presentation on dm plant
DESCRIPTION
DM PLANT BASICSTRANSCRIPT
-
DEMINERALISATION PLANTPRESENTATION ON
-
MGFACFLBCDEGASSERTOWERWBASBAMBDM PLANT FLOW DIAGRAMG.C.TANK-1G.C.TANK-11DM WATER.TANKDM WATER CONDENSATES FROM 1.All Paper Machines 2.New Fiber line 3.P.D.Plant 4.Coating Plant 5.Turbines etc.Fresh water6.Evaporator-3 300 m3 110 m3100 m3MGF: Multi gravel filter.ACF: Activated carbon filter.LBC : Layered bed cation.WBA: Weak base anion.SBA : Strong base anion.MB : Mixed bed.
-
IMPORTANCE OF DIFFERENT UNITS MGF : Contains gravels with different grade of pebbles. It will remove suspended matter (TOTAL SUPENDED SOLIDS).
ACF : Contains Activated Carbons AC is defined as highly porous,carbonaceous material.The very large porosity provides a large surface area,which results in exceptional adsorptive properties.Works: Adsorbs Organic load & Chlorine.
-
LBC: This is having Strong and Weak Cation resins. ( Indion-525 H= 2740 Lts and Indion-236 H=4160 Lts).Here flow of water is from top to bottom and flow of regenerant is from bottom to top.It absorbs hardness : Na,Ca & Mg.These are exchanged with Hydrogen on the resin. In regeneration : Na,Ca & Mg ions. are replaced by Hydrogen ions Reactions: RESINS- H + ions + Water CaCl2,MgSo4,NaCl RESINS-Ca +HCl , H2So4
+HCl RESINS- H + ions+CaCl2,CaSo4 (Drained during regeneration )
-
DEGASSER: Here Carbon dioxide is removed. Reactions: Carbonic Acid + Air by blower Carbon dioxide + WaterWBA : It is having weak anion resin.(Indion-850 Resin = 2350 Lts) It will absorb all the Free mineral acidity in cation treated water. FMA: Conversation of neutral salt (Chloride,Sulphate & Nitrate ) to their respective mineral acids. EMA: Equivalent mineral Acidity a measure of the neutral salts (Chloride,Sulphate & Nitrate ) content of the water. EMA-FMA = Sodium Slip
-
SBA: This is having Strong anion resins. ( Indion-FFIP = 5690 Lts).Here flow of water is from top to bottom and flow of regenerant is from bottom to top. It absorbs : Chloride,Sulphate,Nitrate and Silica Reactions: RESINS- OH - ions + HCl,H2So4,
RESINS-Cl, So4 + H2O
+NaOH RESINS- OH - ions+ NaCl,Na2So4 (Drained during regeneration )
-
MB: This the final polishing unit. It contains both cation and anion resins ( Indion-FFIP=1210 Lts and Indion-225 H=2360 Lts) . If there is some traces of hardness and anions leakages,then these are absorbs in MB. Cation resins : are regenerated with HCl. Anion resins : are regenerated with NaOH.DM Water Parameters1.pH = 6.8 to 7.22.Conductivity = 0.5 PPM ( Max)3.Silica = 0.02 PPM ( Max)4.Total Hardness = NiL
-
Boiler water parameters1.pH = 8.7 to 9.52.Silica = 5 PPM (Max)3.Total Dissolved Solid = 50 PPM(Max)4.Total Hardness = NILSteam 1.pH = 8.5 to 9.02.Silica = 0.02 PPM (Max)3.Total Dissolved Solid = 8 Micro Simens/Cm(Max)4.Total Hardness = NIL
-
Return Condensate1.pH = 8.5 to 9.02.Silica = 0.02 PPM (Max)3.Conductivity = 8 PPM(Max)4.Total Hardness = NIL
-
Return Condensate received at G.C.TankAll Paper Machines ( 5 Nos)PD PlantCoating PlantFiber LineTG Sets ( 3 Nos)Evaporators ( 2 Nos)Condensate from LFB-4CFB-5 Feed Water Heater
-
CONDENSATE BALANCETotal Feed water =DM Water ( Make up) + Return Condensate.Make Up Water = 30 % Return Condensate = 70 % Steam Generated = 4051 M3/Day Expected Condensate = 3195 M3/Day ( 68.28 % ) Actual Condensate received = 2888 M3/Day ( 82.40 % ) Deviation of Condensate = 307 M3/Day ( 14.13 % ) Make up Water = 1276 M3/Day ( 31.41% ) Total CBD/IBD = 41 M3/Day Total Feed Water = 4092 M3/Day
-
FF-MM
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
DAILY RETURN CONDENSATE BALANCE
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
LPMPHPTOTALNON RECOVRABLERECOVARABLEEXPECTEDACTUALDEVIATION
MTMTMTMTMTMT%M3%M3%M3
1PAPER MACHINES
AP M/C I33300333303038628883275413Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II0620622599156895521Dandy shower 4%
CP M/C III23600236223494222831951127Dandy shower 1%
DP M/C IV148001484144921379113512Dandy shower 3%
EP M/C V1750017525151821437913835Dandy shower 2%,starch prep.12%
TOTAL M/C893620954648918984684798548
2PD PLANT36003603695347025259
3COATING PLANT0
AHEAT EXCHANGER065065065956270452516Exhaust vent loss 1%
BDRYERS CYLINDERS20002002095197014255
CSUPER CALENDER1200120129511708253
COATING PLANT TOTAL3265097097959270682524
4PULP MILL0
ARDH03780378037895359702652595
BFIBRE LINE213002132130000Warm water tank,Bleaching.
CCHLORINE GASSIFIER3900390399537009537
DClO2 PLANT30003022723700237Chiller
P/MILL TOTAL2813780659235424614034026521138
5S.R. PLANT0
ACAUSTICIZING0
a) MAKING HOT WATER3600363600001.52 T/Hr steam is used
b) GREEN LIQUOR HEATING49004904995460095462 T/Hr steam is used
c) FORMAINTAINING CAUSTICIZER TEMP2600262600001.08 T/Hr steam is used
d) SPOUT USE1000101000000.4 T/Hr steam is used
CAUSTICIZING TOTAL1210012173493846003846
BEVAPORATOR-I0
a) FIRST BODY000000000000
b) PRE-HEATER000000000000Ejector running 21 Hr @ 1T/Hr Steam used
c) STEAM JET EJECTOR000000000000
EVAPORATOR-I TOTAL000000000000
CEVAPORATOR-III0
a) FINISHER BODY50700507050795481814101471
b) STEAM JET EJECTOR090990000Ejector running 263 Hr @ 1T/Hr Steam used
EVAPORATOR-III TOTAL5079051695079348185439842
DLFB 40
a) DEAERATOR60006006095579557002.5 T/Hr Steam is used
b) B/L HEATER0909900.37T/Hr Steam is used
c) AIR HEATER57238008095769576003.33 T/Hr Steam is used
d) SMELT SHATTERING0707700000.27 T/Hr Steam is used
e) CASCADE FOR B/L HEATING0110111100000.46 T/Hr Steam is used
f) SOOT BLOWER0022222200000.926 T /Hr Steam is used
g) OIL HEATING & TRACING01101101195119511000.46 T/Hr Steam is used
h) LINE FLUSHING0220222200000.92 T/Hr Steam is used
LFB 4 TOTAL65132262227115165144651440
ELFB 50
a) DEAERATOR66006606695629562002.6 T/Hr Steam used
b) B/L HEATER070725494494000.3 T/Hr Steam used
c) AIR HEATER4633710719568956800LP=0.18 T/Hr,MP=2.64 T/Hr & HP=0.139 T/Hr Steam used
d) SMELT SHATTERING0505500000.197 T/Hr Steam is used
e) SOOT BLOWER00241241242170001 T/Hr Steam is used
f) OIL HEATING & TRACING0505500000.197 T/Hr Steam is used
g) LINE FLUSHING0505500000.197 T/Hr Steam is used
LFB 5 TOTAL708524439940358331333313300
6CFB INTERNAL0
a) CFB-5 FEED WATER HEATER72007207295699569003 T/Hr Steam is used
b) DEAERATORS25700257025795244952440010.69 T/Hr Steam is used
7TURBINE00703703070310070310070300
8CBD004141041000
9STEAM BLOW001515150000
GRAND TOTAL FEED WATER23347301050409250735857831957128878308
Water used for Steam Generation ( 4092 M3 ) = Steam Generated ( 4051 M3) + CBD Losses ( 41 M3)
Total Steam Generation = 4051 M3/Day
Total Feed water =4092 M3/Day
Total Expected Condensate =3195 M3/Day ( 78 %)
Actual Condensate received = 2887 M3/Day ( 71 %)
Condensate to be recovered ( Deviation) = 308 M3/Day ( 8 %)
Gen Manager (Power Block)
Sheet6
NOV-05
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR THE MONTH OF NOV-05
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
LPMPHPTOTALNON RECOVRABLERECOVARABLEEXPECTEDACTUALDEVIATION
MTMTMTMTMTMT%M3%M3%M3
1PAPER MACHINES
AP M/C I9994009994900909486.4863969.16907171732Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II018580185874178491.2169570.8131520380Dandy shower 4%
CP M/C III707700707771700694.0665670.85012231644Dandy shower 1%
DP M/C IV4449004449134431592.1409979.2352213577Dandy shower 3%
EP M/C V5255005255736451981.7429369.8367012623Dandy shower 2%,starch prep.12%
TOTAL M/C26775185802863319152671888.6253827120426174956
2PD PLANT10750010750107595.010217075325269
3COATING PLANT0
AHEAT EXCHANGER01946019460194695.0184970.0136225487Exhaust vent loss 1%
BDRYERS CYLINDERS60100601060195.057170.042125150
CSUPER CALENDER35000350035095.033370.02452588
COATING PLANT TOTAL9511946028970289795.0275270202825724
4PULP MILL0
ARDH01134601134601134695.01077970.07942252837
BFIBRE LINE6384006384638400.00.00Warm water tank,Bleaching.
