation(IFC)ComplianceAdvisor-Ombudsman(CAO)andinIndependentAuditReportsavailableathttp://ot.mn/esia-audit-reports/.TheIndependentExpertPanelReportsummarizedintheExecutiveSummaryhavebeenpreparedpursuanttotwoformalcomplaintsfiledbyherdersandherdersupportorganizationswiththeInternationalFinanceCorporation(IFC)ComplianceAdvisor/Ombudsman(CAO)in2012and2013.AsofJanuary2016,onlytheIEPReportExecutiveSummary,ratherthanthefullreport,ispublicallyavailable.IFCisoneofthelenderscommittingfundstoOTPhase2identifiedintheDecember14,2015announcementoftheOTPhase2multi-bankfundingfacility.TheherdercomplaintsfiledwiththeIFCCAOandassociateddocumentsareavailableat:

Mongolia/OyuTolgoi-01/SouthernGobi:http://www.cao-ombudsman.org/cases/document-links/links-191.aspx

andMongolia/OyuTolgoi-02/SouthernGobi:http://www.cao-ombudsman.org/cases/document-links/links-196.aspx

TheIndependentAuditReports(IARs),preparedperiodicallysinceOctober2013,identifyissuesassociatedwithcompanyperformancetoaddressofnon-conformancewithOTprojectcommitmentsfromtheESIA(SeeIARApril2015,P.18)OTTR2014doesnotacknowledgeordiscusstheissuesrelatedtonon-conformancewithOT’scommitmentsaddressedintheIARsortheIEPES2015.The“ENVIRONMENTALSTUDIES,PERMITTINGANDSOCIALORCOMMUNITYIMPACT”sectionofOTTR2014,beginningatP.441,summarizesthetypesofimpactsidentifiedinESIA2012andDraftESIAspreparedtoaddressOToperations.ThatsectionoftheOTTR2014doesnotprovideanassessmentofthenature,extentofseverityofimpactsofOToperationstodateoranychangestopreviousESIAsnecessarytoaddressimpactsthathaveoccurred. Similarly,OTTR2014doesnotincorporaterecentlycompiledinformationonwaterresourceimpactsofcurrentOToperationsorprojecthowtheimpactsidentifiedintheIARs,IEPES2015andthefullIEPReportwillbeaddressedinthefuture,suchasanESIAforOTPhase2.

Page 38: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

37

Figure23–“WaterImpactsonHerderssurroundingOThavebeensignificantandaregrowing”

Page 39: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

38

TheinformationgatheredintheIARandIEPreviewsarecriticaltothepublicandinvestorawarenessofOT’simpactsonandriskstolocalwaterresources,socio-economicandculturalheritageconditionssincethemineoperationsbegan.Updatingwaterresource,socio-economicandculturalheritageconditionsisnecessarytoaddressdeficienciesorinaccuraciesinbaselinedatacompiledpriortoOTstart-up.UpdatingtheassessmentofimpactstothesecriticallyimportantelementsofthelivesofherdersandtheirfamiliessurroundingOTisessentialtodeterminingarewhetherimpactshaveoccurredaspredictedoraremoreorlessseverethatthanpredictedintheESIA2012.TheIndependentExpertPanel(IEP)foundimpactsonherderwaterresourcesthataffectherdersocio-economicandculturalconditionssignificantlyandmoreseverelythanpreviouslyidentified.IEPES2015reportsthat:

“ThedirecteffectoftherelocationoftheBorOvoospringontheherders’accesstowaterandwaterqualityisthecompletelossofthespring.ThetemporaryreplacementwatersourceattheSouthernfencelineoftheMLAdeliverswater,howeveritdoesnotreplicatethefunctionsforlivestockherdingneithertheecologicalfunctionsofwildlifehabitatofBorOvoospring.“ThelossoftheoriginalBorOvoospringhascausedlongerdistancesforherderstoaccesswateratthecurrentwateroutletofthediversionpipe;withtheestablishmentofthelatestfencelinealongtheMLAborder,thishasbecomeevenmorepronounced.”

and“ThelossofaccesstosummerpastureandlossofwatersourcesduetowatershedwideimpactsbytheOTmineandinfrastructuredevelopment(includingcoalroad)hasresultedinfarreachingandirreversibledisturbancetotraditionalnomadiclivestockhusbandryinKhanbogdSoum,especiallyinJavkhalantBageffectingthewholeherdingcommunity.Thesearchforwaterandpastureandinabilitytoletwinterpasturesrest,isdegradingremainingpastures;withtheeffectsoffragmentation,mechanicaldisturbance,dustandlitteralonginfrastructurecorridors,thecumulativeimpactsaresevereandwillcontinuetoincreaseasminedevelopmentproceeds.”(IEPES2015)

OTTR2014assertsthatOThasnot,“seen…anyconnectionbetweenthedeepaquiferandtheshallowherders’wellsinnear-surfacestreambedaquifers,”atP.413,failingtoacknowledgeorignoringthe“interaquiferflow”betweenshallowherders’wellsandthedeepaquifercausedbypoorboreholeconstructionidentifiedintheIARs.TheApril2015IndependentAuditReportisdescribedbyitsauthorsasa“DesktopAudit”asitwas“conductedasadesk-topreviewofthedocumentationprovidedandteleconferenceswithOTsitepersonnel”withoutsupportingfieldobservations,orinterviewswithareaherdersandotherauthorities.(IAR4-2015,P.18)WaterandWasteManagementNon-ConformanceIssuesidentifiedintheApril2015IARaddresscontinuingproblemsassociatedwiththeUndaiRiverDiversion(IssueM1.1)and

Page 40: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

39

InterconnectedHydrologicUnits(IssueM1.5)associatedwith“cascadingwells.”(SeeSchneider2013,Bale2014amongothersources)RegardingtheUndaiRiverDiversion,theIAR4-2015,atP.19,identifiesthecontinuingconcernthat,

“TheUndaiRiverDiversionhasnotbeencompletedinaccordancewiththeESIAduetoadelayinissuanceofaLandUsePermit.Atemporaryapproach(theUndaiRiverPartialAdjustmentandProtectionProject)hasbeencompletedtodivertsurfaceflowandtocaptureandre-routegroundwaterflowfromtheUndaiRiverandaroundthezoneofinfluenceoftheopenpit.ThecurrentUndaiRiverPartialAdjustmentandProtectionProjectdoesnotfullymeetthedesignrequirementsasspecifiedintheESIA.”

