petron corporate presentation
Embed Size (px)
TRANSCRIPT
-
8/10/2019 Petron Corporate Presentation
1/46
tron
In touch with tomorrow
-
8/10/2019 Petron Corporate Presentation
2/46
Petron
Operational Presence
Petron Petron
Petron
-
8/10/2019 Petron Corporate Presentation
3/46
Petron
Organization
Petron Emirates Contracting & Manufacturing Co. L.L.C. Dubai, United Arab Emirates
Established in the Middle East in 1983
Civil, Mechanical, Electrical, Instrumentation and Painting Works
ISO 9000 Company with ASME U, U2, S and R Stamp
Has 4 large Fabrication Yards across the U.A.E.
Total fabrication capacity is 2500 to 3000 tons
Petron Gulf L.L.C. Sultanate of Oman Started Operations in Oman in 2007
ISO 9000 Company for EPC, Fabrication C M E & I Works
ASME U, S and R Stamp
New Fabrication Facilities in Sohar over 60,000 sqm
State of Art of Technology for Pressure Vessels, Tanks, Piping & Structural Fabrication
Large Construction Projects in Steel, Aluminum, Power, Oil & Gas Industries
Petron Saudi Industrial Co. L.L.C. Saudi Arabia
Started Operations in 2011
-
8/10/2019 Petron Corporate Presentation
4/46
Petron
Founders
Mr. Ramesh Shankar AmbekarManaging Director
An Engineering graduate and business Entrepreneur from India.
More than 4 decades of experience in the Construction field.
Founded Petron Engineering Construction Ltd., Mumbai
Chairman of Petron Group of Companies
Mr. Apurba BhattacharyaDirector (Operations)
Started as Project Engineer with Petron in Mumbai in 1978.
Solely responsible for all projects of Petron, India in Dubai.
Established Petron, Dubai in 1992 and became a Board Member.
Since 1992, responsible for the overall operations of Petron, Dubai.
-
8/10/2019 Petron Corporate Presentation
5/46
Petron
Some of our major clients
-
8/10/2019 Petron Corporate Presentation
6/46
Petron
Expertise
FABRICATION
MECHANICAL
CONSTRUCTION
ELECTRICAL&
INSTRUMENTATION
CIVIL CONSTRUCTION ENGINEERING, PROCUREMENT &
CONSTRUCTION
-
8/10/2019 Petron Corporate Presentation
7/46
-
8/10/2019 Petron Corporate Presentation
8/46
Petron
Sector Presence
FABRICATIONMECHANICAL
CONSTRUCTION
ELECTRICAL
&
INSTRUMENTATION
CIVIL
CONSTRUCTION
ENGINEERING,
PROCUREMENT &
CONSTRUCTION
POWER SECTOR
OIL & GAS SECTOR
ALUMINIUM
SECTOR
REFINERY/
PETROCHEMICAL/
FERTILIZER
SECTOR
STEEL SECTOR
CEMENT SECTOR
FOOD SECTOR
-
8/10/2019 Petron Corporate Presentation
9/46
Petron
People Strength
TOTAL MANPOWER
-
500
1,000
1,500
2,000
2,500
2007 2008 2009 2010 2011 May-12
184
602
858
1,9822,146
2,437
-
8/10/2019 Petron Corporate Presentation
10/46
Petron
People Strength
TOTAL NATIONAL STAFF
-
100
200
300
400
500
600
700
800
2007 2008 2009 2010 2011 May-12
70
212
292
521
602
723
-
8/10/2019 Petron Corporate Presentation
11/46
Petron
H.S.E. Policy
-
8/10/2019 Petron Corporate Presentation
12/46
-
8/10/2019 Petron Corporate Presentation
13/46
Petron
Certifications
-
8/10/2019 Petron Corporate Presentation
14/46
Petron
Certifications
-
8/10/2019 Petron Corporate Presentation
15/46
Petron
Projects
-
8/10/2019 Petron Corporate Presentation
16/46
Petron
Projects
SUR INDEPENDENT POWER PLANT
Client Name DAEWOO ENGINEERING & CONSTRUCTION
Project Name SUR INDEPENDENT POWER PLANT PROJECT
Scope of Work Mechanical Construction for 2000 MW
Combined Cycle Power Station
Package A for Early Power
5 x Siemens VG 94.3A Gas Turbines
5 x HRSGs
Balance of Plant
Contract Value USD 30 Million
Contract Duration 18 Months
Peak Manpower 1,500
-
8/10/2019 Petron Corporate Presentation
17/46
-
8/10/2019 Petron Corporate Presentation
18/46
Petron
Projects
BARKA III INDEPENDENT POWER PLANT
Client Name GS ENGINEERING & CONSTRUCTION CORP.