CCHLORINE GASSIFIER11600011600116095.011020.00951102
DClO2 PLANT8900089067421623.12050.0023205Chiller
P/MILL TOTAL84341134601978070581272261.112086407942214144
5S.R. PLANT0
ACAUSTICIZING0
a) MAKING HOT WATER1092001092109200.00.001.52 T/Hr steam is used
b) GREEN LIQUOR HEATING14550014550145595.013820.009513822 T/Hr steam is used
c) FORMAINTAINING CAUSTICIZER TEMP7820078278200.00.001.08 T/Hr steam is used
d) SPOUT USE3120031231200.00.000.4 T/Hr steam is used
CAUSTICIZING TOTAL36410036412186145538.013820.00381382
BEVAPORATOR-I0
a) FIRST BODY87008708795.0830.009583
b) PRE-HEATER22002202295.0210.009521Ejector running 21 Hr @ 1T/Hr Steam used
c) STEAM JET EJECTOR0210212100.00.00
EVAPORATOR-I TOTAL1092101302110979.71040.0080104
CEVAPORATOR-III0
a) FINISHER BODY15205001520501520595.01444572.511018233427
b) STEAM JET EJECTOR0263026326300.00.00Ejector running 263 Hr @ 1T/Hr Steam used
EVAPORATOR-III TOTAL152052630154682631520593.4144457111018223427
DLFB 40
a) DEAERATOR18000018000180095.0171095.01710002.5 T/Hr Steam is used
b) B/L HEATER0267026726700.37T/Hr Steam is used
c) AIR HEATER150215010024000240095.0228095.02280003.33 T/Hr Steam is used
d) SMELT SHATTERING0199019919900.00.000.27 T/Hr Steam is used
e) CASCADE FOR B/L HEATING0333033333300.00.000.46 T/Hr Steam is used
f) SOOT BLOWER0066766766700.00.000.926 T /Hr Steam is used
g) OIL HEATING & TRACING03330333033394.931694.9316000.46 T/Hr Steam is used
h) LINE FLUSHING0667066766700.00.000.92 T/Hr Steam is used
LFB 4 TOTAL1950394976766662133453364.643066543060
ELFB 50
a) DEAERATOR19680019680196895.0187095.01870002.6 T/Hr Steam used
b) B/L HEATER021902196515449.210849.2108000.3 T/Hr Steam used
c) AIR HEATER132190010021320213295.0202595.0202500LP=0.18 T/Hr,MP=2.64 T/Hr & HP=0.139 T/Hr Steam used
d) SMELT SHATTERING0142014214200.00.000.197 T/Hr Steam is used
e) SOOT BLOWER0072272272200.00.001 T/Hr Steam is used
f) OIL HEATING & TRACING0142014214200.00.000.197 T/Hr Steam is used
g) LINE FLUSHING0142014214200.00.000.197 T/Hr Steam is used
LFB 5 TOTAL2100254582254671213425473.2400373400300
6CFB INTERNAL0
a) CFB-5 FEED WATER HEATER21730021730217395.0206495.02064003 T/Hr Steam is used
b) DEAERATORS77030077030770395.0731895.073180010.69 T/Hr Steam is used
7TURBINE00211002110002110010021100100.02110000
8CBD0012191219012190.00.00
9STEAM BLOW0017717717700.00.00
GRAND TOTAL FEED WATER70116219072410611612914966101163839596370809581315005
Water used for Steam Generation ( 116129 M3 ) = Steam Generated ( 114910 M3) + CBD Losses ( 1219 M3)
705
Total DM Water Make up = 38171 M3
DM Water Supplied to ClO2 Plant = 150 M3
DM Water Supplied to Boiler for Hydraulic use = 650 M3
DM Water Supplied to Vedanta Alumina = 200 M3
Total DM Water extra used = 1000 M3
DM Water used for regeneration =2000 M3
Actual DM Water Make up = 35171 M3
(Flash losses=10%,Trap losses=5% consedered)
Gen Manager (Power Block)
Sheet7
J.K. PAPER MILLS : JAYKAPUR
POWER BLOCK
RETURN CONDENSATE BALANCE IN M3 FOR THE MONTH OF APRIL - 03
SUB SOIL WELL
WATER
120800
978177931597157893
RIVER37093
NAGAVALI931597
46580TO MILLSEffluent
894504
DESLUDGING134209
LOSSESBore Well Water
25719
RC408519276822303350000340015704
7210342000239874116032899038148272007461
5500
111840851
1118
+5500C.T. of Evp-3
3992441160
551788130
52442222693
Process: 28455m3 / day
D.M. Plant:1362m3 / day316630457783230708813348
Domestic: 5263m3 / day2186127360684047500
Recycled water used in Pulp Mill 10966 m3 / day
Recycled water used in Evp.- III cooling tower (from compressor) 1372 m3 / day
Recycled water used in Chipper 960 m3 / day
Bore Well Water is used in Pulp Mill as 857 m3/Day
R.C =Return condensate 2403m3 / day
Others: Amn,gardening,toilets, canteen
WATER IN TAKE
CLARIFIER
RESERVOIR
DOMESTIC PURPOSE
POWER BOILER
DM PLANT
COMPRESSOR HOUSE
PB COOLING TOWER
RECOVERY BOILER
PULP MILL + CHIPPER
P.D. PLANT
PAPER MACHINES
OTHERS
WATER RECLAMATION PLANT
EFFLUENT TREATMENT PLANT 837616
COOLING TOWER
COOLING TOWER
Sheet1
LOSS DUE TO POOR(OLD) INSULATION
POWER BLOCK
AVE.AMB.TEMP. 28DATE 17 01 2002
AVE.EXP.TEMP.AFT.INS. 38
SL.NOLOCATIONAREA (APPOX)AVE.SKIN TEMP.PRESENT EXTRA TEMP.MONEY LOSS/DAYCOST OF INS.PAY BACK
12.5 MWTG
H P HEADER20592114000
2M P HEADER256931
3L P HEADER306224
5.4MWTG
4H P HEADER205517
6CFB 1&2
H P LINE1005618
7CFB-4 HP LINE
AFTER R/V707638
8CFB-1&2
STEAM DRUM306729
9CFB 2&5
ESP90
10TOTAL405
ENERGY LOSS =114 W / 0C / M2 ( REF M/S JNM DATA BOOK PAGE 1&6 )GCV OF COAL = 4000 k cal / kg
=114 X 1 cal/s/0c/m2Boiler Efficiency = 85 %
4.18Cost of coal = Rs 950 /-per ton
=114 X 60 X 60 X24kcal / day / 0c / m2savingEnergy loss x Cost of coal x Extra temp
4.18 X 1000GCV of Coal x boiler efficency
=2356kcal / day / 0c / m2
steam
J.K PAPER MILLS,JAYKAY PUR
POWER BLOCK
STEAM BALANCING INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTION
(ON DAY AVE.FOR THE MONTH OFJULY 2000)
BASESI.NODESCRIPTIONPRODUCTIONSTEAM MTACTUALTARGETREMARKS
MTHPMPLPEQV.HPT/TT/T
PAPER MACHINE -- I973262902.992.94
-- II14.479714.884.82
-- III92.973092752.963
-- IV28.45108963.383.3
-- V55.581911703.062.97
1TOTAL288.45799349023.133.1
PD2PD PLANT (AD)13.8751453.273.13
RDH4413921.451.34
PULPFIBER LINE2382120.780.8
GASSIFIER36320.120.13
CLO2 PLANT57510.190.26
3TOTAL2714413316872.542.53
PULPEVAPORATOR4724201.551.4
C.S PLANT1191060.390.38
LF BOILER IV4060601470.540.59
LF BOILER V6091912220.820.7
4TOTAL2711001517428953.33.07
5CF BOILER'S INTERNAL USE288.452522240.780.74
6STEAM BLOW OUT ,RADIATION288.4552520.180.18Steam blow =2 T Rest losses
PAPERAND TRAP LOSS.
7STEAM TO TURBINE288.457614726410383.63.28Condensate +equivalent enrgy drop in extractions
8STEAM TO TURBINES & POWER288.458134751613144.564.2Steam for PH +CFB Int+Losses (5+6+7)
BOILERS.
9TOTAL STEAM288.459137182574384313.3212.19
PULP10STEAM FOR PULP(3+4)271100592107315825.845.6Steam consumed in Pulp Mill & Recovery
11SCREW PULP (AD)42.392235.845.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP
12SALABLE PULP (BD)50.65341Steam for salable pulp + steam for PD sheet
(SCREW PULP+PD SHEET)0.9
13PULP FOR PAPER(1-13)220.3512875.845.6Total Pulp - Salable Pulp,i.e(10-12)
PAPER14PROCESS STEAM FOR PAPER288.4521887.67.25(9-8-12)
NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE.
Kg/CM2DEG.CK.cal/Kg
HP STEAM354107751
MP STEAM92206860.89
( MEASURED AFTER INJECTION )
LP STEAM2.82106880.89
( MEASURED BEFORE INJECTION )Gen. Manager (Power Block)
J.K PAPER MILLS,JAYKAY PURJ.K PAPER MILLS,JAYKAY PUR
POWER BLOCKQF / 030 / 55POWER BLOCKQF / 030 / 55
STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001
FOR APRIL -- 2001Date: 01.05.2001FOR APRIL -- 2001Date: 01.05.2001
BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATIONBASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION
MTHPMPLPEQV.HPT/TT/TMTHPMPLPEQV.HPT/TT/T
This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.
PAPER MACHINE I29342934112801128010039100393.423.422.94This MonthTodateThis MonthTodatePAPER MACHINE I000.000.002.94This MonthTodateThis MonthTodate
II43243218751875166916693.863.864.82CFB 1155311553112 MWTG72238007223800II000.000.004.82CFB 112 MWTG
III2546254673577357654865482.572.573CFB 210422104225.4 MWTG34862903486290III000.000.003CFB 25.4 MWTG
IV1051105142864286381538153.633.633.3CFB 3300030002.5 MWTG15330001533000IV000.000.003.3CFB 32.5 MWTG
V1740174049054905436543652.512.512.97CFB 41234612346TOTAL.1224309012243090V000.000.002.97CFB 4TOTAL.
1TOTAL8703870318751875278282782826436264363.043.043.1CFB 53890038900STEAM1TOTAL000.000.003.1CFB 5STEAM
PD2PD PLANT (AD)1042104222262226198119811.901.903.13Sub Total.8019980199EXTR - 12670026700PD2PD PLANT (AD)000.000.003.13Sub Total.EXTR - 1
RDH76527652131501315011704117041.531.531.34LFB 41663416634EXTR - 26499964999RDH000.000.001.34LFB 4EXTR - 2
PULPFIBER LINE7652765272377237644164410.840.840.8LFB 52262422624Condensate2631026310PULPFIBER LINE000.000.000.8LFB 5Condensate
GASSIFIER7652765211631163103510350.140.140.13Grand Total119457119457PRDS14481448GASSIFIER000.000.000.13Grand TotalPRDS00
CLO2 PLANT765276529189188178170.110.110.26Coal1686216862Tot.Equ Coal1794717947CLO2 PLANT000.000.000.26CoalTot.Equ Coal
3TOTAL7652765213150131509318931819997199972.612.612.53B.Dust656656Steam / Kg of coal4.4694.4693TOTAL000.000.002.53B.DustSteam / Kg of coal0.0000.000
PULPEVAPORATOR76527652134941349412010120101.571.571.4Charcoal fines636636PULPEVAPORATOR000.000.001.4Charcoal fines
CAUSTICIZING Plant7652765237133713330533050.430.430.38REMARKSCAUSTICIZING Plant000.000.000.38REMARKS
LF BOILER IV76527652120012001823182318231823444544450.580.580.5940TPD FOR S/B,REST 50%MP,50%LPLF BOILER IV000.000.000.5940TPD FOR S/B,REST 50%MP,50%LP
LF BOILER V76527652180018003145314520962096646464640.840.840.760TPD FOR S/B ,REST 60% MP,40%LPLF BOILER V000.000.000.760TPD FOR S/B ,REST 60% MP,40%LP
4TOTAL765276523000300049684968211262112626224262243.433.433.074TOTAL000.000.003.07
5CF Boiler's internal8703870384938493755975590.870.870.745CF Boiler's internal000.000.000.74
6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES87038703339333930.390.390.181163 Tons by Steam Blow and rest by losses.6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES000.000.000.181163 Tons by Steam Blow and rest by losses.
