PBN & Airspace

ICAO PBN Symposium

Paul-Franck BIJOU - VP Customer Affairs October 2012

The Airbus ATM performance provider

Page 2: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

Introduction

• our job is all about PERFORMANCE, and good cooperation with

ATC

• A successful PBN implementation =

Efficient trajectory +

High rate of ATC clearance

© AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document.

Page 3: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

2 examples of successful implementation of PBN to ease airspace situation 1. Abu Dhabi 2. Vagar ( Faroe Islands)

© AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document.

Page 4: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

© AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document.

Objectives: fuel savings / Optimised descent profile (i.e. CDO) Context: •5 entry WPT, 2 parallel (independent) runways •Wide variety of aircraft types: A320 family, A330/A340 family, B777 and B777F •RNAV 1 STARs, RNP AR (0.3 and 0.2NM) approaches

•Optimization and better repeatibility of the trajectories

•Less pilot to controller communications No need for speed constraints communication (already coded in the Nav Database), No vectoring, Clearance very early in the approach (i.e. when reaching entry WPT)

•Improved segregation (lateral and vertical) between departures and arrivals, thanks to more precise routes and altitude constraints

Benefits expected and provided

Project

Page 5: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

© AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document.

PBN in OMAA Existing STARs to ILS

Page 6: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

© AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document.

PBN in OMAA New STARs to RNAV(RNP)

Page 7: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

© AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document.

PBN in OMAA Tracks Compared

NM Saved: 15 NM miles from BOXAK

•Simple: •1 track for all arrivals •ATC on the job training •ATFM & conops

Page 8: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

Achievements in Abu Dhabi Airspace

© AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document.

RNAV 1 STARs and RNP AR approaches published in UAE AIP in July 2012

Several Validation and demonstration flights

Training of Etihad crews started in September 2012

ATC controllers trained to support RNP operations

Entry into operation planned in Oct/Nov 2012

Page 9: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

2 examples of successful implementation of PBN to ease airspace situation 1. Abu Dhabi 2. Vagar ( Faroes Islands)

© AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document.

Page 10: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

RNP AR 0.1 in Vagar

© AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document.

• Introducing the A319 in Vagar with RNP AR 0.1 :

o A challenging airport o Tough weather o High level of diversions

• Improve regularity • Raise the level of safety • Reduce track miles and optimize the

profitability of the aircraft operation

Objectives

Project

Poor visibility Strong winds

Short and narrow runway Surrounded by hills

Page 11: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

© Q

UO

VA

DIS

. All

right

s re

serv

ed. C

onfid

entia

l and

pro

prie

tary

do

cum

ent.

RNP AR 0.1 in Vagar

Curved Paths : runway alignment in final Conventional approaches in Vagar : not aligned with runway axis In poor weather conditions, difficult for pilots

Visual acquisition

Approach beam

Antenna

Tricky manual manoeuver required

= pilot workload

Page 12: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

© Q

UO

VA

DIS

. All

right

s re

serv

ed. C

onfid

entia

l and

pro

prie

tary

do

cum

ent.

Curved Paths : runway alignment in final Conventional approaches in Vagar : not aligned with runway axis. In poor weather conditions, difficult for pilots

Visual acquisition

Approach beam

Antenna

Tricky manual manoeuver required

= pilot workload

RNP AR approach

Visual acquisition

RNP AR 0.1 in Vagar

Page 13: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

Achievements in Vagar

© AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document.

RNP AR 0.1 : Most diversions avoided thanks to lower Minima Runway alignment in Final Reduced Distance & Flight Time

13 Conventional

Procedure turn

RNP AR

38.6 NM

Approx 11min

51 NM

Approx. 16min

• Miles saving 12.4 NM • Time saving 5 min • Fuel savings # 200 kg per approach

Page 14: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

Conclusion: PBN optimizes airspace

• Reduces required number of radio transmissions

• Improved predictability • Fewer diversions

1 major condition though: ATC must have a good concept of operations.

Page 14 © AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document.

Page 15: PBN & Airspace 4/4... · Entry into operation planned in Oct/Nov 2012 . 2 examplesof successful implementationof PBN to ease airspacesituation 1. ... runway alignment in final Conventional

Thank You !

Paul-Franck BIJOU - VP Customer Affairs October 2012