powerpoint presentationno outages are excluded from the metrics. outage causes: other: e.g.,...
TRANSCRIPT
Circuit Reliability Review
Cudahy
2020
2
• Southern California Edison (SCE) is an Edison International company
• One of the nation’s largest electric utilities
• More than 130 years of history
• Headquartered in Rosemead, California
• Regulated by the California Public Utilities Commission (CPUC) and the Federal Energy Regulatory Commission (FERC)
• 50,000 square miles of SCE service area across Central, Coastal, and Southern California
• 15 million residents in service territory
• 5 million customer accounts in 445 cities and communities
Who We Are
Our Grid
To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system.
730,000 Transformers
119,000 Miles of Transmission and Distribution Lines
4,600 Circuits
1.5 Million Poles
50,000 Square Miles
3
Strengthening and Modernizing the Grid
• Infrastructure reliability – updating underground
cables, poles, switches, and transformers
• Wildfire mitigation – hardening infrastructure,
bolstering situational awareness capabilities, and
enhancing operational practices
• Transmission – connecting renewables, installing
new substations, and updating lines
• Grid readiness – updating the grid for impacts
from new technologies
• Long-term energy policy – supporting energy
storage, electric vehicles, and renewables
SCE plans to spend more than $5B each
year to maintain, improve, and harden
its infrastructure.
SCE’s investments support safe, reliable, affordable, and clean energy for our customers
2019 Capital Investments
179 miles of underground cable replaced
502 miles of overhead conductor replaced for public safety
16.4k distribution poles replaced
4.3k transmission poles replaced
71 underground structure replacements
4
PATHWAY 2045SCE’S vision to help California achieve a carbon neutral future
Carbon neutrality is achieved through deep decarbonization of
electricity, transportation and building electrification,
and the use of low-carbon fuels
Meeting California’s Climate Change Goals
5
• SCE filed its second Wildfire
Mitigation Plan in February 2020
• It builds on the progress made
in 2019 to reduce the risk of fire
ignitions caused by utility
infrastructure
• SCE crews will continue to work
to install hi-tech wildfire
mitigation tools and
technologies to make
communities safer, more
resilient, and to help reduce the
number of Public Safety Power
Shutoffs (PSPS)
Addressing Wildfire Risk
6
• De-energizing power lines to prevent ignitions
• Used during elevated fire conditions
• Primarily impacts circuits in high fire risk areas
• Use of multiple methods to notify people in affected areas before, during and after a de-energization event
Public Safety Power Shutoffs (PSPS)
7
4-7 DAYS AHEAD
3 DAYSAHEAD
2 DAYSAHEAD
1 DAY AHEAD POWER SHUTOFF
POWER RESTORATION
PLANNING AND MONITORING OUTAGE
*Erratic or sudden onset of conditions may impact our ability to provide advanced notice to customers.
Forecast Weather & Fire
Conditions
SCE Incident Management Team on Alert
County Operational Areas
informed of potential activation
SCE Incident Management
Team Activated
1st Notification PSPS Possible sent
to agencies and customers
2nd Notification PSPS
Possible
3rd Notification Power Shutoff
4th Notification Power Restored After Inspection
Reliability Overview
8
What is Reliability?
• In simplest terms:
Having dependable electricity when you need it.
• Outages:
• Maintenance outages (aka planned outages)
• Repair outages (aka unplanned outages)
• Sustained Outage = An outage lasting > 5 minutes
• Momentary Outage = An outage lasting ≤ 5 minutes
9
Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption that spans multiple calendar days is accrued to the day on which the interruption began. Statistically, days having a daily system SAIDI greater than a threshold value are days on which the energy delivery system experienced stresses beyond that normally expected (such as severe weather).
Public Safety Power Shutoff (PSPS) : An operational protocol that SCE implements under extreme weather conditions in order to minimize the threat of wildfires and keep communities safe from potentially dangerous situations. These types of sustained outages are temporary and usually involve situations where high fire areas are experiencing adverse weather or public safety is at risk.
How Do We Measure Reliability?
