Presentation of Results Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of NewGen Strategies & Solutions, LLC February 18, 2014

Upload: others

Post on 19-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Presentation of ResultsPresentation of ResultsWater and Sewer Rate Study

Trophy Club MUD No. 1

ADivisionofNewGenStrategies&Solutions,LLC

February 18, 2014

Page 2: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Agenda

Fundamental Assumptions

Key Issues

Recommendations Recommendations

Monthly Bill Comparison

Questions

ADivisionofNewGenStrategies&Solutions,LLC 2

Page 3: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Fundamental Assumptions

A Water & Sewer Utility is essentially a business and y ytherefore, should be operated accordingly  Considered a Business‐Like Activity of Government Typically accounted for in an Enterprise Fund Cost to provide service should be recovered from water and sewer revenuesand sewer revenues

Study only considered rate revenues

ADivisionofNewGenStrategies&Solutions,LLC 3

Page 4: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Key Issues

TCMUD is in need of significant wastewater capital i TCMUD l i i $6 0 Milli iimprovements. TCMUD plans on issuing $6.0 Million in revenue‐supported debt in FY 2014 for Treatment Plant Upgrades 

TCMUD is nearing build‐out capacity, and will be losing Utility Fee Revenues from the PIDUtility Fee Revenues from the PID PID contract terminates when all utility fees are paid  Estimated to Occur in 2016; Contract Term is 2018

ADivisionofNewGenStrategies&Solutions,LLC 4

Page 5: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Key Issues

Wholesale Cost Increases Continue to Impact TCMUD Over $300,000 increase in wholesale water cost from City of 

Ft. Worth Increases must be passed through to customers to maintain p g

financial position of the utility

TCMUD’s existing short term debt will decline through 2016

ADivisionofNewGenStrategies&Solutions,LLC 5

Page 6: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Key Issues

Assuming “normal” precipitation conditions, TCMUD’s existing water and wastewater rates are insufficient to fully fund the costwater and wastewater rates are insufficient to fully fund the cost of providing water and wastewater service

Under Contract, PID customers must be charged the same rate as gMUD Residential Customers through 2016

Recommend Revenue Adjustment to recover Projected 2016 Cost of Service Will require use of reserves to cover projected shortfalls Total estimated shortfall for FY 2014 & FY 2015 of $553,000Total estimated shortfall for FY 2014 & FY 2015 of $553,000 $359,000 for Water and $194,000 for Wastewater

ADivisionofNewGenStrategies&Solutions,LLC 6

Page 7: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Projected Revenue Under Current RatesWater FY 2014 FY 2015 FY 2016 FY 2017 FY 2018

Revenue Requirement $ 4,588,940 $  4,336,331 $  4,516,381 $ 4,571,910 $ 4,767,839

Revenue Under Current Rates 3,577,181 3,711,207 3,851,935 3,999,698 4,154,850

Over / (Under) ($) ($  1,011,759) ($  625,124) ($  664,447) ($  572,212) ($  612,988)

Over / Under (%) ‐28.28% ‐16.84% ‐17.25% ‐14.31%  ‐14.75%

WastewaterRevenue Requirement $ 2,157,623 $  2,219,073 $  2,229,793 $  2,269,112 $ 2,323,933

Revenue Under Current Rates 1,794,717 1,867,521 1,943,966 2,024,233 2,108,513

Over / (Under) ($) ($ 362,906) ($ 351,552) ($ 285,827) ($ 244,879) ($  215,419)

Over / Under (%) ‐20.22% ‐18.82% ‐14.70% ‐12.10%  ‐10.22%

TotalsTotalsRevenue Requirement $ 6,746,563 $  6,555,405 $  6,746,174 $  6,841,022 $ 7,091,771

Revenue Under Current Rates 5,371,897 5,578,728 5,795,900 6,023,931 6,263,364

Over / (Under) ($) ($ 1,374,666) ($ 976,676) ($ 950,274) ($ 817,091) ($ 828,408)

7

Over / (Under) ($) ($ 1,374,666) ($ 976,676) ($  950,274) ($ 817,091) ($  828,408)

Over / Under (%) ‐25.59% ‐17.51% ‐16.40% ‐13.56%  ‐13.23%

Page 8: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Recommendations – Water Rate Options

