p0 - sjeccd plumbing.pdf · opa-0003: the superstrut seismic restraint system. 4. opa-0114: the...
TRANSCRIPT
XX-X
LOCATION
X
COTG
FCO
FD
FS
OD
RD
VTR
WCO
G
OD
SD
SD
TW
TP
X GPM
Abbreviations
EXISTING(E)
ABOVE FINISHED FLOORAFF
BELOW FINISHED FLOORBFF
BACKFLOW PREVENTERBFP
CONDENSATE DRAINCD
CONTINUATIONCONT.
CHECK VALVECV
COLD WATERCW
DRINKING FOUNTAINDF
DIAMETERDIA
DOWNDN
ELECTRICALELECT
FLOOR CLEANOUTFCO
FLOOR DRAINFD
FEETFT
GALLONSGAL
GALLONS PER HOURGPH
GALLONS PER MINUTEGPM
GREASE WASTEGW
HEAD, HUB DRAINHD
HEATINGHTG
HEATERHTR
HOT WATERHW
HOT WATER RETURNHWR
INSIDE DIAMETERID
INVERT ELEVATIONIE
INCHESIN, "
INDIRECT WASTEIW
LAVATORYL
POUNDSLBS.
MINIMUMMIN
NOT APPLICABLEN/A
NOT IN CONTRACTNIC
NUMBERNO.
NOT TO SCALENTS
ON CENTEROC
OVERFLOW DRAIN, OUTSIDE DIAMETEROD
PRESSURE DROP, PLUMBING DEMOLITION, PUMPED DISCHARGEPD
POINT OF CONNECTIONPOC
PRESSURE REDUCING VALVEPRV
POUNDS PER SQUARE INCHPSI
QUANTITYQTY
ROOF DRAINRD
SINKS, SK
STORM DRAINSD
SQUARE FEETSF
SHUT OFF VALVESOV
SERVICE SINKSS
TEMPERATURE, THERMOMETERT
TEMPERATURETEMP
TRAP PRIMERTP
TEMPERED WATERTW
URINALU, UR
VACUUM, VENT, VOLTV
VENT THRU ROOFVTR
WITHW/
WASTEW
WATER COLUMNWC
WALL CLEANOUTWCO
General
DEMOLISH
EXISTING WORK
NEW WORK
CONTINUATION
EQUIPMENT IDENTIFICATION
KEYED NOTE
PIPE OR CONDUIT BELOW GRADE
POINT OF CONNECTION
Piping Fittings
CAP
CLEANOUT TO GRADE
FLOOR CLEANOUT
FLOOR DRAIN
FLOOR SINK
HOSE BIBB
OVERFLOW ROOF DRAIN
PIPE DROP
PIPE RISE
ROOF DRAIN
TEE DOWN ON PIPE
TEE UP ON PIPE
VENT THROUGH ROOF
WALL CLEANOUT
Piping Systems
COLD WATER PIPING
HOT WATER PIPING
HOT WATER RETURN PIPING
NATURAL GAS PIPING, STANDARD PRESSURE
OVERFLOW DRAIN PIPING ABOVE GRADE OR FINISHED FLOOR
SANITARY VENT PIPING
SANITARY WASTE OR SOIL PIPING ABOVE GRADE OR FINISHEDFLOOR
SANITARY WASTE OR SOIL PIPING BELOW GRADE ORFINISHED FLOOR
STORM DRAIN PIPING ABOVE GRADE OR FINISHED FLOOR
STORM DRAIN PIPING BELOW GRADE OR FINISHED FLOOR
TEMPERED WATER PIPING
TRAP PRIMER PIPING
Valves
BALANCING VALVE
CHECK VALVE
GLOBE VALVE
PRESSURE REDUCING VALVE
SHUTOFF VALVE, GENERAL
PLUMBING SYMBOL LISTNOTE: This is a standard symbol list and not all items listed may be used.
GENERAL SEISMIC NOTES
A. CONTRACTOR TO PROVIDE COMPLETE SEISMIC ANCHORAGE AND BRACING FOR
ALL PLUMBING EQUIPMENT WEIGHING 400 POUNDS OR MORE THAT IS DIRECTLY
MOUNTED ON THE FLOOR OR ROOF AND ALL MECHANICAL EQUIPMENT WEIGHING
OVER 20 POUNDS THAT IS SUSPENDED FROM THE FLOOR, WALL OR SUPPORTED
BY VIBRATION ISOLATORS TO RESIST A HORIZONTAL FORCE ACTING IN ANY
DIRECTION USING THE CRITERIA OUTLINED IN THE 2013 CALIFORNIA BUILDING
CODE, ASCE 7-10.13, #13.1.4. CONSIDER THE AFFECT OF TEMPERATURE
CHANGE IN PREPARATION OF ANCHORAGE AND BRACING DETAILS. PROVIDE
ANCHORAGE CALCULATIONS AND DETAILS CERTIFIED BY A STRUCTURAL
ENGINEER REGISTERED IN THE STATE OF CALIFORNIA.
D. SEISMIC BRACING POINTS SHALL BE SUBMITTED ON CONTRACTOR'S COORDINATED
SHOP DRAWINGS.
GENERAL PLUMBING NOTESA. CONDITIONS SHOW ON THE PLANS RELATIVE TO THE WORK TO BE
PERFORMED ARE BASED ON THE BEST INFORMATION AVAILABLE AND SUBJECT
TO VERIFICATION. VERIFY LOCATIONS AND ELEVATIONS OF UTILITIES TO BE
CROSSED OR CONNECTED. CORRECT DEFICIENCIES CAUSED BY FAILURE TO
PERFORM SUCH VERIFICATIONS AT NO EXPENSE TO OWNER. IMMEDIATELY
NOTIFY ARCHITECT AND ENGINEER OF CONDITION IN CONFLICT WITH THE
DETAILS/PLANS.
B. COORDINATE INSTALLATION OF PIPING, FIXTURES, EQUIPMENT AND THE LIKE
BELOW AND ABOVE GRADE WITH STRUCTURAL COMPONENTS AND OTHER
SYSTEMS INSTALLATION.
C. COORDINATE FIXTURES, EQUIPMENT, PIPE ROUGH-IN/CONNECTION
LOCATIONS AND DRAIN LOCATIONS WITH ARCHITECTURAL DRAWINGS.
D. LOCATE VALVES FOR SERVICE ACCESSIBILITY. VALVES INSTALLED ABOVE
CEILING SHALL BE WITHIN 18" OF CEILING.
E. SEE PLUMBING FIXTURE SCHEDULE FOR PIPE CONNECTION SIZES.
F. SANITARY SEWER AND STORM/OVERFLOW PIPING SLOPE @ 2% UNLESS
OTHERWISE SPECIFIED.
MEP COMPONENT ANCHORAGE NOTEALL MECHANICAL, PLUMBING, AND ELECTRICAL COMPONENTS SHALL BE ANCHORED AND INSTALLED PER
THE DETAILS ON THE DSA APPROVED CONSTRUCTION DOCUMENTS. WHERE NO DETAIL IS INDICATED, THE
FOLLOWING COMPONENTS SHALL BE ANCHORED OR BRACED TO MEET THE FORCE AND DISPLACEMENT
REQUIREMENTS PRESCRIBED IN THE 2013 CBC, SECTIONS 1616A.1.23 THROUGH 1616A.1.26 AND ASCE 7-10
CHAPTER 13 AND 29.
1. ALL PERMANENT EQUIPMENT AND COMPONENTS.
2. TEMPORARY OR MOVABLE EQUIPMENT THAT IS PERMANENTLY ATTACHED (e.g. HARD WIRED) TO THE
BUILDING UTILITY SERVICES SUCH AS ELECTRICITY, GAS OR WATER.
3. MOVABLE EQUIPMENT WHICH IS STATIONED IN ONE PLACE FOR MORE THAN 8 HOURS AND HEAVIER
THAN 400 POUNDS ARE REQUIRED TO BE ANCHORED WITH TEMPORARY ATTACHMENTS.
THE ATTACHMENT OF THE FOLLOWING MECHANICAL AND ELECTRICAL COMPONENTS SHALL BE POSITIVELY
ATTACHED TO THE STRUCTURE, BUT NEED NOT BE DETAILED ON THE PLANS. THESE COMPONENTS SHALL
HAVE FLEXIBLE CONNECTIONS PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK, PIPING,
AND CONDUIT.
A. COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVE A CENTER OF MASS LOCATED 4 FEET OR
LESS ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT THE COMPONENT.
B. COMPONENTS WEIGHING LESS THAN 20 POUNDS, OR IN THE CASE OF DISTRIBUTED SYSTEMS, LESS
THAN 5 POUNDS PER FOOT, WHICH ARE SUSPENDED FROM A ROOF OR FLOOR OR HUNG FROM A WALL.
FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS ON THE APPROVED DRAWINGS, THE INSTALLATION
SHALL BE SUBJECT TO THE APPROVAL OF THE STRUCTURAL ENGINEER OF RECORD AND THE DSA DISTRICT
STRUCTURAL ENGINEER. THE PROJECT INSPECTOR WILL VERIFY THAT ALL COMPONENTS AND EQUIPMENT
HAVE BEEN ANCHORED IN ACCORDANCE WITH ABOVE REQUIREMENTS.
PIPING AND DUCTWORK BRACING NOTEPIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE BRACED TO COMPLY WITH THE FORCES AND
DISPLACEMENTS PRESCRIBED IN ASCE 7-10 SECTION 13.3 AND SECTION 13.6, AND 2013 CBC, SECTIONS 1616A.1.23
THROUGH 1616A.1.26.
THE BRACING AND ATTACHMENTS TO THE STRUCTURE SHALL BE DETAILED ON THE APPROVED DRAWINGS OR THEY
SHALL COMPLY WITH ONE OF THE OSPHD PRE-APPROVALS (OPA #) AS MODIFIED TO SATISFY ANCHORAGED
COPIES OF THE MANUAL SHALL BE AVAILABLE ON THE JOBSITE PRIOR TO THE START OF HANGING AND BRACING OF
THE PIPE, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS.
B. PIPING SHALL BE SUPPORTED AND BRACED WITH ONE OF THE FOLLOWING
SEISMIC RESTRAINT SYSTEMS:
1. OPA-0010: THE SMACNA GUIDELINES OF THE SEISMIC RESTRAINT OF
MECHANICAL SYSTEMS AND PLUMBING SYSTEMS.
2. OPA-0215: NUSIG SEISMIC SUPPORT DEVICES.
3. OPA-0003: THE SUPERSTRUT SEISMIC RESTRAINT SYSTEM.
4. OPA-0114: THE B-LINE SEISMIC RESTRAINT SYSTEM.
REQUIREMENTS OF ACI 318, APPENDIX D.
THE STRUCTURAL ENGINEER OF RECORD SHALL VERIFY THE ADEQUACY OF THE STRUCTURE TO SUPPORT THE HANGER
AND BRACE LOADS.
C. CALCULATIONS AND DRAWINGS SHALL BE SUBMITTED FOR PIPING SUPPORTS AND
BRACING SHOWING:
1. LOCATION OF SEISMIC BRACING.
2. REACTION FORCES TO THE SUPPORTING STRUCTURE.
3. MANUFACTURER'S DESIGNATION OF SUPPORT DEVICES.
POINT OF DISCONNECTION
EFORPDERETSI
GE R
REEN
IGN
E
LANOISS
C A L I F OR N I AS T A T E O F
No. 030802
M
E C H A N IC A
L
HO
RM
OZ L. JANSS
EN
S
E N G I N E E R I N G
I N T E R F A C E
TEL
FAX
PROJECT
CONTACT
www.interfaceengineering.com
717 Market Street
Suite 500
San Francisco, CA 94103
415.489.7240
415.489.7289
SHEET NO:
DATE:
PROJECT NO:
THIS DOCUMENT CONTAINS INFORMATION THAT IS PROPRIETARY TO LPAS, INC. AND IS FURNISHED FOR THEPURPOSES OF REVIEW, BIDDING OR CONSTRUCTION OF THE PROJECT LISTED IN THE JOB TITLE BOX ABOVEAND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR RELEASED TO ANY OTHER PARTY WITHOUT THEWRITTEN CONSENT OF LPAS, INC. INFOMATION CONTAINED HEREIN IS AN INSTRUMENT OF PROFESSIONALSERVICES AND SHALL REMAIN THE PROPERTY OF LPAS, INC. ALL RIGHTS RESERVED COPYRIGHT © 2009.
THIS DRAWING IS NOT FINAL OR TO BE USED FOR CONSTRUCTION UNTIL IT IS SIGNED BY THE ARCHITECTAND ENGINEER.
CONSULTANT
6910 5 31112 8 7 4 2 1
J
K
H
G
F
E
D
C
B
A
B
A
J
K
H
G
F
E
D
C
6910 5 31112 8 7 4 2 1
NO. ISSUE DATE
ARCHITECT'S STAMP APPROVAL
Hasan Shah
2014-0174
SAN JOSE CITYCOLLEGE
PHYSICAL EDUCATION BUILDING ANDRENOVATED LAB BUILDING
SAN JOSE, CALIFORNIA
PLUMBING SYMBOLSLISTS, GENERAL NOTESAND SHEET INDEX
P0.01
1.12.2015
1089-0001
DSA SUBMITTAL
P0.01 PLUMBING SYMBOLS LISTS, GENERAL NOTES AND SHEET INDEX
P0.02 SCHEDULES - PLUMBING
P2.01 UNDERGROUND PLAN - PHYSICAL EDUCATION BUILDING -PLUMBING
P2.02 1ST FLOOR PLAN - PHYSICAL EDUCATION BUILDING - PLUMBING
P2.03 2ND FLOOR PLAN - PHYSICAL EDUCATION BUILDING - PLUMBING
P2.04 ROOF PLAN - PLUMBING
P4.01 ENLARGED PLANS AND SECTIONS - PLUMBING
P4.02 ENLARGED PLANS AND SECTIONS - PLUMBING
P7.01 DETAILS - PLUMBING
SHEET INDEX
WP0.02 DETAIL & SCHEDULE - PLUMBING
WP2.05 1ST FLOOR, AND ROOF PLANS - WELLNESS CENTER - PLUMBING
SHEET INDEX - WELLNESS CENTER
SYMBOL FIXTURE TYPE DESCRIPTION MFR MODEL ACCESSORIES W V CW HW NOTESDF-1 DRINKING FOUNTAIN
(ELECTRIC WATERCOOLED)
NO LEAD TWO LEVEL FOUNTAINBASINS (18 GAUGE) REFRIGERATEDFOUNTAIN WITH BOTTLING FILLINGSTATION; FLEXI GUARD SAFETYBUBBLERS; NO-TOUCH SENSORACTIVATED BOTTLE FILLER
ELKAY LZWS-LRPBM28K 2" 1-1/2" 1/2" -- PROVIDE ALLNECESSARYACCESSORIESINCLUDING MOUNTINGBRACKET FOR SYSTEMTO WORK PROPERLY.
DF-2 DRINKING FOUNTAIN(ELECTRIC WATER
COOLED)
REFRIGERATED BOTTLING FILLINGSTATION; NO-TOUCH SENSORACTIVATED BOTTLE FILLER WITH 20SEC. SHUT OFF TIMER
ELKAY LZWS8K 2" 1-1/2" 1/2" -- PROVIDE ALLNECESSARYACCESSORIESINCLUDING MOUNTINGBRACKET FOR SYSTEMTO WORK PROPERLY.
DSN-1 DOWNSPOUT NOZZLE FABRICATED TYPE 304 STAINLESSSTEEL DOWNSPOUT COVER WITHHINGED PERFORATED COVER
J.R. SMITH 1775 -- -- -- --
FCO FLOOR CLEANOUT DURA COATED CAST IRON BODYWITH GAS AND WATER TIGHTTHREADED PLUG AND ROUNDPOLISHED NICKEL BRONZESCORIEATED TOP
ZURN Z1400 -- -- -- --
FD-1 FLOOR DRAIN DUCO CAST IRON BODY WITHPOLISHED NICKEL BRONZE TOP.
