Partnering withPartnering with Operation LifesaverOperation Lifesaver
15 May 201415 May 2014
Dave Goeres PEDave Goeres, PEChief Safety [email protected]
Why Partner ?Why Partner ?• Teaming with like-minded partners to g p
promote safety• Increase safe behaviors around rail,Increase safe behaviors around rail,
trains and buses• Expands educational outreachExpands educational outreach• Helps in audits with FRA and FTA
H i P t i t d thi ?• How is Partnering not a good thing ?
UTA SystemUTA System
FrontR nner (Comm ter Rail)FrontRunner (Commuter Rail) TRAX (Light Rail)
S-Line (Streetcar)Bus (Diesel, CNG, BRT)
Service Area6 Counties
85 Municipalities2.25 mil population
4,158 sq mi
6,500 Bus Stops140 Rail Miles
157 at grade Xings2,200 employees
UTA Rail OpeningsUTA Rail Openings140 Miles in 14 years
• TRAX (Light Rail) North South 15 mi Dec 1999TRAX (Light Rail) North South 15 mi Dec 1999• TRAX University Line 2 mi Jan 2002• TRAX Med Extension 2 mi Aug 2003• FrontRunner (CRT) North 45 mi Apr 2008• TRAX Hub Extension 2 mi Aug 2008
TRAX Mid J d 11 i A 2011• TRAX Mid Jordan 11 mi Aug 2011• TRAX West Valley 6 mi Aug 2011• FrontRunner South 45 mi Dec 2012• FrontRunner South 45 mi Dec 2012• TRAX Airport 6 mi Apr 2013• TRAX Draper 4 mi Aug 2013p g• S-Line Streetcar 2 mi Dec 2013
PurposePurpose
“We are gratified with the continued improvement in highway-rail grade crossing collisions but educating a distracted public incollisions, but educating a distracted public in order to reduce trespassing injuries and fatalities continues to be a challenge ”fatalities continues to be a challenge.
Operation Lifesaver President and CEO Joyce Rose.
Safety Focus at UTASafety Focus at UTA• Safety Culture
Safety First Moment at all meetingsSafety AmbassadorsSafety Committees / Hazard formSafety Committees / Hazard formWeekly Safety message / Monthly Poster
• 4+ E’sEliminate, Educate, Engineer,Enforce + Encourage
S f t M t S t (OSHAS 18001) tifi d• Safety Management System (OSHAS 18001) certified
Partnering OpportunitiesPartnering Opportunities• Rail Openings• Outreach to Schools and Communities• Outreach to Schools and Communities• Outreach to Businesses and Organizations
(Trucking)(Trucking)• UTA Safety School – UTA Police• UTA staff as Operation Lifesaver presenters• UTA staff as Operation Lifesaver presenters• Conferences / Fairs / Seminars
Partnering OpportunitiesPartnering Opportunities• Sponsoring “Bees” Traing• Area leadership train rides• Correcting Photographers and Commercialsg g p• State and National Leadership opportunities• Updating Utah Drivers Training Manualp g g
The Utah WayThe Utah WayUTA, UDOT, WFRC, MAG• Collaboration• IntegrationIntegration• Cooperation
Alli• Alliance• Partnership
USDOT Sec Foxx and UTA GM Allegra• Joint projects• Team against the project
USDOT Sec. Foxx and UTA GM Allegraat Draper TRAX Opening, Aug 2013
g p j
EducateUTA Bicycle Pedestrian
Transit Safety Symposium
Educate
Transit Safety Symposium
March 2014
FTA Region 8 Dep. AdministratorCharmaine Knighton
Operation Lifesaver
Charmaine Knighton
Utah State CoordinatorVern Keesler
Educate
Darin Francom UTA and
Educate
Darin Francom, UTA and Walt Webster, OLI at
Utah Drivers Training and Ed ti C fEducation Conference
28 April 2014
CooperateCooperateBig Boy No. 4014
Salt Lake City 5 May 2014