Scenario 1: Adjust all out of District rates (Excluding PID) to 1 15x Adjust all out of District rates (Excluding PID) to 1.15x Keep inclining block rate design Increase upper blocks and hold percent increase between blocks constant

Scenario 2:Scenario 2: Adjust All out of District Rates (Excluding PID) to 1.15x Keep meter charge for 5/8 x 3/4 inch @ $12.71(Lifeline Rate) Any meter greater than 5/8 x 3/4 inch charge $19.04 Increase upper blocks and hold percent increase between blocks constant

Scenario 3:  Adjust All out of District Rates (Excluding PID) to 1.15x Charge by Meter Size and Phase into AWWA Meter Equivalents Increase upper blocks and hold percent increase between blocks constant

8

Page 9: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Projected Water Rates 

5/8 3/4 i h $ 12 71 $ 14 90 $ 12 71 $ 12 71

Current Scenario 1 Scenario 2 Scenario 3Minimum Charge

5/8 x 3/4 inch $ 12.71 $ 14.90 $ 12.71 $ 12.711 inch 12.71 14.90 19.04 16.711 1/2 inch 12.71 14.90 19.04 26.422 inch 12 71 14 90 19 04 38 062 inch 12.71 14.90 19.04 38.063 inch 12.71 14.90 19.04 65.234 inch 12.71 14.90 19.04 104.046 inch 12.71 14.90 19.04 201.06

Volumetric Rate (per 1,000 gallons)0 – 6,000 $ 2.50 $ 2.70 $ 2.70 $ 2.706 001 17 000 3 05 3 14 3 14 3 146,001 – 17,000 3.05 3.14 3.14 3.1417,001 – 25,000 3.30 3.64 3.64 3.6425,001 – 50,000 3.40 4.23 4.23 4.2350 000 + 3 50 4 91 4 91 4 91

9

50,000 + 3.50 4.91 4.91 4.91

Page 10: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Projected Water % Increase from Current Rates 

5/8 3/4 i h 17 23% 0 00% 0 00%

Scenario 1 Scenario 2 Scenario 3Minimum Charge

5/8 x 3/4 inch 17.23% 0.00% 0.00%1 inch 17.23% 49.80% 31.47%1 1/2 inch 17.23% 49.80% 107.87%2 inch 17 23% 49 80% 199 45%2 inch 17.23% 49.80% 199.45%3 inch 17.23% 49.80% 413.22%4 inch 17.23% 49.80% 718.57%6 inch 17.23% 49.80% 1481.90%

Volumetric Rate (per 1,000 gallons)0 – 6,000 8.00% 8.00% 8.00%6 001 17 000 2 95% 2 95% 2 95%6,001 – 17,000 2.95% 2.95% 2.95%17,001 – 25,000 10.30% 10.30% 10.30%25,001 – 50,000 24.41% 24.41% 24.41%50 000 + 40 29% 40 29% 40 29%

10

50,000 + 40.29% 40.29% 40.29%

Page 11: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Projected Residential Water Rate ImpactMonthly Impact of Water Scenarios on Residential Customers

Current Scenario 1 Scenario 2 Scenario 3

Meter Charge (5/8 X 3/4 Inch) $ 12.71 $ 14.90 $ 12.71 $ 12.71Volumetric Revenue (5,000 gal) 12.50 13.50 13.50 13.50

Total Bill $ 25 21 $ 28 40 $ 26 21 $ 26 21Total Bill $ 25.21 $ 28.40 $ 26.21 $ 26.21Change Over / (Under) Current ($) 3.19 1.00 1.00

Meter Charge (5/8 X 3/4 Inch) $ 12.71 $ 14.90 $ 12.71 $ 12.71g ( / / ) $ $ $ $Volumetric Revenue (10,000 gal) 27.20 28.76 28.76 28.76

Total Bill $ 39.91 $ 43.66 $ 41.47 $ 41.47Change Over / (Under) Current ($) 3.75 1.56 1.56

Meter Charge (5/8 X 3/4 Inch) $ 12.71 $ 14.90 $ 12.71 $ 12.71Volumetric Revenue (15,000 gal) 42.45 44.46 44.46 44.46

Total Bill $ 55 16 $ 59 36 $ 57 17 $57 17

11

Total Bill $ 55.16 $ 59.36 $ 57.17 $57.17Change Over / (Under) Current ($) 4.20 2.01 2.01