PAPERPAPER
7STEAM TO TURBINE870387032631026310142714277065706533868338683.893.893.28Condensate +equivalent enrgy drop in extractions7STEAM TO TURBINE000.000.003.28Condensate +equivalent enrgy drop in extractions
8STEAM TO TURBINES & POWER BOILERS8703870344820448205.155.154.2Steam for PH +CFB Int+Losses (5+6+7)8STEAM TO TURBINES & POWER BOILERS000.000.004.2Steam for PH +CFB Int+Losses (5+6+7)
9TOTAL STEAM8703870311945711945713.7313.7312.199TOTAL STEAM000.000.0012.19
PULP10Steam for Pulp(3+4)7652765246220462206.046.045.6Steam consumed in Pulp Mill & RecoveryPULP10Steam for Pulp(3+4)000.000.005.6Steam consumed in Pulp Mill & Recovery
11SCREW PULP (AD)52523143146.046.045.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP11SCREW PULP (AD)000.000.005.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP
12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,9985985792879288.058.05Steam for salable pulp + steam for PD sheet12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,9000.000.00Steam for salable pulp + steam for PD sheet
13Pulp for Paper(10-12)6667666738292382925.745.745.6Total Pulp - Salable Pulp,i.e(10-12)13Pulp for Paper(10-12)000.000.005.6Total Pulp - Salable Pulp,i.e(10-12)
Paper14Process Stream for Paper8703870366709667097.677.677.25(9-8-12)Paper14Process Stream for Paper000.000.007.25(9-8-12)
NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BESTNOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST
Kg/CM2DEG.CK.cal/KgKg/CM2DEG.CK.cal/Kg
HP STEAM354107751HP STEAM354107751
MP STEAM92206860.89( MEASURED AFTER INJECTION )MP STEAM92206860.89( MEASURED AFTER INJECTION )
LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )
Gen. Manager (Power Block)Gen. Manager (Power Block)
J.K PAPER MILLS,JAYKAY PUR
POWER BLOCKQF / 030 / 55
STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001
FOR JUNE -- 2001Date: 01.05.2001
BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION
MTHPMPLPEQV.HPT/TT/T
This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.
PAPER MACHINE I30828719113683282310118292123.283.352.94This MonthTodateThis MonthTodate
II440133718305527162949193.703.684.82CFB 1172465011812 MWTG725460021356800
III260679577429226076612201202.542.533CFB 216999449725.4 MWTG360576010678550
IV98831294134130203679115883.723.703.3CFB 3045292.5 MWTG15804004683760
V182553985014150894462134292.452.492.97CFB 4143520718TOTAL.1244076036719110
1TOTAL89412654018305527279458353926500792692.962.993.1CFB 541713116437STEAM
PD2PD PLANT (AD)1431357329007501258166761.801.873.13Sub Total.77393236774EXTR - 12688580856
RDH798023492125743863011191343811.401.461.34LFB 41750551022EXTR - 266010194530
PULPFIBER LINE7980234927847212516984189130.880.810.8LFB 52565570327Condensate2724280122
GASSIFIER79802349211703542104131520.130.130.13Grand Total120553358123PRDS4162615
CLO2 PLANT798023492900273480124330.100.100.26Coal1642149394Tot.Equ Coal1685751926
3TOTAL798023492125743863099172752720017588802.512.512.53B.Dust6402000Steam / Kg of coal4.5914.560
PULPEVAPORATOR798023492128123985411403354701.431.511.4Charcoal fines01176
CAUSTICIZING Plant7980234924239119933773106740.470.450.38REMARKS
LF BOILER IV7980234921200336017493572174954204313113630.540.480.5940TPD FOR S/B,REST 50%MP,50%LP
LF BOILER V7980234921800510033416486222762256756164130.850.700.760TPD FOR S/B ,REST 60% MP,40%LP
4TOTAL79802349230008460509010058210276349226244739203.293.153.07
5CF Boiler's internal8941265408267252427358224650.820.850.74
6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES8941265402975144480.330.540.18761 Tons by Steam Blow and rest by losses.
PAPER
7STEAM TO TURBINE894126540272428012210784049750221056348781024653.903.863.28Condensate +equivalent enrgy drop in extractions
8STEAM TO TURBINES & POWER BOILERS894126540452111393795.065.254.2Steam for PH +CFB Int+Losses (5+6+7)
9TOTAL STEAM89412654012055335812313.4813.4912.19
PULP10Steam for Pulp(3+4)798023492462611327995.805.655.6Steam consumed in Pulp Mill & Recovery
11SCREW PULP (AD)011806675.805.655.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP
12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,91288332210047254547.807.66Steam for salable pulp + steam for PD sheet
13Pulp for Paper(10-12)669220170362141073455.415.325.6Total Pulp - Salable Pulp,i.e(10-12)
Paper14Process Stream for Paper894126540652951932897.307.287.25(9-8-12)
NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST
Kg/CM2DEG.CK.cal/Kg
HP STEAM354107751
MP STEAM92206860.89( MEASURED AFTER INJECTION )
LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )
Gen. Manager (Power Block)
J.K PAPER MILLS,JAYKAY PUR
POWER BLOCKQF / 030 / 55
STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001
FOR JULY -- 2001Date: 01.05.2001
BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION
MTHPMPLPEQV.HPT/TT/T
This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.
PAPER MACHINE I29821170110604434279438386503.163.302.94This MonthTodateThis MonthTodate
II396173316177144143963583.633.674.82CFB 1176506776812 MWTG736750028724300
III2490104476920295276159262792.472.523CFB 217879628515.4 MWTG335892014037470
IV105641854325173453849154373.653.693.3CFB 3045292.5 MWTG16008766284636
V171571134931200204389178182.562.502.97CFB 4288823606TOTAL.1232729649046406
1TOTAL8639351791617714426780110319252731045422.932.973.1CFB 542651159088STEAM
PD2PD PLANT (AD)12874860281310314250491791.951.893.13Sub Total.81068317842EXTR - 124801105657
RDH770131193115115014110245446251.331.431.34LFB 41427365295EXTR - 267684262214
PULPFIBER LINE7701311937416286676600255140.860.820.8LFB 52596896295Condensate28501108623
GASSIFIER77013119311904732105942110.140.140.13Grand Total121309479432PRDS3232938
CLO2 PLANT770131193922365682132540.110.100.26Coal1796867362Tot.Equ Coal1801369939
3TOTAL770131193115115014195283705518725776042.432.492.53B.Dust662066Steam / Kg of coal4.5014.545
PULPEVAPORATOR770131193132665312011807472771.531.521.4Charcoal fines01176
CAUSTICIZING Plant7701311934399163923915145890.510.470.38REMARKS
LF BOILER IV7701311931240460013664939136667863671150350.480.480.5940TPD FOR S/B,REST 50%MP,50%LP
LF BOILER V7701311931860696034339919228985146953233650.900.750.760TPD FOR S/B ,REST 60% MP,40%LP
4TOTAL7701311933100115604799148582132084812263461002663.423.213.07
5CF Boiler's internal8639351799024342668031304970.930.870.74
6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES8639351793228176760.370.500.182316 Tons by Steam Blow and rest by losses.
PAPER
7STEAM TO TURBINE8639351792850110862314925541828429340372021396674.313.973.28Condensate +equivalent enrgy drop in extractions
8STEAM TO TURBINES & POWER BOILERS863935179484611878405.615.344.2Steam for PH +CFB Int+Losses (5+6+7)
9TOTAL STEAM86393517912130947943214.0413.6312.19
PULP10Steam for Pulp(3+4)770131193450711778715.855.705.6Steam consumed in Pulp Mill & Recovery
11SCREW PULP (AD)011806730.005.705.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP
12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,9115844802504347272.167.75Steam for salable pulp + steam for PD sheet
13Pulp for Paper(10-12)654326713425671431446.515.365.6Total Pulp - Salable Pulp,i.e(10-12)
Paper14Process Stream for Paper863935179703442568668.147.307.25(9-8-12)
NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST
Kg/CM2DEG.CK.cal/Kg
HP STEAM354107751
MP STEAM92206860.89( MEASURED AFTER INJECTION )
LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )
Gen. Manager (Power Block)
N190=L190/D190
J.K PAPER MILLS,JAYKAY PUR
POWER BLOCKQF / 030 / 55
STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001
FOR AUGUST -- 2001Date: 01.05.2001
BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION
MTHPMPLPEQV.HPT/TT/T
This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.
PAPER MACHINE I31161481710598540259432480823.033.252.94This MonthTodateThis MonthTodate
II440217317298873153978973.503.634.82CFB 1175928536012 MWTG578690034511200
III2878133257997375247117333962.472.513CFB 218328811795.4 MWTG350424017541710
IV107652614257216023789192263.523.653.3CFB 3335078792.5 MWTG15832007867836
V164087534820248404290221082.622.532.97CFB 4751731123TOTAL.1087434059920746
1TOTAL9150443291729887327672137991261671307092.862.953.1CFB 528157187245STEAM
PD2PD PLANT (AD)167865383533138473144123241.871.883.13Sub Total.74944392786EXTR - 123444129101
RDH850339696113316147210085547101.191.381.34LFB 41761482909EXTR - 260112322326
PULPFIBER LINE8503396966856355236102316150.720.800.8LFB 524417120712Condensate23542132165
GASSIFIER85033969611805912105052620.120.130.13Grand Total116975596407PRDS987712815
CLO2 PLANT850339696910456681040640.100.100.26Coal1679084152Tot.Equ Coal1679086729
3TOTAL850339696113316147289464600118047956512.122.412.53B.Dust02066Steam / Kg of coal4.4644.529
PULPEVAPORATOR850339696130326615211598588751.361.481.4Charcoal fines01176
CAUSTICIZING Plant8503396964613210054106186940.480.470.38REMARKS
LF BOILER IV8503396961160576018796818188186674506195420.530.490.5940TPD FOR S/B,REST 50%MP,50%LP
LF BOILER V850339696180087603443133622295108096907302720.810.760.760TPD FOR S/B ,REST 60% MP,40%LP
4TOTAL85033969629601452053222018021821106633271171273843.193.213.07
5CF Boiler's internal9150443298694429607738382340.850.860.74
6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES9150443293006206810.330.470.181426 Tons by Steam Blow and rest by losses.