J.R. SMITH 2005Y 3" 2" -- -- PROVIDE WITH TRAPPRIMER CONNECTION
FD-2 FLOOR DRAIN(MECHANICAL ROOM)
DURA COATED CAST IRON BODYWITH BOTTOM OUTLET, SEEPAGEPAN WITH ANTI TILT HEAVY DUTYSLOTTED GRATE WITH SUSPENDEDPOLYPROPYLENE SEDIMENT BUCKET
ZURN Z541 3" 2" -- -- PROVIDE WITH TRAPPRIMER CONNECTION
FSK-1 FLOOR SINK 12"x12" SQUARE; 14 GAUGESTAINLESS STEEL RECEPTOR BODYWITH SEEPAGE HOLES; CAST TYPE316SS NON-TILT MEDIUM DUTY 3/4GRATE WITH 1/4" SQUARE HOLES;SEDIMENT BUCKET
J.R. SMITH 3007 3" 2" -- -- PROVIDE WITH TRAPPRIMER CONNECTION
HB-1 HOSE BIBB WALL FAUCET DESIGN WITH LOOSE TKEY HANDLE AND VACUUM BREAKER
WOODFORD 24 -- -- 3/4" --
HB-2 HOSE BIBB NARROW WALL HYDRANT, BRONZEBODY, KEY OPERATED CONTROLVALVE
ZURN Z1350 -- -- 3/4" --
HB-3 HOSE BIBB ANTI SIPHON VACUUM BREAKERWITH POLYCARBONATE WHEELHANDLE; CP INLET
WOODFORD 24 -- -- 3/4" --
L-1 LAVATORY UNDERCOUNTER LAVATORY WITHSANAGLOSS CERAMIC GLAZE ANDFRONT OVERFLOW
TOTO LT540G FAUCET: TOTO MODEL TEL5LI15; HYDROPOWERSELF GENERATING SYSTEM
2" 1-1/2" 1/2" 1/2"
L-2 LAVATORY(ADA)
UNDERCOUNTER LAVATORY WITHSANAGLOSS CERAMIC GLAZE ANDFRONT OVERFLOW
TOTO LT540G FAUCET: TOTO MODEL TEL5LI15; HYDROPOWERSELF GENERATING SYSTEM
2" 1-1/2" 1/2" 1/2"
MS-1 MOP SINK HALF ROUND DROP FRONT MOPRECEPTORS
FLORESTONE 99 PROVIDE WITH 5' HOSE (MR-370), FAUCET(MR-371), MOP HANGER (MR-372), STAINLESSSTEEL RIMGUARD (MR-373)
3" 2" 3/4" 3/4"
RD-1/OD-1 ROOF DRAIN /OVERFLOW DRAIN
DURA COATED CAST IRON BODYWITH COMBINATION OF STORM ANDOVERFLOW DRAIN
ZURN Z164 -- -- -- --
RR-1 ROOF RECEPTOR DURA COATED CAST IRON BODYWITH COMBINATION MEMBRANEFLASHING CLAMP/DECK RECEPTORFRAME AND INTERNAL DOMESTRAINER
ZURN Z122 SEEPLAN
SEEPLAN
-- --
RPBP-1 REDUCED PRESSUREBACKFLOWPREVENTER
LEAD FREE VALVES FORBACKSIPHONAGE ANDBACKPRESSURE PROTECTION
ZURN 975XL2U PROVIDE WITH AIR GAP FITTINGS AND QT-SET -- -- SEEPLAN
-- ROUTE DRAIN TOFLOOR SINK
SH-1 SHOWER NON ADJUSTABLE SHOWER HEADWITH 1.5 GPM FLOW RATE
GROHE 28 342G PROVIDE WITH TUBULAR SHOWER ARM MODEL27 414, VALVE TRIM MODEL 19 311, PRESSUREBALANCE VALVE MODEL 35 015
2" 1-1/2" 1/2" 1/2" SEE ARCHITECTURALDRAWING FOR SHOWERPAN DRAIN MODEL
SH-2 SHOWER RELEXA ULTRA HAND SHOWER WITHMULTI FUNCTION MOUNTINGBRACKETS SERVE AS A HOSE GUIDE
GROHE 28 917 5 PROVIDE WITH HAND SHOWER WALL UNIONMODEL 28 672, VALVE TRIM MODEL 19 312,PRESSURE BALANCE VALVE MODEL 35 015
2" 1-1/2" 1/2" 1/2" SEE ARCHITECTURALDRAWING FOR SHOWERPAN DRAIN MODEL
SK-1 SINK SEAMLESS CONSTRUCTION OF TYPE304, 18-8 STAINLESS STEEL; FULLYCOATED UNDERSIDE FOR SOUNDAND CONDENSATION
JUST SL-ADA-2231-A-GR FAUCET: JUST MODEL JTR 51 WITH 4"WRISTBLADES; DECK MOUNTED ON 8" ONCENTER; CAST BRASS BODY WITH HEAVY CASTSPOUT ; 1.5 GPM; J-35 DRAIN
2" 1-1/2" 1/2" 1/2"
SK-2 SINK CONSTRUCTED OF 14 GA., TYPE 304SS WITH 12" HIGH BACKSPLASH;STAINLESS STEEL TUBULAR LEGSAND ADJUSTABLE BULLET FEET.
JUST SNSFB-124-12/12 FAUCET: SPEAKMAN MODEL SC-5814; CASTBRASS NOZZLE WITH 3/4" HOSE THREAD, PAILHOOK AND VACUUM BREAKER. J-35 DRAIN SERIES
2" 1-1/2" 1/2" 1/2"
TP-1 TRAP PRIMER MIFAB MR-500
U-1 URINAL HIGH EFFICIENCY SANAGLOSSCEERAMIC GLAZE WITH 0.125 GPF
TOTO UT105UG FLUSH VALVE: TOTO MODEL TEU1UN12#CP;HYDROPOWER SELF GENERATING SYSTEM WITHMANUAL OVERIDE SYSTEM
2" 1-1/2" 3/4" --
U-2 URINAL(ADA)
HIGH EFFICIENCY SANAGLOSSCEERAMIC GLAZE WITH 0.125 GPF
TOTO UT105UG FLUSH VALVE: TOTO MODEL TEU1UN12#CP;HYDROPOWER SELF GENERATING SYSTEM WITHMANUAL OVERIDE SYSTEM
2" 1-1/2" 3/4" --
WC-1 WATER CLOSET HIGH EFFICIENCY WALL MOUNTEDTOILET WITH SANAGLOSS CERAMICGLAZE WITH 1.28 GPF
TOTO CT708EG FLUSH VALVE: TOTO MODEL TET1LN32#CP;HYDROPOWER SELF GENERATING SYSTEM WITHMANUAL OVERIDE SYSTEM; SEAT MODEL SC534
4" 2" 1-1/4" --
WC-2 WATER CLOSET (ADA) HIGH EFFICIENCY WALL MOUNTEDTOILET WITH SANAGLOSS CERAMICGLAZE WITH 1.28 GPF
TOTO CT708EG FLUSH VALVE: TOTO MODEL TET1LN32#CP;HYDROPOWER SELF GENERATING SYSTEM WITHMANUAL OVERIDE SYSTEM; SEAT MODEL SC534
4" 2" 1-1/4" --
WCO WALL CLEANOUT ROUND STAINLESS STEEL WALLACCESS COVER COMPLTE WITHSECURING SCREW AND BRONZERAISED HEX HEAD PLUG
ZURN Z1468 -- -- -- --
WHA-1 WATER HAMMERARRESTER
ZURN Z1700 SERIES -- -- -- --
NOTES:
PLUMBING FIXTURE SCHEDULEBASIS OF DESIGN CONNECTION
* UNLESS NOTED OTHERWISE ON DRAWINGS
WH-1 INDIRECT WATER HEATER HYDRONICS ROOM CEMLINE V120SPH2000-DW 120 120 1 DOUBLE WALL WITH SOLID STATE CONTROL MODULE ANDCONNECTION TO THE BAS; STORAGE TANK DIMENSION 24"DIA. x 63" HEIGHT
CP-1/CP-2 CIRCULATING PUMP HYDRONICS ROOM BELL & GOSSETT PL-55B 277 1.9
ET-1 EXPANSION TANK HYDRONICS ROOM BELL & GOSSETT PTA-30V
NOTES:
PLUMBING EQUIPMENT SCHEDULE SCHEDULE
SYMBOL EQUIPMENT TYPE LOCATION / SERVING
BASIS OF DESIGN TANKCAPACITY(GALLONS)
ELECTRICAL
COMMENTSMFR MODEL VOLTS PH AMPS WATTS
2013 CPC
PRIVATE PUBLIC PUBLIC PRIVATE PUBLIC PUBLIC TOTAL
INDIVIDUAL GENERAL HEAVY USE INDIVIDUAL GENERAL HEAVY-USE FIXTURE
DWELLING USE ASSEMBLY DESCRIPTION DWELLING USE ASSEMBLY UNITS