Page 12: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Projected Residential Water Rate ImpactMonthly Impact of Water Scenarios on Residential Customers

Current Scenario 1 Scenario 2 Scenario 3

Meter Charge (5/8 X 3/4 Inch) $ 12.71 $ 14.90 $ 12.71 $ 12.71Volumetric Revenue (18,000 gal) 51.85 54.38 54.38 54.38

Total Bill $ 64 56 $ 69 28 $ 67 09 $ 67 09Total Bill $ 64.56 $ 69.28 $ 67.09 $ 67.09Change Over / (Under) Current ($) 4.72 2.53 2.53

Meter Charge (5/8 X 3/4 Inch) $ 12.71 $ 14.90 $ 12.71 $ 12.71g ( / / ) $ $ $ $Volumetric Revenue (20,000 gal) 58.45 61.66 61.66 61.66

Total Bill $ 71.16 $ 76.56 $ 74.37 $ 74.37Change Over / (Under) Current ($) 5.40 3.21 3.21

Meter Charge (5/8 X 3/4 Inch) $ 12.71 $ 14.90 $ 12.71 $ 12.71Volumetric Revenue (25,000 gal) 74.95 79.86 79.86 79.86

Total Bill $ 87 66 $ 94 76 $ 92 57 $ 92 57

12

Total Bill $ 87.66 $ 94.76 $ 92.57 $ 92.57Change Over / (Under) Current ($) 7.10 4.91 4.91

Page 13: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Projected Residential Water Rate ImpactMonthly Impact of Water Scenarios on Residential Customers

Current Scenario 1 Scenario 2 Scenario 3

Meter Charge (1 Inch) $ 12.71 $ 14.90 $ 19.04 $ 16.71Volumetric Revenue (5,000 gal) 12.50 13.50 13.50 13.50

Total Bill $ 25 21 $ 28 40 $ 32 54 $ 30 21Total Bill $ 25.21 $ 28.40 $ 32.54 $ 30.21Change Over / (Under) Current ($) 3.19 7.33 5.00

Meter Charge (1 Inch) $ 12.71 $ 14.90 $ 19.04 $ 16.71g ( ) $ $ $ $Volumetric Revenue (10,000 gal) 27.20 28.76 28.76 28.76

Total Bill $ 39.91 $ 43.66 $ 47.80 $ 45.47Change Over / (Under) Current ($) 3.75 7.89 5.56

Meter Charge (1 Inch) $ 12.71 $ 14.90 $ 19.04 $ 16.71Volumetric Revenue (15,000 gal) 42.45 44.46 44.46 44.46

Total Bill $ 55 16 $ 59 36 $ 63 50 $ 61 17

13

Total Bill $ 55.16 $ 59.36 $ 63.50 $ 61.17Change Over / (Under) Current ($) 4.20 8.34 6.01

Page 14: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Projected Residential Water Rate ImpactMonthly Impact of Water Scenarios on Residential Customers

Current Scenario 1 Scenario 2 Scenario 3

Meter Charge (1 Inch) $ 12.71 $ 14.90 $ 19.04 $ 16.71Volumetric Revenue (18,000 gal) 51.85 54.38 54.38 54.38

Total Bill $ 64 56 $ 69 28 $ 73 42 $ 71 09Total Bill $ 64.56 $ 69.28 $ 73.42 $ 71.09Change Over / (Under) Current ($) 4.72 8.86 6.53

Meter Charge (1 Inch) $ 12.71 $ 14.90 $ 19.04 $ 16.71g ( ) $ $ $ $Volumetric Revenue (20,000 gal) 58.45 61.66 61.66 61.66

Total Bill $ 71.16 $ 76.56 $ 80.70 $ 78.37Change Over / (Under) Current ($) 5.40 9.54 7.21

Meter Charge (1 Inch) $ 12.71 $ 14.90 $ 19.04 $ 16.71Volumetric Revenue (25,000 gal) 74.95 79.86 79.86 79.86

Total Bill $ 87 66 $ 94 76 $ 98 90 $ 96 57

14

Total Bill $ 87.66 $ 94.76 $ 98.90 $ 96.57Change Over / (Under) Current ($) 7.10 11.24 8.91

