integrating a work package based engineering …groupasi.net/conferencelibrary/2016/awpc...

40
Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst AWP Conference Houston TX 2016-10-05

Upload: others

Post on 11-Apr-2020

19 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Integrating a Work Package Based Engineering Phase with AWP

Presenter: Andrew Herbst

AWP Conference Houston TX 2016-10-05

Page 2: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

To consistently provide the successful execution of the detailed engineering phase in heavy industrial projects.

Success Criteria: STBQ

• Safely

• On-Time

• On-Budget

• Meets Quality Requirements

Purpose of the method

2 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 3: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

3

Phase-Gate Projects

2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 4: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

4

STBQ Applicability

2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 5: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

STBQ Acceptability Domains

5

Safely Timely Budget Quality

Over Unacceptable Unacceptable Unacceptable Acceptable

Goal Zero LTIs On Schedule On Budget Meets Quality

Under Acceptable Acceptable Acceptable Unacceptable

1. Sr. Management to recognize all WP team members when S,T,B, & Q are all in the green zones.

2. Conduct Lessons Learned sessions to capture what needs improvement when any red zones are encountered.

2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 6: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Apply the 100% Rule

6

No Gaps or Overlaps

2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 7: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Types of Work Packages

EWP – for Engineering (internal, external, or interim)

CWP – for Construction (ECWP?)

FWP – for Fabrication (single craft)

MWP – for Modularization (multi-craft)

SWP – for Suppliers

FIWP – for Field Installation

ITP – for Inspection and Testing

STP – for System Turnover

SCP – for System Commissioning

7 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 8: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Integrate

Integrate the method with two widely used standards and an industry best practice:

• ANSI/PMI 99-001-2008 - A Guide to the Project Management Body of Knowledge (PMBOK Guide)

• ISO 9001:2015 Quality Management Systems - Requirements

• CII IR-272-2, version 3.1 - Advanced Work Packaging: Design through Workface Execution

8 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 9: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

9 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 10: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Example WBS – Level 2

10

Level 0

Level 1

Level 2

2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 11: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

WBS Level 3 (WP level)

11 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 12: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

NTLAP & M/C/R WPs

12 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 13: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Commercial Linking Diagram

2016-10-05 A. Herbst - AWP Conference 2016 - Draft 13

Page 14: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

14 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 15: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Quality Checkpoints in WPs

15 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 16: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

16

Work Package Inputs and Outputs

2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 17: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

17

Work Package Execution Diagram

2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 18: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

WP-Based Project Engineering

Management System

Project Team

Q. Is it worth the effort?

2016-10-05 A. Herbst - AWP Conference 2016 - Draft 18

Page 19: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

19 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 20: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

20

Knowledge Management Loop 1. Team member intuits and interprets to the WP sub-team

2. Sub-team agrees and recommends integration into job instructions by PMT

3. PMT agrees and integrates into PEP and recommends institutionalizing as company standard by Higher Mgt.

4. Higher Mgt. agrees and institutionalizes improvements in Standard Practices and issues to all Project Teams.

Adapted from: Crossan, M. M., Lane, H. W., & White, R. E. (1999). An Organizational Learning Framework: From Intuition to Institution. Academy of Management Review, 522-537.

2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 21: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Worker Motivation

• Need workers committed to completing their tasks on-time and within their own budget. This requires motivation.

• Use positive motivation only for this purpose. Recognition of work done correctly, on-time, on-budget should be done routinely with enthusiasm.

21 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 22: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Motivation Theorists adapted from J. D. Westbrook 2011

Maslow McGregor Herzberg McClelland Skinner

Esteem, Recognition, Achievement,

Career Advancement Theory Y Motivators nAchievers

Rewarded behavior

is repeated

Membership, Security

Theory X Hygienes nAffilliators Ignored behavior is

extinguished; punished behavior

generates a negative,

fragmented response

22 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 23: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Hierarchy of Needs A.H. Maslow, 1943

23 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Motivate here

Page 24: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

McGregor’s Theory X and Theory Y

• Theory X - The average human being has an inherent dislike of work and will avoid it if he can.

• Theory Y - The expenditure of physical and mental effort in work is as natural as play or rest. Depending upon controllable conditions, work may be a source of satisfaction.

• Assume Theory Y and try to create a situation where

the employee can achieve his own goals best by directing his efforts toward the objectives of the enterprise.

24 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 25: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Herzberg’s Motivators/Hygienes Herzberg, F. “One More Time, How Do you Motivate Employees?”, Harvard Business Review, Sept. 1987.

25 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 26: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

McClelland’s Needs/Achievement Theory McClelland, D.C, Human Motivation, 1987

• Achievers are motivated by the attainment of realistic but challenging goals, and advancement in the job.

• There is a strong need for feedback as to achievement and progress, and a need for a sense of accomplishment.

26 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 27: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Characteristics of Achievers

• Achievement is more important than material or financial reward. • Achieving the aim or task gives greater personal satisfaction than receiving praise or

recognition. • Financial reward is regarded as a measurement of success, not an end in itself. • Security is not a prime motivator, nor is status. • Feedback is essential, because it enables measurement of success, not for reasons of

praise or recognition (the implication here is that feedback must be reliable, quantifiable and factual).

• Achievement-motivated people constantly seek improvements and ways of doing things better.

• McClelland firmly believed that achievement-motivated people are generally the ones who make things happen and get results.

• This extends to getting results through the organization of other people and resources, although they often demand too much of their staff because they prioritize achieving the goal above the many varied interests and needs of their people.

27 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 28: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Operant Conditioning Theory Skinner, B.F. Science and Human Behavior, 1953

28

Behavior that is rewarded tends to be repeated Behavior that is ignored tends to be extinguished Behavior that is punished generates a negative, fragmented response

2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 29: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

29 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 30: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

30 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 31: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

31 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 32: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

32 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 33: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

33 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 34: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

34 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 35: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

35 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 36: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

36 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 37: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

37 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 38: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

38 2016-10-05 A. Herbst - AWP Conference 2016 - Draft

Page 39: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

“The planning will be done,

either in advance,

or on weekends and evenings”.

– Bill Tillman

Final Thought

2016-10-05 A. Herbst - AWP Conference 2016 - Draft 39

Page 40: Integrating a Work Package Based Engineering …groupasi.net/conferencelibrary/2016/AWPC 2016...Integrating a Work Package Based Engineering Phase with AWP Presenter: Andrew Herbst

Thank you for listening!

Questions?

2016-10-05 40 A. Herbst - AWP Conference 2016 - Draft