DM PLANT BASICS

TRANSCRIPT

  • DEMINERALISATION PLANTPRESENTATION ON

  • MGFACFLBCDEGASSERTOWERWBASBAMBDM PLANT FLOW DIAGRAMG.C.TANK-1G.C.TANK-11DM WATER.TANKDM WATER CONDENSATES FROM 1.All Paper Machines 2.New Fiber line 3.P.D.Plant 4.Coating Plant 5.Turbines etc.Fresh water6.Evaporator-3 300 m3 110 m3100 m3MGF: Multi gravel filter.ACF: Activated carbon filter.LBC : Layered bed cation.WBA: Weak base anion.SBA : Strong base anion.MB : Mixed bed.

  • IMPORTANCE OF DIFFERENT UNITS MGF : Contains gravels with different grade of pebbles. It will remove suspended matter (TOTAL SUPENDED SOLIDS).

    ACF : Contains Activated Carbons AC is defined as highly porous,carbonaceous material.The very large porosity provides a large surface area,which results in exceptional adsorptive properties.Works: Adsorbs Organic load & Chlorine.

  • LBC: This is having Strong and Weak Cation resins. ( Indion-525 H= 2740 Lts and Indion-236 H=4160 Lts).Here flow of water is from top to bottom and flow of regenerant is from bottom to top.It absorbs hardness : Na,Ca & Mg.These are exchanged with Hydrogen on the resin. In regeneration : Na,Ca & Mg ions. are replaced by Hydrogen ions Reactions: RESINS- H + ions + Water CaCl2,MgSo4,NaCl RESINS-Ca +HCl , H2So4

    +HCl RESINS- H + ions+CaCl2,CaSo4 (Drained during regeneration )

  • DEGASSER: Here Carbon dioxide is removed. Reactions: Carbonic Acid + Air by blower Carbon dioxide + WaterWBA : It is having weak anion resin.(Indion-850 Resin = 2350 Lts) It will absorb all the Free mineral acidity in cation treated water. FMA: Conversation of neutral salt (Chloride,Sulphate & Nitrate ) to their respective mineral acids. EMA: Equivalent mineral Acidity a measure of the neutral salts (Chloride,Sulphate & Nitrate ) content of the water. EMA-FMA = Sodium Slip

  • SBA: This is having Strong anion resins. ( Indion-FFIP = 5690 Lts).Here flow of water is from top to bottom and flow of regenerant is from bottom to top. It absorbs : Chloride,Sulphate,Nitrate and Silica Reactions: RESINS- OH - ions + HCl,H2So4,

    RESINS-Cl, So4 + H2O

    +NaOH RESINS- OH - ions+ NaCl,Na2So4 (Drained during regeneration )

  • MB: This the final polishing unit. It contains both cation and anion resins ( Indion-FFIP=1210 Lts and Indion-225 H=2360 Lts) . If there is some traces of hardness and anions leakages,then these are absorbs in MB. Cation resins : are regenerated with HCl. Anion resins : are regenerated with NaOH.DM Water Parameters1.pH = 6.8 to 7.22.Conductivity = 0.5 PPM ( Max)3.Silica = 0.02 PPM ( Max)4.Total Hardness = NiL

  • Boiler water parameters1.pH = 8.7 to 9.52.Silica = 5 PPM (Max)3.Total Dissolved Solid = 50 PPM(Max)4.Total Hardness = NILSteam 1.pH = 8.5 to 9.02.Silica = 0.02 PPM (Max)3.Total Dissolved Solid = 8 Micro Simens/Cm(Max)4.Total Hardness = NIL

  • Return Condensate1.pH = 8.5 to 9.02.Silica = 0.02 PPM (Max)3.Conductivity = 8 PPM(Max)4.Total Hardness = NIL

  • Return Condensate received at G.C.TankAll Paper Machines ( 5 Nos)PD PlantCoating PlantFiber LineTG Sets ( 3 Nos)Evaporators ( 2 Nos)Condensate from LFB-4CFB-5 Feed Water Heater

  • CONDENSATE BALANCETotal Feed water =DM Water ( Make up) + Return Condensate.Make Up Water = 30 % Return Condensate = 70 % Steam Generated = 4051 M3/Day Expected Condensate = 3195 M3/Day ( 68.28 % ) Actual Condensate received = 2888 M3/Day ( 82.40 % ) Deviation of Condensate = 307 M3/Day ( 14.13 % ) Make up Water = 1276 M3/Day ( 31.41% ) Total CBD/IBD = 41 M3/Day Total Feed Water = 4092 M3/Day

  • FF-MM

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    DAILY RETURN CONDENSATE BALANCE

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    LPMPHPTOTALNON RECOVRABLERECOVARABLEEXPECTEDACTUALDEVIATION

    MTMTMTMTMTMT%M3%M3%M3

    1PAPER MACHINES

    AP M/C I33300333303038628883275413Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II0620622599156895521Dandy shower 4%

    CP M/C III23600236223494222831951127Dandy shower 1%

    DP M/C IV148001484144921379113512Dandy shower 3%

    EP M/C V1750017525151821437913835Dandy shower 2%,starch prep.12%

    TOTAL M/C893620954648918984684798548

    2PD PLANT36003603695347025259

    3COATING PLANT0

    AHEAT EXCHANGER065065065956270452516Exhaust vent loss 1%

    BDRYERS CYLINDERS20002002095197014255

    CSUPER CALENDER1200120129511708253

    COATING PLANT TOTAL3265097097959270682524

    4PULP MILL0

    ARDH03780378037895359702652595

    BFIBRE LINE213002132130000Warm water tank,Bleaching.