SAIDI SAIFI MAIFI CAIDI
10
CityList1Communities in the DOMINGUEZ HILLS District
LOS ANGELES
LYNWOOD
WEST COMPTON
WILLOWBROOK
MAYWOOD
PARAMOUNT
BELL GARDENS
BELLFLOWER
CARSON
COMMERCE
COMPTON
CUDAHY
BELL
SOUTH GATE
VERNON
WALNUT PARK
WEST CARSON
EAST COMPTON
EAST LOS ANGELES
FLORENCE-GRAHAM
HUNTINGTON PARK
11
*”Exclusions” are days which utilities are allowed to remove from their metrics because the outages on those days were caused by a severe acts of nature.**In the columns showing “Rank,” lower numbers indicate poorer performance.
12
CircuitList1Overview of CudahyThere are 20 circuits that serve Cudahy 1
Circuit Type Customers Circuit Type Customers Circuit Type Customers Circuit Type Customers
ABLE(4.16KV) 1,496 - - -
CLARA(4.16KV) 276 - - -
CREAMERY(16KV) 1,724 - - -
CYANIDE(16KV) 1,838 - - -
FLORENCE(16KV) 4,455 - - -
HARTLE(4.16KV) 399 - - -
HOME GARDENS(4.16KV) 832 - - -
LIBERTY(4.16KV) 871 - - -
MAAS(4.16KV) 1,045 - - -
NATIONAL(4.16KV) 1,233 - - -
OTIS(16KV) 3,297 - - -
PARAFINE(16KV) 886 - - -
PIRATE(16KV) 4,448 - - -
PUREX(16KV) 162 - - -
RHEEM(16KV) 72 - - -
SALES(4.16KV) 1,253 - - -
SALT LAKE(16KV) 1,819 - - -
SENGA(4.16KV) 631 - - -
SILVERSIDE(16KV) 3,298 - - -
WILCOX(16KV) 1,491 - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Grand Total 31,526
13
BarChart
SCE SYSTEMWIDE
**Data is as of 02/14/2020, data
can be slightly different due to
outage data validation process
Cudahy
Reliability History of Circuits Serving Cudahy (No Exclusions)
**“Exclusions” are days which
utilities are allowed to
remove from their metrics
because the outages on
those days were caused by
acts of nature.
147.7
102.7
45.2
97.1
134.5 139.7 136.8
178.0
0.0
50.0
100.0
150.0
200.0
2016 2017 2018 2019
SAIDI
(average
minutes of
sustained
interruptions)
0.9 0.9
0.6
0.9
1.11.2
0.9
1.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
SAIFI
(average
frequency of
sustained
interruptions)
2.9
2.4
3.3
2.1
1.61.8
1.4 1.4
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
MAIFI
(average
frequency of
momentary
interruptions)
14
SAIDIChart
SAIDI = the cumulative amount of time the average customer is interrupted by “sustained” outages each year.
Causes of Repair Outages in Cudahy
2019
3rd Party
46.2%
Equipment Failure
18.1%
Operation
17.8%
Other
1.7%Vegetation /Animal
11.5%
Weather /Fire
/Earthquake
4.7%
PSPS
0.0%
Contributions to SAIDI by Outage Cause
3rd Party
Equipment Failure
Operation
Other
Vegetation /Animal
Weather /Fire /Earthquake
PSPS
Equipment Failure
e.g., in-service failure of transformer,
switch, or conductorsVegetation/Animal
e.g., tree branch, rodent, or birdcausing a short circuit between
conductors Other
e.g., patrolled but no cause found,PSPS
Operationse.g., urgent maintenance w/o 3-day
notice 3rd Party
e.g., balloon, car hit pole, dig-in
PSPS
e.g., Public Safety Power Shutoff
15
SAIFIChart
SAIFI = the number of times the average customer is interrupted by “sustained” outages each year
Causes of Repair Outages in Cudahy
2019
3rd Party
46.7%
Equipment Failure
24.0%
Operation
14.4%
Other
1.2%Vegetation /Animal
12.6%
Weather /Fire
/Earthquake
1.1%PSPS
0.0%
Contributions to SAIFI by Outage Cause
3rd Party
Equipment Failure
Operation
Other
Vegetation /Animal
Weather /Fire /Earthquake
PSPS
Equipment Failure
e.g., in-service failure of transformer, switch, or conductors
