Page 1: Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on

Phone 9.Sept.2004 A.Fabich, CERN 1

modifying beam line TT2A

A.Fabich

Phone conference

9.Sept.2004

All information available onhttp://proj-hiptarget.web.cern.ch/

Page 2: Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on

Phone 9.Sept.2004 A.Fabich, CERN 2

Page 3: Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on

Phone 9.Sept.2004 A.Fabich, CERN 3

Going down, down …(in fact we are looking up here)

TT2 with a slope of about 7 degree

Page 4: Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on

Phone 9.Sept.2004 A.Fabich, CERN 4

Entrance to TT2A around the corner

… around the corner

Page 5: Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on

Phone 9.Sept.2004 A.Fabich, CERN 5

Option 2

Option 3

Page 6: Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on

Phone 9.Sept.2004 A.Fabich, CERN 6

Elements to install/remove

• Blocks at entrance TT2A (around the corner)

• Metallic chassis of nToF cooling• Quadrupole at entrance• Dipole/quadrupole between option 2&3• Solenoid (4 tons)• Beam attenuator (iron block 7.5 tons)• Mercury loop• …

Page 7: Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on

Phone 9.Sept.2004 A.Fabich, CERN 7

contacts

– Patrice Ziegler• Former responsible of this tunnel

– Christian Lacroix• Given by Patrice Ziegler

– J. Bernard (with S. Prodon)• Invited by Helmut for meeting November 2003

Page 8: Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on

Phone 9.Sept.2004 A.Fabich, CERN 8

Chat with Patrice

• For transport usually a track vehicle• Lifting with pneumatic lifter

• Displacing a dipole one team for half a day– Also needed: vacuum, power cables, water

• Solenoid one day for transport

• Just recently they exchanged some quads