Harnessing LEED for Existing Buildings to Green Campus Operations: Lessons Learned at Western Michigan University. Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture TUFF Educational Facilities Best Practices Summit, September 2011. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/1.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
HARNESSING LEED FOR EXISTING BUILDINGS TO GREEN CAMPUS
OPERATIONS:LESSONS LEARNED AT WESTERN
MICHIGAN UNIVERSITY
Pete J. Strazdas, Western Michigan UniversityJim Nicolow, Lord, Aeck & Sargent ArchitectureTUFF Educational Facilities Best Practices Summit, September 2011
![Page 2: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/2.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Western Michigan University
Kalamazoo25,000
students1,200 acres151 buildings8 million sfCogen plantDiv 1 sports
![Page 3: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/3.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Outline Why Existing Buildings? LEED-EBOM Overview CHHS Case Study Results & Lessons
Learned Where Are We Going
Next? Discussion
![Page 4: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/4.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
WHY EXISTING BUILDINGS?
![Page 5: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/5.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Total Cost of Ownership Concept
![Page 6: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/6.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Total Cost Distribution Over Lifetime
10-20%
50-70%
20-30%
1%
![Page 7: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/7.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Total Cost of OwnershipCriticism of LEED-
NC
“LEED certified commercial buildings: Are they really more efficient?”
“LEED risk management: Crossing the model/reality chasm”
![Page 8: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/8.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
85,394
29,769
11,696
Building Energy Use
Travel/Commuting
WMU Campus GHG Inventory
![Page 9: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/9.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
LEED-EBOM OVERVIEW
![Page 10: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/10.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
LEED Rating Systems
![Page 11: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/11.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
LEED and TCO
![Page 12: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/12.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
LEED-EBOM DifferencesPolicy-based (construction /
renovation)Measured PerformanceMaintenance & Operations
ProceduresPurchasingStaff EducationGreen Cleaning
![Page 13: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/13.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
LEED-EBOM Differences3-step Process
1. Implementation2. Performance Period (3 months to 1 year)3. Certification
![Page 14: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/14.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
CHHS CASE STUDY
![Page 15: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/15.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Project Timeline – 22 monthsGrant Awarded – Sept 2007Project Kick Off – October 2007Feasibility Study – Feb 2008Implementation – Feb-May 2008Performance Period – May-July
2008Review – Oct 2008 – May 2009
![Page 16: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/16.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Grant – Sept 2007State of Michigan $15,000 grant
32-39 40-47 48-63 64-85
![Page 17: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/17.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Feasibility Analysis – Feb 2008
![Page 18: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/18.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Feasibility Analysis – Feb 2008
14 prerequisites:10 met1 required policy change
(erosion control)1 required operational adj.
(ventilation)2 required additional analysis
(energy & mercury in lights)
![Page 19: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/19.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Feasibility Analysis – Feb 2008
48 points targeted (silver + 8):29 met11 required policy change or
minor building changes8 required additional analysisWMU Approval to ProceedGrant Variance Approved
![Page 20: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/20.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
IMPLEMENTATION
![Page 21: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/21.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
LEED CategoriesSustainable SitesWater EfficiencyEnergy &
AtmosphereMaterials &
ResourcesIndoor
Environmental Quality
Innovation, Operations & Maintenance
![Page 22: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/22.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Sustainable Sites Erosion & Sedimentation
Control◦ Policy in place
◦ Prereq
Age of Building◦ > 2 years
◦ Prereq
Plan for Green Site and Building Exterior Management◦ Policy addressing
Maintenance equipment Plantings Animal and vegetation Landscape water Irrigation management Fertilizer use Snow removal Cleaning of building exterior
◦ 2 Points 11 Earned/ 14 Possible
![Page 23: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/23.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Sustainable SitesAlternative
Transportation◦ Proximity to public
transportation◦ Bicycle Storage &
Changing Rooms◦ Alternative Fuel Vehicles◦ Car Pooling &
Telecommuting◦ 4 points
Reduced Site Disturbance◦ Asylum Lake◦ 2 points
11 Earned/ 14 Possible
![Page 24: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/24.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Sustainable SitesStormwater
Management◦Mitigation of at
least 50 % of the annual stormwater
◦ 2 pointsLight Pollution
Reduction◦Shield all out door
luminaries > 50 watts
◦ 1 point
11 Earned/ 14 Possible
![Page 25: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/25.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Water EfficiencyMinimal Water
Efficiency◦ Prereq
Discharge Water Compliance◦ Prereq
Water Efficient Landscape◦ 1 point
Water Use Reduction◦ Dual flush
toilets/aerators◦ 2 points
3 Earned/ 5 Possible
![Page 26: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/26.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Energy & AtmosphereExisting Building
Commissioning◦ Prereq
Minimum Energy Performance◦ Baseline measurement◦ Historical
consumption◦ Prereq◦ 3 points
Ozone Protection◦ Prereq◦ 1 point
10 Earned/ 23 Possible
![Page 27: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/27.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Commissioning Sidebar
30,000 square foot office buildingJuly ‘08 and “is still a work in
progress operationally”◦Faulty sensors◦Errors in equipment installation & setup◦System control interface problems◦Non-optimized operating sequences and