0 2 0 CLOTHESWASHER, DOMESTIC 3.00 3.00 3.00 6.00
0 3 0 DRINKING FOUNTAIN OR WATER COOLER 0.50 0.50 1.00 1.50
0 0 0 FOOD-WASTE-GRINDER, COMMERCIAL 0.00 3.00 3.00 0.00
0 20 0 FLOOR DRAIN, EMERGENCY 0.00 0.00 0.00 0.00
0 1 0 KITCHEN SINK, DOMESTIC W/ONE 1 1/2" TRAP 2.00 2.00 0.00 2.00
0 24 0 LAVATORY, SINGLE 1.00 1.00 1.00 24.00
0 3 0 RECEPTOR, INC. WASTE, 3" TRAP 7-4 0.00 4.00 4.00 12.00
0 2 0 SERVICE SINK OR MOP BASIN, 3" TRAP 0.00 3.00 0.00 6.00
0 24 0 SHOWER, STALL, 2" TRAP 2.00 2.00 2.00 48.00
0 1 0 SINK, GENERAL, 2" TRAP 3.00 4.00 4.00 4.00
0 0 0 SINK, GENERAL, 3" TRAP 0.00 6.00 6.00 0.00
0 8 0 URINAL, 1.0 GPF 2.00 2.00 5.00 16.00
0 28 0 WATER CLOSET, 1.6 GPF, FLUSHOMETER VALVE 3.00 4.00 6.00 112.00
TOTAL 231.50
PIPE SIZE 6"
SANITARY DRAINAGE
CALCULATIONSFIXTURE QUANTITY TABLE 7-3
PRIVATE PUBLIC PRIVATE PUBLIC TOTAL (.75)
INDIVID. GENERAL INDIVIDUAL GENERAL COLD HOT
DWELLING USE DESCRIPTION DWELLING USE WATER WATER
2 SINK 1.00 2.00 4.00 3.00
24 BATHTUB OR COMB. BATH/SHOWER 4.00 2.00 48.00 36.00
2 CLOTHESWASHER, DOMESTIC 4.00 4.00 8.00 6.00
3 DRINKING FOUNTAIN OR WATER COOLER 0.00 0.50 1.50 0.00
1 HOSE BIBB 2.50 2.50 2.50 0.00
HOSE BIBB (HW/CW) 2.50 2.50 0.00 0.00
5 HOSE BIBB, EACH ADDITIONAL 1.00 1.00 5.00 0.00
24 LAVATORY 1.00 1.00 24.00 18.00
2 SERVICE SINK OR MOP BASIN (3" TRAP) 0.00 3.00 6.00 4.50
8 URINAL, 1.0 GPF 0.00 4.00 32.00 0.00
28 WATER CLOSET, 1.6 GPF, FLUSHOMETER VALVE 5.00 5.00 140.00 0.00
TOTAL FIXTURE UNITS 271.00 67.50
FLOW IN GPM 108 GPM 36 GPM
SERVICE SIZE FROM BUILDING PIPING 4" 2-1/2"
WATER SERVICE
CALCULATIONS
EFORPDERETSI
GE R
REEN
IGN
E
LANOISS
C A L I F OR N I AS T A T E O F
No. 030802
M
E C H A N IC A
L
HO
RM
OZ L. JANSS
EN
S
E N G I N E E R I N G
I N T E R F A C E
TEL
FAX
PROJECT
CONTACT
www.interfaceengineering.com
717 Market Street
Suite 500
San Francisco, CA 94103
415.489.7240
415.489.7289
SHEET NO:
DATE:
PROJECT NO:
THIS DOCUMENT CONTAINS INFORMATION THAT IS PROPRIETARY TO LPAS, INC. AND IS FURNISHED FOR THEPURPOSES OF REVIEW, BIDDING OR CONSTRUCTION OF THE PROJECT LISTED IN THE JOB TITLE BOX ABOVEAND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR RELEASED TO ANY OTHER PARTY WITHOUT THEWRITTEN CONSENT OF LPAS, INC. INFOMATION CONTAINED HEREIN IS AN INSTRUMENT OF PROFESSIONALSERVICES AND SHALL REMAIN THE PROPERTY OF LPAS, INC. ALL RIGHTS RESERVED COPYRIGHT © 2009.
THIS DRAWING IS NOT FINAL OR TO BE USED FOR CONSTRUCTION UNTIL IT IS SIGNED BY THE ARCHITECTAND ENGINEER.
CONSULTANT
6910 5 31112 8 7 4 2 1
J
K
H
G
F
E
D
C
B
A
B
A
J
K
H
G
F
E
D
C
6910 5 31112 8 7 4 2 1
NO. ISSUE DATE
ARCHITECT'S STAMP APPROVAL
Hasan Shah
2014-0174
SAN JOSE CITYCOLLEGE
PHYSICAL EDUCATION BUILDING ANDRENOVATED LAB BUILDING
SAN JOSE, CALIFORNIA
SCHEDULES - PLUMBING
P0.02
1.12.2015
1089-0001
DSA SUBMITTAL
EFORPDERETSI
GE R
REEN
IGN
E
LANOISS
C A L I F OR N I AS T A T E O F
No. 030802
M
E C H A N IC A
L
HO
RM
OZ L. JANSS
EN
S
E N G I N E E R I N G
I N T E R F A C E
TEL
FAX
PROJECT
CONTACT
www.interfaceengineering.com
717 Market Street
Suite 500
San Francisco, CA 94103
415.489.7240
415.489.7289
SHEET NO:
DATE:
PROJECT NO:
THIS DOCUMENT CONTAINS INFORMATION THAT IS PROPRIETARY TO LPAS, INC. AND IS FURNISHED FOR THEPURPOSES OF REVIEW, BIDDING OR CONSTRUCTION OF THE PROJECT LISTED IN THE JOB TITLE BOX ABOVEAND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR RELEASED TO ANY OTHER PARTY WITHOUT THEWRITTEN CONSENT OF LPAS, INC. INFOMATION CONTAINED HEREIN IS AN INSTRUMENT OF PROFESSIONALSERVICES AND SHALL REMAIN THE PROPERTY OF LPAS, INC. ALL RIGHTS RESERVED COPYRIGHT © 2009.
THIS DRAWING IS NOT FINAL OR TO BE USED FOR CONSTRUCTION UNTIL IT IS SIGNED BY THE ARCHITECTAND ENGINEER.
CONSULTANT
6910 5 31112 8 7 4 2 1
J
K
H
G
F
E
D
C
B
A
B
A
J
K
H
G
F
E
D
C
6910 5 31112 8 7 4 2 1
NO. ISSUE DATE
ARCHITECT'S STAMP APPROVAL
Hasan Shah
2014-0174
SAN JOSE CITYCOLLEGE
PHYSICAL EDUCATION BUILDING ANDRENOVATED LAB BUILDING
SAN JOSE, CALIFORNIA
SITE PLAN - PLUMBING
P1.01
1.12.2015
1089-0001
DSA SUBMITTAL
0' 4' 8' 16'
1" = 20'-0"
1 SITE PLAN - PLUMBING
SHEET KEYNOTES1 XXX
Tectonic Cop
yright 2007
Tectonic Cop
yright 2007
Tectonic Cop
yright 2007
Tectonic Cop
yright 2007
Tectonic Cop
yright 2007
Tectonic Cop
yright 2007
Tectonic Cop
yright 2007
Tectonic Cop
yright 2007
E F GA.5 F.2 JH
5
6
7
8
9
B C DA
1
2
3
4
ELEV.
E1.1
HALL
167
PUBLIC WOMEN'SRESTROOM
122
SPECTATOR GYMNASIUM
160
PUBLIC MEN'S RESTROOM
126
MEN'S TEAM SHOWER
147
FOOTBALL LOCKER ROOM
146
TEAM DRESSING ROOM
148
VEST.
149
TEAM DRESSING ROOM
155HYDRONICS
157
WOMEN'S STUDENTLOCKERS
129
MEN'S STUDENT LOCKERS
132
MULTIPURPOSE CLASSROOM
141
SOUTH CORRIDOR
150
TRAINING ROOM
138
EQUIPMENT STORAGE
133
TICKETS/ CONCESSIONS
124
TELECOM
125
LOBBY
101
6" W(IE=-3'-4")
6" SDP.O.C
4" SDP.O.C
GAS LINEP.O.C
4" CWP.O.C
6" SDP.O.C
6" SDP.O.C
4" W(IE=-2'-6")
6" SDP.O.C
ELEC.