PAPER
7STEAM TO TURBINE9150443292354213216514807021775037090317571714243.473.873.28Condensate +equivalent enrgy drop in extractions
8STEAM TO TURBINES & POWER BOILERS915044329425002303404.645.204.2Steam for PH +CFB Int+Losses (5+6+7)
9TOTAL STEAM91504432911697559640712.7813.4512.19
PULP10Steam for Pulp(3+4)850339696451642230355.315.625.6Steam consumed in Pulp Mill & Recovery
11SCREW PULP (AD)011806630.005.625.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP
12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,9151059903144459812.087.68Steam for salable pulp + steam for PD sheet
13Pulp for Paper(10-12)699333706420191770536.015.255.6Total Pulp - Salable Pulp,i.e(10-12)
Paper14Process Stream for Paper915044329713313200867.807.227.25(9-8-12)
NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST
Kg/CM2DEG.CK.cal/Kg
HP STEAM354107751
MP STEAM92206860.89( MEASURED AFTER INJECTION )
LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )
Gen. Manager (Power Block)
J.K PAPER MILLS,JAYKAY PUR
POWER BLOCKQF / 030 / 55
STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001
FOR SEPTEMBER -- 2001Date: 01.05.2001
BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION
MTHPMPLPEQV.HPT/TT/T
This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.
PAPER MACHINE I28811769810230642559105571873.163.232.94This MonthTodateThis MonthTodate
II4302603171610589152794243.553.624.82CFB 11485010021012 MWTG615650040667700
III2362156877030445546257396532.652.533CFB 214848960275.4 MWTG351700021058710
IV95162123903255053474226993.653.653.3CFB 320680852.5 MWTG15225009390336
V1623103764900297404361264692.692.552.97CFB 4379634919TOTAL.1119600071116746
1TOTAL82475257617161058926063164054247231554323.002.963.1CFB 539274226519STEAM
PD2PD PLANT (AD)180183394077179243629159522.011.913.13Sub Total.72974465760EXTR - 125638154739
RDH816047856119447341610630653401.301.371.34LFB 418185101094EXTR - 259618381944
PULPFIBER LINE8160478567126426496342379580.780.790.8LFB 522727143439Condensate22451154616
GASSIFIER81604785611607072103262940.130.130.13Grand Total113886710293PRDS617918994
CLO2 PLANT816047856898546479948630.100.100.26Coal1554199693Tot.Equ Coal15955102684
3TOTAL8160478561194473416918455185188041144552.302.392.53B.Dust6162682Steam / Kg of coal4.5744.536
PULPEVAPORATOR816047856130557920711619704941.421.471.4Charcoal fines01176
CAUSTICIZING Plant8160478564410254153925226190.480.470.38REMARKS
LF BOILER IV81604785611206880191887361917105844533240750.560.500.5940TPD FOR S/B,REST 50%MP,50%LP
LF BOILER V8160478561680104403188165502126129356409366820.790.770.760TPD FOR S/B ,REST 60% MP,40%LP
4TOTAL81604785628001732051062528621508128141264861538703.253.223.07
5CF Boiler's internal8247525768589515497644458790.930.870.74
6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES8247525762336230180.280.440.18448 Tons by Steam Blow and rest by losses.
PAPER
7STEAM TO TURBINE8247525762245115461612818302749744587302632016873.673.843.28Condensate +equivalent enrgy drop in extractions
8STEAM TO TURBINES & POWER BOILERS824752576402442705834.885.154.2Steam for PH +CFB Int+Losses (5+6+7)
9TOTAL STEAM82475257611388671029313.8113.5112.19
PULP10Steam for Pulp(3+4)816047856452902683255.555.615.6Steam consumed in Pulp Mill & Recovery
11SCREW PULP (AD)011806620.005.615.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP
12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,9162176113629586282.247.70Steam for salable pulp + steam for PD sheet
13Pulp for Paper(10-12)653940245416622096976.375.215.6Total Pulp - Salable Pulp,i.e(10-12)
Paper14Process Stream for Paper824752576700143810818.497.257.25(9-8-12)
NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST
Kg/CM2DEG.CK.cal/Kg
HP STEAM354107751
MP STEAM92206860.89( MEASURED AFTER INJECTION )
LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )
Gen. Manager (Power Block)
J.K PAPER MILLS,JAYKAY PUR
POWER BLOCKQF / 030 / 55
STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001
FOR OCTOBER -- 2001Date: 01.05.2001
BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION
MTHPMPLPEQV.HPT/TT/T
This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.
PAPER MACHINE I2589202879963742188867660543.423.262.94This MonthTodateThis MonthTodate
II40130041674122631490109143.723.634.82CFB 11451511472512 MWTG438410045051800
III2746184337882524367015466682.552.533CFB 2128121088395.4 MWTG368288024741590
IV109973114377298823896265953.543.643.3CFB 3080852.5 MWTG146800910858345
V1756121325160349004592310612.622.562.97CFB 472435643TOTAL.953498980651735
1TOTAL85916116716741226327382191436258601812923.012.963.1CFB 540012266531STEAM
PD2PD PLANT (AD)151998583416213403040189932.001.933.13Sub Total.68063533823EXTR - 119503174242
RDH758255438120138542910692760321.411.371.34LFB 416964118058EXTR - 255633437577
PULPFIBER LINE7582554386064487135397433550.710.780.8LFB 523957167396Condensate18495173111
GASSIFIER75825543812038275107173650.140.130.13Grand Total108984819277PRDS1535334347
CLO2 PLANT758255438884634878756500.100.100.26Coal14524114217Tot.Equ Coal14943117627
3TOTAL7582554381201385429815163336179461324012.372.392.53B.Dust6333315Steam / Kg of coal4.5554.538
PULPEVAPORATOR758255438123769158311015815091.451.471.4Charcoal fines01176
CAUSTICIZING Plant7582554384697301124180268000.550.480.38REMARKS
LF BOILER IV758255438114080201838105741839124234413284870.580.510.5940TPD FOR S/B,REST 50%MP,50%LP
LF BOILER V7582554381740121803311198612207151426651433330.880.780.760TPD FOR S/B ,REST 60% MP,40%LP
4TOTAL75825543828802020051493043521119149260262591801293.463.253.07
5CF Boiler's internal8591611677873594227007528860.820.860.74
6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES8591611672833258510.330.420.18840 Tons by Steam Blow and rest by losses.
PAPER
7STEAM TO TURBINE8591611671849517311112519553722651813260402277273.033.723.28Condensate +equivalent enrgy drop in extractions
8STEAM TO TURBINES & POWER BOILERS859161167358793064634.185.014.2Steam for PH +CFB Int+Losses (5+6+7)
9TOTAL STEAM85916116710898481927712.6913.3912.19
PULP10Steam for Pulp(3+4)758255438442043125295.835.645.6Steam consumed in Pulp Mill & Recovery
11SCREW PULP (AD)011806650.005.645.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP
12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,9136789783040696082.227.75Steam for salable pulp + steam for PD sheet
13Pulp for Paper(10-12)621546460411642429216.625.235.6Total Pulp - Salable Pulp,i.e(10-12)
Paper14Process Stream for Paper859161167700644432068.167.257.25(9-8-12)
NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST
Kg/CM2DEG.CK.cal/Kg
HP STEAM354107751
MP STEAM92206860.89( MEASURED AFTER INJECTION )
LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )
Gen. Manager (Power Block)
J.K PAPER MILLS,JAYKAY PUR
POWER BLOCKQF / 030 / 55
STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001
FOR NOVEMBER -- 2001Date: 01.05.2001
BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION
MTHPMPLPEQV.HPT/TT/T
This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.
PAPER MACHINE I29562324310472846909320753743.153.242.94This MonthTodateThis MonthTodate
II42534291668139311485123993.493.624.82CFB 11453912926412 MWTG623640051288200
III2671211047737601736886535542.582.543CFB 2135861224255.4 MWTG310392027845510
IV89582063777336593362299573.763.653.3CFB 3080852.5 MWTG141580012274145
V1672138045213401134640357012.772.592.97CFB 4163437277TOTAL.1075612091407855
1TOTAL86196978616681393127199218635256922069842.982.973.1CFB 540604307135STEAM
PD2PD PLANT (AD)1680115383717250573308223011.971.933.13Sub Total.70363604186EXTR - 119185193427
RDH810263540117409716910449864801.291.361.34LFB 417362135420EXTR - 269816507393
PULPFIBER LINE8102635406185548985505488590.680.770.8LFB 523773191169Condensate20836193947
GASSIFIER81026354011509425102483880.130.130.13Grand Total111498930775PRDS166136008
CLO2 PLANT810263540880722878364330.100.100.26Coal14768128985Tot.Equ Coal15307132934
3TOTAL8102635401174097169821571551177601501612.192.362.53B.Dust7954110Steam / Kg of coal4.5974.545
PULPEVAPORATOR8102635401224110382410894924031.341.451.4Charcoal fines01176
CAUSTICIZING Plant8102635405076351884518313170.560.490.38REMARKS
LF BOILER IV810263540120092201861124351862142854513330010.560.520.5940TPD FOR S/B,REST 50%MP,50%LP
LF BOILER V8102635401800139803153230142102172446477498100.800.780.760TPD FOR S/B ,REST 60% MP,40%LP
4TOTAL81026354030002320050143544921281170541264032065313.263.253.07
5CF Boiler's internal8619697868465678877534604190.870.870.74
6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES8619697861896277470.220.400.18362 Tons by Steam Blow and rest by losses.
PAPER
7STEAM TO TURBINE86196978620836193947105810611800959822289062566323.353.683.28Condensate +equivalent enrgy drop in extractions
8STEAM TO TURBINES & POWER BOILERS861969786383363447994.454.944.2Steam for PH +CFB Int+Losses (5+6+7)
9TOTAL STEAM86196978611149893077512.9413.3412.19
PULP10Steam for Pulp(3+4)810263540441633566925.455.615.6Steam consumed in Pulp Mill & Recovery
11SCREW PULP (AD)011806620.005.615.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP
12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,91512104909157811906.067.74Steam for salable pulp + steam for PD sheet
13Pulp for Paper(10-12)659053050350052755025.315.195.6Total Pulp - Salable Pulp,i.e(10-12)
Paper14Process Stream for Paper861969786640055047867.437.237.25(9-8-12)
NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST
Kg/CM2DEG.CK.cal/Kg
HP STEAM354107751
MP STEAM92206860.89( MEASURED AFTER INJECTION )
LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )
Gen. Manager (Power Block)
J.K PAPER MILLS,JAYKAY PUR
POWER BLOCKQF / 030 / 55
STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001
FOR DECEMBER -- 2001Date: 01.05.2001
BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION
MTHPMPLPEQV.HPT/TT/T
This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.
