prepare uganda f - university of bristol...the uganda national developemt plan two (ndp 2) and...

16
MINISTRY OF ENERGY AND MINERAL DEVELOPMENT THE REPUBLIC OF UGANDA Directorate of Geological Survey and Mines EARTHQUAKE OCCURRENCES IN UGANDA DURING THE LAST 100 YEARS AND GOVERNEMENT’S EFFORTS TO MITIGATE EARTHQUAKE EFFECTS IN THE COUNTRY. FRED ALEX TUGUME A/C GEOPHYSICS AND SEISMOLOGY DIVISION DIRECTORATE OF GEOLOGICAL SURVEY AND MINES MINISTRY OF ENERGY AND MINERAL DEVELOPMENT UGANDA CHAIR EAST AND SOUTHERN AFRICA REGIONAL SEISMLOGICAL WORKING GROUP (ESARSWG)

Upload: others

Post on 14-Mar-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s

EARTHQUAKE OCCURRENCES IN UGANDA DURING THE LAST 100 YEARS AND GOVERNEMENT’S EFFORTS TO MITIGATE EARTHQUAKE EFFECTS IN THE COUNTRY.

FRED ALEX TUGUME

A/CGEOPHYSICS AND SEISMOLOGY DIVISION

DIRECTORATE OF GEOLOGICAL SURVEY AND MINESMINISTRY OF ENERGY AND MINERAL DEVELOPMENT

UGANDA

CHAIR

EAST AND SOUTHERN AFRICA REGIONAL SEISMLOGICAL WORKING GROUP (ESARSWG)

Page 2: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s

PRESENTATION OUTLINE

• CAUSES OF EARTHQUAKES IN UGANDA

• MAJOR EATHQUAKES FELT IN COUNTRY SINCE 1900

• OIL, GAS & GEOTHERMAL & MINERAL RESOURCE PROJECTS

• OTHER INFRASTRUCTURE PROJECTS:

• GOVERNMENT POSITION ON MITIGATION OF EARTHQUAKE EFFECTS

• Brief on ESARSWG

• CONCLUSION

Page 3: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s

CAUSES OF EARTHQUAKES IN UGANDA

Page 4: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s7 4

MAJOR EATHQUAKES FELT IN COUNTRY SINCE 1900

Date MagnitudeLocation

Reported effects

9th July, 1912 6.0 Northern Uganda, Associated with AswarShear Zone

Partial destruction of buildings in northern and northwestern Uganda.

Date Magnitude Reported effects

2nd October, 1929 5.9

Albertine Graben, WesternRift of the EARS

Change of water color in thehot springs and earthquakeinduced landslides(Simmons 1930).

Date Magnitude Reported effects18th March, 1945 6.0

Central Uganda. AssociatedWith Katonga break

Entebbe seismograph putout of order, 5 people deadand destruction of somebuildings (Bisset 1945;Gutenberg and Richter,1949).

Page 5: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s7 5

MAJOR EATHQUAKES FELT IN COUNTRY SINCE 1900

Date Magnitude Reported effects

29th March, 1966 6.6

Rwenzori Region,Western Arm of the Rift

150 people dead andover 1,300 injured aswell as property lossworth millions of dollars.(Loupekine 1966; Sykes1967).

Date Magnitude Reported effects

5th February, 1994 6.2 8 people dead anddestruction of propertyworth US$ 61M in thewestern districts ofKasese, Bundibugyoand Kabarole. Thehottest hot spring inBuranga (Sempaya)geothermal field (98oC)emerged.

Date Magnitude Reported effects10th September 2016 5.8 Damaged a lot of

property in North EastTanzania and SouthernUganda.

Page 6: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s

SEISMICITY MAP

Page 7: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s 7

OIL, GAS, GEOTHERMAL & MINERAL OCCURENCESOIL, GAS, GEOTHERMAL & MINERAL OCCURENCES

Page 8: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s 8

OIL, GAS & GEOTHERMAL & MINERAL OCCURENCESOIL, GAS & GEOTHERMAL & MINERAL OCCURENCES

Page 9: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s 9

OIL, GAS & GEOTHERMAL & MINERAL OCCURENCESOIL, GAS & GEOTHERMAL & MINERAL OCCURENCES

Page 10: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s 10

OIL, GAS & GEOTHERMAL & MINERAL OCCURENCESOIL, GAS & GEOTHERMAL & MINERAL OCCURENCES

Page 11: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s

OTHER INFRASTRUCTURE DEVELOPMENT PROJECTS

KARUMA HPP 600 MW (Construction is going on)

ISIMBA HPP 183 MW (Construction is going on)

STANDARD GAUGE RAILWAY LINE (Advanced stages of Feasibility studies)

SUKULU PHOSPHATE FERTILIZER FACTORY (Under construction)

CRUDE OIL PIPE LINE (From Albertine Graben in Uganda to Tanga, Tanzania)

Page 12: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s

GOVERNMENT POSITION ON MITIGATION OF EARTHQUAKE EFFECTS

NATIONAL BUILDING ACT 2013,

FORMULATION OF THE NATIONAL BUILDING CODE UNDER THE BUILDING CONTROL ACT, 2013

1 - Building Standards and Building Control Regulations

2 - Structural Designs and Geotechnical Reports

3 - Electrical Installations

4 - Mechanical Installations, Plumbing, Fire and Safety

5 - Accessibility Standards

6 - Postal Code Numbering

Page 13: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s

GOVERNMENT POSITION ON MITIGATION OF EARTHQUAKE EFFECTS

THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014.

Increase response to mitigate seismic risk.

I. Map all areas prone to seismic risk and monitor all seismic events.

II. Establish earthquake administration policy, disaster management plan and legal framework to enforce seismic

safety standards,

III. Extend and strengthen seismological network coverage to areas prone to seismic and volcanic risk.

IV. Strengthen institutional research capacity and develop skills of Ugandans in seismology, earthquake engineering,

seismic instrumentation, and computing.

Page 14: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s

Brief on ESARSWG

1. This group was formed at the meeting held in Tanzania in 1993 with support from the International Science Program (ISP), Uppsala, Sweden

2. Member countries are: Ethiopia, Eritrea, Kenya, Uganda, Tanzania, Malawi, Mozambique, Zambia and Zimbabwe

3. All 9 countries lie along the great EARS which is one of the seismically active part on the continent.

4. The main objectives of the group are:

a) To monitor, record, accurately locate earthquakes occurring in the region,

b) Capacity building in form of training of technicians and scientists,

c) Promote research in seismic hazard assessment so that earthquake effects can be reduced.

5. The group has an EC members which handles critical decision, before the decisions are communicated to the group members

Call for Abstract Review 28052018(1).pdf

Page 15: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s

CONCLUSION

1) Promotion of earthquake research at local, regional  and international levels should continue.

2) It is the role of our Government(s) to enforce the  Laws, rules and regulations (building codes) that 

are developed to mitigate earthquake effects.

3) Government(s) to create an enabling environment for scientists/technicians involved in earthquake 

research to avoid brain drain  coupled with high staff turnover.

Page 16: PREPARE UGANDA F - University of Bristol...THE UGANDA NATIONAL DEVELOPEMT PLAN TWO (NDP 2) AND VISION 2014. Increase response to mitigate seismic risk. I. Map all areas prone to seismic

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

THE REPUBLIC OF UGANDA

D i r e c t o r a t e o f G e o l o g i c a l S u r v e y a n d M i n e s 16

4) Sensitization on local traditional houses