Page 15: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Projected Commercial Water Rate ImpactMonthly Impact of Water Scenarios on Commercial Customers

Current Scenario 1 Scenario 2 Scenario 3

Meter Charge (2 Inch) $ 12.71 $ 14.90 $ 19.04 $ 38.06Volumetric Revenue (25,000 gal) 74.95 79.86 79.86 79.86

Total Bill $ 87 66 $ 94 76 $ 98 90 $ 117 92Total Bill $ 87.66 $ 94.76 $ 98.90 $ 117.92Change Over / (Under) Current ($) 7.10 11.24 30.26

Meter Charge (2 Inch) $ 12.71 $ 14.90 $ 19.04 $ 38.06Volumetric Revenue (50,000 gal) 159.95 185.61 185.61 185.61

Total Bill $ 172.66 $ 200.51 $ 204.65 $ 223.67Change Over / (Under) Current ($) 27.85 31.99 51.01

15

Page 16: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Projected Commercial Water Rate ImpactMonthly Impact of Water Scenarios on Commercial Customers

Current Scenario 1 Scenario 2 Scenario 3

Meter Charge (2 Inch) $ 12.71 $ 14.90 $ 19.04 $ 38.06Volumetric Revenue (75,000 gal) 247.45 308.36 308.36 308.36

Total Bill $ 260 16 $ 323 26 $ 327 40 $ 346 42Total Bill $ 260.16 $ 323.26 $ 327.40 $ 346.42Change Over / (Under) Current ($) 63.10 67.24 86.26

Meter Charge (2 Inch) $ 12.71 $ 14.90 $ 19.04 $ 38.06Volumetric Revenue (100,000 gal) 334.95 431.11 431.11 431.11

Total Bill $ 347.66 $ 446.01 $ 450.15 $ 469.17Change Over / (Under) Current ($) 98.35 102.49 121.51

16

Page 17: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Number of Customers By Meter Size (May 2013 Active Meter Count)(May 2013 Active Meter Count)

5/8 x 3/4 inch 2,4911 inch 1,4031 1/2 inch 182 inch 773 inch 134 inch 126 inch 28 inch 1

Note: All active meters including Effluent meters in May 2013 Billing Data. Apartments Units are charged at 5/8 x 3/4 inch meter size per Apartment Unit

17

Apartments Units are charged at 5/8 x 3/4 inch meter size per Apartment Unit and NOT by Meter Size. Only Meter Sizes indicated above. 

Page 18: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Recommendations – Sewer Rate Options

Scenario 1: Keep current rate structure to recover cost of service Adjust All out of District Rates (Excluding PID) to 1.15x

Scenario 2:  Adjust all out of District rates (excluding PID) to 1.15x Raise Residential Cap to 18K Keep inclining block rate design for commercial

Scenario 3:Adj ll f Di i ( l di PID) 1 15 Adjust all out of District rates (excluding PID) to 1.15x

All Volumes Charged the same rate, No Blocks Keep Residential Cap at 12K gallons

Scenario 4: Scenario 4: Adjust all out of District rates (excluding PID) to 1.15x All Volumes Charged the same rate, No Blocks Raise Residential Cap at 18K gallons

18

Page 19: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Projected Residential Sewer Rates 

Current Scenario 1 Scenario 2 Scenario 3 Scenario 4

Minimum Charge $  12.71 $  14.58 $  13.00 $ 14.58 $  14.58

l ( ll )Volumetric Rate (000, gallons)

0 – 6,000 $  2.50 $  2.88 $  2.50 $  3.05 $ 2.50

6,001 ‐ 12,000 2.50 2.88 3.05, ,

6,0001 – 18,000 2.50 2.50

19

Page 20: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Projected % Increase from Current Residential Sewer RatesSewer Rates 

Scenario 1 Scenario 2 Scenario 3 Scenario 4

Minimum Charge 14.68% 2.28% 14.68% 14.68%

l ( ll )Volumetric Rate (000, gallons)

0 – 6,000 15.20% 0.00% 22.00% 0.00%

6,001 ‐ 12,000 15.20% 22.00%, ,

6,0001 – 18,000 *0.00% *0.00%

* No change in volumetric charge because of adjustment to rate design. 