PAPER MACHINE I2997262400846900753740.002.872.94This MonthTodateThis MonthTodate
II45438830139310123990.003.194.82CFB 1012926412 MWTG051288200
III2878239820601730535540.002.233CFB 201224255.4 MWTG027845510
IV119682060336590299570.003.653.3CFB 3080852.5 MWTG012274145
V1702155060401130357010.002.302.97CFB 4037277TOTAL.091407855
1TOTAL922777817013931021863502069840.002.663.1CFB 50307135STEAM
PD2PD PLANT (AD)1263128010250570223010.001.743.13Sub Total.0604186EXTR - 10193427
RDH8201717410971690864800.001.211.34LFB 40135420EXTR - 20507393
PULPFIBER LINE8201717410548980488590.000.680.8LFB 50191169Condensate0193947
GASSIFIER82017174109425083880.000.120.13Grand Total0930775PRDS036008
CLO2 PLANT82017174107228064330.000.090.26Coal0128985Tot.Equ Coal0132934
3TOTAL82017174109716907155101501610.002.092.53B.Dust04110Steam / Kg of coal0.0004.545
PULPEVAPORATOR82017174101038240924030.001.291.4Charcoal fines01176
CAUSTICIZING Plant8201717410351880313170.000.440.38REMARKS
LF BOILER IV820171741092200124350142850330010.000.460.5940TPD FOR S/B,REST 50%MP,50%LP
LF BOILER V8201717410139800230140172440498100.000.690.760TPD FOR S/B ,REST 60% MP,40%LP
4TOTAL820171741023200035449017054102065310.002.883.07
5CF Boiler's internal9227778170678870604190.000.780.74
6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES9227778170277470.000.360.18362 Tons by Steam Blow and rest by losses.
PAPER
7STEAM TO TURBINE922777817019394701061105982202566320.003.303.28Condensate +equivalent enrgy drop in extractions
8STEAM TO TURBINES & POWER BOILERS92277781703447990.004.434.2Steam for PH +CFB Int+Losses (5+6+7)
9TOTAL STEAM92277781709307750.0011.9612.19
PULP10Steam for Pulp(3+4)82017174103566920.004.975.6Steam consumed in Pulp Mill & Recovery
11SCREW PULP (AD)011805870.004.975.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP
12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,91137116270801100.006.89Steam for salable pulp + steam for PD sheet
13Pulp for Paper(10-12)70646011402765820.004.605.6Total Pulp - Salable Pulp,i.e(10-12)
Paper14Process Stream for Paper92277781705058660.006.507.25(9-8-12)
NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST
Kg/CM2DEG.CK.cal/Kg
HP STEAM354107751
MP STEAM92206860.89( MEASURED AFTER INJECTION )
LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )
LOSS DUE TO POOR(OLD) INSULATION
Gen. Manager (Power Block)
AVE.AMB.TEMP. 28
AVE.EXP.TEMP.AFT.INS. 38
SL.NOLOCATIONAREA (APPOX)AVE.SKIN TEMP.PRESENT EXTRA TEMP.MONEY LOSS/DAYCOST OF INS.PAY BACK
12.5 MWTG
H P HEADER20592114000
2M P HEADER256931
3L P HEADER306224
5.4MWTG
4H P HEADER205517
5L P HEADER205618
6CFB 1&2
H P LINE1005618
7CFB-4 HP LINE
AFTER R/V707638
8CFB-1&2
STEAM DRUM306729
9CFB 2&5
ESP90
10TOTAL405
&R&F
&L&F&T&D
water
J.K.PAPER MILLS , JAYKAYPUR
POWER BLOCK
WATER BALANCE FOR APRIL TO JULY 2000 AVERAGE PER DAY
BASESI.NOPARTCULARSPRODNACTUALTARGETWATER CONSUMED (M3)RECLAMATIONEFFLUENTLOSSESREMARKS
MTM3/TM3/TFRESHRECYCLEDM3%M3%M3%
PAPER1Total water286135.61130387803473289.56404810.44
2To Colony28617.602050304778952525
3To Mills286118110337502995488.75379611.25
PULP4For Pulp25778.2200989B+9C1+9C3+10E+10F+10G+10I+10J+10K+10L+10M
5For saleable Pulp29992868Salaeable pulp*water per Ton of pulp*
PAPER6For Power2867.862247112557625.6155969.49C2+9C4
7For Paper Machines28637.781080589688312951254259A+10A+10B+10C+10D
8For Process286100.1228635(3)-(5)-(6)
921" Pipe13035
PAPER9APM-11003245269383389121635
PULP9BSR Plant2575561141134865031374534953486M3 Water from EVP CT to Pulp Mill HW Tank
PAPER9CPower Block42292026202632.4251840.25171127.35
PULP9C1DM Plant19821914191449194250401Back wash=250,Return con.1914,make up1732
PAPER9C2Cooling Tower217411255032315597223% CBD=0.7% Circu.,72%Evp.&Wid.=2.2% Circu.
PULP9C3Ash Conditioner112112100coal*0.4*0.5
9C4CBD Losses73731% of steam
1018" Pipe Line20715
10APM-215720598838612365
10BPM-3843120258983374121575
10CPM-429180014948321612905
10DPM-558192015948323012965
10EFiber Line54051149416054958455
10FClo2 Plant60057095305
10GChemical Plant48045695245
10HPD Plant60057095305
10ICompressor House14401411982921411 M3 Water to EVP cooling Tower
10JET Plant48045695245
10KReclimation1440141195295
10LOthers27102575951355
10MChipper96091295485
NOTE:SI No 1 to 8 only fresh water considered.
SI No 9A onwards Fresh water and recycled water considered.
Losses = evaporation, windage,seapage , moiture in products ie. Paper,pulp,slurry etc.
Pm/c 1,2,3,4,5,Clo2,NFL and DM Plant make up are having Flow Meters and rest are assumption.Gen. Manager (Power Block)
J.K.PAPER MILLS , JAYKAYPURFormat No. QF / 030 / WS / 04
POWER BLOCKRev. No. 000
WATER BALANCE FOR THE MONTH OFDate : 1.09.2000
BASESI.NOPARTCULARSPRODNACTUALTARGETWATER CONSUMED (M3)RECLAMATIONEFFLUENTLOSSESREMARKS
MTM3/TM3/TFRESHRECYCLEDM3%M3%M3%
PAPER1Total water
2To Colony
3To Mills
PULP4For Pulp9B+9C1+9C3+10E+10F+10G+10I+10J+10K+10L+10M
5For saleable PulpSalaeable pulp*water per Ton of pulp*
PAPER6For Power9C2+9C4
7For Paper Machines9A+10A+10B+10C+10D
8For Process(3)-(5)-(6)
921" Pipe
PAPER9APM-1
PULP9BSR PlantM3 Water from EVP CT to Pulp Mill HW Tank
PAPER9CPower Block
PULP9C1DM PlantBack wash=250,Return con.1914,make up1732
PAPER9C2Cooling Tower23% CBD=0.7% Circu.,72%Evp.&Wid.=2.2% Circu.
PULP9C3Ash Conditionercoal*0.4*0.5
9C4CBD Losses1% of steam
1018" Pipe Line
10APM-2
10BPM-3
10CPM-4
10DPM-5
10EFiber Line
10FClo2 Plant
10GChemical Plant
10HPD Plant
10ICompressor HouseM3 Water to EVP cooling Tower
10JET Plant
10KReclimation
10LOthers
10MChipper
NOTE:SI No 1 to 8 only fresh water considered.
SI No 9A onwards Fresh water and recycled water considered.
Losses = evaporation, windage,seapage , moiture in products ie. Paper,pulp,slurry etc.
Pm/c 1,2,3,4,5,Clo2,NFL and DM Plant make up are having Flow Meters and rest are assumption.Gen. Manager (Power Block)
Flow Diagram
Date : 19.12.05
J.K. PAPER MILLS : JAYKAPUR
POWER BLOCK
DAILY RETURN CONDENSATE BALANCE IN M3
DM Plant
2888
Regeneration,ClO2,SPRD etcG.C.Tanks4092Boilers for Steam Generation
1204
41
CBD / IBD4051
Steam Supplied954369765912151662132970315
Paper MachinesPD PlantCoating PlantPulp MillCausticizing PlantEvaporators ( I & III)LFB-4&5CFB InternalTurbinesSteam Blow
Return Condensate
%%%%%%%%%
1) Expected84688.6792452833495929540361463848193.217054263627744.605475040331395.1367781155703100
2) Actual7988425706870265400043985.077519379827744.605475040331395.1367781155703100
3) Deviation4859252425138214638.0165289256428000000
RETURN CONDENSATE
2888
Steam Generated = 4051 M3/Day
Expected Condensate = 3195 M3/Day ( 68.28 % )
Actual Condensate received = 2888 M3/Day ( 82.40 % )
Deviation of Condensate = 307 M3/Day ( 14.13 % )
Make up Water = 1276 M3/Day ( 31.41% )
Total CBD/IBD = 41 M3/Day
Total Feed Water = 4092 M3/Day
72
1204
1276
Sheet3
Sheet2
Sheet4
Date : 16.08.03
J.K.PAPER MILLS : JAYKAYPUR
POWER BLOCK
EFFECT OF BLEACH LIQUOR ADDITION IN MILL WATER
Daily about 2400Lts of Bleach liquor is used at water supply.Due to the addition of bleach liquor, the calcium hardness and Total hardness is increased in mill water.Following are the observations .
Date & TimeTotal hardness (ppm)Calcium hardness (ppm)
BeforeAfterDifferenceBeforeAfterDifference
13.08.03
7.30 A.M4449528335
8.00A.M4349627336
8.30A.M4449527.5335.5
9.00A.M4448.54.527325
2.30P.M4348530333
3.30P.M4649330322
4.00P.M4348.55.529345
Average43.8648.714.8628.3632.864.5
After addition of bleach liqour there is a increase of 4.5 ppm of calcium hardness and 4.86 ppm of Total hardness.
Drinking water standard (IS 10500:1991)Desirable limit
1.Total hardness300 ppm
2.Calcium as Ca75 ppm
Both parameters are within the limit.
cond-June-03
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR JULY 02.