    CCHLORINE GASSIFIER3900390399537009537

    DClO2 PLANT30003022723700237Chiller

    P/MILL TOTAL2813780659235424614034026521138

    5S.R. PLANT0

    ACAUSTICIZING0

    a) MAKING HOT WATER3600363600001.52 T/Hr steam is used

    b) GREEN LIQUOR HEATING49004904995460095462 T/Hr steam is used

    c) FORMAINTAINING CAUSTICIZER TEMP2600262600001.08 T/Hr steam is used

    d) SPOUT USE1000101000000.4 T/Hr steam is used

    CAUSTICIZING TOTAL1210012173493846003846

    BEVAPORATOR-I0

    a) FIRST BODY000000000000

    b) PRE-HEATER000000000000Ejector running 21 Hr @ 1T/Hr Steam used

    c) STEAM JET EJECTOR000000000000

    EVAPORATOR-I TOTAL000000000000

    CEVAPORATOR-III0

    a) FINISHER BODY50700507050795481814101471

    b) STEAM JET EJECTOR090990000Ejector running 263 Hr @ 1T/Hr Steam used

    EVAPORATOR-III TOTAL5079051695079348185439842

    DLFB 40

    a) DEAERATOR60006006095579557002.5 T/Hr Steam is used

    b) B/L HEATER0909900.37T/Hr Steam is used

    c) AIR HEATER57238008095769576003.33 T/Hr Steam is used

    d) SMELT SHATTERING0707700000.27 T/Hr Steam is used

    e) CASCADE FOR B/L HEATING0110111100000.46 T/Hr Steam is used

    f) SOOT BLOWER0022222200000.926 T /Hr Steam is used

    g) OIL HEATING & TRACING01101101195119511000.46 T/Hr Steam is used

    h) LINE FLUSHING0220222200000.92 T/Hr Steam is used

    LFB 4 TOTAL65132262227115165144651440

    ELFB 50

    a) DEAERATOR66006606695629562002.6 T/Hr Steam used

    b) B/L HEATER070725494494000.3 T/Hr Steam used

    c) AIR HEATER4633710719568956800LP=0.18 T/Hr,MP=2.64 T/Hr & HP=0.139 T/Hr Steam used

    d) SMELT SHATTERING0505500000.197 T/Hr Steam is used

    e) SOOT BLOWER00241241242170001 T/Hr Steam is used

    f) OIL HEATING & TRACING0505500000.197 T/Hr Steam is used

    g) LINE FLUSHING0505500000.197 T/Hr Steam is used

    LFB 5 TOTAL708524439940358331333313300

    6CFB INTERNAL0

    a) CFB-5 FEED WATER HEATER72007207295699569003 T/Hr Steam is used

    b) DEAERATORS25700257025795244952440010.69 T/Hr Steam is used

    7TURBINE00703703070310070310070300

    8CBD004141041000

    9STEAM BLOW001515150000

    GRAND TOTAL FEED WATER23347301050409250735857831957128878308

    Water used for Steam Generation ( 4092 M3 ) = Steam Generated ( 4051 M3) + CBD Losses ( 41 M3)

    Total Steam Generation = 4051 M3/Day

    Total Feed water =4092 M3/Day

    Total Expected Condensate =3195 M3/Day ( 78 %)

    Actual Condensate received = 2887 M3/Day ( 71 %)

    Condensate to be recovered ( Deviation) = 308 M3/Day ( 8 %)

    Gen Manager (Power Block)

    Sheet6

    NOV-05

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR THE MONTH OF NOV-05

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    LPMPHPTOTALNON RECOVRABLERECOVARABLEEXPECTEDACTUALDEVIATION

    MTMTMTMTMTMT%M3%M3%M3

    1PAPER MACHINES

    AP M/C I9994009994900909486.4863969.16907171732Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II018580185874178491.2169570.8131520380Dandy shower 4%

    CP M/C III707700707771700694.0665670.85012231644Dandy shower 1%

    DP M/C IV4449004449134431592.1409979.2352213577Dandy shower 3%

    EP M/C V5255005255736451981.7429369.8367012623Dandy shower 2%,starch prep.12%

    TOTAL M/C26775185802863319152671888.6253827120426174956

    2PD PLANT10750010750107595.010217075325269

    3COATING PLANT0

    AHEAT EXCHANGER01946019460194695.0184970.0136225487Exhaust vent loss 1%

    BDRYERS CYLINDERS60100601060195.057170.042125150

    CSUPER CALENDER35000350035095.033370.02452588

    COATING PLANT TOTAL9511946028970289795.0275270202825724

    4PULP MILL0

    ARDH01134601134601134695.01077970.07942252837

    BFIBRE LINE6384006384638400.00.00Warm water tank,Bleaching.

    CCHLORINE GASSIFIER11600011600116095.011020.00951102

    DClO2 PLANT8900089067421623.12050.0023205Chiller

    P/MILL TOTAL84341134601978070581272261.112086407942214144

    5S.R. PLANT0

    ACAUSTICIZING0

    a) MAKING HOT WATER1092001092109200.00.001.52 T/Hr steam is used

    b) GREEN LIQUOR HEATING14550014550145595.013820.009513822 T/Hr steam is used

    c) FORMAINTAINING CAUSTICIZER TEMP7820078278200.00.001.08 T/Hr steam is used

    d) SPOUT USE3120031231200.00.000.4 T/Hr steam is used

    CAUSTICIZING TOTAL36410036412186145538.013820.00381382

    BEVAPORATOR-I0

    a) FIRST BODY87008708795.0830.009583

    b) PRE-HEATER22002202295.0210.009521Ejector running 21 Hr @ 1T/Hr Steam used

    c) STEAM JET EJECTOR0210212100.00.00

    EVAPORATOR-I TOTAL1092101302110979.71040.0080104

    CEVAPORATOR-III0

    a) FINISHER BODY15205001520501520595.01444572.511018233427

    b) STEAM JET EJECTOR0263026326300.00.00Ejector running 263 Hr @ 1T/Hr Steam used

    EVAPORATOR-III TOTAL152052630154682631520593.4144457111018223427

    DLFB 40

    a) DEAERATOR18000018000180095.0171095.01710002.5 T/Hr Steam is used

    b) B/L HEATER0267026726700.37T/Hr Steam is used

    c) AIR HEATER150215010024000240095.0228095.02280003.33 T/Hr Steam is used

    d) SMELT SHATTERING0199019919900.00.000.27 T/Hr Steam is used

    e) CASCADE FOR B/L HEATING0333033333300.00.000.46 T/Hr Steam is used

    f) SOOT BLOWER0066766766700.00.000.926 T /Hr Steam is used

    g) OIL HEATING & TRACING03330333033394.931694.9316000.46 T/Hr Steam is used

    h) LINE FLUSHING0667066766700.00.000.92 T/Hr Steam is used

    LFB 4 TOTAL1950394976766662133453364.643066543060

    ELFB 50

    a) DEAERATOR19680019680196895.0187095.01870002.6 T/Hr Steam used

    b) B/L HEATER021902196515449.210849.2108000.3 T/Hr Steam used

    c) AIR HEATER132190010021320213295.0202595.0202500LP=0.18 T/Hr,MP=2.64 T/Hr & HP=0.139 T/Hr Steam used