20

Page 21: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Projected Commercial Sewer Rates 

Current Scenario 1 Scenario 2 Scenario 3 Scenario 4

Minimum Charge $  12.71 $  14.58 $  13.00 $ 14.58 $  14.58

Volumetric Rate (000, gallons)

0 – 6,000 $  2.50 $  2.88 $  2.50 $  3.05 $ 2.50

6,001 – 17,000 3.05 3.52 3.05 3.05 2.50

17 001 25 000 3 30 3 81 3 30 3 05 2 5017,001 – 25,000 3.30 3.81 3.30 3.05 2.50

25,001 – 50,000  3.40 3.92 3.40 3.05 2.50

50,000+ 3.50 4.04 3.50 3.05 2.50

21

Page 22: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Projected % Increase/Decrease from Current Commercial Sewer RatesCommercial Sewer Rates 

Scenario 1 Scenario 2 Scenario 3 Scenario 4

Minimum Charge 14.68% 2.28% 14.68% 14.68%

Volumetric Rate (000, gallons)

0 – 6,000 15.50% 0.00% 22.00% 0.00%

6,001 – 17,000 15.41% 0.00% 0.00% ‐18.03%

17 001 25 000 15 45% 0 00% 7 58% 24 24%17,001 – 25,000 15.45% 0.00% ‐7.58% ‐24.24%

25,001 – 50,000  15.29% 0.00% ‐10.29% ‐26.47%

50,000+ 15.43% 0.00% ‐12.86% ‐28.57%

22

Page 23: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Residential Sewer Rate ImpactMonthly Impact of Sewer Scenarios on Residential Customers

Current Scenario 1 Scenario 2 Scenario 3 Scenario 4

Minimum Charge $ 12.71 $ 14.58 $ 13.00 $ 14.58 $ 14.58Flow Revenue (5,000 gal) 12.50 14.40 12.50 15.25 12.50

Total Bill $ 25 21 $ 28 98 $ 25 50 $ 29 83 $ 27 08Total Bill $ 25.21 $ 28.98 $ 25.50 $ 29.83 $ 27.08Change Over / (Under) Current ($) 3.77 0.29 4.62 1.87

Minimum Charge $ 12.71 $ 14.58 $ 13.00 $ 14.58 $ 14.58Flow Revenue (10,000 gal) 25.00 28.80 25.00 30.50 25.00

Total Bill $ 37.71 $ 43.38 $ 38.00 $ 45.08 $ 39.58Change Over / (Under) Current ($) 5.67 0.29 7.37 1.87

Minimum Charge $ 12.71 $ 14.58 $ 13.00 $ 14.58 $ 14.58Flow Revenue (15,000 gal) 30.00 34.56 37.50 36.60 37.50

Total Bill $ 42 71 $ 49 14 $ 50 50 $ 51 18 $ 52 08

23

Total Bill $ 42.71 $ 49.14 $ 50.50 $ 51.18 $ 52.08Change Over / (Under) Current ($) 6.43 7.79 8.47 9.37

Page 24: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Residential Sewer Rate ImpactMonthly Impact of Sewer Scenarios on Residential Customers

Current Scenario 1 Scenario 2 Scenario 3 Scenario 4

Minimum Charge $ 12.71 $ 14.58 $ 13.00 $ 14.58 $ 14.58Flow Revenue (18,000 gal) 30.00 34.56 45.00 36.60 45.00

Total Bill $ 42 71 $ 49 14 $ 58 00 $ 51 18 $ 59 58Total Bill $ 42.71 $ 49.14 $ 58.00 $ 51.18 $ 59.58Change Over / (Under) Current ($) 6.43 15.29 8.47 16.87

Minimum Charge $ 12.71 $ 14.58 $ 13.00 $ 14.58 $ 14.58g $ $ $ $ $Flow Revenue (20,000 gal) 30.00 34.56 45.00 36.60 45.00

Total Bill $ 42.71 $ 49.14 $ 58.00 $ 51.18 $ 59.58Change Over / (Under) Current ($) 6.43 15.29 8.47 16.87

Minimum Charge $ 12.71 $ 14.58 $ 13.00 $ 14.58 $ 14.58Flow Revenue (25,000 gal) 30.00 34.56 45.00 36.60 45.00