Big Boy No. 4014 was delivered to Union Pacific in December 1941 Thein December 1941. The locomotive was retired in December 1961, having t l d 1 031 205 il itraveled 1,031,205 miles in its 20 years in service
Take Aways
• Partnering with Operation Lifesaver
Take Aways
Partnering with Operation Lifesaver expands your outreach
• Rail Safety is the focus for both entities• Rail Safety is the focus for both entities• Partnering provides benefits in multiple,
i isurprising ways• Messages need multiple means of delivery• Educate, Educate, Educate
Rail Activation “Hold Point” Process
Hold Hold Hold
Chief Safety OfficerRail Activation Comm
CSO / Rail GMRail Activation Comm
General Manager CSO / Rail GMRail Activation Committee
Approval & Sign off >Recommends Approval >
Rail Activation Hold Point Process
Phase 1 Design, Construction & Stand Alone Testing
Phase 2System Integration
Testing (SIT)
Phase 3Pre‐Revenue
Operations (PRO)
Phase 4Revenue
Operations (RO)
Hold Point #1 SIRR
Hold Point #2
PRRR
Hold Point #3RRR
Project Manager PM / Sys Integration Mgr PM / Rail Svc Intfr Mgr Rail System GM
Phase /Hold Point
Contract Manager >
System Safety Program Plan
(SSPP)
Stakeholder Collaboration
SA – ConstructionContractor
SA ‐ Construction Contractor
SA – OperationsRail Services
SA – OperationsRail Services
Safety Administrator >Control of Corridor >
(SSPP)
System Security Plan (SPP)
Preliminary Hazard Analysis
CertifiableItems Lists
Educational Outreach
Certifiable Items Lists (CIL)
Operational Hazard Analysis Hazard Log
State Safety Oversight (SSO)
Federal Railroad
Emergency Preparedness Plan
(EPP)
Federal Transit Administration (FTA)
Review
(CIL)
Standard Operating
Grade Crossing Surveillance Letters
(UDOT)
Lists (CIL)
Admin. (FRA) Coordp g
ProceduresPublic Awareness
PlanHiring (Oper , Line & Signal, MOW, Mech)
Emergency Response Plan /
Exercises
Airport TRAX SuccessesAirport TRAX Successes• Alliance agreement• Solar panels on stationsp• North Temple Viaduct • Grand Boulevard• 2014 AGC National Award
EliminateEliminate• Grade Separation (11400 South, 2100 North)• Station Crossings (5300 South)Station Crossings (5300 South)• Farmington, Lehi Pedestrian Crossings• 200 South American Fork• Route changes – far side at platforms• Bingham Junction (at 7500 South)
New signalized crossing at Bingham Junction
Engineer• TCRP Study national review • Pedestrian Sidewalk Crossing (SC) treatments
Engineer
• Eliminating “straight-thru” access• Refreshing Platform Yellow lines • “Look Both Ways” signsLook Both Ways signs• Additional Gates• Cameras on Trains, Platforms• Bell height and decibel level• Bell height and decibel level• Bike crossings and signs• Blinking Blankout signs• Design Safety Reviews / SSWG• Construction Safety Walks• Construction SafetyConstruction Safety• UDOT Grade Crossing Manual
Educate• Safety Ambassador Blitzes• “Train for Safety” Media Program
Educate
y gTrain Wraps, TV, Billboard, Radio, Social media
• SL Tribune / Salt Lake Magazine Safety Articles• Schools Scouts City Councils COG Presentations• Schools, Scouts, City Councils, COG Presentations• Driver License Manual Update• Operation Lifesaver Coordination• Safety Management System (SMS)
EducateEducate
• Monthly Posters• Monthly Posters• Weekly Messages• Tip Lines
See Something ? Say Something ! 801-287-EYES (3937)
If you are aware of it,take care of it.