CommentsonthisissueintheIAP4-2015asaresultoftheDesktopAuditinclude,

“TheUndaiRiverDiversionhasnotbeencompletedinaccordancewiththeESIAduetoadelayinissuanceofaLandUsePermit.Atemporaryapproach(theUndaiRiverPartialAdjustmentandProtectionProject)hasbeencompletedtodivertsurfaceflowandtocaptureandre-routegroundwaterflowfromtheUndaiRiverandaroundthezoneofinfluenceoftheopenpit.ThecurrentUndaiRiverPartialAdjustmentandProtectionProjectdoesnotfullymeetthedesignrequirementsasspecifiedintheESIA.”

AtP.20,theIAP4-2015identifiesthecontinuingconcernthat,

“Mitigationsarerequiredintheeventofinterconnectionofhydrogeologicalunits.Thesemitigationshavenotyetbeenimplementedinallinstances.OTisprogressingeffortstoabandonorconverttoproductiveusetheseinterconnectingbores.”

CommentsonthisissueintheIAP4-2015asaresultoftheDesktopAuditinclude,

“EvidenceexistsofexplorationboresinterconnectinghydrogeologicalunitswithintheGuniiHooloiborefield,intheGalbynGobiregion,andwithintheMLA.FuturedispositionofthesewellsiscurrentlyunderevaluationbyaworkgroupestablishedwiththeKhanbogdsoum.Therearesomerequestsforconversionofthewellsforcommunityuse;thisrequesthasbeenforwardedtothecommunities’team.“BesteffortsarebeingmadebyOTtoprogressthesealingofinterconnectingboreswithinandoutsideoftheMLA,howevertheissueisoutstanding.PerrequestfromtheworkgroupOThasprovidedboringlogsforallinterconnectingbores.”

OTTR2014,atp.24,says,

“Althoughithasarequirementtomakeitsself-discoveredwaterresourcesavailabletobeusedforhouseholdpurposes,itisconfirmedinthe[OTInvestmentAgreement]IAthatOTLLCholdsthesolerightstousethesewaterresourcesfortheProject.OTLLChastherightundertheIAforawateruserightfortheperiodofitsmininglicence.”

Page 41: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

40

OTTR2014,atP.52says,“OTLLCwillmakeitsself-discoveredwaterresourcesavailabletobeusedforhouseholdpurposes,herderfamilies,andagriculturalactivitiesofthelocalsoumcommunities.”

NeithertheIARorOTTR2014describethe“bestefforts”thatOTisreportedtobemakingtoaddresstheinterconnectedaquiferproblemsaffectingshallowwellsusedbyherdersresultingfromOTwellconstruction,orhowtheperformanceofthosebesteffortswithbeevaluated.OTTR2014doesnotidentifywhether,when,how,andinwhatamount,OTwould“makeitsself-discoveredwaterresourcesavailabletobeusedforhouseholdpurposes,herderfamilies,andagriculturalactivitiesofthelocalsoumcommunities”throughthelifeoftheOToperation,orhowOTself-discoveredwaterresourceswillbeusedtoaddressreplacementofandcompensationforlossestoherderwaterresourcesintheUndaiRiverwatershedorareasofaquiferinterconnectionresultingfromfaultyboreholeconstruction.

OThasnotyetproposedaplanforuseof“itsself-discoveredwaterresourcesavailabletobeusedforhouseholdpurposes,herderfamilies,andagriculturalactivitiesofthelocalsoumcommunities”throughthelifeoftheOToperation.Herdershavebeenimpactedbyboreholesconnectingshallowanddeepaquifers – “cascadingwells” – formanyyears.Cascadingwellswerefirstidentifiedbyherdersin2004.Herders’livestockmanagementandculturalpatternshavebeenseverelydisruptedbytheineffectivenessoftheUndaiRiverDiversionandtheReplacementBorOvoospringsince2013whenthecurrentUndaiDiversionconstructionworkswerecompleted.Developmentandimplementationofplansto“makeitsself-discoveredwaterresourcesavailabletobeusedforhouseholdpurposes,herderfamilies,andagriculturalactivitiesofthelocalsoumcommunities”throughthelifeoftheOToperationwouldbeappropriatetoaddress:

“OTLLC....obligationswithregardtowaterutilisation:[including]-Notreduc[ing]fromthecurrentlevelthequalityandquantityoftheexistingpotableandlivestockwatersuppliesusedbyexistingusersatthedateoftheIA[OTInvestmentAgreement2009]withinthewaterresourcesareadefinedintheDEIAReports.”(OTTR2014P.53)

BoththeIARconsultantsandIFCCAOOyuTolgoi-01andOyuTolgoi-02ComplaintfilesacknowledgethataJune8,2015MemorandumofUnderstandingtoformaTri-PartiteCounciltohasbeenagreedtobyKhanbogdSoumadministration,RepresentativesofHerdersofKhanbogdSoumandOTLLCtoaddresstheHerderComplaintsfiledwiththeIFCCAO.TheCouncilprovidesanimportantnewvenuewherethepartiescan,

“consider,address,resolve,exchangeinformationabout,makeproposalsandrecommendationsinrespectof,implementandrelaytotheappropriatelevels,any

Page 42: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

41

issuesrelatingtoherders,pastureandwaterandanyotherrelevantissues…”associatedwiththeHerders’IFCCAOComplaints.”

MongolianandEnglishlanguageversionsoftheJune8,2015MoUareavailableontheIFCCAOpagesfortheOTComplaintsat:http://www.cao-ombudsman.org/cases/document-links/links-191.aspxandhttp://www.cao-ombudsman.org/cases/document-links/links-196.aspxThisrecentdevelopmentmayprovideaeffectivevenueforairingandresolvingherdersandSoumGovernmentcomplaintsregardingOTimpactsiffundedadequatelytoprovidesufficientsupportforsustainedparticipationbyherderandSoumrepresentativesincludingtheirtimeandtravelandsustainedprofessionaltechnicalsupport.

