p.15.02.07 airport surface datalink icao wg-s 3 icao montreal, 09/07/2013
TRANSCRIPT
P.15.02.07
AIRPORT SURFACE DATALINK
ICAO WG-S 3
ICAO Montreal, 09/07/2013
ICA
O W
G-S
3 /
Mo
ntr
ea
l 9th
of
July
2
013
2|
This presentation is created by INDRA and is based on ©SESAR JOINT UNDERTAKING material developed within the frame of the SESAR Programme, co-financed by the EU and EUROCONTROL. The opinions expressed herein reflect the author’s view only. The SESAR Joint Undertaking is not liable for the use of any of the information included herein. Reprint of information included herein with approval of publisher and with reference to source code only
DISCLAIMER
ICA
O W
G-S
3 /
Mo
ntr
ea
l 9th
of
July
2
013
3|
AGENDA
01 Introduction to P15.02.07
02 Achievements
03 Project status – Closed activities
04 Project status – Ongoing activities
ICA
O W
G-S
3 /
Mo
ntr
ea
l 9th
of
July
2
013
4|
PROJECT SCOPE OVERVIEW
01 INTRODUCTION TO P.15.02.07
PROJECT MEMBERS
AENA, AIRBUS, DSNA,
EUROCONTROL, INDRA, NATMIG,
SELEX ES, THALES
P.15.02.07Airport Surface Datalink
T01Overall IEEE 802.16e/aero System Analysis & Design (Lead
EUROCONTROL)
T02Channel models and propagation analysis (Lead NATMIG)
T03IEEE 802.16e/aero profile (Lead EUROCONTROL)
T04Development & Integration Analysis (Lead AENA)
T05System Implementation (Lead SELEX ES)
T06 Integration and Testing (Lead THALES)
T07Standardization and Global Interoperability (Lead EUROCONTROL)
T08Security and Safety Analysis (Lead DSNA)
T09
Man
agem
ent
(Lea
d I
ND
RA
)
“The project aims at defining, validating and demonstrating a technical profile and architecture for a new generation of airport surface data link system”
ICA
O W
G-S
3 /
Mo
ntr
ea
l 9th
of
July
2
013
5|
02 ACHIEVEMENTS
• Project has substantially contributed to the joint (EUROCAE and RTCA)
development of the AeroMACS profile based on mobile WiMAX standard
• Extensive simulations have been carried out to validate the AeroMACS profile
• AeroMACS ground prototypes/mock-ups testbed platforms developed. Testbed
will support laboratory and airport tests within the integration and testing activities
• Hardware prototypes are delivered to further validate the profile and confirm the
simulation results and support both laboratory and Toulouse airport tests
• AeroMACS system implementation document delivered, including Ground
Prototypes Description and Verification Objectives and Verification Strategy that
supports the Integration and Testing activities
• Support to standardisation bodies for AeroMACS profile standardisation: Eurocae
WG-82, RTCA SC-223, ICAO WG-S and Wimax Forum (AWG)
• Ongoing coordination with US/FAA
ACHIEVEMENTS
ICA
O W
G-S
3 /
Mo
ntr
ea
l 9th
of
July
2
013
6|
03 PROJECTS TATUS – CLOSED ACTIVITIES
T01 Overall IEEE 802.16e/aero System Analysis & Design• Status: Completed 23/11/2010
T02 Channel models and propagation analysis• Status: Completed 01/07/2011
T03 IEEE 802.16e/aero Profile• Status: Completed 11/11/2011
T04 Deployment & Integration Analysis• Status: Completed 21/09/2012
T05 System Implementation
• Status: Completed: 31/05/2013
PROJECT STATUS – CLOSED ACTIVITIES
ICA
O W
G-S
3 /
Mo
ntr
ea
l 9th
of
July
2
013
7|
04 PROJECTS TATUS – ONGOING ACTIVITIES
PROJECT STATUS – ONGOING ACTIVITIES
ICA
O W
G-S
3 /
Mo
ntr
ea
l 9th
of
July
2
013
8|
04 PROJECTS TATUS – ONGOING ACTIVITIES
PROJECT STATUS – ONGOING ACTIVITIES
ICA
O W
G-S
3 /
Mo
ntr
ea
l 9th
of
July
2
013
9|
04 PROJECTS TATUS – ONGOING ACTIVITIES
PROJECT STATUS – ONGOING ACTIVITIES
WA6 Integration and Testing (III)
• Progress:
• Verification Plan (VP) for Phase 1 testing: first draft issued for P.15.02.07 internal
review
• Verification Report (VR) Phase 1 : internal draft
• Thales and Selex Laboratory Tests: ongoing
• Toulouse Airport test: anticipated with DSNA (even if now planned in 2014), first
site survey already occurred in 2012, new meeting for details confirmation under
preparation
• Airport testing planning:
• 9.16 Airport testbed integrated and ready: 26/07/2013
• 15.2.7 Airport testbed integrated and ready: 18/03/2014
ICA
O W
G-S
3 /
Mo
ntr
ea
l 9th
of
July
2
013
11|
04 PROJECTS TATUS – ONGOING ACTIVITIES
PROJECT STATUS – ONGOING ACTIVITIES
T07 Standardization and Global Interoperability
• Planning:
• Actual forecast date: 04/02/2014
• Progress:
• Open Consultation Process for the AeroMACS MOPS just completed – publication
is expected by end of year
• Draft MASPS available - completion planned by end of year
• WMF documents (AeroMACS PICS and CRSLv1.2) under finalisation for
submission to WMF available
• Draft SARPS available
• Support to EUROCAE WG82, RTCA SC223, ICAO ACP WGS, Wimax Forum
AWG
ICA
O W
G-S
3 /
Mo
ntr
ea
l 9th
of
July
2
013
12|
04 PROJECTS TATUS – ONGOING ACTIVITIES
PROJECT STATUS – ONGOING ACTIVITIES
T08 Security and Safety Analysis
• Planning:
• Actual forecast date: 04/02/2014
• Progress:
• AeroMACS Safety and Performance Analysis: internal draft
• AeroMACS Security Analysis: internal draft for review
ICA
O W
G-S
3 /
Mo
ntr
ea
l 9th
of
July
2
013
13|
THANK YOU FOR YOUR ATTENTIONANY QUESTIONS?
15.2.7 Project Manager:15.2.7 Project Manager:Hyung Woo KimSD ATM & Airports SESAR [email protected]
San Fernando Business Park – Kenia bldg.Avenida de Castilla 2, 28830. San Fernando de Henares, Madrid.España
T +34 91 627 37 71www.indracompany.com