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I9619866875385744075.06568Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II1731691662901496791197Dandy shower 4%
CP M/C III7977807897957502704738Dandy shower 1%
DP M/C IV4818145467395443965.03037Dandy shower 3%
EP M/C V5008701430785366160.02584Dandy shower 2%,starch prep.12%
TOTAL M/C291531861272922453818124
2PD PLANT27220272295258645.01225
3PULP MILL
ARDH1153901153985980833.53870
BFIBRE LINE544754470
CCHLORINE GASSIFIER120912090
DClO2 PLANT930682248
P/MILL TOTAL
4S.R. PLANT
ACSP50185018
BEVAPORATORS11757011757951116968.28021
CLFB 46842
ia) S/B161216120
iib) B/L HEATER155015500
iiic) DEAERATOR176701767951679951679
ivd) AIR HEATER170501705951620951620
ve) LINE FLUSHING2082080
DLFB 57756
ia) S/B186018600
iib) B/L HEATER170517050
iiic) DEAERATOR176701767951679851679
ivd) AIR HEATER180001800951710851710
ve) LINE FLUSHING6246240
TOTAL SRP
5CFB INTERNAL860008600958170958170
6TURBINE214150214151002141510021415
7CBD112501125556556
8STEAM BLOW1471470
GRAND TOTAL11366021923917378443067569
Water used for Steam Generation =Steam Generated + CBD Losses
1136601125113660
Expected Return Condensate =84430 M3
Actual Return Condensate =67569 m359.45%
Actual DM Water Make up =46091 m340.55%
Targeted DM Water Make up =39781 m335%
Pm/c 1 & EVP 3 (not working) are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen Manager (Power Block)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR AUGUST- 02.
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I9557860869785739284.57350Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II1709681641901477801313Dandy shower 4%
CP M/C III7136717065956715805654Dandy shower 1%
DP M/C IV4918147477195453280.03817Dandy shower 3%
EP M/C V4904687421785358480.03374Dandy shower 2%,starch prep.12%
TOTAL M/C282241833263912370021508
2PD PLANT30050300595285570.02104
3PULP MILL
ARDH11925011925851013634.34093
BFIBRE LINE575557550
CCHLORINE GASSIFIER120912090
DClO2 PLANT930682248
P/MILL TOTAL
4S.R. PLANT
ACSP51085108
BEVAPORATORS13372013372951270364.38598
CLFB 47344
ia) S/B173617360
iib) B/L HEATER161216120
iiic) DEAERATOR180001800951710951710
ivd) AIR HEATER176701767951679951679
ve) LINE FLUSHING4294290
DLFB 57904
ia) S/B186018600
iib) B/L HEATER170517050
iiic) DEAERATOR204602046951944951944
ivd) AIR HEATER179801798951708951708
ve) LINE FLUSHING4954950
TOTAL SRP
5CFB INTERNAL860508605958175958175
6TURBINE212570212571002125710021257
7CBD115001150557557
8STEAM BLOW3203200
GRAND TOTAL11610822744933648592472833
Water used for Steam Generation =Steam Generated + CBD Losses
1149581150116108
Expected Return Condensate =85924 M3
Actual Return Condensate =72833 m363.07%
Actual DM Water Make up =43275 m336.93%
Targeted DM Water Make up =40638 m335%
Pm/c 1 & EVP 3 (not working) are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen Manager (Power Block)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR SEPT- 02.
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I9584863872185741380.06977Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II1904761828901645901645Dandy shower 4%
CP M/C III7684777607957227906864Dandy shower 1%
DP M/C IV4798144465495442190.04189Dandy shower 3%
EP M/C V4554638391685332980.03133Dandy shower 2%,starch prep.12%
TOTAL M/C285241798267262403522808
2PD PLANT22840228495217079.21809
3PULP MILL
ARDH11911011911851012436.84379
BFIBRE LINE565256520
CCHLORINE GASSIFIER117011700
DClO2 PLANT900660240
P/MILL TOTAL
4S.R. PLANT
ACSP45474547
BEVAPORATORS12614012614951198372.99190
CLFB 47372
ia) S/B173617360
iib) B/L HEATER161216120
iiic) DEAERATOR180001800951710951710
ivd) AIR HEATER176701767951679951679
ve) LINE FLUSHING4574570
DLFB 57590
ia) S/B186018600
iib) B/L HEATER170517050
iiic) DEAERATOR176701767951679951679
ivd) AIR HEATER180001800951710951710
ve) LINE FLUSHING4584580
TOTAL SRP
5CFB INTERNAL752407524957148957148
6TURBINE152830152831001528310015283
7CBD105701057553553
8STEAM BLOW3543540
GRAND TOTAL10678222009847737757467448
Water used for Steam Generation =Steam Generated + CBD Losses
1057251057106782
Expected Return Condensate =77574 M3
Actual Return Condensate =67448 m363.16%
Actual DM Water Make up =39334 m336.84%
Targeted DM Water Make up =37374 m335%
Pm/c 1 & EVP 3 (not working) are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen Manager (Power Block)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR NOV- 02.
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I8542769777385660483.46484Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II2060821978901780801582Dandy shower 4%
CP M/C III7038706968956620805574Dandy shower 1%
DP M/C IV4942148479495455480.03835Dandy shower 3%
EP M/C V4499630386985328980.03095Dandy shower 2%,starch prep.12%
TOTAL M/C270811699253822284720570
2PD PLANT25720257295244380.02058
3PULP MILL
ARDH11957011957851016349.35897
BFIBRE LINE623562350
CCHLORINE GASSIFIER115311530
DClO2 PLANT890650240
P/MILL TOTAL
4S.R. PLANT
ACSP47704770
BEVAPORATORS12912012912951226668.48828
CLFB 47432
ia) S/B186018600
iib) B/L HEATER180018000
iiic) DEAERATOR180001800951710951710
ivd) AIR HEATER176701767951679951679
ve) LINE FLUSHING2052050
DLFB 57630
ia) S/B186018600
iib) B/L HEATER170517050
iiic) DEAERATOR176701767951679951679
ivd) AIR HEATER180001800951710951710
ve) LINE FLUSHING4984980
TOTAL SRP
5CFB INTERNAL882608826958385958385
6TURBINE191020191021001910210019102
7CBD111001110556556
8STEAM BLOW4074070
GRAND TOTAL11207722842892358204063.9571674
Water used for Steam Generation =Steam Generated + CBD Losses
1109671110112077
Expected Return Condensate =82040 M3
Actual Return Condensate =71674 m363.95%
Actual DM Water Make up =40403 m336.05%
Targeted DM Water Make up =39227 m335%
Pm/c 1 & EVP 3 (not working) are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen Manager (Power Block)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR DEC- 02.
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I8882799808385687076.86204Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II1991801911901720801529Dandy shower 4%
CP M/C III7676777599957219806079Dandy shower 1%
DP M/C IV5107153495495470680.03963Dandy shower 3%
EP M/C V4799672412785350880.03302Dandy shower 2%,starch prep.12%
TOTAL M/C284551781266742402321077
2PD PLANT26300263095249865.01710
3PULP MILL
ARDH12498012498851062355.56930
BFIBRE LINE664966490
CCHLORINE GASSIFIER120912090
DClO2 PLANT930682248
P/MILL TOTAL
4S.R. PLANT
ACSP47104710
BEVAPORATORS12922012922951227670.99158
CLFB 47444
ia) S/B186018600
iib) B/L HEATER180018000
iiic) DEAERATOR180001800951710951710
ivd) AIR HEATER176701767951679951679
ve) LINE FLUSHING2172170
DLFB 58040
ia) S/B200020000
iib) B/L HEATER180018000
iiic) DEAERATOR180001800951710951710
ivd) AIR HEATER176701767951679951679
ve) LINE FLUSHING6736730
TOTAL SRP
5CFB INTERNAL893308933958486958486
6TURBINE203220203221002032210020322
7CBD115001150558558
8STEAM BLOW2462460
GRAND TOTAL11613823627925118506464.1674519
Water used for Steam Generation =Steam Generated + CBD Losses
1161381149881150
Expected Return Condensate =85064 M3
Actual Return Condensate =74519 m364.16%
Actual DM Water Make up =41619 m335.84%
Targeted DM Water Make up =40649 m335%
Pm/c 1 ( not working )& EVP 3 are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen Manager (Power Block)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR DEC- 02.
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I8882799808385687076.86204Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II1991801911901720801529Dandy shower 4%
CP M/C III7676777599957219806079Dandy shower 1%
DP M/C IV5107153495495470680.03963Dandy shower 3%
EP M/C V4799672412785350880.03302Dandy shower 2%,starch prep.12%
TOTAL M/C284551781266742402321077
2PD PLANT26300263095249865.01710
3PULP MILL
ARDH12498012498851062355.56930
BFIBRE LINE664966490
CCHLORINE GASSIFIER120912090
DClO2 PLANT930682248
P/MILL TOTAL
4S.R. PLANT
ACSP47104710
BEVAPORATORS12922012922951227670.99158
CLFB 47444
ia) S/B186018600
iib) B/L HEATER180018000
iiic) DEAERATOR180001800951710951710
ivd) AIR HEATER176701767951679951679
ve) LINE FLUSHING2172170
DLFB 58040
ia) S/B200020000
iib) B/L HEATER180018000
iiic) DEAERATOR180001800951710951710
ivd) AIR HEATER176701767951679951679
ve) LINE FLUSHING6736730
TOTAL SRP
5CFB INTERNAL893308933958486958486
6TURBINE203220203221002032210020322
7CBD115001150558558
8STEAM BLOW2462460
GRAND TOTAL11613823627925118506464.1674519
Water used for Steam Generation =Steam Generated + CBD Losses
1161381149881150
Expected Return Condensate =85064 M3
Actual Return Condensate =74519 m364.16%
Actual DM Water Make up =41619 m335.84%
Targeted DM Water Make up =40649 m335%
Pm/c 1 ( not working )& EVP 3 are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR JAN- 03.
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I9021812820985697880.06567Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II2281912190901971851862Dandy shower 4%
CP M/C III7639767563957185806050Dandy shower 1%
DP M/C IV4946148479895455882.03934Dandy shower 3%
EP M/C V4653558409585348185.03481Dandy shower 2%,starch prep.12%
TOTAL M/C285401685268552417321894
2PD PLANT20140201495191380.01611
3PULP MILL
ARDH12229012229851039558.77172
BFIBRE LINE678267820
CCHLORINE GASSIFIER120912090
DClO2 PLANT930682248
P/MILL TOTAL
4S.R. PLANT
ACSP48634863
BEVAPORATORS13181013181951252269.48684
CLFB 47622
ia) S/B201520150
iib) B/L HEATER182918290
iiic) DEAERATOR201502015951914951914
ivd) AIR HEATER155101551951473951473
ve) LINE FLUSHING2122120
DLFB 58027
ia) S/B182918290
iib) B/L HEATER201520150
iiic) DEAERATOR195301953951855951855
ivd) AIR HEATER201502015951914951914
ve) LINE FLUSHING2152150
TOTAL SRP
5CFB INTERNAL898608986958537958537
6TURBINE206290206291002062910020629
7CBD115301153558558
8STEAM BLOW3353350
GRAND TOTAL11650023671928298538365.0175741
Water used for Steam Generation =Steam Generated + CBD Losses
1165001153471153
Expected Return Condensate =85383 M3
Actual Return Condensate =75741 m365.01%
Actual DM Water Make up =40759 m334.99%
Targeted DM Water Make up =40775 m335%
Pm/c 1 ( not working )& EVP 3 are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen.Manager (PB)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR FEB- 03.