    d) SMELT SHATTERING0142014214200.00.000.197 T/Hr Steam is used

    e) SOOT BLOWER0072272272200.00.001 T/Hr Steam is used

    f) OIL HEATING & TRACING0142014214200.00.000.197 T/Hr Steam is used

    g) LINE FLUSHING0142014214200.00.000.197 T/Hr Steam is used

    LFB 5 TOTAL2100254582254671213425473.2400373400300

    6CFB INTERNAL0

    a) CFB-5 FEED WATER HEATER21730021730217395.0206495.02064003 T/Hr Steam is used

    b) DEAERATORS77030077030770395.0731895.073180010.69 T/Hr Steam is used

    7TURBINE00211002110002110010021100100.02110000

    8CBD0012191219012190.00.00

    9STEAM BLOW0017717717700.00.00

    GRAND TOTAL FEED WATER70116219072410611612914966101163839596370809581315005

    Water used for Steam Generation ( 116129 M3 ) = Steam Generated ( 114910 M3) + CBD Losses ( 1219 M3)

    705

    Total DM Water Make up = 38171 M3

    DM Water Supplied to ClO2 Plant = 150 M3

    DM Water Supplied to Boiler for Hydraulic use = 650 M3

    DM Water Supplied to Vedanta Alumina = 200 M3

    Total DM Water extra used = 1000 M3

    DM Water used for regeneration =2000 M3

    Actual DM Water Make up = 35171 M3

    (Flash losses=10%,Trap losses=5% consedered)

    Gen Manager (Power Block)

    Sheet7

    J.K. PAPER MILLS : JAYKAPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE IN M3 FOR THE MONTH OF APRIL - 03

    SUB SOIL WELL

    WATER

    120800

    978177931597157893

    RIVER37093

    NAGAVALI931597

    46580TO MILLSEffluent

    894504

    DESLUDGING134209

    LOSSESBore Well Water

    25719

    RC408519276822303350000340015704

    7210342000239874116032899038148272007461

    5500

    111840851

    1118

    +5500C.T. of Evp-3

    3992441160

    551788130

    52442222693

    Process: 28455m3 / day

    D.M. Plant:1362m3 / day316630457783230708813348

    Domestic: 5263m3 / day2186127360684047500

    Recycled water used in Pulp Mill 10966 m3 / day

    Recycled water used in Evp.- III cooling tower (from compressor) 1372 m3 / day

    Recycled water used in Chipper 960 m3 / day

    Bore Well Water is used in Pulp Mill as 857 m3/Day

    R.C =Return condensate 2403m3 / day

    Others: Amn,gardening,toilets, canteen

    WATER IN TAKE

    CLARIFIER

    RESERVOIR

    DOMESTIC PURPOSE

    POWER BOILER

    DM PLANT

    COMPRESSOR HOUSE

    PB COOLING TOWER

    RECOVERY BOILER

    PULP MILL + CHIPPER

    P.D. PLANT

    PAPER MACHINES

    OTHERS

    WATER RECLAMATION PLANT

    EFFLUENT TREATMENT PLANT 837616

    COOLING TOWER

    COOLING TOWER

    Sheet1

    LOSS DUE TO POOR(OLD) INSULATION

    POWER BLOCK

    AVE.AMB.TEMP. 28DATE 17 01 2002

    AVE.EXP.TEMP.AFT.INS. 38

    SL.NOLOCATIONAREA (APPOX)AVE.SKIN TEMP.PRESENT EXTRA TEMP.MONEY LOSS/DAYCOST OF INS.PAY BACK

    12.5 MWTG

    H P HEADER20592114000

    2M P HEADER256931

    3L P HEADER306224

    5.4MWTG

    4H P HEADER205517

    6CFB 1&2

    H P LINE1005618

    7CFB-4 HP LINE

    AFTER R/V707638

    8CFB-1&2

    STEAM DRUM306729

    9CFB 2&5

    ESP90

    10TOTAL405

    ENERGY LOSS =114 W / 0C / M2 ( REF M/S JNM DATA BOOK PAGE 1&6 )GCV OF COAL = 4000 k cal / kg

    =114 X 1 cal/s/0c/m2Boiler Efficiency = 85 %

    4.18Cost of coal = Rs 950 /-per ton

    =114 X 60 X 60 X24kcal / day / 0c / m2savingEnergy loss x Cost of coal x Extra temp

    4.18 X 1000GCV of Coal x boiler efficency

    =2356kcal / day / 0c / m2

    steam

    J.K PAPER MILLS,JAYKAY PUR

    POWER BLOCK

    STEAM BALANCING INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTION

    (ON DAY AVE.FOR THE MONTH OFJULY 2000)

    BASESI.NODESCRIPTIONPRODUCTIONSTEAM MTACTUALTARGETREMARKS

    MTHPMPLPEQV.HPT/TT/T

    PAPER MACHINE -- I973262902.992.94

    -- II14.479714.884.82

    -- III92.973092752.963

    -- IV28.45108963.383.3

    -- V55.581911703.062.97

    1TOTAL288.45799349023.133.1

    PD2PD PLANT (AD)13.8751453.273.13

    RDH4413921.451.34

    PULPFIBER LINE2382120.780.8

    GASSIFIER36320.120.13

    CLO2 PLANT57510.190.26

    3TOTAL2714413316872.542.53

    PULPEVAPORATOR4724201.551.4

    C.S PLANT1191060.390.38

    LF BOILER IV4060601470.540.59

    LF BOILER V6091912220.820.7

    4TOTAL2711001517428953.33.07

    5CF BOILER'S INTERNAL USE288.452522240.780.74

    6STEAM BLOW OUT ,RADIATION288.4552520.180.18Steam blow =2 T Rest losses

    PAPERAND TRAP LOSS.

