Post Fire Stability
Hans Gerlich
for Winstone Wallboards Ltd
![Page 3: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/3.jpg)
‘Post-Fire’ ‘Stability’
![Page 4: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/4.jpg)
‘Stability’vs
‘Structural Adequacy’
not the same
![Page 5: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/5.jpg)
‘Structural Adequacy’
Ability of a specimen to resist vertical loads, applied
in a standard furnace test
e.g.,30/30/30
![Page 6: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/6.jpg)
Commonly involves lateral forcesnot by test but by design
![Page 7: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/7.jpg)
Designing for Stability
in accordance with
NZBC B1/VM1
During and After fire
![Page 8: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/8.jpg)
Designing for Stability
Of boundary fire walls
![Page 9: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/9.jpg)
FRR based on ‘Time Equivalence’ or ‘S’ rating
based on FLED and constant ventilation conditions FRR rounded (up) in C/AS documents
Post-fire stability required on assumption of
building collapse significantly increased ventilation much lower FRR
High FRR - compartment integrityStability - compartment failure
FRR of Boundary Fire Wall
![Page 11: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/11.jpg)
Post-Fire
NZBC B1/VM1
‘After the fire until the building is either repaired or
demolished’
??
![Page 12: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/12.jpg)
Post-Fire Stability
Many questions remain, such as;
• What are we trying to achieve?• What elements require post-fire stability?• Are the B1/VM1 provisions workable?• Do we have the FRR right? • One way or two-way?
MBIE Work Group
![Page 13: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/13.jpg)
MEFE Thesis – Daniel JessopFire Performance of a Laterally Loaded LTF Structure
![Page 14: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/14.jpg)
![Page 15: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/15.jpg)
Horizontal furnace testISO 834 standard time-temperature curve
![Page 16: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/16.jpg)
![Page 17: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/17.jpg)
![Page 18: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/18.jpg)
![Page 19: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/19.jpg)
![Page 20: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/20.jpg)
![Page 21: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/21.jpg)
30.5 mins – Run-away deflection in fire-rated wall, furnace shut-off
![Page 22: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/22.jpg)
![Page 23: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/23.jpg)
![Page 24: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/24.jpg)
30.5 minutes Run-away deflection in fire-rated wallfurnace shut-down
![Page 26: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/26.jpg)
C/AS1NZS3604
NZBC Compliance
B1 – Structure C 1-6 Protection from Fire
![Page 27: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd](https://reader035.vdocument.in/reader035/viewer/2022062301/5697bfe21a28abf838cb49ed/html5/thumbnails/27.jpg)
Thanks for Listening !
In short;
• ‘Stability’ vs ‘Structural Adequacy’• ‘Post-Fire’• B1/VM1 provisions• Required FRRs for Boundary Walls• Testing LTF structure (MEFE Project - Daniel Jessop)