schedules◦Equipment failures and leaks
![Page 28: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/28.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Commissioning Sidebar
September ‘09 down 22% New glitch in control
programming make up air unit, continuous 20kW
30% further to match predicted
![Page 29: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/29.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Energy & Atmosphere Building Operation &
Maintenance◦ Staff education◦ Best practices monitoring &
maintenance◦ 3 points
Performance Measurement◦ Enhanced metering
Domestic water Irrigation system Process water (Cooling tower) Cooling load (Steam absorption) Boiler efficiency
◦ Emissions reduction◦ 2 points
Building Cost Impacts◦ Operating costs of all aspects◦ 1 point
10 Earned/ 23 Possible
![Page 30: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/30.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Materials & Resources Source Reduction & Waste
Management◦ Waste stream audit
◦ Storage and collection of recyclables
◦ Occupant recycling
◦ 2 prereqs
◦ 3 points
Toxic Material Source Reduction◦ Mercury in light bulbs
◦ Prereq
◦ 1 point
Construction, Demolition and Renovation Waste Management◦ 1 point
Sustainable Cleaning Products and Materials◦ 3 points
8 Earned/ 16 Possible
![Page 31: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/31.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Indoor Environmental Quality Outside Air and Exhaust
◦ Increased ventilation◦ Prereq
Tobacco, Asbestos and PCB free◦ 3 prereqs
Outdoor Air Delivery Monitoring◦ 1 point
Increased Ventilation◦ 1 point
Construction IAQ Management Plan◦ 1 point
13 Earned/ 22 Possible
![Page 32: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/32.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Indoor Environmental Quality
Indoor Chemical and Pollutant Source Control◦ ≥ MERV 13◦ 1 point
Controllability of lighting◦ 1 point
Thermal comfort◦ ASHRAE 55◦ 1 point
Day lighting & views◦ 2 points
Green cleaning◦ Entryway systems◦ Pest control◦ Equipment◦ Policy◦ 5 points
13 Earned/ 22 Possible
![Page 33: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/33.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Innovation, Operations & Maintenance
Asylum LakeWater ReductionBronco Bio-
diesel Dolphin fountain
treatmentLEED Accredited
professional
5 Earned/ 5 Possible
![Page 34: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/34.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
PERFORMANCE PERIOD
![Page 35: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/35.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Performance Period
![Page 36: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/36.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
CERTIFICATION
![Page 37: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/37.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Submittal – October 2008* *3 months later
![Page 38: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/38.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Certification Process (7 months)Submittal – Oct 2008Preliminary Review – January 2009Clarification – March 2009Final Review – April 2009◦Additional information requested
Preliminary Certification – May 2009Appeal – May 2009◦Water efficiency and mercury in lights
Gold Certification – May 2009
![Page 39: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/39.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
![Page 40: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/40.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
EBOM Changes110-point scale (all LEED systems)◦40/50/60/80
Surprise! 60 day submittal deadline◦Feb 1 – Apr 30 Aug 31
Surprise! 1-year’s data for energy◦Sep 1 Feb 1 – Apr 30 Aug 31
Application Guide for Multiple Buildings
![Page 41: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/41.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
RESULTS AND LESSONS LEARNED
![Page 42: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/42.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Lessons LearnedArchitect: Better
understanding of operations & maintenance issues & TCO
Involve Operating Staff◦Part of process /
ownershipBreaking Down Silos
Across Campus
![Page 43: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/43.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Upper Management
Building LevelFM
Operations
Internal FM
Sustainability Office
Outside Design Professionals Purchasing
Building Managers
Occupants
EngineeringDesign & Planning
Custodial
Maintenance
GroundsRecycling
![Page 44: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/44.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Lessons LearnedTransformative◦Campus-wide changes
Custodial Policies Life-Cycle Design Guide
◦ROI Drives Decisions CO2 Sensor Deployment Daylighting Controls
◦Awareness = occupants & staff feel good about selves and the building
![Page 45: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/45.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Lessons LearnedOutside consulting
expertise =◦LEED-EB Certification◦plus Best Operating
Practices Health & Productivity v.
Energy EfficiencyWorthwhile InvestmentPublic Relations Benefit
![Page 46: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/46.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Public Relations
![Page 47: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/47.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
WHERE ARE WE GOING NEXT?
![Page 48: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/48.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Current 5-Building EBOM
Chemistry Building Richmond Center for the Performing Arts
Brown Hall College of Engineering and Applied Science
S. Kohrman Hall
*more than ½ million square feet
![Page 49: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/49.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Broader Context & Results
![Page 50: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/50.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Broader Context & Results
![Page 51: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/51.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Broader Context & Results
![Page 52: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/52.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Broader Context & Results
![Page 53: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/53.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
Broader Context & Results
![Page 54: Pete J. Strazdas , Western Michigan University Jim Nicolow , Lord, Aeck & Sargent Architecture](https://reader035.vdocument.in/reader035/viewer/2022070408/568143b5550346895db03fc3/html5/thumbnails/54.jpg)
© 2
01
1 L
ord
, A
eck
& S
arg
en
t A
rch
itect
ure
, A
ll R
igh
ts R
ese
rved
DISCUSSION