    7STEAM TO TURBINE288.457614726410383.63.28Condensate +equivalent enrgy drop in extractions

    8STEAM TO TURBINES & POWER288.458134751613144.564.2Steam for PH +CFB Int+Losses (5+6+7)

    BOILERS.

    9TOTAL STEAM288.459137182574384313.3212.19

    PULP10STEAM FOR PULP(3+4)271100592107315825.845.6Steam consumed in Pulp Mill & Recovery

    11SCREW PULP (AD)42.392235.845.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP

    12SALABLE PULP (BD)50.65341Steam for salable pulp + steam for PD sheet

    (SCREW PULP+PD SHEET)0.9

    13PULP FOR PAPER(1-13)220.3512875.845.6Total Pulp - Salable Pulp,i.e(10-12)

    PAPER14PROCESS STEAM FOR PAPER288.4521887.67.25(9-8-12)

    NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE.

    Kg/CM2DEG.CK.cal/Kg

    HP STEAM354107751

    MP STEAM92206860.89

    ( MEASURED AFTER INJECTION )

    LP STEAM2.82106880.89

    ( MEASURED BEFORE INJECTION )Gen. Manager (Power Block)

    J.K PAPER MILLS,JAYKAY PURJ.K PAPER MILLS,JAYKAY PUR

    POWER BLOCKQF / 030 / 55POWER BLOCKQF / 030 / 55

    STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001

    FOR APRIL -- 2001Date: 01.05.2001FOR APRIL -- 2001Date: 01.05.2001

    BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATIONBASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION

    MTHPMPLPEQV.HPT/TT/TMTHPMPLPEQV.HPT/TT/T

    This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.

    PAPER MACHINE I29342934112801128010039100393.423.422.94This MonthTodateThis MonthTodatePAPER MACHINE I000.000.002.94This MonthTodateThis MonthTodate

    II43243218751875166916693.863.864.82CFB 1155311553112 MWTG72238007223800II000.000.004.82CFB 112 MWTG

    III2546254673577357654865482.572.573CFB 210422104225.4 MWTG34862903486290III000.000.003CFB 25.4 MWTG

    IV1051105142864286381538153.633.633.3CFB 3300030002.5 MWTG15330001533000IV000.000.003.3CFB 32.5 MWTG

    V1740174049054905436543652.512.512.97CFB 41234612346TOTAL.1224309012243090V000.000.002.97CFB 4TOTAL.

    1TOTAL8703870318751875278282782826436264363.043.043.1CFB 53890038900STEAM1TOTAL000.000.003.1CFB 5STEAM

    PD2PD PLANT (AD)1042104222262226198119811.901.903.13Sub Total.8019980199EXTR - 12670026700PD2PD PLANT (AD)000.000.003.13Sub Total.EXTR - 1

    RDH76527652131501315011704117041.531.531.34LFB 41663416634EXTR - 26499964999RDH000.000.001.34LFB 4EXTR - 2

    PULPFIBER LINE7652765272377237644164410.840.840.8LFB 52262422624Condensate2631026310PULPFIBER LINE000.000.000.8LFB 5Condensate

    GASSIFIER7652765211631163103510350.140.140.13Grand Total119457119457PRDS14481448GASSIFIER000.000.000.13Grand TotalPRDS00

    CLO2 PLANT765276529189188178170.110.110.26Coal1686216862Tot.Equ Coal1794717947CLO2 PLANT000.000.000.26CoalTot.Equ Coal

    3TOTAL7652765213150131509318931819997199972.612.612.53B.Dust656656Steam / Kg of coal4.4694.4693TOTAL000.000.002.53B.DustSteam / Kg of coal0.0000.000

    PULPEVAPORATOR76527652134941349412010120101.571.571.4Charcoal fines636636PULPEVAPORATOR000.000.001.4Charcoal fines

    CAUSTICIZING Plant7652765237133713330533050.430.430.38REMARKSCAUSTICIZING Plant000.000.000.38REMARKS

    LF BOILER IV76527652120012001823182318231823444544450.580.580.5940TPD FOR S/B,REST 50%MP,50%LPLF BOILER IV000.000.000.5940TPD FOR S/B,REST 50%MP,50%LP

    LF BOILER V76527652180018003145314520962096646464640.840.840.760TPD FOR S/B ,REST 60% MP,40%LPLF BOILER V000.000.000.760TPD FOR S/B ,REST 60% MP,40%LP

    4TOTAL765276523000300049684968211262112626224262243.433.433.074TOTAL000.000.003.07

    5CF Boiler's internal8703870384938493755975590.870.870.745CF Boiler's internal000.000.000.74

    6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES87038703339333930.390.390.181163 Tons by Steam Blow and rest by losses.6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES000.000.000.181163 Tons by Steam Blow and rest by losses.