Page 43: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

42

HowdoInternationalMetalMarketPricesaffectOyuTolgoiPhase2DevelopmentandFundingPlanandTechnicalReports?AllprojectionsofthefuturevalueandeconomicimpactsofOTPhase2presentedintheMay18,2015OyuTolgoiUndergroundMineDevelopmentandFinancingPlan(OTUMDFP2015)arebasedontheinternationalmarketpricesforthecopper,goldandsilverthatwouldbeextracted.December1,2015marketpricesforcopper,goldandsilveraresignificantlylowerthanthepricesusedinthedevelopmentofOTPhase2expansionplansforcopper,gold,andsilver,thethreemetalcommoditiesbeingproducedatOT.Aslongaslowermetalpriceslast,thevalueofOTcopper,goldandsilverproductionwillbereducedbelowtheestimatedOTPhase2incomeandvaluewhichwerebasedonhigherprojectedprices.IncomederivedfromthemineandgovernmentpaymentsassociatedwithCurrentOTPhase1operationsthatreflectthevalueofmineproductionwillalsobereducedduetolowermetalpricesthanthoseprojectedintheOTTR2014.ThecentralroleofinternationalmarketpricesintheassumptionsregardingthefuturevalueandeconomicimpactofOTPhase2asprojectedinOTUMDFP2015,signedbyOT’sownershiponMay18,2015inDubai,isshownatP.4inthetableof“ImpactsontheDomesticEconomy”thatare,“basedonanumberofassumptionsrelatingtoscope,costs,schedule,technicalaspectsandmarketconditions.”TheOTUMDFP2015isanagreementbetweenthe“GovernmentofMongoliathroughErdenesOyuTolgoiLLC”(“EOT”–thecorporateentitycreatedbytheGovernmentofMongoliatorepresentits34%shareintheOyuTolgoi)andOyuTolgoi’scorporateownersoftheremaining66%oftheOyuTolgoiMine:TurquoiseHillResourcesLimited,THROyuTolgoiLtdandOyuTolgoiNetherlandsB.V.,(together“TRQ”)andRioTintoInternationalHoldingsLimited(“RioTinto”)andOyuTolgoiLLC(“OTLLC”).RioTintocontrolsthemajorityofsharesinOyuTolgoithroughitsownershipof51%ofTurquoiseHillResourcesLimited.TheOTUMDFP2015listsagreements“inprinciple”amongOT’sownersandnotes,atP.5,thattheactualcost–usingtheword“quantum”fortheestimated“actualamount”–“offundingrequirementswillbedeterminedbyanumberoffactorsincludingthebusinessperformanceofOTLLCandvariancesinthecopperandgoldprices.”TheDubaiAgreementsaysatP.5,thatformal“Approvalof[OTPhase2financing]isadecisionfortheBoardsofRioTinto,TRQandOTLLCandtheShareholdersofOTLLC.OyuTolgoiBoardapprovalof[OTPhasefinancing]isrequiredbythelenders…tobeunanimous.”InadditiontooutliningagreementsinprincipleandtheactionsnecessaryforformalapprovalofprojectfinancingtostartOTPhase2,theOTUMDFP2015includes

Page 44: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

43

commitmentsrelatedtoprogressonanOTpowersupply,researchonafutureOTcoppersmelter,andfinancialreportingandtaxconsiderationsandotheractivities.Uncertaintyregardingfuturepricesforcopper,goldandsilverandothercommoditiesreflectstheglobalmarketuncertaintyaboutwhetherthesteepfallinpricesforthosemetalssince2010willbealong-termorshort-termtrend.Ascopperisthesourceofmorethan75%ofthevalueofOyuTolgoiPhase2,thisuncertaintyfocusesonquestionsregardingfuturecopperprice.HowmuchhaveinternationalmetalmarketpricesfallensincetheOTPhase2TechnicalReport(OTTR2014)wasreleased?December2015internationalmarketpricesforcopper,goldandsilveraresignificantly:20–30%lowerthanthoseusedinOTTR2014resourceevaluationsandeconomicprojectsforOTPhase2.Copper,goldandsilverpriceshavebeendroppingsteadysincetheOctober2014releaseofOTTR2014,whichtheMay2015OTOTUMDFPand2015OTFeasibilityStudy(notdisclosedtothepublic)havebeen“aligned”with(THR2015).The“ReserveCase”isthetermintheOTTR2014fortheOTPhase2expansion.OT’s2014“ReserveCase”summary(OTTR2014atP.4)projectstheminingof1.5billiontonsoforeatcoppergrade(“content”)of0.83%,goldgradeof0.32gramspertonandsilvergradeof1.94gramspertons.OTPhase2oreisestimatedtocontain24.9billionpoundsofcopper,11.9millionouncesofgoldand78.0millionouncesofsilver.ThevalueofrecoveredmetalfromOTPhase2usedinOTTR2014are:

“[f]ormineplanning…themetalpricesused…werecopperat$3.01/lb,goldat$1,250/ozandsilverat$20.37/ozand….costfortheundergroundminearebasedon$15.32/t.”(OTTR2014atP.20).

Atthoseprices,thetotalvalueofthemetalrecoveredfromOTPhase2wouldbeabout$88.4billiondollars,ofwhichmorethan82%–$74.7billion–wouldcomefromcoppersales.SinceOTTR2014wasreleased,copper,goldandsilverprices(andothercommoditiesthatareimportanttotheMongolianeconomy)havefallensignificantly.IfDecember1,2015internationalmarketpricesforcopper-$2.11/lb,gold-$1,065/oz,andsilver-$14.21/oz,areusedtocalculatethevalueoftheoreproposedforminingatOTPhase2,thetotalvalueofthemetaltoberecoveredwouldfallmorethan$22billion,from$88.4billionto$66.1billion,withthecoppervaluefallingfrom$74.7billionto$52.4billion,alsomorethan$20billion.Figure24–“MarketPriceUncertainty”including“5YearCopperSpot”–included5-yeartrendincopperspotmarketpricesshowscoppersportmarketpricesbetweenNovember2010andDecember2015.