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I8100729737185626580.05897Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II2041821959901763851665Dandy shower 4%
CP M/C III6292636229958768804983Dandy shower 1%
DP M/C IV4308129417995397082.03427Dandy shower 3%
EP M/C V4195587360885306784.03031Dandy shower 2%,starch prep.12%
TOTAL M/C249361590233462383319003
2PD PLANT29200292095277485.02482
3PULP MILL
ARDH1083701083785921153.05742
BFIBRE LINE597559750
CCHLORINE GASSIFIER106910690
DClO2 PLANT822626196
P/MILL TOTAL
4S.R. PLANT
ACSP416941690
BEVAPORATORS11485011485951091175.08613
CLFB 46888
ia) S/B173617360
iib) B/L HEATER173217320
iiic) DEAERATOR148401484951410951410
ivd) AIR HEATER168001680951596951596
ve) LINE FLUSHING2562560
DLFB 57224
ia) S/B193619360
iib) B/L HEATER168016800
iiic) DEAERATOR168001680951596951596
ivd) AIR HEATER176401764951676951676
ve) LINE FLUSHING1641640
TOTAL SRP
5CFB INTERNAL804008040957638957638
6TURBINE194960194961001949610019496
7CBD104101041552552
8STEAM BLOW2702700
GRAND TOTAL10517221203839698019365.9069304
Water used for Steam Generation =Steam Generated + CBD Losses
1051721041311041
Expected Return Condensate =80193 M376.25%
Actual Return Condensate =69304 m365.90%
Actual DM Water Make up =35868 m334.10%
Targeted DM Water Make up =36810 m335%
Pm/c 1 ( not working )& EVP 3 are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen.Manager (PB)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR MARCH- 03.
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I8580.0Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II9085Dandy shower 4%
CP M/C III9580Dandy shower 1%
DP M/C IV9582.0Dandy shower 3%
EP M/C V8584.0Dandy shower 2%,starch prep.12%
TOTAL M/C
2PD PLANT9585.0
3PULP MILL
ARDH8553.0
BFIBRE LINE
CCHLORINE GASSIFIER
DClO2 PLANT
P/MILL TOTAL
4S.R. PLANT
ACSP
BEVAPORATORS9575.0
CLFB 4
ia) S/B
iib) B/L HEATER
iiic) DEAERATOR9595
ivd) AIR HEATER9595
ve) LINE FLUSHING
DLFB 5
ia) S/B
iib) B/L HEATER
iiic) DEAERATOR9595
ivd) AIR HEATER9595
ve) LINE FLUSHING
TOTAL SRP
5CFB INTERNAL9595
6TURBINE100100
7CBD55
8STEAM BLOW
GRAND TOTAL1051720065.90
Water used for Steam Generation =Steam Generated + CBD Losses
1051721041311041
Expected Return Condensate =80193 M376.25%
Actual Return Condensate =69304 m365.90%
Actual DM Water Make up =35868 m334.10%
Targeted DM Water Make up =36810 m335%
Pm/c 1 ( not working )& EVP 3 are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen.Manager (PB)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR OCT- 02.
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I9536858867885737680.06942Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II2134852049901844801639Dandy shower 4%
CP M/C III7637767561957183806049Dandy shower 1%
DP M/C IV4835145469095445680.03752Dandy shower 3%
EP M/C V4798672412685350780.03301Dandy shower 2%,starch prep.12%
TOTAL M/C2894018362710421683
2PD PLANT35740357495339540.01430
3PULP MILL
ARDH12494012494851062036.74584
BFIBRE LINE575857580
CCHLORINE GASSIFIER120912090
DClO2 PLANT930682248
P/MILL TOTAL
4S.R. PLANT
ACSP48514851
BEVAPORATORS14173014173951346468.49701
CLFB 47669
ia) S/B186018600
iib) B/L HEATER170517050
iiic) DEAERATOR176701767951679951679
ivd) AIR HEATER180001800951710951710
ve) LINE FLUSHING5375370
DLFB 57872
ia) S/B200020000
iib) B/L HEATER180018000
iiic) DEAERATOR180001800951710951710
ivd) AIR HEATER176701767951679951679
ve) LINE FLUSHING5055050
TOTAL SRP
5CFB INTERNAL888708887958443958443
6TURBINE213780213781002137810021378
7CBD117901179559559
8STEAM BLOW1441440
GRAND TOTAL11905822887961718850362.2074056
Water used for Steam Generation =Steam Generated + CBD Losses
1178791179119058
Expected Return Condensate =88503 M383.73%
Actual Return Condensate =74056 m362.20%
Actual DM Water Make up =43427 m337.48%
Targeted DM Water Make up =41670 m335%
Pm/c 1 & EVP 3 (not working) are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen Manager (Power Block)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR MARCH- 03.
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I8491764772785656880.05254Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II1744701674901507801206Dandy shower 4%
CP M/C III7537757462957089805671Dandy shower 1%
DP M/C IV4903147475695451880.03614Dandy shower 3%
EP M/C V4676655402185341880.02734Dandy shower 2%,starch prep.12%
TOTAL M/C273511711256402310018479
2PD PLANT28020280295266291.02423
3PULP MILL
ARDH12119012119851030180.09695
BFIBRE LINE597359730
CCHLORINE GASSIFIER120912090
DClO2 PLANT930682248
P/MILL TOTAL
4S.R. PLANT
ACSP377837780
BEVAPORATORS15516015516951474060.49373
CLFB 47662
ia) S/B201520150
iib) B/L HEATER182918290
iiic) DEAERATOR201502015951914951914
ivd) AIR HEATER155101551951473951473
ve) LINE FLUSHING2522520
DLFB 58069
ia) S/B182918290
iib) B/L HEATER201520150
iiic) DEAERATOR195301953951855951855
ivd) AIR HEATER201502015951914951914
ve) LINE FLUSHING2572570
TOTAL SRP
5CFB INTERNAL883008830958389958389
6TURBINE212710212711002127110021271
7CBD130901309565565
8STEAM BLOW4474470
GRAND TOTAL11726621997952698768465.5476851
Water used for Steam Generation =Steam Generated + CBD Losses
1159571309117266
Expected Return Condensate =87684 M374.77%
Actual Return Condensate =76851 m365.54%
Actual DM Water Make up =40415 m334.46%
Targeted DM Water Make up =41043 m335%
Pm/c 1 ( not working ) & EVP 3 are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen Manager (Power Block)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR JUNE - 03
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I8410757765385650570.05357Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II1806721734901561801387Dandy shower 4%
CP M/C III7485757410957040805928Dandy shower 1%
DP M/C IV3643109353495335760.02120Dandy shower 3%
EP M/C V4491629386285328380.03090Dandy shower 2%,starch prep.12%
TOTAL M/C258351642241932174617882
2PD PLANT25910259195246130.0738
3PULP MILL
ARDH89250892585758639.63006
BFIBRE LINE664166410
CCHLORINE GASSIFIER117011700
DClO2 PLANT900660240
P/MILL TOTAL
4S.R. PLANT
ACSP367336730
BEVAPORATORS14525014525951379975.010352
CLFB 47402
ia) S/B201520150
iib) B/L HEATER192219220
iiic) DEAERATOR155101551951473951473
ivd) AIR HEATER170501705951620951620
ve) LINE FLUSHING2092090
DLFB 57835
ia) S/B192219220
iib) B/L HEATER198419840
iiic) DEAERATOR213902139952032952032
ivd) AIR HEATER155101551951473951473
ve) LINE FLUSHING2392390
TOTAL SRP
5CFB INTERNAL740807408957038957038
6TURBINE171220171221001712210017122
7CBD104601046552552
8STEAM BLOW6176170
GRAND TOTAL10569022694829967640259.4162788
Water used for Steam Generation =Steam Generated + CBD Losses
1046441046105690
Expected Return Condensate =76402 M372.28%
Actual Return Condensate =62788 m359.41%
Actual DM Water Make up =42902 m340.59%
Targeted DM Water Make up =36992 m335%
Pm/c 1 ( not working ) & EVP 3 are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen Manager (Power Block)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR MAY-03
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I8631777785485667680.06283Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II1931771854901669801483Dandy shower 4%
CP M/C III5739575682955398804546Dandy shower 1%
DP M/C IV4811144466795443460.02800Dandy shower 3%
EP M/C V4727662406585345580.03252Dandy shower 2%,starch prep.12%
TOTAL M/C258391717241222163218364
2PD PLANT28980289895275330.0867
3PULP MILL
ARDH1108201108285942034.23795
BFIBRE LINE609160910
CCHLORINE GASSIFIER120912090
DClO2 PLANT930682248
P/MILL TOTAL
4S.R. PLANT
ACSP371037100
BEVAPORATORS13499013499951282470.19998
CLFB 47657
ia) S/B150015000
iib) B/L HEATER210021000
iiic) DEAERATOR207002070951967951967
ivd) AIR HEATER186001860951767951767
ve) LINE FLUSHING1271270
DLFB 56815
ia) S/B150015000
iib) B/L HEATER159015900
iiic) DEAERATOR177001770951682951682
ivd) AIR HEATER156001560951482951482
ve) LINE FLUSHING3933950
TOTAL SRP
5CFB INTERNAL950509505959030959030
6TURBINE233700233701002337010023370
7CBD21750217551095109
8STEAM BLOW107810780
GRAND TOTAL11585821699941598603662.5272431
Water used for Steam Generation =Steam Generated + CBD Losses
1136832175115858
Expected Return Condensate =86036 M374.25%
Actual Return Condensate =72431 m362.52%
Actual DM Water Make up =43427 m337.48%
Targeted DM Water Make up =40550 m335%
Pm/c 1 ( not working ) & EVP 3 are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen Manager (Power Block)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR THE MONTH OF NOV-05
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I85Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II90Dandy shower 4%
CP M/C III95Dandy shower 1%
DP M/C IV95Dandy shower 3%
EP M/C V85Dandy shower 2%,starch prep.12%
TOTAL M/C
2PD PLANT95
3PULP MILL
ARDH85
BFIBRE LINE
CCHLORINE GASSIFIER
DClO2 PLANT
P/MILL TOTAL
4S.R. PLANT
ACSP
BEVAPORATORS95
CLFB 4
ia) S/B
iib) B/L HEATER
iiic) DEAERATOR95
ivd) AIR HEATER95
ve) LINE FLUSHING
DLFB 5
ia) S/B
iib) B/L HEATER
iiic) DEAERATOR95
ivd) AIR HEATER95
ve) LINE FLUSHING
TOTAL SRP
5CFB INTERNAL95
6TURBINE100
7CBD5
8STEAM BLOW
GRAND TOTAL
Water used for Steam Generation =Steam Generated + CBD Losses
Expected Return Condensate =
Actual Return Condensate =
Actual DM Water Make up =
Targeted DM Water Make up =
Pm/c 1 ( not working ) & EVP 3 are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen Manager (Power Block)
check list
Gen.Manager ( PB)
J.K.PAPER MILLS:JAYKAYPUR
POWER BLOCK
FRESH WATER WASTAGES,LOSSESS & LEAKAGES CHECK LIST
SL NOCHECKING POINTSOVER FLOWSDRAINAGELEAKAGESREMARKS
21" Pipe line
112 mw cooling tower
25.4 mw cooling tower
3Dm plant (old) degassor sump
4Dm plant (new) degassor sump
5Evaporator -3 cooling tower
6Pm/c no: 1 ADKA
7Pm/c no: 1 Hydropulper
8Pm/c no: 2 Hydropulper
9Singapur road railway station
10Mist chamber
18" pipe line
1Pm/c no:3 warm water tank
2Pm/c no:3 Hydropulper
3Pm/c no: 4 warm water tank
4Pm/c no: 4 Hydropulper
5Pm/c no: 5 warm water tank
6Pm/c no: 5 Hydropulper
7PD plant ( new) warm water tank
8PD plant vacuum pump
9Clo2 plant cooling tower : 1
10Clo2 plant cooling tower : 2
11Clo2 plant filters and storage tank
12Clo2 plant chilled tank
13Reclaimation plant old reservoir
14Reclaimation plant new reservoir
15Fiber line warm water tank
16Atlas capco compressor
17Admn building & Gardening
18techincal building
19Drinking water make up
20Bada chandili
Signature
Date :Time :
Blank
POWER BLOCK
9/11/00
ACTION PLAN FOR MONITORING THERMAL EFFICIENCY OF INDIVIDUAL BOILERS
DESCRIPTIONTARGET
1) INSTALLATION OF WEIGHTOMETERDEC.2000
ON CONVEYOR BELT BC -4A
2) INDIVIDUAL BOILER EFFICIENCYJan-01
CALCULATIONS
Gen.Manager (Power Block)
POWER BLOCK
9/12/00
ACTION PLAN FOR REDUCING BOILER HOUSE DISCHRGE WATER TEMP.
