Page 1: P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013

P.15.02.07

AIRPORT SURFACE DATALINK

ICAO WG-S 3

ICAO Montreal, 09/07/2013

Page 2: P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013

ICA

O W

G-S

3 /

Mo

ntr

ea

l 9th

of

July

2

013

2|

This presentation is created by INDRA and is based on ©SESAR JOINT UNDERTAKING material developed within the frame of the SESAR Programme, co-financed by the EU and EUROCONTROL. The opinions expressed herein reflect the author’s view only. The SESAR Joint Undertaking is not liable for the use of any of the information included herein. Reprint of information included herein with approval of publisher and with reference to source code only

DISCLAIMER

Page 3: P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013

ICA

O W

G-S

3 /

Mo

ntr

ea

l 9th

of

July

2

013

3|

AGENDA

01 Introduction to P15.02.07

02 Achievements

03 Project status – Closed activities

04 Project status – Ongoing activities

Page 4: P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013

ICA

O W

G-S

3 /

Mo

ntr

ea

l 9th

of

July

2

013

4|

PROJECT SCOPE OVERVIEW

01 INTRODUCTION TO P.15.02.07

PROJECT MEMBERS

AENA, AIRBUS, DSNA,

EUROCONTROL, INDRA, NATMIG,

SELEX ES, THALES

P.15.02.07Airport Surface Datalink

T01Overall IEEE 802.16e/aero System Analysis & Design (Lead

EUROCONTROL)

T02Channel models and propagation analysis (Lead NATMIG)

T03IEEE 802.16e/aero profile (Lead EUROCONTROL)

T04Development & Integration Analysis (Lead AENA)

T05System Implementation (Lead SELEX ES)

T06 Integration and Testing (Lead THALES)

T07Standardization and Global Interoperability (Lead EUROCONTROL)

T08Security and Safety Analysis (Lead DSNA)

T09

Man

agem

ent

(Lea

d I

ND

RA

)

“The project aims at defining, validating and demonstrating a technical profile and architecture for a new generation of airport surface data link system”

Page 5: P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013

ICA

O W

G-S

3 /

Mo

ntr

ea

l 9th

of

July

2

013

5|

02 ACHIEVEMENTS

• Project has substantially contributed to the joint (EUROCAE and RTCA)

development of the AeroMACS profile based on mobile WiMAX standard

• Extensive simulations have been carried out to validate the AeroMACS profile

• AeroMACS ground prototypes/mock-ups testbed platforms developed. Testbed

will support laboratory and airport tests within the integration and testing activities

• Hardware prototypes are delivered to further validate the profile and confirm the

simulation results and support both laboratory and Toulouse airport tests

• AeroMACS system implementation document delivered, including Ground

Prototypes Description and Verification Objectives and Verification Strategy that

supports the Integration and Testing activities

• Support to standardisation bodies for AeroMACS profile standardisation: Eurocae

WG-82, RTCA SC-223, ICAO WG-S and Wimax Forum (AWG)

• Ongoing coordination with US/FAA

ACHIEVEMENTS

Page 6: P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013

ICA

O W

G-S

3 /

Mo

ntr

ea

l 9th

of

July

2

013

6|

03 PROJECTS TATUS – CLOSED ACTIVITIES

T01 Overall IEEE 802.16e/aero System Analysis & Design• Status: Completed 23/11/2010

T02 Channel models and propagation analysis• Status: Completed 01/07/2011

T03 IEEE 802.16e/aero Profile• Status: Completed 11/11/2011

T04 Deployment & Integration Analysis• Status: Completed 21/09/2012

T05 System Implementation

• Status: Completed: 31/05/2013

PROJECT STATUS – CLOSED ACTIVITIES

Page 7: P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013

ICA

O W

G-S

3 /

Mo

ntr

ea

l 9th

of

July

2

013

7|

04 PROJECTS TATUS – ONGOING ACTIVITIES

PROJECT STATUS – ONGOING ACTIVITIES

Page 8: P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013

ICA

O W

G-S

3 /

Mo

ntr

ea

l 9th

of

July

2

013

8|

04 PROJECTS TATUS – ONGOING ACTIVITIES

PROJECT STATUS – ONGOING ACTIVITIES

Page 9: P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013

ICA

O W

G-S

3 /

Mo

ntr

ea

l 9th

of

July

2

013

9|

04 PROJECTS TATUS – ONGOING ACTIVITIES

PROJECT STATUS – ONGOING ACTIVITIES

WA6 Integration and Testing (III)

• Progress:

• Verification Plan (VP) for Phase 1 testing: first draft issued for P.15.02.07 internal

review

• Verification Report (VR) Phase 1 : internal draft

• Thales and Selex Laboratory Tests: ongoing

• Toulouse Airport test: anticipated with DSNA (even if now planned in 2014), first

site survey already occurred in 2012, new meeting for details confirmation under

preparation

• Airport testing planning:

• 9.16 Airport testbed integrated and ready:      26/07/2013

• 15.2.7 Airport testbed integrated and ready:    18/03/2014

Page 10: P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013

ICA

O W

G-S

3 /

Mo

ntr

ea

l 9th

of

July

2

013

11|

04 PROJECTS TATUS – ONGOING ACTIVITIES

PROJECT STATUS – ONGOING ACTIVITIES

T07 Standardization and Global Interoperability

• Planning:

• Actual forecast date: 04/02/2014

• Progress:

• Open Consultation Process for the AeroMACS MOPS just completed – publication

is expected by end of year

• Draft MASPS available - completion planned by end of year

• WMF documents (AeroMACS PICS and CRSLv1.2) under finalisation for

submission to WMF available

• Draft SARPS available

• Support to EUROCAE WG82, RTCA SC223, ICAO ACP WGS, Wimax Forum

AWG

Page 11: P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013

ICA

O W

G-S

3 /

Mo

ntr

ea

l 9th

of

July

2

013

12|

04 PROJECTS TATUS – ONGOING ACTIVITIES

PROJECT STATUS – ONGOING ACTIVITIES

T08 Security and Safety Analysis

• Planning:

• Actual forecast date: 04/02/2014

• Progress:

• AeroMACS Safety and Performance Analysis: internal draft

• AeroMACS Security Analysis: internal draft for review

Page 12: P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013

ICA

O W

G-S

3 /

Mo

ntr

ea

l 9th

of

July

2

013

13|

THANK YOU FOR YOUR ATTENTIONANY QUESTIONS?

Page 13: P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013

15.2.7 Project Manager:15.2.7 Project Manager:Hyung Woo KimSD ATM & Airports SESAR [email protected]

San Fernando Business Park – Kenia bldg.Avenida de Castilla 2, 28830. San Fernando de Henares, Madrid.España

T +34 91 627 37 71www.indracompany.com