Page 45: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

44

Source: The source for the “5 year Copper Spot Chart” www.kitco.com, is alsothesourceusedforcommoditymetalpricesontheTurquoiseHillResourceswebsiteathttp://www.turquoisehill.com/s/commodity_metal_prices.asp.TheDecember1,2015copperpriceof$2.11/poundis30%lessthantheOTTR2014planningpriceforcopperof$3.01.TheDecember1,2015goldpriceof$1,065/ozis15%lessthantheOTTR2014planningpriceforgoldof$1,250/oz.(seewww.kitco.com forgoldpricecharts)TheDecember1,2015silverpriceof$14.21/pzis30%lessthantheOTTR2014planningpriceforsilver.(seewww.kitco.com forsilverpricecharts)ThereductionintotalmetalvalueforOTPhase2usingDecember1,2015metalpricesinsteadofOTTR2014metalplanningpricesisabout25%,withthetotalvalueofthecoppertobeminedintheOTPhase2falling30%.Howlongthecurrentdepressioninmetalcommoditypricesrelativetopeakpricesin2010and2011willlastisnotpredictablewithanycertaintyandisthefocusofintensespeculationbycopperproducers,investors,banksandcopperconsumers.

MarketPriceUncertainty-Marketpricesforthecopper,goldandsilverhavefalleninvaluesinceOTPhase2mineplanswerereportedinOTTR2014where“metalpricesused…werecopperat$3.01/lb,goldat$1,250/ozandsilverat$20.37/oz”(OTTR2014P.20).Atthoseprices,thetotalvalueofthemetalrecoveredfromOTPhase2wouldbeabout$88.4billiondollars,ofwhichmorethan82%-$74.7billion-wouldcomefromcoppersales.

Copperprices,aswellasgoldandsilverprices,havefallensteadyformorethan5years.Current,December2015,marketpricesforcopper,goldandsilverarewellbelowthoseusedforOTPhase2mineplanninginOTTR2014.IfDecember1,2015interna4onalmarketpricesforcopper-$2.11/lb,gold-$1,065/oz,andsilver-$14.21/oz,wereusedtocalculatethevaluetoberecoveredfromOTPhase2ore,thevalueofOTPhase2produc4onwouldfallfrom$88.4billionto$66.1billion-adropofmorethan25%;withthecoppervaluefallingfrom$74.7billionto$52.4billion–adropof30% 19

Metalmarketpricesfromwww.kitco.com

Page 46: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

45

Metalmarketpriceuncertaintymayinfluencetheultimatedesign,costandcorporateboardapprovalofOTPhase2,allofwhicharenecessarybeforeacceptanceofthemulti-bankloanfacilityofferedtoOTbyaconsortiumofbanksDecember14,2015.OTmanagementrecognizesthechangeinmetalpricesduringtherecentyearsaffecttheprojectedvalueofOT.TurquoiseHill,RioTintoandOTmanagementcontinuetobeoptimisticthatinvestmentinOTexpansionwillgeneratecopper,goldandsilverthatwillfindanimproved,higherprice,market,whentheOTPhase2expansioniscompleted.RioTintomanagement’sviewontheeffectsoftherecentfallinthecopperpriceonOTaresummarizedinaNovember26,2015articletitled,“CopperpricesmayweighonRioTinto’sloomingdecisiononOyuTolgoiexpansion,”thatreportsRioTinto’schiefexecutiveforcopperandcoalJean-SebastienJacques’sandRioTinto’sbeliefthat“thecoppermarketisfacingtwoorthreeyearsmoreofpain,itistheonecommoditytheyexpecttorecoverthefastest.”(Mining2015)Similarly,Mr.Jacqueswasreportedtohavesaidthat, “"Weareprettybullishaboutthecoppermarketinthelongtermandthereasonisweexpecta6to8milliontonneshortfall[ofcopper]inthenext10years,”hesaid.“OyuTolgoiwillbepartofthesolutiontoprovidethecopperthatisrequiredinChinaoranypartoftheworldatthatpointintime.”(INVEZZ2016).Forperspective,OTPhase2,the24.9billionpoundsofcopperOTPhase2isprojectedtoproduceisequalto1,250,000tonsofcopperallowingforanaverageof31,250tonsperyearfor40years.ThecopperproducedbyOTPhase2willbeintheformofcopperconcentrate,about100,000tonsperyearcontainingabout33%copper,unlessanduntilacoppersmelterorothercopperrefineryisconstructedtofurtherprocesstheOTcopperconcentrate.Whileavery,verylargemine,OT’sannualcopperproductionislessthan1%ofthe6-8millionton“shortfall”incoppersupplyprojectedbyMr.Jacques.OTPhase1producescopper,gold,andsilverfrom100,000tonsoforeperday.OTPhase2willproduce115,000tonsperdayofore–95,000tonsfromtheNorthHugoLift1UndergroundMineoncefullproductionisreached.FullproductionatNorthHugoLift1isprojectedtobeachievedintheearly2020s–about5-7yearsaway.OTmanagementprojectsthatthelowpriceconditionsinthecoppermarketwillendafteracouplemoreyears,beforeOTPhase2hasreachedfullproductionlevels.

Page 47: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

46

WhataresomeoftheplansandissuesassociatedwithdevelopingapowersourceforOTPhase2?ApowersupplysourcetooperateOTPhase2atfullcapacityhasnotyetbeenbuilt.OTTR2014discussionofthepowersupplyneedsfocusondevelopmentofan“IndependentPowerProject”[IPP]includingacoal-firedpowerplantusingcoalfromtheTavanTolgoidepositwestofOT.PowersupplyneedsforOTareprojectedtogrowfrom145Megawattsatstart,to246MWwhenundergroundminedevelopmentiscompleted.DevelopmentofaTavanTolgoiIPPintimetomeetOTPhase2demandbythe2020-2022periodasprojectedinOTTR2014facesmanyobstaclesincludingfundingchallenges,mixedpoliticalsupportandoperatingissues.AlternativesourcessuchaswindpowermaybeabletobeconstructedintimetomeetOTPhase2powerdemandandatlowercost,asatleastfiveutilityscalewindprojectsareinvolvedinpermittingorconstructingmorethan350megawattsinSouthernorEasternMongolia.OTPhase2“OperatingAssumptions,”asprovidedinOTTR2014atp.24,include,

“ThesupplyofpowerhasbeenrecognisedasbeingcriticaltotheprojectexecutionofOyuTolgoiinthe2009InvestmentAgreement].OTLLChasbeengiventherighttoimportpowerinitiallybutmustsecurepowerfromsourceswithinMongoliafromthefourthyearofoperation.SigningofaPSCAwiththeGOMinAugust2014hasresetthefouryearsobligationwhiletheopportunityfortheestablishmentofanIPPatTavanTolgoiisstudied.OTLLChasretainedtherighttoconstructapowerstationatOyuTolgoi.“(OTTR2014,P.24)