Total Bill $ 42 71 $ 49 14 $ 58 00 $ 51 18 $ 59 58

24

Total Bill $ 42.71 $ 49.14 $ 58.00 $ 51.18 $ 59.58Change Over / (Under) Current ($) 6.43 15.29 8.47 16.87

Page 25: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Commercial Sewer Rate ImpactMonthly Impact of Sewer Scenarios on Commercial Customers

Current Scenario 1 Scenario 2 Scenario 3 Scenario 4

Minimum Charge $ 12.71 $ 14.58 $ 13.00 $ 14.58 $ 14.58Flow Revenue (25,000 gal) 74.95 86.48 74.95 76.25 62.50

Total Bill $ 87 66 $ 101 06 $ 87 95 $ 90 83 $ 77 08Total Bill $ 87.66 $ 101.06 $ 87.95 $ 90.83 $ 77.08Change Over / (Under) Current ($) 13.40 0.29 3.17 (10.58)

Minimum Charge $ 12.71 $ 14.58 $ 13.00 $ 14.58 $ 14.58Flow Revenue (50,000 gal) 159.95 184.48 159.95 152.50 125.00

Total Bill $ 172.66 $ 199.06 $ 172.95 $ 167.08 $ 139.58Change Over / (Under) Current ($) 26.40 0.29 (5.58) (33.08)

25

Page 26: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Commercial Sewer Rate ImpactMonthly Impact of Sewer Scenarios on Commercial Customers

Current Scenario 1 Scenario 2 Scenario 3 Scenario 4

Minimum Charge $ 12.71 $ 14.58 $ 13.00 $ 14.58 $ 14.58Flow Revenue (75,000 gal) 247.45 285.48 247.45 228.45 187.50

Total Bill $ 260 16 $ 300 06 $ 260 45 $ 243 33 $ 202 08Total Bill $ 260.16 $ 300.06 $ 260.45 $ 243.33 $ 202.08Change Over / (Under) Current ($) 39.90 0.29 (16.83) (58.08)

Minimum Charge $ 12.71 $ 14.58 $ 13.00 $ 14.58 $ 14.58Flow Revenue (100,000 gal) 334.95 386.48 334.95 305.00 250.00

Total Bill $ 347.66 $ 401.06 $ 347.95 $ 319.58 $ 264.58Change Over / (Under) Current ($) 53.40 0.29 (28.08) (83.08)

26

Page 27: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Overall Recommendations

Recover water & sewer expenses through rates Charge by meter size and phase in AWWAMeter Charge by meter size and phase in AWWA Meter 

Equivalents Pass Through TCEQ Regulatory Assessment Fee & include g g y

as Line‐Item on Bill Lower Out of District Charges from 2x to 1.15x In‐district rates Increase rates to recover projected 2016 Cost of Service; fund 

projected short‐falls with reserves Continue to evaluate rate performance and adjust as p j

necessary, to protect the financial integrity of the utility system

27

Page 28: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Comparison of Monthly Water and Sewer Bill Residential ‐ 5 000 GallonResidential  5,000 Gallon

57 50 43 80

‐ 20.00  40.00  60.00  80.00  100.00  120.00 

W tl k

72.50 

85.40 

101.30 

37.34 

41.76 

57.50 

35.16 

43.64 

43.80 

Southlake

Argyle

Westlake

53.82 

57.80 

59.20 

26.27 

39.30 

30.70 

27.55 

18.50 

28.50 

Keller

Roanoke

Denton

44.86 

50.42 

20.66 

25.21 

24.20 

25.21 

E l

Fort Worth

TCMUD (Current)

43.63 23.64  19.99 

‐ 20.00  40.00  60.00  80.00  100.00  120.00 

Euless

Water  Sewer

28

Page 29: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Comparison of Monthly Water and Sewer Bill Residential ‐ 18 000 GallonResidential  18,000 Gallon

188 097 80 90 60

‐ 20.00  40.00  60.00  80.00  100.00  120.00  140.00  160.00  180.00  200.00 

W tl k

162.25 

180.31 

188.40 

85.00 

86.23 

97.80 

77.25 

94.08 

90.60 

Denton

Argyle

Westlake

141.81 

141.95 

149.96 

73.44 

85.79 

72.56 

68.37 

56.16 

77.40 

Keller

Southlake

Fort Worth

124.21 

124.70 

78.68 

79.45 

45.53 

45.25 

TCMUD (C )