136
TRAINING STAFF ROOM
139
JAN.
140
MEN'S TEAM TOILETS
145
MENS
106
WOMENS
107
DEAN'S OFFICE
104
OFFICE
103 OPEN OFFICE
102
OFFICE
110
OFFICE
109
OFFICE
111OFFICE
112
OFFICE
113
MACH. ROOM
120
RISER
123
FD-1
FCO
FCO
FCO
FCOFCO
FCOFCO
4" SDP.O.C
4" W(IE=-3'-3")
FF=0'-0"
4" W(IE=-1'-8")
4" W(IE=-1'-8")
4" W(FCO)(IE=-1'-8")
4" W(IE=-3'-4")
4" W(IE=-3'-5")
4" W(IE=-1'-8")
WCO
TPTP
TP
WCO
WCO
FCO
FCO
FCO
FCO
FCOFCO
4"
WCO
FCO
TPTP
TP
TP
TP
TP
TPTPTP
FCO
TP
TP
FCO
FCO
FCO
SH
SH
WC
L4"
4"
FCO
FCO
WC
WCWCWCWCU
WC WC WC WC WC WC WC WC WC
UUU
L L
6" W
4"
4"
4"
L L
3"
4"
4"SH SH
SH
SHSH
SH
WC
WC
WCWC
WC
WC
U U
3"
SHSHL
3"
DF
FCO
WCO
FCO
TP
2" 2"
2"2"
3"
3"
3"
4"
4"
4"
4"SK
4" W(IE=-1'-8")
MS
FD
FDFD
FD
FDFD
FD
FDFD
FD
DF
FSK
FSK
FDFD
SHSHSHSH
FD
FD
SH
SH
SH
L
WC
U
UWC
4"
3"
3"
4"
FD
FD
FD
SHSHSHSH
SH SHSH
FD
FD
SK
WC
WC WC WC
FD
FD
4"
4"
3"
3"TP
TP
FSK
GAS (300CFH ) FROMGAS MAIN SUPPLY
4" CW (350FU) FROMCITY WATER MAIN
3" W UP
7
P7.01
EFORPDERETSI
GE R
REEN
IGN
E
LANOISS
C A L I F OR N I AS T A T E O F
No. 030802
M
E C H A N IC A
L
HO
RM
OZ L. JANSS
EN
S
E N G I N E E R I N G
I N T E R F A C E
TEL
FAX
PROJECT
CONTACT
www.interfaceengineering.com
717 Market Street
Suite 500
San Francisco, CA 94103
415.489.7240
415.489.7289
SHEET NO:
DATE:
PROJECT NO:
THIS DOCUMENT CONTAINS INFORMATION THAT IS PROPRIETARY TO LPAS, INC. AND IS FURNISHED FOR THEPURPOSES OF REVIEW, BIDDING OR CONSTRUCTION OF THE PROJECT LISTED IN THE JOB TITLE BOX ABOVEAND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR RELEASED TO ANY OTHER PARTY WITHOUT THEWRITTEN CONSENT OF LPAS, INC. INFOMATION CONTAINED HEREIN IS AN INSTRUMENT OF PROFESSIONALSERVICES AND SHALL REMAIN THE PROPERTY OF LPAS, INC. ALL RIGHTS RESERVED COPYRIGHT © 2009.
THIS DRAWING IS NOT FINAL OR TO BE USED FOR CONSTRUCTION UNTIL IT IS SIGNED BY THE ARCHITECTAND ENGINEER.
CONSULTANT
6910 5 31112 8 7 4 2 1
J
K
H
G
F
E
D
C
B
A
B
A
J
K
H
G
F
E
D
C
6910 5 31112 8 7 4 2 1
NO. ISSUE DATE
ARCHITECT'S STAMP APPROVAL
Hasan Shah
2014-0174
SAN JOSE CITYCOLLEGE
PHYSICAL EDUCATION BUILDING ANDRENOVATED LAB BUILDING
SAN JOSE, CALIFORNIA
UNDERGROUND PLAN -PHYSICAL EDUCATIONBUILDING - PLUMBING
P2.01
1.12.2015
1089-0001
DSA SUBMITTAL
0' 4' 8' 16'
1/8" = 1'-0"
1 1ST FLOOR PLAN - PHYSICAL EDUCATION BUILDING - PLUMBING
ELEV.
E1.1
HALL
167
PUBLIC WOMEN'SRESTROOM
122
SPECTATOR GYMNASIUM
160
PUBLIC MEN'S RESTROOM
126
MEN'S TEAM SHOWER
147
FOOTBALL LOCKER ROOM
146
VEST.
149
TEAM DRESSING ROOM
155
HYDRONICS
157
WOMEN'S STUDENTLOCKERS
129
MEN'S STUDENT LOCKERS
132
MULTIPURPOSE CLASSROOM
141SOUTH CORRIDOR
150
TRAINING ROOM
138
EQUIPMENT STORAGE
133
TICKETS/ CONCESSIONS
124
TELECOM
125
LOBBY
101
DSN-1
P4.01
3
P4.01
2
P4.02
1
P4.01
1
2" CW
E F GA.5 F.2 JH
5
6
7
8
9
ELEC.
136
TRAINING STAFF ROOM
139
JAN.
140
MEN'S TEAM TOILETS
145
MENS
106
WOMENS
107
DEAN'S OFFICE
104
OFFICE
103
OPEN OFFICE
102
OFFICE
110
OFFICE
109
OFFICE
111OFFICE
112
OFFICE
113
MACH. ROOM
120
RISER
123
B C D
1" HW
A
1
2
3
43" CW(218FU)
3/4" HWR(3GPM)
1-1/2" HW(28FU)
3" CW(253FU)
1" HWR(6GPM)
2" HW(49FU)
3/4" HWR
2" CW(18FU)
3/4" HWR(3GPM)
1" HW(8FU)
2" CW (21FU) UP
3/4" HWR (3GPM) UP
1" HW (11FU) UP
GYM EQUIPMENT
134
OFFICE
135
1/2" CW
3" CW(239FU)
1" HWR(6GPM)
2" HW(39FU)
2
3
3/4" RPBP-1
3/4" CW &3/4" HW (7FU)
1/2" CW &1/2" HW
3/4" CW (9FU)
4
5
2" HW
3" CW (342FU)
1-1/4" HWR (10GPM)
2-1/2" HW (82FU)
3" CW (297FU)
1" HWR (8GPM)
2" HW (65FU)
1
TP-1
2" V UP
2" V UP
1" CW (11FU)
DF-1
MS-1
FSK-1
FSK-1
SK-1
FD-1
FD-1
FD-1
FD-1
FD-1
64" SD/OD
7
66" SD/OD
DSN-17
2" V2" V
DF
3/4"CD
3/4"CD
8
3/4
"CD
8
9
9
9
9
10
10
10
TEAM DRESSING ROOM
148
WOMEN'S STUDENTRESTROOM
130
STAFF LOCKER
105
STAFF LOCKER
108
4
P7.01
4
P7.01
SDOD
11
11
HB-2
11
3"
4"
4"
3/4" CW UP
EFORPDERETSI
GE R
REEN
IGN
E
LANOISS
C A L I F OR N I AS T A T E O F
No. 030802
M
E C H A N IC A
L
HO
RM
OZ L. JANSS
EN
S
E N G I N E E R I N G
I N T E R F A C E
TEL
FAX
PROJECT
CONTACT
www.interfaceengineering.com
717 Market Street
Suite 500
San Francisco, CA 94103
415.489.7240
415.489.7289
SHEET NO:
DATE:
PROJECT NO:
THIS DOCUMENT CONTAINS INFORMATION THAT IS PROPRIETARY TO LPAS, INC. AND IS FURNISHED FOR THEPURPOSES OF REVIEW, BIDDING OR CONSTRUCTION OF THE PROJECT LISTED IN THE JOB TITLE BOX ABOVEAND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR RELEASED TO ANY OTHER PARTY WITHOUT THEWRITTEN CONSENT OF LPAS, INC. INFOMATION CONTAINED HEREIN IS AN INSTRUMENT OF PROFESSIONALSERVICES AND SHALL REMAIN THE PROPERTY OF LPAS, INC. ALL RIGHTS RESERVED COPYRIGHT © 2009.