Vegetation/Animale.g., tree branch, rodent, or bird
causing a short circuit between conductors
Othere.g., patrolled but no cause found
Operationse.g., urgent maintenance w/o 3-day
notice 3rd Party
e.g., balloon, car hit pole, dig-in
PSPS
e.g., Public Safety Power Shutoff
16
17
18
Back-up Slides
Reliability Histories of Circuits Serving Cudahy
Updated through Dec 2019
19
CitySummary
SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI
147.7 0.9 2.9 102.7 0.9 2.4 45.2 0.6 3.3 26.6 0.2 0.5 25.5 0.3 0.2 37.3 0.3 1.1 7.8 0.1 0.3 97.1 0.9 2.1
3rd Party 19% 29% 39% 23% 28% 40% 35% 31% 44% 56% 69% 49% 2% 1% 4% 78% 88% 5% 4% 1% 14% 46% 47% 17%
Equipment Failure 22% 44% 30% 61% 53% 33% 29% 28% 17% 1% 0% - 46% 65% 26% 9% 3% 12% 33% 12% 1% 18% 24% 9%
Operation 17% 12% 9% 8% 13% 0% 27% 37% - 1% 1% - 51% 32% - 9% 7% - 7% 13% - 18% 14% -
Other 22% 7% 20% 8% 6% 22% 7% 2% 20% - - 8% 1% 2% 70% 4% 1% 83% - - 43% 2% 1% 57%
Vegetation/Animal 0% 0% 2% - - 6% 0% 0% 19% 26% 27% 23% - - - 0% 0% - 52% 72% 42% 11% 13% 12%
Weather/Fire/Earthquake 19% 8% - - - - 1% 1% - 16% 4% 20% - - - - - - 4% 2% - 5% 1% 5%
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
SCE SYSTEMWIDE 134.5 1.1 1.6 139.7 1.2 1.8 136.8 0.9 1.4 28.1 0.3 0.4 18.9 0.2 0.4 31.8 0.2 0.3 99.3 0.3 0.3 178.0 1.0 1.4
2nd Qtr 2019 3rd Qtr 2019
20 Circuits Serving Cudahy -- Total Customers:
31,526
Average Reliability of 20 Circuits Serving Cudahy
4th Qtr 2019 20192016 2017 2018 1st Qtr 2019
Notes:
No outages are excluded from the metrics.
Outage Causes: Other: e.g., patrolled but no cause could be foundOperations: e.g., urgent maintenance w/o 3-day notice to customers3rd Party: e.g., balloons, car hit pole, dig-inVegetation/Animal: e.g., tree branch, rodent, or bird causing short circuit across conductorsPSPS: e.g., Public Safety Power Shutoff
SAIDI (minutes) = the cumulative amount of time the average customer is interrupted by “sustained” (longer than 5 minutes) outages.
SAIFI (interruptions) = the number of times the average customer is interrupted by “sustained” outages.
MAIFI (interruptions) = the number of times the average customer is interrupted by “momentary " (lasting 5 minutes or less) outages.
20
CircuitHistory1
SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI
ABLE(4.16KV) - Customers: 1,496 11.8 0.0 - - - 1.0 3.1 0.0 3.0 - - - 4.9 0.0 - - - 1.0 - - 1.0 4.9 0.0 2.0
3rd Party - - - - - - - - 67% - - - - - - - - 100% - - 100% - - 100%
Equipment Failure 100% 100% - - - 100% - - - - - - - - - - - - - - - - - -
Operation - - - - - - 100% 100% - - - - 100% 100% - - - - - - - 100% 100% -
Other - - - - - - - - 33% - - - - - - - - - - - - - - -
Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
CLARA(4.16KV) - Customers: 276 - - 2.0 115.4 1.0 4.0 - - - 142.0 0.1 - - - 1.0 - - - - - - 142.0 0.1 1.0
3rd Party - - 50% - - 25% - - - 100% 100% - - - 100% - - - - - - 100% 100% 100%
Equipment Failure - - - 100% 100% 25% - - - - - - - - - - - - - - - - - -
Operation - - - - - - - - - - - - - - - - - - - - - - - -
Other - - 50% - - 50% - - - - - - - - - - - - - - - - - -
Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
CREAMERY(16KV) - Customers: 1,724 89.4 0.4 1.6 - - 1.0 13.9 0.0 1.0 3.6 0.0 3.0 - - - - - 1.0 - - - 3.6 0.0 4.0
3rd Party 98% 97% 100% - - - - - - 79% 87% 33% - - - - - - - - - 79% 87% 25%