    PAPERPAPER

    7STEAM TO TURBINE870387032631026310142714277065706533868338683.893.893.28Condensate +equivalent enrgy drop in extractions7STEAM TO TURBINE000.000.003.28Condensate +equivalent enrgy drop in extractions

    8STEAM TO TURBINES & POWER BOILERS8703870344820448205.155.154.2Steam for PH +CFB Int+Losses (5+6+7)8STEAM TO TURBINES & POWER BOILERS000.000.004.2Steam for PH +CFB Int+Losses (5+6+7)

    9TOTAL STEAM8703870311945711945713.7313.7312.199TOTAL STEAM000.000.0012.19

    PULP10Steam for Pulp(3+4)7652765246220462206.046.045.6Steam consumed in Pulp Mill & RecoveryPULP10Steam for Pulp(3+4)000.000.005.6Steam consumed in Pulp Mill & Recovery

    11SCREW PULP (AD)52523143146.046.045.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP11SCREW PULP (AD)000.000.005.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP

    12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,9985985792879288.058.05Steam for salable pulp + steam for PD sheet12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,9000.000.00Steam for salable pulp + steam for PD sheet

    13Pulp for Paper(10-12)6667666738292382925.745.745.6Total Pulp - Salable Pulp,i.e(10-12)13Pulp for Paper(10-12)000.000.005.6Total Pulp - Salable Pulp,i.e(10-12)

    Paper14Process Stream for Paper8703870366709667097.677.677.25(9-8-12)Paper14Process Stream for Paper000.000.007.25(9-8-12)

    NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BESTNOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST

    Kg/CM2DEG.CK.cal/KgKg/CM2DEG.CK.cal/Kg

    HP STEAM354107751HP STEAM354107751

    MP STEAM92206860.89( MEASURED AFTER INJECTION )MP STEAM92206860.89( MEASURED AFTER INJECTION )

    LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )

    Gen. Manager (Power Block)Gen. Manager (Power Block)

    J.K PAPER MILLS,JAYKAY PUR

    POWER BLOCKQF / 030 / 55

    STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001

    FOR JUNE -- 2001Date: 01.05.2001

    BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION

    MTHPMPLPEQV.HPT/TT/T

    This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.

    PAPER MACHINE I30828719113683282310118292123.283.352.94This MonthTodateThis MonthTodate

    II440133718305527162949193.703.684.82CFB 1172465011812 MWTG725460021356800

    III260679577429226076612201202.542.533CFB 216999449725.4 MWTG360576010678550

    IV98831294134130203679115883.723.703.3CFB 3045292.5 MWTG15804004683760

    V182553985014150894462134292.452.492.97CFB 4143520718TOTAL.1244076036719110

    1TOTAL89412654018305527279458353926500792692.962.993.1CFB 541713116437STEAM

    PD2PD PLANT (AD)1431357329007501258166761.801.873.13Sub Total.77393236774EXTR - 12688580856

    RDH798023492125743863011191343811.401.461.34LFB 41750551022EXTR - 266010194530

    PULPFIBER LINE7980234927847212516984189130.880.810.8LFB 52565570327Condensate2724280122

    GASSIFIER79802349211703542104131520.130.130.13Grand Total120553358123PRDS4162615

    CLO2 PLANT798023492900273480124330.100.100.26Coal1642149394Tot.Equ Coal1685751926

    3TOTAL798023492125743863099172752720017588802.512.512.53B.Dust6402000Steam / Kg of coal4.5914.560

    PULPEVAPORATOR798023492128123985411403354701.431.511.4Charcoal fines01176

    CAUSTICIZING Plant7980234924239119933773106740.470.450.38REMARKS

    LF BOILER IV7980234921200336017493572174954204313113630.540.480.5940TPD FOR S/B,REST 50%MP,50%LP

    LF BOILER V7980234921800510033416486222762256756164130.850.700.760TPD FOR S/B ,REST 60% MP,40%LP

    4TOTAL79802349230008460509010058210276349226244739203.293.153.07

    5CF Boiler's internal8941265408267252427358224650.820.850.74

    6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES8941265402975144480.330.540.18761 Tons by Steam Blow and rest by losses.

    PAPER

    7STEAM TO TURBINE894126540272428012210784049750221056348781024653.903.863.28Condensate +equivalent enrgy drop in extractions

    8STEAM TO TURBINES & POWER BOILERS894126540452111393795.065.254.2Steam for PH +CFB Int+Losses (5+6+7)

    9TOTAL STEAM89412654012055335812313.4813.4912.19

    PULP10Steam for Pulp(3+4)798023492462611327995.805.655.6Steam consumed in Pulp Mill & Recovery

    11SCREW PULP (AD)011806675.805.655.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP

    12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,91288332210047254547.807.66Steam for salable pulp + steam for PD sheet

    13Pulp for Paper(10-12)669220170362141073455.415.325.6Total Pulp - Salable Pulp,i.e(10-12)

    Paper14Process Stream for Paper894126540652951932897.307.287.25(9-8-12)

    NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST

    Kg/CM2DEG.CK.cal/Kg

    HP STEAM354107751

    MP STEAM92206860.89( MEASURED AFTER INJECTION )

    LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )

    Gen. Manager (Power Block)

    J.K PAPER MILLS,JAYKAY PUR

    POWER BLOCKQF / 030 / 55

    STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001

    FOR JULY -- 2001Date: 01.05.2001

    BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION

    MTHPMPLPEQV.HPT/TT/T

    This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.

    PAPER MACHINE I29821170110604434279438386503.163.302.94This MonthTodateThis MonthTodate

    II396173316177144143963583.633.674.82CFB 1176506776812 MWTG736750028724300

    III2490104476920295276159262792.472.523CFB 217879628515.4 MWTG335892014037470

    IV105641854325173453849154373.653.693.3CFB 3045292.5 MWTG16008766284636

    V171571134931200204389178182.562.502.97CFB 4288823606TOTAL.1232729649046406

    1TOTAL8639351791617714426780110319252731045422.932.973.1CFB 542651159088STEAM

    PD2PD PLANT (AD)12874860281310314250491791.951.893.13Sub Total.81068317842EXTR - 124801105657

    RDH770131193115115014110245446251.331.431.34LFB 41427365295EXTR - 267684262214

    PULPFIBER LINE7701311937416286676600255140.860.820.8LFB 52596896295Condensate28501108623

    GASSIFIER77013119311904732105942110.140.140.13Grand Total121309479432PRDS3232938

    CLO2 PLANT770131193922365682132540.110.100.26Coal1796867362Tot.Equ Coal1801369939

    3TOTAL770131193115115014195283705518725776042.432.492.53B.Dust662066Steam / Kg of coal4.5014.545

    PULPEVAPORATOR770131193132665312011807472771.531.521.4Charcoal fines01176

    CAUSTICIZING Plant7701311934399163923915145890.510.470.38REMARKS

    LF BOILER IV7701311931240460013664939136667863671150350.480.480.5940TPD FOR S/B,REST 50%MP,50%LP

    LF BOILER V7701311931860696034339919228985146953233650.900.750.760TPD FOR S/B ,REST 60% MP,40%LP

    4TOTAL7701311933100115604799148582132084812263461002663.423.213.07

    5CF Boiler's internal8639351799024342668031304970.930.870.74

    6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES8639351793228176760.370.500.182316 Tons by Steam Blow and rest by losses.