OTTR2014recognizesthat,

“TheOyuTolgoiProjectisenergy-intensive,withrequirementsofapeakof145MWsincestart-up,increasingto246MWinthelongertermaftercompletionoftheundergrounddevelopment.Areliableandstablepowersupplyisessentialforoperationsandsafety.”(OTTR2014,P.383)

Initsdiscussionof“Power”atP30,OTTR2014says,

“OTLLChasaPowerPurchaseAgreementwiththeInnerMongoliaPowerCorporationtosupplypowertoOyuTolgoi.Thetermofthisagreementcoversthecommissioningofthebusinessplustheinitialfouryearsofcommercialoperations.“InAugust2014,OTLLCsignedaPowerSectorCooperationAgreement(PSCA)withtheGOMfortheexplorationofaTavanTolgoi-basedindependentpowerproducer(IPP).TheaimofthePSCAistolayoutaframeworkforlong-termstrategiccooperationbetweentheGOMandOTLLCforacomprehensiveenergyplanfortheSouthGobiregion.ParticipationinthePSCAmeetsOTLLC’sobligationintheIAtoestablishalong-termpowersupplywithinMongoliawithinfouryearsfromthecommencementofcommercialproduction.SigningofaPSCAhasresetthefour

Page 48: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

47

yearsobligationwhiletheopportunityfortheestablishmentofanIPPatTavanTolgoiisstudied.

“ThePSCAprovidesaframeworkforabroadrangeofpower-relatedissues,includingtheestablishmentofapowergenerationsource,transmissionlines,andpowerimports.ThecentrepieceofthePSCAisanopen,internationaltenderprocesstoidentifyandselectanIPPtoprivatelyfund,construct,own,andoperateapowerplanttosupplyelectricity,withOyuTolgoiastheprimaryconsumer.“FullevaluationoftheIPPoptionisexpectedtotake9–12months.OTLLCplanstoactivelyparticipateintheprocessesofthePSCAtoensurethatthereisatimelyandreliablepowersupplysolutionforOyuTolgoiandthisapproachisendorsed.”

OTTR2014,atP.53recognizesthat,

“ThePowerPlantProjectwillimplementtheenvironmentalprotectionprovisionsoftheIAasdescribedintheESIA(July2012).ASupplementalESIAspecificallyforthePowerPlantProjectisforthcoming.”

TheOTTR2014discussionofaTavanTolgoiPowerPlantforOTPhase2donotacknowledgethemanychallengescurrentlythefacingdevelopmentoftheTavanTolgoiPowerPlantandtheoperationoftheassociatedcoalmineneededtofeedtheplant.SomeofthesechallengeshavebeenrecognizedbyErdenesMongolseniormanagement,theofficersoftheGovernmentofMongoliacorporationthatholdsa34%shareofOTLLC.InAugust,2015,threemonthsaftertheMay18,2015OTUMDFP,Mr.Ch.Otgochuluu,ErdenesMongolsenioreconomist,said,“TurquoiseHillhasissuedafinancialguaranteeworthonebillionUSdollarsfortheconstructionofTavantolgoiPowerPlant.TheGovernmenthasgivendirectionstoassociatedofficialstolaunchdevelopmentoftheplantfromspringof2016.”AsnofeasibilitystudyfortheTavanTolgoiPowerPlant,oranyalternativepowersupplyforOTPhasehasbeenreleased,itisuncleariftheUSDonebillionfinancialguaranteefromTurquoiseHillissufficientfortheconstructionof246-megawattpowersourceOTsaysitneedsfromTavanTolgoi.AtacostofUSDonebillion,the246-megawattplantwouldcostabout$4.06/watttoconstruct.Mr.OtgochuluunotedthatfullcostoftheOTPhase2projectislikelytorisesignificantly,notingthat“[t]hefirstestimationofrequiredinvestmentforundergrounddevelopmentislikelytoincreasefrom5.7billionto7-8billionUSdollars.”IfMr.Otgochuluuestimatesareaccurate,projectedOTPhase2costswouldriseto17–33%morethantheUSD6billionmaximumvalueofthemulti-bankloansforannouncedDecember18,2015.

Page 49: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

48

Developmentoftheupdated2015OTPhase2feasibilitystudyandrevisedconstructioncostsarecriticalstepsthatarerequiredtobecompletedpriortotheconsiderationoffinalOTPhase2projectapprovaloftheBoardsofalloftheOTLCCpartnersasrequiredbytheOTUMDFP2015.SignificantadditionalpowerbeyondOTPhase2demandwillbenecessaryforoperatinganycopperrefiningsmelterconsideredbyOTLLCoranyfutureexpansionbeyondPhase2.AninvestigationoftheeconomicviabilityofaddingacoppersmeltertotheOTcomplexisrequiredbySeptember2016intheOTUMDFP2015.AcoppersmelterwouldbeusedtoupgradeconcentrategradecoppercurrentlyproducedatOTwithabout33%coppercontenttorefinedcoppermetalwith95–99%+coppercontent-dependingonthespecificsmelting,refiningand/orconvertingprocessesselected.CurrentlytheupgradingofOTconcentratestothemorevaluable99%+coppermetalproductisconductedatsmeltersinChina.DevelopmentofcoalproductioncapacityattheTavanTolgoidepositthatwouldfeedaTavanTolgoiPowerPlantisalsofacingsignificantdifficultiesandmaybestalledforanextendedperiod.InearlySeptember2015,Forbesmagazinereportedthat,

“MongolianMinisterMendsaikhanEnkhsaikhansaidthatthelong-delayed$4billionTavanTolgoicoalmineprojectwasunlikelytogoahead,accordingtotheBusinessMongolianewsite,partlyduetoChina’sslowinggrowth.“It’snotonlybecauseofparliament[wheretheprojecthasfacedopposition],butalsobecauseoftheChinesesituation,”Mendsaikhansaid.ThenewsletternotesthatMongoliareliesonChinatobuy“nearlyallofitsmineralsandpetroleum,”whichaccountedfor86percentofexportsinthefirsthalfof2015.”(FORBES2015)

Justweekslater,thefailuretosecureloanstooperatetheTavanTolgoicoalminewasconfirmed,castingashadowoverthelikelihoodofdevelopmentofTavanTolgoidepositonalargeenoughscaletopowerOTPhase2whenthatpowerisneeded.LaterinSeptember2015,www.mining.comreported,

“Mongoliastrugglestodevelopitslargestcoalminingproject,TavanTolgoi,withreservesof7.4billiontonnesofcoal,aftertheMongolianGovernmentfailedtosecure$4billioninfunds.Developmentofthemine,haltedbypoliticsandweakgovernmentinstitutions,reflectstheresourcecurseasMongolia’sParliamentfailedtotransferownershipofthecoalmine.ThetransferofownershiptoaconsortiumofChineseandJapanesecompanies,waspartofMongolia’splantoincreaseinvestors’stakeholdingsin2015and2016.