Equipment Failure - - - - - - 92% 71% - - - - - - - - - - - - - - - -
Operation 2% 3% - - - - 8% 29% - - - - - - - - - - - - - - - -
Other - - - - - 100% - - 100% - - - - - - - - 100% - - - - - 25%
Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - - - - 21% 13% 67% - - - - - - - - - 21% 13% 50%
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
CYANIDE(16KV) - Customers: 1,838 149.4 2.9 5.0 202.0 2.2 1.0 94.2 1.1 - 127.0 0.9 - 412.3 4.0 1.0 2.4 0.0 1.0 75.8 1.0 - 617.5 5.9 2.1
3rd Party 34% 39% 19% 50% 46% 100% 95% 92% - - - - - - - - - - - - - - - -
Equipment Failure 65% 61% 61% 47% 53% - 2% 1% - 0% 0% - 46% 77% 100% - - - - - - 31% 52% 50%
Operation 1% 1% - 3% 1% - - - - - - - 53% 21% - 100% 100% - 3% 0% - 36% 15% -
Other - - 20% - - - 1% 5% - - - - 1% 1% - - - 100% - - - 1% 1% 50%
Vegetation/Animal - - - - - - 2% 2% - 100% 100% - - - - - - - 97% 100% - 32% 33% -
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
Reliability Histories for Individual Circuits Serving Cudahy - 1 of 5
2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019
21
CircuitHistory2
SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI
FLORENCE(16KV) - Customers: 4,455 256.6 0.7 5.5 98.8 1.0 4.0 - - 2.0 32.8 0.1 - 7.9 0.1 - - - 2.0 - - - 40.7 0.2 2.0
3rd Party - - 18% 99% 100% 50% - - 50% - - - - - - - - - - - - - - -
Equipment Failure 4% 36% 14% - - 25% - - - - - - 100% 100% - - - - - - - 19% 62% -
Operation 22% 26% 37% 1% 0% - - - - 8% 14% - - - - - - - - - - 6% 5% -
Other 74% 38% 32% - - - - - - - - - - - - - - 100% - - - - - 100%
Vegetation/Animal - - - - - 25% - - 50% - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - - - - 92% 86% - - - - - - - - - - 74% 33% -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
HARTLE(4.16KV) - Customers: 399 - - 1.0 - - 1.0 - - - - - - - - - - - - 7.2 0.4 - 7.2 0.4 -
3rd Party - - 100% - - - - - - - - - - - - - - - - - - - - -
Equipment Failure - - - - - 100% - - - - - - - - - - - - - - - - - -
Operation - - - - - - - - - - - - - - - - - - 100% 100% - 100% 100% -
Other - - - - - - - - - - - - - - - - - - - - - - - -
Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
HOME GARDENS(4.16KV) - Customers: 832 296.6 2.0 - - - 1.0 21.0 0.2 - - - - - - 1.0 52.6 0.7 - 68.9 0.3 - 121.5 1.0 1.0
3rd Party - - - - - - - - - - - - - - - - - - - - - - - -
Equipment Failure 34% 52% - - - 100% - - - - - - - - - - - - 100% 100% - 57% 32% -
Operation - - - - - - 100% 100% - - - - - - - 100% 100% - - - - 43% 68% -
Other 66% 48% - - - - - - - - - - - - 100% - - - - - - - - 100%
Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
LIBERTY(4.16KV) - Customers: 871 572.3 2.1 1.0 - - 1.0 135.1 1.1 2.0 - - - - - 0.9 90.8 0.3 0.7 - - - 90.8 0.3 1.6
3rd Party 17% 49% 100% - - - - - 100% - - - - - - - - - - - - - - -
Equipment Failure 3% 2% - - - - - - - - - - - - - 100% 100% 100% - - - 100% 100% 42%
Operation 0% 1% - - - - 100% 100% - - - - - - - - - - - - - - - -
Other - - - - - 100% - - - - - - - - 100% - - - - - - - - 58%
Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -
Weather/Fire/Earthquake 79% 49% - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
2019
Reliability Histories for Individual Circuits Serving Cudahy - 2 of 5
2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019
22
