pepfar scenario –based cost projections for pepfar resource requirements for the art program in...

15
PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical Officer-Treatment Centers for Disease Control and Prevention-Ethiopia AIDS 2012 - Turning the Tide Together

Upload: corey-watkins

Post on 03-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

PEPFAR

Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program

in Ethiopia from FY2011 – FY2015

Solomon Ahmed, M.D.Technical Officer-Treatment

Centers for Disease Control and Prevention-Ethiopia

AIDS 2012 - Turning the Tide Together

Page 2: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

Background-Ethiopia

Total Population – 80 million+HIV prevalence* – 2.4% ART eligible – 397,818 (26,053 < 15 years)Currently on ART March 2012** – 257,000+

* 1.5% from the 2011 DHS results. ** PEPFAR Ethiopia SAPRhttp://www.smartraveller.gov.au/zwiki/pub/Maps/countries/dfat/Ethiopia.jpg http://mapsof.net/uploads/static-maps/where_is_ethiopia_located.png

Page 3: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 -

100,000

200,000

300,000

400,000

500,000

600,000

700,000

39,489

164,560

266,507

376,772

473,772 580,919

24,236

97,299

150,136

208,784

268,934

333,434

18,594

73,124 109,930

152,472

207,733 247,805

EVER ENROLLED TO CARE EVER STARTED ON ART CURRENTLY RECEIVING ART700,000

600,000

500,000

400,000

300,000

200,000

100,000

Background - EthiopiaN

umbe

r of P

LHIV

Trends in no. of PLHIV enrolled to care and ART in Ethiopia from 2005 - 2011

YearHSDP IV Annual Performance Report EFY 2003 (2010/11)

Page 4: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

Activities supported for site level services

PEPFAR Global Fund Government of Ethiopia

Site support (mentoring, supervision, supplies, equipment, renovation)In-service trainingLab monitoringM & ESupport staff

Procurement of ARV drugs and OI drugs

InfrastructureClinical staff

Page 5: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

Objective of study

Provide PEPFAR-Ethiopia with funding projections for different scenarios of scale-up

Page 6: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

Methods

Utilized results from FY 2010 expenditure analysis to calculate unit costs

Used the PEPFAR ART Costing model 2010 Developed different scenarios based on rates

of enrollment of new patients

Page 7: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

Service delivery supportProcurement cost of ARVs (contingency), lab

reagents, and other commodities Technical support and managerial overheads

provided by PEPFAR-funded implementing partners

PEPFAR expenditures included

Page 8: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

PEPFAR expenditures excluded

Managerial overheads incurred within USG government agencies

Costs of related services from other program areas (HIV testing, PMTCT, community-based care)

Page 9: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

Scale-up Scenarios used for cost projections

Scenario Description1 Current pace of new patient enrollment –

4000/month

2 50 % reduction in ART enrollment to 2000/month

3 Slow linear scale-up to universal access targets (achieving universal access targets by the end of the fourth year)

4 Rapid scale-up to universal access targets (achieving universal access targets by the end of the first year)

Page 10: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

Assumptions

Number of pre-ART patients grows proportional to the number of ART patients

Pediatric ART proportion increases from 5.9% to 9.0% of total on ART by the end of FY2015

Patients on 2nd line regimens increase from 0.6% to 4.8% of total on ART by the end of FY2015

Page 11: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

Estimated unit cost for ART and pre-ART patients

Average annual per patient costs of $202 for ART patients and $94 for pre-ART patients

Per patient costs expected to be relatively flat over the period of projection

Page 12: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

ART program scale-up trends in alternate scenarios

Start of 2011

End of 2011

End of 2012

End of 2013

End of 2014

End of 2015

0

100,000

200,000

300,000

400,000

500,000

600,000

Scale up 4,000 Per Month

Scale-up 2,000 Per Month

Slow Scale-Up to Universal Access Targets

Rapid Scale-Up to Uni-versal Access Targets

Current pace

No.

of A

RT p

atien

ts

600,000

500,000

400,000

300,000

200,000

100,000

Page 13: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

Comparisons of trends in projected costs under different scenarios FY 2011 - 2015

FY 2011 FY 2012 FY 2013 FY 2014 FY 20150tan28a566028

0tan19a566019

0tan9a56609

0tan29a566029

0tan19a566019

0tan10a566010

0tan30a566030

0tan20a566020

Scale up 4,000 Per Month (base case)Scale-up 2,000 Per MonthSlow Scale-Up to Universal Access TargetsRapid Scale-Up to Universal Access TargetsIn

mill

ions

USD

$344.3 M

$449.3 M

$506.3 M$564.8 M

Page 14: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

Conclusions

Cost projections facilitate informed planningProjections offer options of ART scale-upCurrent trend in patient uptake in Ethiopia fall

short of attaining Universal Access by 2015

Page 15: PEPFAR Scenario –based Cost Projections for PEPFAR Resource Requirements for the ART Program in Ethiopia from FY2011 – FY2015 Solomon Ahmed, M.D. Technical

Acknowledgments

Nick Menzies – ICF MACRO Thomas Kenyon – CDC EthiopiaZenebe Melaku – CU ICAPTsigereda Gadisa – CU ICAP Bill Graham – UW ITECHGetachew Feleke – UW ITECHSolomon Zewdu – JHU

Misrak Makonnen – CRS/AIDSRelief Diana Mattanovich – UCSDYoseph Mamo –UCSDThomas Heller – CDC EthiopiaCate McKinney – CDC EthiopiaAbubaker Bedri – CDC EthiopiaAll CDC Ethiopia technical staff