THIS DRAWING IS NOT FINAL OR TO BE USED FOR CONSTRUCTION UNTIL IT IS SIGNED BY THE ARCHITECTAND ENGINEER.
CONSULTANT
6910 5 31112 8 7 4 2 1
J
K
H
G
F
E
D
C
B
A
B
A
J
K
H
G
F
E
D
C
6910 5 31112 8 7 4 2 1
NO. ISSUE DATE
ARCHITECT'S STAMP APPROVAL
Hasan Shah
2014-0174
SAN JOSE CITYCOLLEGE
PHYSICAL EDUCATION BUILDING ANDRENOVATED LAB BUILDING
SAN JOSE, CALIFORNIA
1ST FLOOR PLAN -PHYSICAL EDUCATIONBUILDING - PLUMBING
P2.02
1.12.2015
1089-0001
DSA SUBMITTAL
0' 4' 8' 16'
1/8" = 1'-0"
1 1ST FLOOR PLAN - PHYSICAL EDUCATION BUILDING - PLUMBING
SHEET KEYNOTES1 GAS METER WITH REGULATOR & EARTHQUAKE VALVE.
2 THERMOSTATIC MIXING VALVE WITH VACUUM BREAKER FOR MOBILEWHIRL POOL.
3 THERMOSTATIC MIXING VALVE WITH VACUUM BREAKER FOR DUAL TANKHYDROTHERAPY CONSOLE.
4 1/2" CW TO ICE MAKER.
5 1/2" CW & 1/2" HW DN.
6 SD/OD DN.
7 TERMINATE OD 16" AFF WITH DSN-1. SEE SHEET 6/P7.01.
8 3/4" CD DN & TERMINATE TO SINK TAILPIECE. SEE DETAIL SHEET 5/P7.01.
9 PROVIDE 3/4" CD TO MECHANICAL UNIT. SEE MECHANICAL DWG. FOREXACT UNIT LOCATION
10 PROVIDE SECONDARY DRAIN PAN WITH 2" LIP (AROUND PAN) ANDTERMINATE 3/4" CONDENSATE DRAIN 2" BELOW CEILING WITHESCUTCHEON PLATE.
11 SD/OD FROM ABOVE
CORRIDOR
201
E F GA.5 F.2 JH
5
6
7
8
9
TERRACE
T1
ELEV.
E1.1
JANITOR
203STAIR 1
S1
B C DA
1
2
3
4
1" HW
2" CW
6" SD/6" ODDN (7500 SF)
6" SD/6" OD DN (7500 SF)
4" SD/4" OD(3200 SF)
4" SD/4" OD(3400 SF)
6" SD/6" OD(3900 SF)
1
3/4
"3/4
"
1" HW (11FU)
2" CW (21FU)
3/4" HWR (3GPM)
2" V UP
2" VTR
2" VTR
EXERCISE LAB
205
SPECTATOR GYMNASIUM
160
STAIR 1
S1
FITNESS CENTER
202
4" VTR
4" VTR3" V UP
2" VTR
MS-1
DF-1
OD
SD
OD
SD
OD
SD
OD
SD
SDOD
2 4" SD/OD 2 4" SD/OD 2 4" SD/OD
2 4" SD/OD2 4" SD/OD2 4" SD/OD2 4" SD/OD
2 4" SD/OD
2 6" SD/OD
2" VUP
3" W
3" W DN
RR
SD
OD2 3" SD/OD3" SD/3" OD
DN (1200 SF)
FITNESS CENTER
202
CORRIDOR
201
3/4" CW UP
EFORPDERETSI
GE R
REEN
IGN
E
LANOISS
C A L I F OR N I AS T A T E O F
No. 030802
M
E C H A N IC A
L
HO
RM
OZ L. JANSS
EN
S
E N G I N E E R I N G
I N T E R F A C E
TEL
FAX
PROJECT
CONTACT
www.interfaceengineering.com
717 Market Street
Suite 500
San Francisco, CA 94103
415.489.7240
415.489.7289
SHEET NO:
DATE:
PROJECT NO:
THIS DOCUMENT CONTAINS INFORMATION THAT IS PROPRIETARY TO LPAS, INC. AND IS FURNISHED FOR THEPURPOSES OF REVIEW, BIDDING OR CONSTRUCTION OF THE PROJECT LISTED IN THE JOB TITLE BOX ABOVEAND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR RELEASED TO ANY OTHER PARTY WITHOUT THEWRITTEN CONSENT OF LPAS, INC. INFOMATION CONTAINED HEREIN IS AN INSTRUMENT OF PROFESSIONALSERVICES AND SHALL REMAIN THE PROPERTY OF LPAS, INC. ALL RIGHTS RESERVED COPYRIGHT © 2009.
THIS DRAWING IS NOT FINAL OR TO BE USED FOR CONSTRUCTION UNTIL IT IS SIGNED BY THE ARCHITECTAND ENGINEER.
CONSULTANT
6910 5 31112 8 7 4 2 1
J
K
H
G
F
E
D
C
B
A
B
A
J
K
H
G
F
E
D
C
6910 5 31112 8 7 4 2 1
NO. ISSUE DATE
ARCHITECT'S STAMP APPROVAL
Hasan Shah
2014-0174
SAN JOSE CITYCOLLEGE
PHYSICAL EDUCATION BUILDING ANDRENOVATED LAB BUILDING
SAN JOSE, CALIFORNIA
2ND FLOOR PLAN -PHYSICAL EDUCATIONBUILDING - PLUMBING
P2.03
1.12.2015
1089-0001
DSA SUBMITTAL
0' 4' 8' 16'
1/8" = 1'-0"
1 2ND FLOOR PLAN - PHYSICAL EDUCATION BUILDING - PLUMBING
1 3/4" CW & 3/4" HW DN TO JANITOR SINK.
SHEET KEYNOTES
2 SD/OD FROM ABOVE ROOF.
E F GA.5 F.2 JH
5
6
7
8
9
B C DA
1
2
3
4
AHU-1
W
6" RD-1 (3800 SF)6" OD-1
4" RD-1 (2500 SF)4" OD-1
4" RD-1 (2500 SF)4" OD-1
4" RD-1 (2500 SF)4" OD-1
4" RD-1 (2500 SF)4" OD-1
4" RD-1 (2500 SF)4" OD-1
4" RD-1 (2500 SF)4" OD-1
4" RD-1 (2600 SF)4" OD-1
4" RD-1 (2900 SF)4" OD-1
4" RD-1 (1800 SF)4" OD-1
4" RD-1 (3200 SF)4" OD-1
4" RD-1 (3400 SF)4" OD-1
6" RD-1 (3900 SF)6" OD-1
4" VTR
4" VTR
2" VTR
2" VTR
4" VTR4" VTR
3" VTR
2" VTR
3'' VTR
2" VTR
3" RR-1
1-1/4" CD
1-1/4" CD
3" RR-1
2" VTR
1" CD
3" RD-1 (1200 SF)3" OD-1
HB-3
HB-3
EFORPDERETSI
GE R
REEN
IGN
E
LANOISS
C A L I F OR N I AS T A T E O F
No. 030802
M
E C H A N IC A
L
HO
RM
OZ L. JANSS
EN
S
E N G I N E E R I N G
I N T E R F A C E
TEL
FAX
PROJECT
CONTACT
www.interfaceengineering.com
717 Market Street
Suite 500
San Francisco, CA 94103
415.489.7240
415.489.7289
SHEET NO:
DATE:
PROJECT NO:
THIS DOCUMENT CONTAINS INFORMATION THAT IS PROPRIETARY TO LPAS, INC. AND IS FURNISHED FOR THEPURPOSES OF REVIEW, BIDDING OR CONSTRUCTION OF THE PROJECT LISTED IN THE JOB TITLE BOX ABOVEAND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR RELEASED TO ANY OTHER PARTY WITHOUT THEWRITTEN CONSENT OF LPAS, INC. INFOMATION CONTAINED HEREIN IS AN INSTRUMENT OF PROFESSIONALSERVICES AND SHALL REMAIN THE PROPERTY OF LPAS, INC. ALL RIGHTS RESERVED COPYRIGHT © 2009.
THIS DRAWING IS NOT FINAL OR TO BE USED FOR CONSTRUCTION UNTIL IT IS SIGNED BY THE ARCHITECTAND ENGINEER.