CircuitHistory3
SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI
MAAS(4.16KV) - Customers: 1,045 179.4 0.2 1.0 9.3 0.1 1.0 21.2 0.1 - - - - 1.3 0.1 - - - - - - - 1.3 0.1 -
3rd Party - - 100% - - 100% - - - - - - - - - - - - - - - - - -
Equipment Failure 100% 100% - - - - 29% 19% - - - - - - - - - - - - - - - -
Operation - - - 100% 100% - 71% 81% - - - - - - - - - - - - - - - -
Other - - - - - - - - - - - - 100% 100% - - - - - - - 100% 100% -
Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
NATIONAL(4.16KV) - Customers: 1,233 447.0 1.1 1.9 36.1 0.1 2.0 0.1 0.0 - - - 1.0 12.9 1.0 - 1.3 0.0 1.0 7.7 0.0 - 21.8 1.1 2.0
3rd Party - - - - - 50% - - - - - - - - - - - - - - - - - -
Equipment Failure - - - 100% 100% 50% - - - - - - - - - - - - - - - - - -
Operation 91% 96% - - - - 100% 100% - - - - 100% 100% - 100% 100% - - - - 65% 96% -
Other 9% 4% 100% - - - - - - - - 100% - - - - - 100% - - - - - 100%
Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - 100% 100% - 35% 4% -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
OTIS(16KV) - Customers: 3,297 207.9 2.7 3.3 311.0 3.6 4.5 77.4 1.1 4.0 113.9 1.2 - 1.3 0.0 - 206.1 0.9 1.1 11.3 0.0 - 332.6 2.1 1.1
3rd Party 27% 18% 35% 9% 15% 69% 12% 1% 75% 100% 100% - 100% 100% - 96% 97% 8% 26% 20% - 95% 97% 8%
Equipment Failure 73% 82% 65% 90% 85% 12% 79% 93% - - - - - - - 2% 3% - 57% 27% - 3% 2% -
Operation - - - 0% 0% - 2% 1% - - - - - - - 1% 1% - 17% 53% - 1% 1% -
Other - - - - - 19% - - 25% - - - - - - - - 92% - - - - - 92%
Vegetation/Animal 0% 0% - - - - - - - - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - 7% 6% - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
PARAFINE(16KV) - Customers: 886 17.2 1.0 - 262.5 1.7 2.0 127.7 1.1 0.1 - - - - - - 86.3 1.1 - 1.9 0.0 - 88.2 1.1 -
3rd Party - - - 2% 34% 61% - - - - - - - - - 68% 98% - - - - 67% 97% -
Equipment Failure - - - 98% 66% 39% 100% 97% 100% - - - - - - - - - - - - - - -
Operation 100% 100% - - - - 0% 3% - - - - - - - 32% 2% - 100% 100% - 33% 3% -
Other - - - - - - - - - - - - - - - - - - - - - - - -
Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
Reliability Histories for Individual Circuits Serving Cudahy - 3 of 5
2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019
23
CircuitHistory4
SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI
PIRATE(16KV) - Customers: 4,448 4.1 0.0 3.0 33.1 0.0 1.0 47.2 0.8 8.4 8.7 0.0 1.1 - - - - - 0.9 - - 0.9 8.7 0.0 3.0
3rd Party 72% 36% 33% - - - 89% 73% 29% 100% 100% 100% - - - - - - - - - 100% 100% 38%
Equipment Failure - - 67% 96% 70% 100% 7% 1% 24% - - - - - - - - - - - - - - -
Operation - - - 4% 30% - 3% 26% - - - - - - - - - - - - - - - -
Other 28% 64% - - - - - - 24% - - - - - - - - 100% - - - - - 31%
Vegetation/Animal - - - - - - 1% 0% 24% - - - - - - - - - - - 100% - - 31%
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
PUREX(16KV) - Customers: 162 112.0 3.0 - - - 1.0 20.8 0.1 2.0 - - - - - - - - - - - - - - -
3rd Party - - - - - - - - - - - - - - - - - - - - - - - -
Equipment Failure 99% 98% - - - 100% 33% 16% 50% - - - - - - - - - - - - - - -
Operation 1% 2% - - - - 10% 26% - - - - - - - - - - - - - - - -
Other - - - - - - 57% 58% - - - - - - - - - - - - - - - -
Vegetation/Animal - - - - - - - - 50% - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