Project Name BARKA III INDEPENDENT POWER PLANT PROJECT
Scope of Work Mechanical and Piping For 750 MW
Combined Cycle Power Station
2 x Siemens VG 94.3A Gas Turbines
2 x HRSGs
1 x 300 MW Steam Turbine
Contract Value USD 10 Million
Contract Duration 16 Months
Peak Manpower 450
-
8/10/2019 Petron Corporate Presentation
19/46
-
8/10/2019 Petron Corporate Presentation
20/46
Petron
Projects
BARKA III INDEPENDENT POWER PLANT
j
-
8/10/2019 Petron Corporate Presentation
21/46
Petron
Projects
BARKA III INDEPENDENT POWER PLANT
-
8/10/2019 Petron Corporate Presentation
22/46
P j
-
8/10/2019 Petron Corporate Presentation
23/46
Petron
Projects
VALE OMAN PELLETIZING COMPANY LLC
P j
-
8/10/2019 Petron Corporate Presentation
24/46
Petron
Projects
VALE OMAN PELLETIZING COMPANY LLC
P j t
-
8/10/2019 Petron Corporate Presentation
25/46
Petron
Projects
VALE OMAN PELLETIZING COMPANY LLC
P j t
-
8/10/2019 Petron Corporate Presentation
26/46
Petron
Projects
SHADEED IRON AND STEEL L.L.C.
Owner Name JINDAL-SHADEED IRON & STEEL LLC
Client Name DOUGLAS OHI LLC
Project Name DRI Steel Plant
Scope of Work Supply, Fabrication and Erection of Material Handling System
Contract Value USD 14 Million
Contract Duration 14 Months
Peak Manpower 650
P j t
-
8/10/2019 Petron Corporate Presentation
27/46
Petron
Projects
SHADEED IRON AND STEEL L.L.C.
P j t
-
8/10/2019 Petron Corporate Presentation
28/46
Petron
Projects
SHADEED IRON AND STEEL L.L.C.
-
8/10/2019 Petron Corporate Presentation
29/46
Projects
-
8/10/2019 Petron Corporate Presentation
30/46
Petron
Projects
SOHAR ALUMINIUM L.L.C.
Client Name Solios France Bechtel
Project Name SOHAR ALUMINUM SMELTER PROJECT
Scope of Work Supply Fabrication and Erection of GTC 1 & 2
(Gas Treatment) and FTC (Fume Treatment)
Contract Value USD 21 Million
Contract Duration 16 Months
Peak Manpower 750
Projects
-
8/10/2019 Petron Corporate Presentation
31/46
Petron
Projects
SOHAR ALUMINIUM L.L.C.
Erection of Stack for GTC (Height 60M, Weight 170 MT) Erection of Cooling, Tower, Rising Duct & Stack for FTC
Projects
-
8/10/2019 Petron Corporate Presentation
32/46
Petron
Projects
SOHAR ALUMINIUM L.L.C.
Erection of FTC with the associated Mechanical equipment's + Piping
Projects
-
8/10/2019 Petron Corporate Presentation
33/46
Petron
Projects
SOHAR ALUMINIUM L.L.C.
Erection of Gas Collector Duct for GTC
Erection of Alumina Silos for FTC
Projects
-
8/10/2019 Petron Corporate Presentation
34/46
Petron
Projects
SOME MAJOR JOBS EXECUTED
Sr. CLIENT NAME PROJECT NAME SCOPE OF WORK
1SOLIOS ENVIRONMENT SAFRANCE
SOHAR ALUMIIUMSMELTER PROJECT
ERECTION OF GAS TREATMENT CENTRE 1 AND 2 ANDFUME TREATMENT CENTRE
2 DOUGHLAS OHIMATERIAL HANDLINGSYSTEM
SUPPLY, FABRICATION & ERECTION OF STRUCTURALSTEEL WORKS, ERECTION OF CONVEYOR SYSTEM,ELECTRICAL & INSTRUMENTATION WORKS
3 ARABIAN INDUSTRIES PDO FAHUD ERECTION OF 5 NOS. TANKS
4 SOHAR ALUMINIUMSOHAR ALUMINIUMSMELTER PROJECT
SERVICE CONTRACT FOR CIVIL, MECHANICAL,ELECTRICAL & INSTRUMENTATION WORKS
5 AES BARKA BARKA POWER &DESALINATION PLANT
SHUTDOWN & MAINTENANCE WORKS
6PETROLEUM POLYMER CO.L.L.C. - SNF GROUP
PDO MARMULPOLYMER FLOODINGPROJECT
MECHANICAL ERECTION WORKS
7OMAN REFINERIES &PETROCHEMICALSCOMPANY
SOHAR REFINERY SHUTDOWN PROJECT (PROJECT & ENGINEERING)
Facility
-
8/10/2019 Petron Corporate Presentation
35/46
Petron
Facility
FABRICATION SHOP AT SOHAR, OMAN
Facility
-
8/10/2019 Petron Corporate Presentation
36/46
Petron
Facility
FABRICATION SHOP AT SOHAR, OMAN
HIGH QUALITY FABRICATION
WORK ON CARBONSTEEL, STAINLESS STEEL SS
316, 304, DUPLEXSS, INCOALLOY 825, 625 ETC.