Enforce + Encourage• UTA Ordinances and State Statutes• Joint enforcement with local police
Enforce + Encourage
Jo t e o ce e t t oca po ce• Safety Ambassador Blitzes• Police in Hi-Visibility Uniforms• Plain Clothes duty• Public Safety (OLI) Class – UTA Police• TSA Gold Standard AwardTSA Gold Standard Award
Safety Department
Safety Department(Safety / EM/ Public Safety / Cameras)
As of : March 2014
Safety pUTA
General ManagerMichael A. Allegra
Chi f Chi fChi f C it l Chi f Chi f Fi i lG l
As of : March 2014
Chi fChi f
Office of General Manager
Internal Auditors
Chief Safety OfficerDave Goeres
ChiefOperating OffJerry Benson
Chief Capital Dev OfficerSteve Meyer
Public Safety (6000)
Chief CommOfficerAndrea Packer
Chief Financial OfficerBob Biles
General Counsel
Bruce Jones
Office
ChiefTechn OfficerClair Fiet
Chief Planning OffMatt Sibul
Transit Communication
Safety Manager EmergencyVideo SurveillancePublic Safety (6000)Chief Ross LarsenCoordinator
Black
Training
Grantley MartellyMichelle Smith
Safety Manager
Public Safety Department
ManagementAmy Cornell‐Titcomb
AdminLaMount Worthy
ConstructionSafety
Max Hanna
Design / Training SafetyHanna
FrontRunner (CRT) Safety
Sheldon Shaw
TRAX (LRT)/ Streetcar SafetyEd Buchanan (E)
Darin Francom (W)
Bus / Paratransit Safety
Tim Rhoades (N)Martin Cocker (S)
Occupational / Facility SafetyBuchanan
Snr Prog Mgr, Construction Paul Edwards
FrontRunner (CRT)Bruce CardonRobin BrazielZac Thomas
TRAX (LRT)Todd ProvostDave Steadman
Tal BrooksSteve Beverly
Bus Business UnitsOgden Eddy CuminsSalt Lake Lorin SimpsonSL Planning Grantley MartellyTimpanogos Hugh Johnson
Snr Prog Mgr,Project DevGrey Turner
Steve Beverly
RiskManagementDave Pitcher
Mike Benvegnu
Special Svcs Cheryl Beveridge
Legal CouncilRob HughesJennifer RigbyMichelle Larsen
MOWRon Benson
Scott Neeley Richard Castleberry
UTA Operational SafetyAreas of Responsibility
Sugar House SRT
Areas of
g1.8 miles6 stations
Responsibility TRAX WestDarin Francom
TRAX NS & EastEd Buchanan
Bus
FrontRunnerSheldon Shaw
BusTim RhoadesMartin Cocker
ConstructionMax Hanna
Safety FocusSafety Focus
Safety Can’t be Silent
Find, Fix and Follow Up
Red Lights Control the Grade CrossingRed Lights Control the Grade Crossing
Stand Behind the Yellow
Look Twice
Chief Operating Officer
General Manager Safety & Security Comm
(GMSSC)ChiefSafetyOfficer
General Manager
Chief Capital Officer
SafetyUTA Safety & Security Committees Structure
Chief FinancialOfficer
Chief PlanningOfficer
As of : 1 October 2013
Chief Communications
Officer
Safety & SecurityReview Comm (SSRC)
Management ofChange (MOC) Teams* Accident Review
Comm ‐ Bus(ARC‐B)
Construction Accident Review
Design & Construction Mtg
(DCM)
Configuration Control Comm
(CCC)
Bus Safety Comm
UTA Police &Security Mgr
TrainingEmergency Management
Drug & Alcohol Program
Rail Services
Business Units
GeneralCounsel
Claims & RiskRail Safety CommFacility Safety
Police 2100 S
Meadowbrook B‐8
Timpanogos
Special ServicesRail Activation Comm(RAC)
Fire Life Safety & Security Comm
(FLSSC)Frontrunner (WS)
ConstructionSafety Comm
(CSC)
Accident Review Comm ‐ Rail(ARC‐R)
Salt Lake
Bus Safety Comm(BSC)Ogden
TRAX (Jordan River)
Rail Safety Comm(RSC)
TRAX (Midvale) Chief Technology Officer
Mobility Center
Meadowbrook B‐1
Facility Safety Comm (FSC)
FLHQSafety and Security Working Group
(SSWG)
Accident Evaluation Group (AEG) *
SSRCChief Safety OfficerSecurity Mgr