Euless

Roanoke 

107.27 64.56  42.71 

‐ 20.00  40.00  60.00  80.00  100.00  120.00  140.00  160.00  180.00  200.00 

TCMUD (Current)

Water  Sewer

29

Page 30: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Residential Water 5/8 x 3/4 inch 5 000 Gallon Comparison5,000 Gallon Comparison

l k

Water 5,000 Gallons

37 34

39.30 

41.76 

57.50 

Southlake

Roanoke

Argyle

Westlake

26.27 

28.40 

30.70 

37.34 

Keller

TCMUD Scenario 1

Denton

Southlake

25.21 

26.21 

26.21 

TCMUD (Current)

TCMUD Scenario 3

TCMUD Scenario 2

20.66 

23.64 

‐ 10.00  20.00  30.00  40.00  50.00  60.00  70.00 

Fort Worth

Euless

30

Page 31: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Residential Water 5/8 x 3/4 inch 18 000 Gallon Comparison18,000 Gallon Comparison

Water 18,000 Gallons

85.79 

86.23 

97.80 

Southlake

Argyle

Westlake

78.68 

79.45 

85.00 

ll

Euless

Roanoke 

Denton

67 09

69.28 

72.56 

73.44 

TCMUD Scenario…

TCMUD Scenario …

Fort Worth

Keller

64.56 

67.09 

67.09 

‐ 20.00  40.00  60.00  80.00  100.00  120.00 

TCMUD (Current)

TCMUD Scenario …

TCMUD Scenario …

31

Page 32: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Residential Sewer5 000 Gallon Comparison5,000 Gallon Comparison

46.10 Argyle

Sewer 5,000 Gallons

29.83 

35.16 

43.80 

TCMUD Scenario 3

Southlake

Westlake

27.08 

27.55 

28.98 

TCMUD Scenario 4

Keller

TCMUD Scenario 1

24 15

25.21 

25.50 

26.50 

Fort Worth

TCMUD (Current)

TCMUD Scenario 2

Denton

18.50 

19.99 

24.15 

‐ 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00

Roanoke

Euless

Fort Worth

5.00  10.00  15.00  20.00  25.00  30.00  35.00  40.00  45.00  50.00 

32

Page 33: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Residential Sewer 18 000 Gallon Comparison18,000 Gallon Comparison

94.08Argyle

Sewer 18,000 Gallons

77.25 

77.40 

90.60 

94.08 

Denton

Fort Worth

Westlake

gy

58.00 

59.58 

68.37 

TCMUD Scenario 2

TCMUD Scenario 4

Keller

49.14 

51.18 

56.16 

E l

TCMUD Scenario 1

TCMUD Scenario 3

Southlake

42.71 

45.25 

45.53 

10 00 20 00 30 00 40 00 50 00 60 00 70 00 80 00 90 00 100 00

TCMUD (Current)

Roanoke 

Euless

‐ 10.00  20.00  30.00  40.00  50.00  60.00  70.00  80.00  90.00  100.00 

33

Page 34: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Annual Consumption Distribution Residential (FY 2012)Residential (FY 2012)

hly)

3,5364,000

(Avg. M

onth 3,536

2,3872 500

3,000

3,500

Custom

ers 

,

1,1811,500

2,000

2,500

Num

ber o

f  , 8

667

106500

1,000

032% 34% 15% 16% 3%

1,140 1,206 514 561 106

3,536 2,387 1,181 667 106Passing Through Blocks

Stopping in Blocks

34Consumption Blocks (Gallons)

0‐6,000 6,000 ‐ 17,000 17,001 ‐ 25,000 25,001 ‐ 50,000 > 50,001Passing Through Blocks

Page 35: Presentation of Results - tcmud.orgtcmud.org/wp-content/...Rates-Presentation-021814.pdf · Presentation of Results Water and Sewer Rate Study Trophy Club MUD No. 1 A Division of

Questions

Project Manager, Chris EkrutJ. Stowe & Co.

1300 E Lookout Drive Ste 100

Presenters:Matthew Garrett

1300 E. Lookout Drive, Ste. 100Richardson, TX 75082Phone: 972.680.2000

Email: [email protected]

Justin Rasor