Page 1: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

1 INTELLIWAVE TECHNOLOGIES INC.1 INTELLIWAVE TECHNOLOGIES INC.

AWP Conference 2015

Predictable Work Package Execution using RFID on a

Billion Dollar Project

Page 2: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

2 INTELLIWAVE TECHNOLOGIES INC.

Page 3: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

3 INTELLIWAVE TECHNOLOGIES INC.

Source: CII Publication RT240-1, 2008

Page 4: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

4 INTELLIWAVE TECHNOLOGIES INC.

Page 5: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

5 INTELLIWAVE TECHNOLOGIES INC.

Page 6: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

6 INTELLIWAVE TECHNOLOGIES INC.

Page 7: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

7 INTELLIWAVE TECHNOLOGIES INC.

Page 8: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

8 INTELLIWAVE TECHNOLOGIES INC.

Page 9: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

9 INTELLIWAVE TECHNOLOGIES INC.Total Project Visibility™

Page 10: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

10 INTELLIWAVE TECHNOLOGIES INC.Total Project Visibility™

Page 11: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

11 INTELLIWAVE TECHNOLOGIES INC.

Page 12: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

12 INTELLIWAVE TECHNOLOGIES INC.

Page 13: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

13 INTELLIWAVE TECHNOLOGIES INC.

Plug-in Adapter

RESTful Web API

Page 14: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

14 INTELLIWAVE TECHNOLOGIES INC.

Page 15: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

15 INTELLIWAVE TECHNOLOGIES INC.

Page 16: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

16 INTELLIWAVE TECHNOLOGIES INC.

• More than twenty eight years of experience in the heavy construction

industry

• Construction background includes the petrochemical, chemical, power,

pharmaceutical, and refining industries

• Accountabilities in project management, constructability, planning,

scheduling, quality control, cost control, craft services and overall safety

in a multiple site environment

• Nine years with Austin Industrial and four years with Technip

• B.S. in Business Administration and Project Management from Colorado

Technical University and an AAS degree in Construction Management

from San Jacinto College

Page 17: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

17 INTELLIWAVE TECHNOLOGIES INC.

Page 18: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

18 INTELLIWAVE TECHNOLOGIES INC.

Page 19: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

19 INTELLIWAVE TECHNOLOGIES INC.

Page 20: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

20 INTELLIWAVE TECHNOLOGIES INC.

Page 21: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

21 INTELLIWAVE TECHNOLOGIES INC.

Page 22: Predictable Work Package Execution using RFID on a Billion Dollar …groupasi.net/conferencelibrary/2015/AWPC 2015... · 2017-03-07 · AWP Conference 2015 Predictable Work Package

22 INTELLIWAVE TECHNOLOGIES INC.22 INTELLIWAVE TECHNOLOGIES INC.

Questions?