    PAPER

    7STEAM TO TURBINE8639351792850110862314925541828429340372021396674.313.973.28Condensate +equivalent enrgy drop in extractions

    8STEAM TO TURBINES & POWER BOILERS863935179484611878405.615.344.2Steam for PH +CFB Int+Losses (5+6+7)

    9TOTAL STEAM86393517912130947943214.0413.6312.19

    PULP10Steam for Pulp(3+4)770131193450711778715.855.705.6Steam consumed in Pulp Mill & Recovery

    11SCREW PULP (AD)011806730.005.705.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP

    12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,9115844802504347272.167.75Steam for salable pulp + steam for PD sheet

    13Pulp for Paper(10-12)654326713425671431446.515.365.6Total Pulp - Salable Pulp,i.e(10-12)

    Paper14Process Stream for Paper863935179703442568668.147.307.25(9-8-12)

    NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST

    Kg/CM2DEG.CK.cal/Kg

    HP STEAM354107751

    MP STEAM92206860.89( MEASURED AFTER INJECTION )

    LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )

    Gen. Manager (Power Block)

    N190=L190/D190

    J.K PAPER MILLS,JAYKAY PUR

    POWER BLOCKQF / 030 / 55

    STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001

    FOR AUGUST -- 2001Date: 01.05.2001

    BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION

    MTHPMPLPEQV.HPT/TT/T

    This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.

    PAPER MACHINE I31161481710598540259432480823.033.252.94This MonthTodateThis MonthTodate

    II440217317298873153978973.503.634.82CFB 1175928536012 MWTG578690034511200

    III2878133257997375247117333962.472.513CFB 218328811795.4 MWTG350424017541710

    IV107652614257216023789192263.523.653.3CFB 3335078792.5 MWTG15832007867836

    V164087534820248404290221082.622.532.97CFB 4751731123TOTAL.1087434059920746

    1TOTAL9150443291729887327672137991261671307092.862.953.1CFB 528157187245STEAM

    PD2PD PLANT (AD)167865383533138473144123241.871.883.13Sub Total.74944392786EXTR - 123444129101

    RDH850339696113316147210085547101.191.381.34LFB 41761482909EXTR - 260112322326

    PULPFIBER LINE8503396966856355236102316150.720.800.8LFB 524417120712Condensate23542132165

    GASSIFIER85033969611805912105052620.120.130.13Grand Total116975596407PRDS987712815

    CLO2 PLANT850339696910456681040640.100.100.26Coal1679084152Tot.Equ Coal1679086729

    3TOTAL850339696113316147289464600118047956512.122.412.53B.Dust02066Steam / Kg of coal4.4644.529

    PULPEVAPORATOR850339696130326615211598588751.361.481.4Charcoal fines01176

    CAUSTICIZING Plant8503396964613210054106186940.480.470.38REMARKS

    LF BOILER IV8503396961160576018796818188186674506195420.530.490.5940TPD FOR S/B,REST 50%MP,50%LP

    LF BOILER V850339696180087603443133622295108096907302720.810.760.760TPD FOR S/B ,REST 60% MP,40%LP

    4TOTAL85033969629601452053222018021821106633271171273843.193.213.07

    5CF Boiler's internal9150443298694429607738382340.850.860.74

    6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES9150443293006206810.330.470.181426 Tons by Steam Blow and rest by losses.

    PAPER

    7STEAM TO TURBINE9150443292354213216514807021775037090317571714243.473.873.28Condensate +equivalent enrgy drop in extractions

    8STEAM TO TURBINES & POWER BOILERS915044329425002303404.645.204.2Steam for PH +CFB Int+Losses (5+6+7)

    9TOTAL STEAM91504432911697559640712.7813.4512.19

    PULP10Steam for Pulp(3+4)850339696451642230355.315.625.6Steam consumed in Pulp Mill & Recovery

    11SCREW PULP (AD)011806630.005.625.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP

    12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,9151059903144459812.087.68Steam for salable pulp + steam for PD sheet

    13Pulp for Paper(10-12)699333706420191770536.015.255.6Total Pulp - Salable Pulp,i.e(10-12)

    Paper14Process Stream for Paper915044329713313200867.807.227.25(9-8-12)

    NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST

    Kg/CM2DEG.CK.cal/Kg

    HP STEAM354107751

    MP STEAM92206860.89( MEASURED AFTER INJECTION )

    LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )

    Gen. Manager (Power Block)

    J.K PAPER MILLS,JAYKAY PUR

    POWER BLOCKQF / 030 / 55

    STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001

    FOR SEPTEMBER -- 2001Date: 01.05.2001

    BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION

    MTHPMPLPEQV.HPT/TT/T

    This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.