“Mongolia’scontinuouslydevelopingminingsectorandvastresourcescauseobstaclesinmanagingMongolia’sresources.ThedevelopmentofOyuTolgoiandTavanTolgoirepresentaminingboomthatcouldbeshort-lastingasthecountryexperiencesboom-bustcyclesinlinewithinternationaldemandandinternationalcommoditymarketprices.Mongolia’sdouble-digitgrowthofthelastfewyearsandin2014slowedto7.8%.In2011,therewas17.3%GDPgrowth.”(Mining9-2015)

Page 50: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

49

ThecurrentdownturnincopperpricingisacauseofadownturninoperationsofmanycopperminesaroundtheworldthoughRioTintomanagementcontinuetoinvestmentinOTinanticipationofaupturnincopperpricesinthenext2-3years.(TRQ8-2015)ArealternativesourcesofpowerpossibleforOTPhase2?WhileOTTR2014atP.438notesthat,“Copperdemandwillalsobenefitfromagreaterlong-termfocusonrenewablesourcesofenergyandenergy-efficienttechnologiessuchaswindturbinesandelectric/hybridvehicles,whichareofcopper-intensivefabrication,”OTTR2014offersnorenewableenergyoptionsfortheOTpowersupply.AtthesametimethatForbes2015wasreportingonthelong-termobstaclesfacingTavanTolgoicoalproduction,itwasalsoreportingonenergyproductiontrendsinChinamovingawayfromcoaltorenewableenergyproduction.InSeptember2015Forbesalsoreportedthat,

“RenewableenergyisalsokeytoChina’stransitionawayfromcoal.Chinainvested$90billioninclean-techinvestmentslastyear,accordingtoBloombergNewEnergyFinance,farmorethantheU.S.Non-fossilfuelsources–solar,wind,hydroandnuclear–areexpectedtomakeup20%ofChina’senergymixin15years.Chinaalreadyhasmorewind-generatingcapacitythananycountryintheworldanditislikelythisyeartoovertakeGermanyastheworld’slargestsolarcountry,measuredbyinstalledcapacity.By2030,China’snon-fossil-fuelenergybasealonewillbealmostequivalenttothetotalelectricalcapacityoftheU.S.today.”(FORBES9-2015b)

OptionsforwindpowerproductioninMongoliaattheindustrialscaleneededbyOTareidentifiedinthe“ScalingUpRenewableEnergyinMongoliaInvestmentPlan”summarizedattheMongoliaNationalRenewableEnergyCenter’swebpageat:http://www.nrec.mn/web/data/main/main1441093417.pdf. TA-8757MONScalingUpRenewableEnergyinMongolia(InvestmentPlan),28August2015(NREC2015) The“ScalingUpRenewableEnergyinMongoliaInvestmentPlan”(NREC2015)identifiesfiveactivewindpowerdevelopmentprojects,withpotentialtogenerateatotalof350MW,asfollows:–OyuTolgoiWindPowerProjectbyQleantechLLC,102MW–SainshandWindPark,SainshandWindParkLLC,52MW–ChoirWindFarm,AydinerGlobalLLC,50.4MW–TsetsiiWindFarm,CleanEnergyAsiaLLC,50MWand-ABSolarWind,ABSolarWindLLC,100MWNREC2015saysthat,“Allhavegovernmentapprovalandtheirreadinessallowsconstructiontostartin2016.”

Page 51: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

50

OT’sownershipshouldconsiderinvestmentinrenewableenergysourcesforthemine’sfuturepowersupply.ThewindprojectslistedhavepotentialtocomeonlinebeforeaTavanTolgoicoal–firedpowerplantfedbyTavanTolgoicoalandatpotentiallylowercost.ProgressontheSainshandWindProjectthroughMarch,2015,includedanannouncementbyFerrostaalIndustrialProjectsGmbHthatitwillbeginconstructionofitsSainshandWindFarminApril,slatedtobeMongolia’ssecondandlargestwhenitiscompletedin2016.The$115millionparkwillhave27towersandaninstalledcapacityof54megawatts.Itwilldeliver54megawattstoMongolia’selectricalgrid,OliverSchnorr,directorofSainshandWindParkLLC,saidinatextmessage.(BLOOMBERG3-2015)TheSainshandprojectwouldbethesecondutilityscalewindprojecttobeconstructedinMongolia.Thefirst,the50-MWSalkhitWindFarmbeganoperationsin2013.Ifthe$115millioncostfor54megawattSainshandwindprojectisaccurate,thecostperwattfortheprojectwillbe$2.12/watt.EuropeanBankforReconstructionandDevelopment(EBRD)reportsthatcostdesignandconstructionofthe50megawattSalkhitWindProject,theonlyoperatingindustrialscalefindfarminMongolia,was$123million,acostof$2.46/watt.(EBRD2013)TheprojectcostofSainshandwindprojectwouldbeonly53%perwattoftheprojectedcostofa246-megawattTavanTolgoiPowerPlantifitwouldcost$1billion,acostof$4.06/watt.IfthemoreconservativecostoftheSalkhitWindFarmwereusedforcomparison,thecostofwindpowerforOTPhase2wouldbe40%lessthatthecostperwhatforTavanTolgoipowerat$4.06/watt.InApril2015,NewcomLLC,developeroftheSalkhitwithfundingfromtheEuropeanbankforReconstructionandDevelopment(EBRD)amongothersourcesannounced“The$100millionTsetsiiplantreceiveditspermitfromtheNationalDispatchingCenter,whichmanagesMongolia’sgrid.”NewcomChiefExecutiveBolorJargalsaikhansaid,“ThewindfarmisthefirstprojectofCleanEnergyAsiaLLC,whichis51percentownedbyUlaanbaatar-basedNewcomand49percentbyJapan’sSBEnergy,whichisSoftBankCorp.’senergyarm.Theoperatorsplantoexpandpowercapacityfrom50to250megawattswithin10years.”(BLOOMBERG4-2015)