CONSULTANT
6910 5 31112 8 7 4 2 1
J
K
H
G
F
E
D
C
B
A
B
A
J
K
H
G
F
E
D
C
6910 5 31112 8 7 4 2 1
NO. ISSUE DATE
ARCHITECT'S STAMP APPROVAL
Hasan Shah
2014-0174
SAN JOSE CITYCOLLEGE
PHYSICAL EDUCATION BUILDING ANDRENOVATED LAB BUILDING
SAN JOSE, CALIFORNIA
ROOF PLAN - PLUMBING
P2.04
1.12.2015
1089-0001
DSA SUBMITTAL
0' 4' 8' 16'
1/8" = 1'-0"
1 ROOF PLAN - PHYSICAL EDUCATION BUILDING - PLUMBING
MEN'S TEAM TOILETS
145
MEN'S TEAM SHOWER
147
8
9
WC-2
L-2
SH-2SH-1SH-1SH-1
L-2L-2
U-1 U-2
WC-1
SH-1
SH-1 SH-1
D
1-1/4" CW (18FU)
FD-1
FD-1
TP-1
2
S
1/2" HWR (2GPM)
2" CW (44FU)
1/4" HW (16FU)
HB-1
3/4" CW
1" HW (10FU)
1/2" CW(TYP.)
1" CW(8FU)
3/4"
3/4"
4
1" CW (14FU)
1-1/4" HW (16FU)
FCO
DF-2 8
2" V
3" V
3" V
2"2" V
4" VTR
SDOD
RR
2" VTR
MENS
106
WOMENS
107
STAFF LOCKER
108
A.5
S
DSN-1
WC-2
WC-2
L-2
L-2
SH-2
SH-2
1-1/2" V
3'' VTR
2'' V
WHA-1
B
2
3
2" CW(18FU)
2
3
1
1/2"
1"
1
3/4" HWR(3GPM)
1" HW(8FU)
1" HW, 1/2" CW& 3/4" HWR
OD
SD
9 6"
10
1-1/2"
2" HB-1
HB-1
SD
OD
3" SD/OD
WOMEN'S TEAM TOILETS
153
HYDRONICS
157
A.5
8
9
B
WC-2
L-2
SH-2
SH-1SH-1SH-1
L-2L-2
WC-1
SH-1 SH-1SH-1
WC-1 WC-1
SK-2
1-1/2"
1 1/4" CW (18FU)
A
4" SD/OD
FCO
1/2" HWR (2GPM)
2" CW (45FU)
1/4" HW (17FU)
1/2"
1" HW(10FU)
1/2" CW(TYP.)
TP-1
3" VTR
TP-2
1 1/4" HWR (10GPM)
2 1/2" HW (82FU)
3" CW (342FU)
CP-1
CP-2
G
G
1 1/4" G(300CFH)
2 1/2"
5
6
3/4" CW3/4" HW
ET-1
STORAGETANK
4" (350FU)
4" CW7
3/4"
3/4"
4
HB-1
1 1/4" HW(16FU)
1" CW(14FU)
1" CW(8FU)
S
FSK-2
FD-2
DF-2 8
WH-1
2 1/2"
FD-1
FD-1
FD-1
6
10DSN-1
OD
SD
2"
2"
3"
3"
2"
4" VTR
2"SS
HB-1
LAUNDRY
159
VEST.
152
WOMEN'S TEAM SHOWER
156
LAUNDRY
159
EFORPDERETSI
GE R
REEN
IGN
E
LANOISS
C A L I F OR N I AS T A T E O F
No. 030802
M
E C H A N IC A
L
HO
RM
OZ L. JANSS
EN
S
E N G I N E E R I N G
I N T E R F A C E
TEL
FAX
PROJECT
CONTACT
www.interfaceengineering.com
717 Market Street
Suite 500
San Francisco, CA 94103
415.489.7240
415.489.7289
SHEET NO:
DATE:
PROJECT NO:
THIS DOCUMENT CONTAINS INFORMATION THAT IS PROPRIETARY TO LPAS, INC. AND IS FURNISHED FOR THEPURPOSES OF REVIEW, BIDDING OR CONSTRUCTION OF THE PROJECT LISTED IN THE JOB TITLE BOX ABOVEAND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR RELEASED TO ANY OTHER PARTY WITHOUT THEWRITTEN CONSENT OF LPAS, INC. INFOMATION CONTAINED HEREIN IS AN INSTRUMENT OF PROFESSIONALSERVICES AND SHALL REMAIN THE PROPERTY OF LPAS, INC. ALL RIGHTS RESERVED COPYRIGHT © 2009.
THIS DRAWING IS NOT FINAL OR TO BE USED FOR CONSTRUCTION UNTIL IT IS SIGNED BY THE ARCHITECTAND ENGINEER.
CONSULTANT
6910 5 31112 8 7 4 2 1
J
K
H
G
F
E
D
C
B
A
B
A
J
K
H
G
F
E
D
C
6910 5 31112 8 7 4 2 1
NO. ISSUE DATE
ARCHITECT'S STAMP APPROVAL
Hasan Shah
2014-0174
SAN JOSE CITYCOLLEGE
PHYSICAL EDUCATION BUILDING ANDRENOVATED LAB BUILDING
SAN JOSE, CALIFORNIA
ENLARGED PLANS ANDSECTIONS - PLUMBING
P4.01
1.12.2015
1089-0001
DSA SUBMITTAL
0' 4' 8' 16'
1/4" = 1'-0"
2 ENLARGED MENS TEAM BATHROOM - 1ST FLOOR - PLUMBING
0' 4' 8' 16'
1/4" = 1'-0"
1 ENLARGED RESTROOM - 1ST FLOOR - PLUMBING0' 4' 8' 16'
1/4" = 1'-0"
3 ENLARGED WOMENS TEAM BATHROOM - 1ST FLOOR - PLUMBING
SHEET KEYNOTES1 1/2" CW & 1/2" HW DN TO SHOWER.
2 2" CW DN WITH SHUT-OFF VALVE & ACCESS PANEL.
3 1/2" HW DN WITH SHUT-OFF VALVE & ACCESS PANEL.
4 3/4" CW & 3/4" HW DN WITH SHUT-OFF VALVE & ACCESS PANEL.
5 1" CW & HW DN TO WASHERS.
6 1 1/4" G DN TO DRYERS.
7 180°F BOILER WATER INLET & OUTLES REFER TO MECHANICALDWG. FOR CONTINUATION.
8 PROVIDE 1/2" CW (WITH SOV), 2" W & 1-1/2" V FOR DF-2. CONNECT ALLPIPING INSIDE PLUMBING CHASE.
9 SD/OD DN.
10 TERMINATE OD 16" AFF WITH DSN-1.
PUBLIC WOMEN'SRESTROOM
122
PUBLIC MEN'S RESTROOM
126
WOMEN'S STUDENTLOCKERS
129
MEN'S STUDENT LOCKERS
132MEN'S STUDENT RESTROOM
131
WOMEN'S STUDENTRESTROOM
130
G JH
6" SDP.O.C
6" WP.O.C
S
L-2
L-2
L-2 L-2 L-2
L-1 L-1L-2L-1
L-2
WC-1WC-1WC-1WC-1WC-1WC-1WC-1WC-1 WC-2
WC-2WC-1WC-1WC-1WC-1
U-1U-1U-1U-2
SH-1
SH-1SH-1
SH-1
SH-1
SH-1
SH-2
SH-2
WC-1 WC-1
WC-1
WC-2
WC-2
WC-1
U-1
U-2
DF-1
S
WHA-1
WHA-1
FCO
3" V UP
1" CW(13FU)
2
3
4
L-2
L-1 L-1 L-1
12 TP-1
HB-1
TP-1
2" CW(58FU)
HB-1
HB-1
HB-1
2"CW(62FU)
3/4
"
1-1/2"HW(22FU)
3/4"
1-1/4"HW(16FU)
3/4"CW(4FU)
1-1/4"HW(13FU)
1
1"HW(7FU)
3/4"HWR(3GPM)
3/4"CW(6FU)
3
(132FU)
1
1" HWR(3GPM)
2-1/2" CW(138FU)
2-1/2" CW(151FU)
1/2"
2" CW(66FU)
3" CW(218FU)
3/4" HWR(3GPM)
1-1/2" HW(28FU)
FD-1 FD-1
FD-1FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
DSN-1
TP-1
TP-1
L-2L-2
2" V
3" V3" V
4" V2" V
4" V UP
2" V1-1/2" V
2" V
3" V
3" V
SD
OD
OD
SD
SD
OD
4 6" SD/OD
5
3" WMS
3" W UP
3" W DN
EFORPDERETSI
GE R
REEN
IGN
E
LANOISS
C A L I F OR N I AS T A T E O F
No. 030802
M
E C H A N IC A
L
HO
RM
OZ L. JANSS
EN
S
E N G I N E E R I N G
I N T E R F A C E
TEL
FAX
PROJECT
CONTACT
www.interfaceengineering.com
717 Market Street
Suite 500
San Francisco, CA 94103
415.489.7240
415.489.7289
SHEET NO:
DATE:
PROJECT NO:
THIS DOCUMENT CONTAINS INFORMATION THAT IS PROPRIETARY TO LPAS, INC. AND IS FURNISHED FOR THEPURPOSES OF REVIEW, BIDDING OR CONSTRUCTION OF THE PROJECT LISTED IN THE JOB TITLE BOX ABOVEAND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR RELEASED TO ANY OTHER PARTY WITHOUT THEWRITTEN CONSENT OF LPAS, INC. INFOMATION CONTAINED HEREIN IS AN INSTRUMENT OF PROFESSIONALSERVICES AND SHALL REMAIN THE PROPERTY OF LPAS, INC. ALL RIGHTS RESERVED COPYRIGHT © 2009.