GMSSCGeneral ManagerChief Safety Officer
CSCSA‐ConstructionSafety Manger
BSC x5 BU RGM/SnrMgrBU Maint Mgr
RSC x3 RS DGM/SnrMgrMaint Mgr
CommitteeChair >
Alt Chair >
FLSSCSA‐FR SA‐LR
RACRail Actv Mgr
Safety
UTA Safety Committee Members * Formed based on type of action / review required
FSC x4 Snr MgrFacilities RepDeptMgrs/Rep
BU RGMBU RGMBU Maint MgrRS F R MgrRS TRAXMgrRS MOW MgrCap Dev Prj Dev
Corporate Staff (13)
InviteesClaimsLegalHRMgr
Cap Dev ConstrSAsSafety TrainingSecurityClaimsContractor’s
ConstructionMgr
SA‐BusBU OpnMgrOperators (2)Maint Staff (2)
InviteesClaims
SA‐Rail OpnMgrOperators (2)Maint Staff (2)
InviteesClaims
Members > UTA PoliceTRAX OpnsFR OpnsBus OpnsUTA DispatchSLC PoliceSLFD
SafetySystemsConstructionRail Svcs
Chief Safety OffSnr Prog Mgr
Dept Mgrs/Rep
InviteesClaimsCap Dev Prj Dev
Cap Dev ConstrTechnology Office
InviteesCap Dev EnvMgrCap Dev FacilitiesClaims
HR Mgr Construction MgrSafety Manager
InviteesLegalInsurance Agents
ClaimsLegal
ClaimsLegal
SLFDTSA Rep
Assoc MbrsAP PoliceDR PoliceSSL PoliceLehi Fire
ARC x2 Admin Ops‐BCBUOps‐BAdmin Ops‐RCBUOps R
ClaimsLegal
LegalSAsAuditor
Weber Co PoliceInviteesUTA CS / PRSafety TrainingUTA EMAUTA ADAUTA Facilities
CBUOps‐RTiebreaker
InviteesLegalClaims
Safety CoordinationSafety Coordination
• UDOT SSOUDOT SSO– Monthly Mtgs– All Activation MtgsAll Activation Mtgs
• Safety Drive (S:\)• Standard forms• Standard forms
– Hazard LogsHazard / Suggestion– Hazard / Suggestion
– Corrective Action PlansInvestigation Report– Investigation Report
SAFETY Dashboard Sep‐13
Total Accidents (by month) Accident Rate (by month/100,000 mi) Accident Rate (12‐mo rolling average)
Jun-13
Jan‐00
EM Log Items
EM Log Items Closed
Hazard Mitigation ProcessHazard Mitigation Process
Transit Experiences
Incident
Safety Committees
Incident data
SAudits
System Modifications
Accident Investigations
Customer Concerns
Inspections, Rules Compliance Reviews
Hazard Mitigation ProcessHazard Mitigation ProcessNew Projects
Phase 1 Design, Construction &Testing
Phase 2 Systems Integration
Phase 3 Pre-Revenue Opns
Phase 4Revenue Opns
Hold Point
1
Hold Point
2
Hold Point
3
Project Delivery / Rail Activation Process
Threat and Vulnerability Assessment (TVA)
Preliminary Hazard Analysis (PHA) Operational Hazard Analysis (OHA)
On-Going Evaluations
Safety & Security Working Group Rail Activation Committee
Safety Admin – Construction Safety Admin – TRAX/FR Unresolved / Recurring
HazardsOn-Going Evaluations
Rail Safety CommitteesSafety Administrator TRAX/FR
Hazard Log (by mode)
Safety Administrator – TRAX/FR
Security Hazard Log (SSI)
SSI Hazards
TRAX/SRT HazardTracking Log
As of: 7-May-13
TRAX Hazard Log 2013
Source Date Time Seg / Line / BU / Fac
Issue / Location
Emp. #
Veh. # Brief Description of Hazard / Incident Prob
Cause Total
Damage
Hrs Dsrpt Srvc
# injury trnspt
# fatality IHR
Srvc trnsptOpen Hazards/
UDOT 8-Dec-11 N/A JRSC Mirros on T14,15 N/A N/A Install mirrors on south side of tracks 14 & 15. N/A N/A N/A N/A N/A 4D
UDOT 18-Jan-12 N/A NS Central Ave N/A N/A Grade Crossing upgrade evaluations at Central Ave (4115 S) to improve signals and add gates. N/A N/A N/A N/A N/A 2B
In the event N B trains are delayed at the platform of
Incident 30-May-12 N/A NS 6100 S N/A N/A
In the event N.B. trains are delayed at the platform of Fashion Place West the gates are held in the down position for the duration encouraging vehcile traffic to go around gates.