Page 52: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

51

SOURCESCITEDBALE2014 “MassiveMongolianMineEndangersNomadsWater,WayofLife”,Rachel

Bale,September30,2014,https://www.revealnews.org/article-legacy/massive-mongolian-mine-endangers-nomads-water-way-of-life/

BLOOMBERG3-2015 “FerrostaalsettobeginworkonMongolia'sbiggestwind

farm”,MichaelKohn,BloombergNews,March17,2015,http://www.bloomberg.com/news/articles/2015-03-17/ferrostaal-set-to-begin-work-on-mongolia-s-biggest-wind-farm

BLOOMBERG4-2015 “Newcom,SBEnergyWinpermitfor50-MWWindFarmin

Mongolia”,MichaelKohn,BloombergNews,April,30,2015,http://www.bloomberg.com/news/articles/2015-04-30/newcom-sb-energy-win-permit-for-50-mw-wind-farm-in-mongolia

CAOIEP2015 Mongolia/OyuTolgoi-01/SouthernGobi–withdocumentsavailable

at:http://www.cao-ombudsman.org/cases/document-links/links-191.aspxandMongolia/OyuTolgoi-02/SouthernGobi-withdocumentsavailableat:http://www.cao-ombudsman.org/cases/document-links/links-196.aspx

EBRD2013 “DevelopmentImpactHonors:MongoliaSalkhitWindFarm”

http://www.ebrd.com/downloads/news/treasury-development-salkhit.pdfESIA2012 “EnvironmentalandSocialImpactAssessment”,2012,Allsectionsavailable

athttp://ot.mn/environmental-social-impact-assessment/FORBES9-2015b “China’sEconomicSlowdown:WeMayHaveSeenPeakCoal”,Mark

Clifford,ForbesMagazine,September3,2015,http://www.forbes.com/sites/mclifford/2015/09/03/chinas-economic-slowdown-we-may-have-seen-peak-coal/

IAR4-2015 ReportoftheIndependentEnvironmentandSocialConsultants–OyuTolgoi

Project;InterimReportApril2015,preparedbyD’Appolonia,S.p.A.,http://ot.mn/media/ot/content/esia-audits/OT_ESIA_Audit_report_Apr_2015_EN.pdf

IEPES2015 “IEPExecutiveSummary”–(CAOIndependentExpertPanelReport–

ExecutiveSummary),January30,2015,http://www.cao-ombudsman.org/cases/document-links/documents/ExecutiveSummary_edit_Jan_30_2015-ENG.pdf

Page 53: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

52

INVEZZ2016 “RioTintoshareprice:Mineragrees$4.4bnMongoliaminefinancing”,VeselinValchevValchev,January4,2016athttp://invezz.com/news/equities/21694-Rio-Tinto-share-price-Miner-agrees-4-4bn-Mongolia-mine-financing

IDPES2005 “OyuTolgoiProject,Mongolia-IntegratedDevelopmentPlan-Executive

Summary”,preparedbyAMECAusencoJointVenture,August2005,Revision1,http://www.turquoisehill.com/i/pdf/IDP_ExecutiveSummary.pdf

IDP2010 “OyuTolgoiProjectJune2010TechnicalReport,preparedbyAMECMinproc,http://www.turquoisehill.com/i/pdf/IDP10_June062010.PDF

IDOP2012 OyuTolgoiProjectIDOP[IntegratedDevelopmentandOperatingPlan]

TechnicalReport,preparedbyAMCConsultants,March12,2012athttp://www.turquoisehill.com/i/pdf/IDOP_2012Mar29_Tech_Rpt.pdf

Mining11-2015 “CopperpricesweighonRioTinto’sloomingdecisiononOyuTolgoi

Expansion”,CeceliaJamasmie,November26,2015athttp://www.mining.com/copper-prices-weigh-on-rio-tintos-looming-decision-on-oyu-tolgoi-expansion/

MINING9-2015 “MongoliastrugglestodevelopTavanTolgoicoalmine”,Samantha

Brletich,www.mining.com,September21,2015,http://www.mining.com/web/mongolia-struggles-to-develop-tavan-tolgoi-coal-mine/

MININGMAG2011 “OreBodyAccess,”MiningMagazine,03May2011at

http://www.miningmagazine.com/equipment/orebody-access)MONTSAME2015 “OTUndergroundMinefundingtobesettlednextmonth,”B.

Amarsaikhan,MontsameNews,October27,2015,http://en.montsame.mn/mining/ot-underground-mine-development-funding-be-settled-next-month-0

NREC2015 “ScalingUpRenewableEnergyInvestmentPlan”summarizedattheMongolia

RenewableEnergyCenter’swebpageat:http://www.nrec.mn/web/data/main/main1441093417.pdf. TA-8757MONScalingUpRenewableEnergyinMongolia(InvestmentPlan),28August2015

OTTR2014 OyuTolgoi2014TechnicalReport,preparedforOTLLCbyOreWin

Consultants,October27,2014http://www.turquoisehill.com/i/pdf/2014-10-27_OyuTolgoiTechReport.pdf

OTUMDFP2015 May2015OyuTolgoiUndergroundMineDevelopmentandFinancing

Page 54: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

53

Plan,http://www.turquoisehill.com/i/pdf/2015-05-18_OTUMDAFP.pdfTRQ8-2015 “OyuTolgoifilesrevisedschedulesfor2015feasibilitystudywith

MongolianMineralsCouncil,”TRQ,PressRelease,August27,2015,http://www.turquoisehill.com/s/news_releases.asp?ReportID=720655[submittalofrevisionstoaMarch2015Phase2FeasibilityStudyforapprovalbytheMongolianMiningCouncilthat“aligns”the2015FeasibilityStudywithboththeOTUMDFP2015andOTTR2014]

SCHNEIDER2013 “MongoliaCopperMineatOyuTolgoiTestsWaterSupplyandYoung

Democracy”,KeithSchneider,November5,2013,http://www.circleofblue.org/waternews/2013/world/mongolia-copper-mine-oyu-tolgoi-tests-water-supply-young-democracy/