THIS DRAWING IS NOT FINAL OR TO BE USED FOR CONSTRUCTION UNTIL IT IS SIGNED BY THE ARCHITECTAND ENGINEER.
CONSULTANT
6910 5 31112 8 7 4 2 1
J
K
H
G
F
E
D
C
B
A
B
A
J
K
H
G
F
E
D
C
6910 5 31112 8 7 4 2 1
NO. ISSUE DATE
ARCHITECT'S STAMP APPROVAL
Hasan Shah
2014-0174
SAN JOSE CITYCOLLEGE
PHYSICAL EDUCATION BUILDING ANDRENOVATED LAB BUILDING
SAN JOSE, CALIFORNIA
ENLARGED PLANS ANDSECTIONS - PLUMBING
P4.02
1.12.2015
1089-0001
DSA SUBMITTAL
0' 2' 4' 8'
1/4" = 1'-0"
1 ENLARGED 1ST FLOOR -PLUMBING PLAN
SHEET KEYNOTES1 3/4" CW & HW DN WITH SHUT-OFF VALVE AND ACCESS PANEL.
2 1/2"CW & HW DN WITH SHUT-OFF VALVE AND ACCESS PANEL.
3 2-1/2" CW DN WITH SHUT-OFF VALVE AND ACCESS PANEL.
4 SD/OD DN.
5 TERMINATE OD 16" AFF WITH DSN-1.
NOTE:
TYPE III
DRY AREA
1" TO 2" CLEARANCE
FLOOR PENETRATION SEAL
STANDARD LINK SEAL TYPE
FINISHED
PIPE SLEEVE
SPACE W/ASPHALT MASTIC
AROUND PIPE, FILL
WET AREA
TYPE I
PIPE SLEEVE
FLOOR
FINISHED
FLOOR/WALL
WET/DRY AREA
SPACE W/ASPHALT MASTIC
AROUND PIPE, FILL
1" TO 2" CLEARANCE
TYPE II
ANCHOR COLLAR
WATER STOP AND
8 TYPICAL MEMBRANE
WATERPROOF FLOOR/WALL PENETRATION
TP
SEWER
V 2"V
4" P-TRAP WITHTRAP PRIMERCONNECTION
1/2" TP SEE PLAN FORCONTINUATION
CONCRETE SLAB
SPR. DRAIN RISER
1" AIR GAP
6"Ø STEEL STAND PIPE
PIPE CLAMP
A
B
4"
2-1/2"
1/4"
4"MIN.
CONDENSATE DRAINDOWN IN WALL.
C.P. ESCUTCHEON.
3/4" COPPER DRAIN FROMFURNACE.
3/4" I.D. APPROVED HOSEAND S.S. HOSE CLAMPS.
P-TRAP.
ADJUST ROUGH-INHEIGHT AS REQ'D.
CABINET TOP.
2 PIPE THRU SLAB ON GRADENO SCALE
36"
NO SCALE
5 CONDENSATE DRAIN LOCATION NO SCALE
4 PUMPED CONDENSATE DRAIN CONNECTION NO SCALE
3 CONDENSATE TRAPNO SCALE
6 OVERFLOW DRAIN CAP COVER DETAIL @ EXTERIOR WALL
1 WATER HEATER NO SCALE
7 SPRINKLER HUB DRAIN DETAIL
HOT WATER OUTLET
BOILER WATER IN
DRAIN
BOILER WATER OUT
EXPANSION
TANK
COLD
RECIRCULATION
SUPPLY
WATER
HOUSE
VALVE
RELIEF
NOTE: SUGGESTED PIPING DESIGN. DESIGNER SHOULD
CHECK WITH LOCAL CODES TO VERIFY COMPLIANCE.
PIPE ALL RELIEF VALVES TO DRAIN
3/4"CD
CD
CD DISCHARGE FROMCONDENSATE PUMP
3" MINIMUM
DRAIN PAN
DRAIN LINE SHALL BE ATLEAST SAME SIZE AS THENIPPLE ON THE DRAIN PAN
SLOPE DOWN TOWARD DRAIN
CLEAN OUT (TYP.)
SEE PLAN FOR CONTINUATION
DIMENSIONS
UNIT TYPE "A" "B"
DRAW THRU 1.0 x S.P. 1.5 x S.P.
BLOW THRU 1" MIN. 2.0 x S.P.
SP = STATIC PRESSURE IN PAN
SEE PLAN FOR CONTINUATION
LS MODEL (S-316)
ELASTOMERIC SEAL ELEMENT
CAST IRON
EXTERIOR WALL
STAINLESS STEEL OVERFLOW
DRAIN & COVER
WALL
INTERIOR
NO SCALE
PIPE
WATER TIGHT LINK-SEAL
TOP OF SLAB
CONCRETE SLAB ON GRADE
CORE OR SAND CUTSLAB AS REQ'D
SAND
EFORPDERETSI
GE R
REEN
IGN
E
LANOISS
C A L I F OR N I AS T A T E O F
No. 030802
M
E C H A N IC A
L
HO
RM
OZ L. JANSS
EN
S
E N G I N E E R I N G
I N T E R F A C E
TEL
FAX
PROJECT
CONTACT
www.interfaceengineering.com
717 Market Street
Suite 500
San Francisco, CA 94103
415.489.7240
415.489.7289
SHEET NO:
DATE:
PROJECT NO:
THIS DOCUMENT CONTAINS INFORMATION THAT IS PROPRIETARY TO LPAS, INC. AND IS FURNISHED FOR THEPURPOSES OF REVIEW, BIDDING OR CONSTRUCTION OF THE PROJECT LISTED IN THE JOB TITLE BOX ABOVEAND SHALL NOT BE USED FOR ANY OTHER PURPOSE OR RELEASED TO ANY OTHER PARTY WITHOUT THEWRITTEN CONSENT OF LPAS, INC. INFOMATION CONTAINED HEREIN IS AN INSTRUMENT OF PROFESSIONALSERVICES AND SHALL REMAIN THE PROPERTY OF LPAS, INC. ALL RIGHTS RESERVED COPYRIGHT © 2009.
THIS DRAWING IS NOT FINAL OR TO BE USED FOR CONSTRUCTION UNTIL IT IS SIGNED BY THE ARCHITECTAND ENGINEER.
CONSULTANT
6910 5 31112 8 7 4 2 1
J
K
H
G
F
E
D
C
B
A
B
A
J
K
H
G
F
E
D
C
6910 5 31112 8 7 4 2 1
NO. ISSUE DATE
ARCHITECT'S STAMP APPROVAL
Hasan Shah
2014-0174
SAN JOSE CITYCOLLEGE
PHYSICAL EDUCATION BUILDING ANDRENOVATED LAB BUILDING
SAN JOSE, CALIFORNIA
DETAILS - PLUMBING
P7.01
1.12.2015
1089-0001
DSA SUBMITTAL