N/A N/A N/A N/A N/A 3D
UDOT 20-Jan-12 N/A Hub Ex Daybreak Platform N/A N/A
Daybreak Pkwy, N. & So. End of platform, Duckhorn Dr. No Ped call buttons on station, peds must cross street to reach ped call buttons on E&W side of Station.
N/A N/A N/A N/A N/A M
UDOT 8-Mar-12 N/A LRV S70 N/A N/A Windshield wipers have a gap and leave streaks (poor visibility) N/A N/A N/A N/A N/A 3B
Avg. Days Open 241 Open Items 37
Discussion / Corrective Action Resp. Dept/POC Days Open
Closed Date FHR NTD FRA UDO
T CAP ID UDOT Comments
UTA Comments
s/CAPS
UDOT 27-Mar-12 N/A City Ctr. platformJaywalkers at City Center
PlatformN/A N/A Pedestrians entering and exiting City Center Platform without
using crosswalk. N/A N/A N/A N/A N/A 2C
UDOT 14-May-12 N/A UniversityLibrary Platform 400 south 200
eastN/A N/A
J-walk cut across the west bound lanes of 400 south and cross the tracks in order to access the library platform and also TRAX passengers J-walk from the platform to the north across 400 south.
N/A N/A N/A N/A N/A 2C
M i C hi A t ti l f l th t k hil iti f li ht
s/CAPSTemporary mirrors installed. Updated by Tal Brooks on 7/17 they are reassessing for better solution. Issue discussed in Safety Committee mtg. on 4/10. Tal and Paul O'Brien are discussed possible solutions. Will determine a solution by next safety meeting.
Facilities / Rob Haider 517 12-017
This location has been assigned to the SSRC group for action. Addition of an additional gate on NW quadrant. Exit gate for the locaiton has been approved pending funding. Discussed with Ron Benson on 4/17/2013. Funding was approved on 4/16/13
T Baxter 476 12-022 N/A
C. Action would involve system changes to call gates as NB train departs FPW. No action taken as of 9/19/12.
MOW / Systems Eng Benson / Baxter 343 N/A N/A N/A 12-023 N/A N/A
Employee 14-May-12 N/A U Mario Capecchi
and South Wasatch drive
N/A N/AAutos routinely foul the tracks while waiting for a green light. This is an area where we have had a number of EB applications to avoid accidents.
N/A N/A N/A N/A N/A 2B
FPW. No action taken as of 9/19/12. Benson / Baxter
Install Pushbuttons at both ends of Daybreak Parkway platform to allow pedestrians to cross track and street. Discussed in SSRC on 4/11. Todd Provost assigned to Travis Baxter.
CD / Provost / Baxter 474 12-024
Gap has been adjusted down as much as possible. Cleaning supplies available in the system. Seimens is still evaluating. Discussed in Safety Committee mtg on 4/11/2013. First instaillation will begin on June 6.
Saini, Sharanjit / Rail Vehicle Procurement 426 12-026 N/A
"Please use crosswalk" painted on the edge of the platfrom. Yellow line painted on the crosswalk to keep pedestrian at a safe distace from the train. Discussed at SSRC on 4/12/13. Needs follow up with T. Hare.
CD Fac / Hare 407 12-032 N/Ap
UTA police to conduct a site evaluation to include education and enforcement. Proposed completion date 9/6/2013. Police / Boddy 359 12-036 N/A
Install a gate at the intersection of Mario Capecchi Drive and South Wasatch Drive. On the Capital Project List (RAP0582). New drawings sent out 12/10/12. Contractor waiting for comments. Proposed completion date April 2014.
Cap D / Baxter 359 12-039
3-15-11 UTA is examining
options to install Z crossing at
grade crossing.