    PAPER MACHINE I28811769810230642559105571873.163.232.94This MonthTodateThis MonthTodate

    II4302603171610589152794243.553.624.82CFB 11485010021012 MWTG615650040667700

    III2362156877030445546257396532.652.533CFB 214848960275.4 MWTG351700021058710

    IV95162123903255053474226993.653.653.3CFB 320680852.5 MWTG15225009390336

    V1623103764900297404361264692.692.552.97CFB 4379634919TOTAL.1119600071116746

    1TOTAL82475257617161058926063164054247231554323.002.963.1CFB 539274226519STEAM

    PD2PD PLANT (AD)180183394077179243629159522.011.913.13Sub Total.72974465760EXTR - 125638154739

    RDH816047856119447341610630653401.301.371.34LFB 418185101094EXTR - 259618381944

    PULPFIBER LINE8160478567126426496342379580.780.790.8LFB 522727143439Condensate22451154616

    GASSIFIER81604785611607072103262940.130.130.13Grand Total113886710293PRDS617918994

    CLO2 PLANT816047856898546479948630.100.100.26Coal1554199693Tot.Equ Coal15955102684

    3TOTAL8160478561194473416918455185188041144552.302.392.53B.Dust6162682Steam / Kg of coal4.5744.536

    PULPEVAPORATOR816047856130557920711619704941.421.471.4Charcoal fines01176

    CAUSTICIZING Plant8160478564410254153925226190.480.470.38REMARKS

    LF BOILER IV81604785611206880191887361917105844533240750.560.500.5940TPD FOR S/B,REST 50%MP,50%LP

    LF BOILER V8160478561680104403188165502126129356409366820.790.770.760TPD FOR S/B ,REST 60% MP,40%LP

    4TOTAL81604785628001732051062528621508128141264861538703.253.223.07

    5CF Boiler's internal8247525768589515497644458790.930.870.74

    6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES8247525762336230180.280.440.18448 Tons by Steam Blow and rest by losses.

    PAPER

    7STEAM TO TURBINE8247525762245115461612818302749744587302632016873.673.843.28Condensate +equivalent enrgy drop in extractions

    8STEAM TO TURBINES & POWER BOILERS824752576402442705834.885.154.2Steam for PH +CFB Int+Losses (5+6+7)

    9TOTAL STEAM82475257611388671029313.8113.5112.19

    PULP10Steam for Pulp(3+4)816047856452902683255.555.615.6Steam consumed in Pulp Mill & Recovery

    11SCREW PULP (AD)011806620.005.615.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP

    12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,9162176113629586282.247.70Steam for salable pulp + steam for PD sheet

    13Pulp for Paper(10-12)653940245416622096976.375.215.6Total Pulp - Salable Pulp,i.e(10-12)

    Paper14Process Stream for Paper824752576700143810818.497.257.25(9-8-12)

    NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST

    Kg/CM2DEG.CK.cal/Kg

    HP STEAM354107751

    MP STEAM92206860.89( MEASURED AFTER INJECTION )

    LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )

    Gen. Manager (Power Block)

    J.K PAPER MILLS,JAYKAY PUR

    POWER BLOCKQF / 030 / 55

    STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001

    FOR OCTOBER -- 2001Date: 01.05.2001

    BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION

    MTHPMPLPEQV.HPT/TT/T

    This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.

    PAPER MACHINE I2589202879963742188867660543.423.262.94This MonthTodateThis MonthTodate

    II40130041674122631490109143.723.634.82CFB 11451511472512 MWTG438410045051800

    III2746184337882524367015466682.552.533CFB 2128121088395.4 MWTG368288024741590

    IV109973114377298823896265953.543.643.3CFB 3080852.5 MWTG146800910858345

    V1756121325160349004592310612.622.562.97CFB 472435643TOTAL.953498980651735

    1TOTAL85916116716741226327382191436258601812923.012.963.1CFB 540012266531STEAM

    PD2PD PLANT (AD)151998583416213403040189932.001.933.13Sub Total.68063533823EXTR - 119503174242

    RDH758255438120138542910692760321.411.371.34LFB 416964118058EXTR - 255633437577

    PULPFIBER LINE7582554386064487135397433550.710.780.8LFB 523957167396Condensate18495173111

    GASSIFIER75825543812038275107173650.140.130.13Grand Total108984819277PRDS1535334347

    CLO2 PLANT758255438884634878756500.100.100.26Coal14524114217Tot.Equ Coal14943117627

    3TOTAL7582554381201385429815163336179461324012.372.392.53B.Dust6333315Steam / Kg of coal4.5554.538

    PULPEVAPORATOR758255438123769158311015815091.451.471.4Charcoal fines01176

    CAUSTICIZING Plant7582554384697301124180268000.550.480.38REMARKS

    LF BOILER IV758255438114080201838105741839124234413284870.580.510.5940TPD FOR S/B,REST 50%MP,50%LP

    LF BOILER V7582554381740121803311198612207151426651433330.880.780.760TPD FOR S/B ,REST 60% MP,40%LP

    4TOTAL75825543828802020051493043521119149260262591801293.463.253.07

    5CF Boiler's internal8591611677873594227007528860.820.860.74

    6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES8591611672833258510.330.420.18840 Tons by Steam Blow and rest by losses.

    PAPER

    7STEAM TO TURBINE8591611671849517311112519553722651813260402277273.033.723.28Condensate +equivalent enrgy drop in extractions

    8STEAM TO TURBINES & POWER BOILERS859161167358793064634.185.014.2Steam for PH +CFB Int+Losses (5+6+7)

    9TOTAL STEAM85916116710898481927712.6913.3912.19

    PULP10Steam for Pulp(3+4)758255438442043125295.835.645.6Steam consumed in Pulp Mill & Recovery

    11SCREW PULP (AD)011806650.005.645.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP

    12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,9136789783040696082.227.75Steam for salable pulp + steam for PD sheet

    13Pulp for Paper(10-12)621546460411642429216.625.235.6Total Pulp - Salable Pulp,i.e(10-12)

    Paper14Process Stream for Paper859161167700644432068.167.257.25(9-8-12)

    NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST

    Kg/CM2DEG.CK.cal/Kg

    HP STEAM354107751

    MP STEAM92206860.89( MEASURED AFTER INJECTION )

    LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )

    Gen. Manager (Power Block)

    J.K PAPER MILLS,JAYKAY PUR

    POWER BLOCKQF / 030 / 55

    STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001

    FOR NOVEMBER -- 2001Date: 01.05.2001

    BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION

    MTHPMPLPEQV.HPT/TT/T

    This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.