WELDING ON P 11, P 22, P 91ETC.
CNC PROFILE CUTTING INCOMPLICATED SHAPES
AUTOMATED CNC LINE FORSTRUCTURAL STEEL
FABRICATION INCLUDINGBLASTING & PRIMER
APPLICATION
ENVIRONMENT FRIENDLYGARNET BASED SURFACE
PREPARATION & PAINTINGSYSTEMS
HUGE MATERIAL HANDLINGOVER DINENSION EQUIPMENT
FABRICATION
INHOUSE DESIGN FACILITIESFOR STATIC EQUIPMENTDESIGN & STRUCTURAL
DESIGN
STRENGTHS
Facility
-
8/10/2019 Petron Corporate Presentation
37/46
Petron
Facility
Location Sohar Industrial Estate Phase V
Total Area 60,000 square meters
Covered Fab Area 2,400 square meters
Open Fab Area 40,000 square meters
Handling Cranes a. EOT 5 tons and 10 tons
b. Gantry 15 tons 140 meters span
c. Tower Crane 12.5 tons 60 meters span
Fabrication Equipment Rolling Machine 25 mm thick capacity
CNC Bending Machine
CNC Profile Cutting Plasma & Gas
Lathe, Drilling, Shearing Machines etc
Blasting & Painting Fully covered, Ventilated Blasting and Painting Sheds
FABRICATION SHOP AT SOHAR, OMAN
Facility
-
8/10/2019 Petron Corporate Presentation
38/46
Petron
Facility
FABRICATION SHOP AT SOHAR, OMAN
Facility
-
8/10/2019 Petron Corporate Presentation
39/46
Petron
Facility
FABRICATION SHOP AT SOHAR, OMAN
Facility
-
8/10/2019 Petron Corporate Presentation
40/46
Petron
Facility
FABRICATION SHOP AT SOHAR, OMAN
Facility
-
8/10/2019 Petron Corporate Presentation
41/46
Petron
Facility
FABRICATION SHOP AT SOHAR, OMAN
-
8/10/2019 Petron Corporate Presentation
42/46
Facility
-
8/10/2019 Petron Corporate Presentation
43/46
Petron
Facility
WORKSHOP MACHINERIES
Sr. MACHINERY DESCRIPTION QUANTITY
1 4 ROLLS, HYDRAULIC PRE-PINCHING TYPE PLATE ROLLING MACHINE 3000 X 25 MM 1
2 HYDAULIC PRESS BRAKE 300 TONS X 3000 MM WIDE 1
3 HYDRAULIC SHEARING MACHINE 3000 MM WIDE X 16 MM THICK 1
4 RADIAL DRILLING MACHINE 50 MM DIA X 1650 MM RADIUS 1
5 LATHE MACHINE CC 3000 MM X 400 MM SWING RADIUS 1
6 RECTIFIER WELDING MACHINES 120
7 MIG WELDING MACHINES 5
8 DIESEL GENERATOR WELDING SETS 400 AMPS 8
9 DIESEL POWER GENERATORS 250 KVA 1
10 DIESEL POWER GENERATORS 140 KVA 1
11 DIESEL POWER GENERATORS 110 KVA 1
12 PUG CUTTING MACHINES 5
13 PIPE THREADING MACHINES 5
14 MAGNETIC DRILLING MACHINE 10
15 PLASMA CUTTING MACHINE 2
16 CNC PROFILE CUTTING MACHINES OXY FUEL & PLASMA CUTTING 1
17 TANK SAW CIR-SEAM & LONG-SEAM WELDING MACHINES 2
18 STRUCTURAL & PIPE ROLLING MACHINES 1
19 VARIOUS MATERIAL HANDLING & ERECTION TOOLS & TACKLES LOT
-
8/10/2019 Petron Corporate Presentation
44/46
-
8/10/2019 Petron Corporate Presentation
45/46
-
8/10/2019 Petron Corporate Presentation
46/46
tron
Petron Gulf LLC
PO Box 1297, Al Athaiba, Postal Code 130
Sultanate of Oman
Tel No +968 24595071
Fax No +968 24595075
Email [email protected]
Web www.petrongulf.com