RHEEM(16KV) - Customers: 72 34.4 0.0 - 1542.5 3.0 1.9 121.6 0.8 1.2 - - - - - - - - - 30.0 0.0 2.0 30.0 0.0 2.0
3rd Party - - - 53% 65% - 100% 100% 16% - - - - - - - - - - - - - - -
Equipment Failure 100% 100% - 46% 34% 51% - - - - - - - - - - - - 100% 100% 100% 100% 100% 100%
Operation - - - 1% 1% 49% - - - - - - - - - - - - - - - - - -
Other - - - - - - - - - - - - - - - - - - - - - - - -
Vegetation/Animal - - - - - - - - 84% - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
SALES(4.16KV) - Customers: 1,253 311.6 1.0 - 222.4 1.5 2.0 - - 1.0 - - 1.0 3.2 0.0 - 83.8 1.0 - - - 1.0 87.0 1.0 2.0
3rd Party - - - - - - - - 100% - - 100% - - - 100% 100% - - - - 96% 98% 50%
Equipment Failure 2% 2% - - - - - - - - - - - - - - - - - - - - - -
Operation - - - 2% 11% - - - - - - - 100% 100% - - - - - - - 4% 2% -
Other - - - 98% 89% 100% - - - - - - - - - - - - - - 100% - - 50%
Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -
Weather/Fire/Earthquake 98% 98% - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
Reliability Histories for Individual Circuits Serving Cudahy - 4 of 5
2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019
24
CircuitHistory5
SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI
SALT LAKE(16KV) - Customers: 1,819 12.8 0.1 3.3 240.6 1.1 2.2 61.5 0.6 2.4 - - - - - - 24.7 0.1 - - - - 24.7 0.1 -
3rd Party - - - - - - 37% 43% 29% - - - - - - - - - - - - - - -
Equipment Failure 60% 6% 40% 99% 98% 100% 58% 51% 71% - - - - - - - - - - - - - - -
Operation 40% 94% - 1% 2% - 6% 6% - - - - - - - - - - - - - - - -
Other - - 60% - - - - - - - - - - - - 100% 100% - - - - 100% 100% -
Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
SENGA(4.16KV) - Customers: 631 - - - - - 1.0 107.8 1.0 2.0 - - - - - - - - - - - - - - -
3rd Party - - - - - 100% - - 100% - - - - - - - - - - - - - - -
Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -
Operation - - - - - - 100% 100% - - - - - - - - - - - - - - - -
Other - - - - - - - - - - - - - - - - - - - - - - - -
Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
SILVERSIDE(16KV) - Customers: 3,298 119.0 1.1 6.0 64.5 1.0 5.0 77.3 1.1 6.0 1.4 0.0 1.1 3.7 0.0 1.0 38.4 1.0 2.9 - - 1.0 43.6 1.0 5.9
3rd Party 91% 93% 84% 3% 1% 39% 13% 2% 50% - - - 100% 100% - 78% 99% - - - - 78% 99% -
Equipment Failure - - - 5% 0% 20% 0% 0% 17% 100% 100% - - - - - - 33% - - - 3% 0% 16%
Operation 9% 7% - 92% 99% - 51% 91% - - - - - - - 22% 1% - - - - 19% 1% -
Other - - 16% - - 41% 36% 7% 17% - - - - - 100% - - 67% - - 100% - - 65%
Vegetation/Animal - - - - - - - - 17% - - 100% - - - - - - - - - - - 19%
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
WILCOX(16KV) - Customers: 1,491 - - 1.0 - - 2.0 15.2 0.2 1.0 - - - - - - 1.0 0.0 - 0.8 0.0 - 1.8 0.1 -
3rd Party - - - - - - 100% 100% - - - - - - - - - - - - - - - -
Equipment Failure - - - - - 50% - - - - - - - - - - - - - - - - - -
Operation - - - - - - - - - - - - - - - - - - 100% 100% - 42% 89% -
Other - - - - - 50% - - - - - - - - - - - - - - - - - -
Vegetation/Animal - - 100% - - - - - 100% - - - - - - 100% 100% - - - - 58% 11% -
Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -
PSPS - - - - - - - - - - - - - - - - - - - - - - - -
Reliability Histories for Individual Circuits Serving Cudahy - 5 of 5
2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019
25