SME2011 “SMEMiningEngineeringHandbookThirdEdition,SocietyforMining,

MetallurgyandExploration,2011,Darling,P.ed.,availableathttp://app.knovel.com/web/toc.v/cid:kpSMEMEHE5/viewerType:toc/root_slug:sme-mining-engineering

TRQ8-2015“OyuTolgoifilesrevisedschedulesfor2015FeasibilityStudywith

MongolianMineralsCouncil”,August27,2015corporatepressreleaseavailableat:http://www.turquoisehill.com/s/news_releases.asp?ReportID=720655. Includes:

“TurquoiseHillResourcestodayannouncedthatOyuTolgoihasfiledrevisedschedulesforthe2015OyuTolgoiFeasibilityStudy(OTFS2015)withtheMongolianMineralsCouncil(MMC).ThefilingalsoalignedOTFS2015withtheOyuTolgoiUndergroundMineDevelopmentandFinancingPlan(UndergroundPlan),whichwassignedinMay2015.TheMMChasalreadytentativelyacceptedOTFS2015,originallyfiledinMarch2015,pendingarevisionofschedulesandalignmentwiththeUndergroundPlan.OTFS2015isbasedonthesamefeasibilitystudyandalignswiththe2014OyuTolgoiTechnicalReport,whichwasdisclosedinOctober2014.”

TRQ8-2015b“AnalystandInvestorMineVisit”Presentation,August25-27,2015

http://www.turquoisehill.com/i/pdf/ppt/TRQ-SiteVisit-Aug2015.pdf TRQ12-2015“OyuTolgoisigns$4.4billionprojectfinancemarkinghistoricmilestone

towardrecommencementofundergrounddevelopment”,TRQPressRelease,December14,2015,http://www.turquoisehill.com/i/pdf/news/2015-12-14_NR_TRQ_YFb2vv.pdf

Woo2009 “Characterizationandempiricalanalysisofblockcavinginducedsurface

subsidenceandmacrodeformations,”Woo,K.,etal,ROCKENG09:Proceedingsofthe3rdCANUSRockMechanicsSymposium,Toronto,May

Page 55: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

54

2009,(Woo2009)at:http://www.geogroup.utoronto.ca/rockeng09/proceedings/innerFrames/PDF/Session19/4044%20PAPER.pdf.

5YearCopperSpotMarketPriceChart

Informationoninternationalmarketpricesandtrendsiscompiledfrom:www.kitco.com,thesourceusedforcommoditymetalpricesontheTurquoiseHillResourceswebsiteathttp://www.turquoisehill.com/s/commodity_metal_prices.asp.

Page 56: Oyu Tolgoi Phase 2: Plans, Issues and Risks - Bankwatch · Oyu Tolgoi Phase 2: Plans, Issues and Risks An Overview of Oyu Tolgoi Phase 2 Mining Plans and some of the issues and risks

BriefBiographyofPaulRobinson

[email protected]

SouthwestResearchandInformationCenterPOBox4524

Albuquerque,NewMexicoUSA87107www.sric.org

William“Paul”RobinsonworksasResearchDirectoratSouthwestResearchandInformationCenterinAlbuquerque,NewMexico,ascientificandeducationalorganizationworkingtopromotethehealthof people and communities, protect natural resources, ensure citizen participation, and secureenvironmentalandsocialjusticenowandforfuturegenerations,wherehehasemployedsince1976.Paulhaspreparedpeerreviewedtechnicalpapers,contractpublications,andeducationalmaterialsandexperttestimonyrelatedtomines,mills,andmineraldevelopmentpolicythroughouthis37-yearcareer.Hisconsultingclientshaveincludedlocalandinternationalnon-governmentalorganizations,law firms, industry trade associations, projectdevelopers,NativeAmericanTribes inTheUS, FirstNationsBandsinCanada,andgovernmentregulatoryandforeignassistanceagencies.PaulearnedhisMastersinCommunityandRegionalPlanning(aterminaldegree)withanemphasisonNaturalResourceManagementfromUniversityofNewMexico(UNM)in1992andaBAfromtheTechnology Assessment Program at Washington University, St. Louis, Missouri in 1974. TheprofessionalprojectforhisMastersaddressed“PlanningforReclamationoftheUraniumWasteSitesintheFormerEastGermany.”Paul’s peer reviewed professional papers have been published by; British Columbia Chamber ofMines, NM Bureau of Mining and Mineral Resources, CO School of Mines, Freiberg TechnicalInstitute–GermanyandEuropeanUnion–ScienceandTechnologyDirectorate..Paulhascoordinatedthree-country - Mongolia, Russia and US – educational and scientific exchanges addressing minereclamation,waterandrenewableenergyannuallysince2007.Paul’stechnicalreviewsofenvironmentalanalysesandmineoperatingplansinMongoliasupportofcivilsocietyorganizationsinvolvementinmulti-lateralbankloanapplicationshaveaddressedtheBigBend, Boroo andGatsuurt goldmines andOyu Tolgoi copper-goldmine. Paul provided an invitedpresentation on “Social and Environmental Responsibility inMining: International Experience andLessons Learned Regarding Accumulated Damage from Abandoned Mines, and Long-term RisksAssociated with Waste Management, and Renewable Energy Use” at Conference on Social andEnvironmental Responsibility in the Mineral Industry in Russia” in Moscow in October 2012available at http://www.wwf.ru/about/what_we_do/mining/conference. With co-author GalinaAnosova,Paulpreparedapeer-reviewpublicationon“MiningandMineralDevelopmentPolicyintheSelengeRiverWatershed”forScienceforWatershedConservation:MultidisciplinaryApproachesforNatural Resource Management Conference, Convened by United States Geological Survey (USGS),InstituteofGeneral andExperimentalBiology, SiberianDivision-RussianAcademyofSciences, andMongolian Academy of Sciences, September, 2004, available at:http://www.sric.org/mining/docs/USGS-siberia.pdf.HepreparedtechnicalreviewsaspartofPublicExpertizaCommitteereportsinRussiafortheDybycksagoldmine,AginskoeAutonomousOkrugandtheKhiagdauraniummine,BuryatRepublic.Afullresumeisavailableuponrequest.