WE HAVE REDUCED THE BOILER BLODOWN WATER FROM 3% TO 1%
BY IMPROVING QUALITY OF D M WATER ,BY PROCESSING OLD DM PLANT
WATER THROW NEW DM PLANT MIXED BED FROM 17-07-2000.
HENCE THE TEMPERATURE OF THE WATER GOING OUT OF BOILER
HOUSE REDUCED TO 38 DEG.C FROM 40 DEG.C
Gen.Manager(Power Block)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR THE YEAR 2001 - 2002
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I12331711098112219859538668.076265Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II19881795190869017177499393Dandy shower 4%
CP M/C III909879109007795855734641495Dandy shower 1%
DP M/C IV50385151248873954642944.021509Dandy shower 3%
EP M/C V59437832151116854344951.026216Dandy shower 2%,starch prep.12%
TOTAL M/C34400722636321371288014174878
2PD PLANT36996036996953514641.515335
3PULP MILL
ARDH14090401409048511976831.043672
BFIBRE LINE77681776810
CCHLORINE GASSIFIER14066140660
DClO2 PLANT1078179202861
P/MILL TOTAL
4S.R. PLANT
ACSP6009360093
BEVAPORATORS15458501545859514685663.998781
CLFB 471162
ia) S/B16839168390
iib) B/L HEATER16755167550
iiic) DEAERATOR1590001590095151058513515
ivd) AIR HEATER1709801709895162438514533
ve) LINE FLUSHING457045700
DLFB 586446
ia) S/B17406174060
iib) B/L HEATER21664216640
iiic) DEAERATOR2119302119395201338518014
ivd) AIR HEATER2101002101095199598517858
ve) LINE FLUSHING517351730
TOTAL SRP
5CFB INTERNAL9914209914295941859594185
6TURBINE2581270258127100258127100258127
7CBD1390001390056955695
8STEAM BLOW638763870
GRAND TOTAL137427727119011030871014231749593
Water used for Steam Generation =Steam Generated + CBD Losses
1374277136037713900
Expected Return Condensate =1014231 M3
Actual Return Condensate =749593 m354.54%
Actual DM Water Make up =624684 m345.46%
Targeted DM Water Make up =618425 m345%
Pm/c 1 & EVP 3 (not working) are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
J.K.PAPER MILLS, JAYKAYPUR
POWER BLOCK
RETURN CONDENSATE BALANCE FOR
S.NO.PARTICULARSSTEAMCONDENSATEREMARKS
TOTALDIRECTINDIRECTEXPECTEDACTUAL
1PAPER MACHINES%m3%m3
AP M/C I85Dandy 1%,calender0.5%starch prep.7.5%
BP M/C II90Dandy shower 4%
CP M/C III95Dandy shower 1%
DP M/C IV95Dandy shower 3%
EP M/C V85Dandy shower 2%,starch prep.12%
TOTAL M/C
2PD PLANT95
3PULP MILL
ARDH85
BFIBRE LINE
CCHLORINE GASSIFIER
DClO2 PLANT
P/MILL TOTAL
4S.R. PLANT
ACSP
BEVAPORATORS95
CLFB 4
ia) S/B
iib) B/L HEATER
iiic) DEAERATOR95
ivd) AIR HEATER95
ve) LINE FLUSHING
DLFB 5
ia) S/B
iib) B/L HEATER
iiic) DEAERATOR95
ivd) AIR HEATER95
ve) LINE FLUSHING
TOTAL SRP
5CFB INTERNAL95
6TURBINE100
7CBD5
8STEAM BLOW
GRAND TOTAL
Water used for Steam Generation =Steam Generated + CBD Losses
1159571309117266
Expected Return Condensate =87684 M374.77%
Actual Return Condensate =76851 m365.54%
Actual DM Water Make up =40415 m334.46%
Targeted DM Water Make up =41043 m335%
Pm/c 1 ( not working ) & EVP 3 are having Flow Meters and rest on assumptions.
(Flash losses=10%,Trap losses=5% consedered)
Gen Manager (Power Block)
2,5 MWTG
J.K PAPER MILLS : JAYKAYPUR
POWER BLOCK
TURBINE EFFICIENCY FOR 2.5 MWTG FOR THE MONTH OFAPRIL 2001
TARGETEfficency: 46.5 + / - 1.5 %
Steam / KWh: 8.0 + / - 0.5 Kg / Kwh
INPUT DATA
STEAMPressureTemperatureEnthalpyQuantity
UNITKg / Cm2oCKCal / KgMT
H.P3540877413855
L.P3.219067711427
Condensate-0.850502428
Power Generated :1533000KWh
ENERGY INPUT
By L.P Extraction :(774-677)*11427*1000/860=1288859KWh
Equivalent H.P Steam :1288859*860 / 774*1000=1440Tons
By Condesate :(774-50)*2428*1000/860=2044037KWh
Total :=3332897KWh
EFFICIENCY
Efficiency =1533000=46.00%
3332897
STEAM / KWh
Steam / KWh =13855000=9.04Kg / KWH
1533000
5.4 MWTG
J.K PAPER MILLS : JAYKAYPUR
POWER BLOCK
TURBINE EFFICIENCY FOR 5.4 MWTG FOR THE MONTH OFAPRIL 2001
TARGETEfficency: 42.0 + / - 1.5 %
Steam / KWh: 9.4 + / - 0.5 Kg / Kwh
INPUT DATA
STEAMPressureTemperatureEnthalpyQuantity
UNITKg / Cm2oCKCal / KgMT
H.P3540077033112
M.P10.528071513061
L.P3.619067711034
Condensate-0.8250509017
Power Generated :3486290KWh
ENERGY INPUT
By M.P Extraction :(770-715)*13061*1000/860=835297KWh
Equivalent H.P Steam :835297*860 / 770*1000=933Tons
By L.P Extraction :(770-677)*11034*1000/860=1193212KWh
Equivalent H.P Steam :1193212*860 / 770*1000=1333Tons
By Condesate :(773-50)*9017*1000/860=7549116KWh
Total :=9577624KWh
EFFICIENCY
Efficiency =3486290=36.40%
9577624
STEAM / KWh
Steam / KWh =33112000=9.50Kg / KWH
3486290
12 MWTG
J.K PAPER MILLS : JAYKAYPUR
POWER BLOCK
TURBINE EFFICIENCY FOR 12 MWTG FOR THE MONTH OF APRIL 2001
TARGETEfficency: 42.0 + / - 1.5 %
Steam / KWh: 9.7 + / - 0.5 Kg / Kwh
INPUT DATA
STEAMPressureTemperatureEnthalpyQuantity
UNITKg / Cm2oCKCal / KgMT
H.P3440677371042
M.P1633874513639
L.P322569542538
Condensate-0.6757514865
Power Generated :7223800KWh
ENERGY INPUT
By M.P Extraction :(773-745)*13639*1000/860=444060KWh
Equivalent H.P Steam :444060*860 / 773*1000=494Tons
By L.P Extraction :(773-695)*42538*1000/860=3858098KWh
Equivalent H.P Steam :3858098*860 / 773*1000=4292Tons
By Condesate :(773-75)*14865*1000/860=12064849KWh
Total :=16367007KWh
EFFICIENCY
Efficiency =7223800=44.14%
16367007
STEAM / KWh
Steam / KWh =71042000=9.83Kg / KWH
7223800
-
Boiler Water Treatment Chemical (Conditioning Chemical) For Boiler water treatment the following Chemicals are used:1. Indion-5203( Filming Amine): used as 8 PPM on Make up Water.2. Indion-5164(pH Booster): used as a Contingency Chemical.Depending on the pH in Boiler water it is dosed as 1 to 2 PPM on Make up Water.3. Hydrazine Hydrate: used as Passivation When Boilers are in Ideal Conditions.
-
Cooling tower Treatment Chemical There are 3 Nos of Cooling towers:Three Cell Cooling towerFour Cell Cooling towerSingle Cell Cooling towerFollowing chemicals are used :Anti scaling & AnticorrosionBio despersentBiocidesSulphuric Acid
Cooling tower Water quality pH = 7.8 to 8.0 COC = 3 to 5
-
12MW COOLING TOWER FILL DEPOSIT CLEANING We are planning to remove the fill deposit with NALCO Chemicals :1. Nalco 73550 : This is a Biodetergent . It will remove the deposits through a combination of Chemical solubilization and Physical scrubbing .2. Nalco 90001 : Quaternary ammonium biocide.3. Sodium Hypochlorite : As per the system requirement.
-
END OF THE PRESENTATION