    PAPER MACHINE I29562324310472846909320753743.153.242.94This MonthTodateThis MonthTodate

    II42534291668139311485123993.493.624.82CFB 11453912926412 MWTG623640051288200

    III2671211047737601736886535542.582.543CFB 2135861224255.4 MWTG310392027845510

    IV89582063777336593362299573.763.653.3CFB 3080852.5 MWTG141580012274145

    V1672138045213401134640357012.772.592.97CFB 4163437277TOTAL.1075612091407855

    1TOTAL86196978616681393127199218635256922069842.982.973.1CFB 540604307135STEAM

    PD2PD PLANT (AD)1680115383717250573308223011.971.933.13Sub Total.70363604186EXTR - 119185193427

    RDH810263540117409716910449864801.291.361.34LFB 417362135420EXTR - 269816507393

    PULPFIBER LINE8102635406185548985505488590.680.770.8LFB 523773191169Condensate20836193947

    GASSIFIER81026354011509425102483880.130.130.13Grand Total111498930775PRDS166136008

    CLO2 PLANT810263540880722878364330.100.100.26Coal14768128985Tot.Equ Coal15307132934

    3TOTAL8102635401174097169821571551177601501612.192.362.53B.Dust7954110Steam / Kg of coal4.5974.545

    PULPEVAPORATOR8102635401224110382410894924031.341.451.4Charcoal fines01176

    CAUSTICIZING Plant8102635405076351884518313170.560.490.38REMARKS

    LF BOILER IV810263540120092201861124351862142854513330010.560.520.5940TPD FOR S/B,REST 50%MP,50%LP

    LF BOILER V8102635401800139803153230142102172446477498100.800.780.760TPD FOR S/B ,REST 60% MP,40%LP

    4TOTAL81026354030002320050143544921281170541264032065313.263.253.07

    5CF Boiler's internal8619697868465678877534604190.870.870.74

    6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES8619697861896277470.220.400.18362 Tons by Steam Blow and rest by losses.

    PAPER

    7STEAM TO TURBINE86196978620836193947105810611800959822289062566323.353.683.28Condensate +equivalent enrgy drop in extractions

    8STEAM TO TURBINES & POWER BOILERS861969786383363447994.454.944.2Steam for PH +CFB Int+Losses (5+6+7)

    9TOTAL STEAM86196978611149893077512.9413.3412.19

    PULP10Steam for Pulp(3+4)810263540441633566925.455.615.6Steam consumed in Pulp Mill & Recovery

    11SCREW PULP (AD)011806620.005.615.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP

    12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,91512104909157811906.067.74Steam for salable pulp + steam for PD sheet

    13Pulp for Paper(10-12)659053050350052755025.315.195.6Total Pulp - Salable Pulp,i.e(10-12)

    Paper14Process Stream for Paper861969786640055047867.437.237.25(9-8-12)

    NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST

    Kg/CM2DEG.CK.cal/Kg

    HP STEAM354107751

    MP STEAM92206860.89( MEASURED AFTER INJECTION )

    LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )

    Gen. Manager (Power Block)

    J.K PAPER MILLS,JAYKAY PUR

    POWER BLOCKQF / 030 / 55

    STEAM DISTRIBUTION INTERMS OF EQUIVALENT HP STEAM / TON OF MACHINE PRODUCTIONRev. No. 001

    FOR DECEMBER -- 2001Date: 01.05.2001

    BASESI.NODESCRIPTIONProductionSTEAM MTACTUALTARGETSTEAM & POWER GENERATION

    MTHPMPLPEQV.HPT/TT/T

    This MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateThis MonthTodateBOILERTotal Gen.TGTotal Gen.

    PAPER MACHINE I2997262400846900753740.002.872.94This MonthTodateThis MonthTodate

    II45438830139310123990.003.194.82CFB 1012926412 MWTG051288200

    III2878239820601730535540.002.233CFB 201224255.4 MWTG027845510

    IV119682060336590299570.003.653.3CFB 3080852.5 MWTG012274145

    V1702155060401130357010.002.302.97CFB 4037277TOTAL.091407855

    1TOTAL922777817013931021863502069840.002.663.1CFB 50307135STEAM

    PD2PD PLANT (AD)1263128010250570223010.001.743.13Sub Total.0604186EXTR - 10193427

    RDH8201717410971690864800.001.211.34LFB 40135420EXTR - 20507393

    PULPFIBER LINE8201717410548980488590.000.680.8LFB 50191169Condensate0193947

    GASSIFIER82017174109425083880.000.120.13Grand Total0930775PRDS036008

    CLO2 PLANT82017174107228064330.000.090.26Coal0128985Tot.Equ Coal0132934

    3TOTAL82017174109716907155101501610.002.092.53B.Dust04110Steam / Kg of coal0.0004.545

    PULPEVAPORATOR82017174101038240924030.001.291.4Charcoal fines01176

    CAUSTICIZING Plant8201717410351880313170.000.440.38REMARKS

    LF BOILER IV820171741092200124350142850330010.000.460.5940TPD FOR S/B,REST 50%MP,50%LP

    LF BOILER V8201717410139800230140172440498100.000.690.760TPD FOR S/B ,REST 60% MP,40%LP

    4TOTAL820171741023200035449017054102065310.002.883.07

    5CF Boiler's internal9227778170678870604190.000.780.74

    6STEAM BLOW OUT ,RADIATION AND TRAP LOSSES9227778170277470.000.360.18362 Tons by Steam Blow and rest by losses.

    PAPER

    7STEAM TO TURBINE922777817019394701061105982202566320.003.303.28Condensate +equivalent enrgy drop in extractions

    8STEAM TO TURBINES & POWER BOILERS92277781703447990.004.434.2Steam for PH +CFB Int+Losses (5+6+7)

    9TOTAL STEAM92277781709307750.0011.9612.19

    PULP10Steam for Pulp(3+4)82017174103566920.004.975.6Steam consumed in Pulp Mill & Recovery

    11SCREW PULP (AD)011805870.004.975.6SCREW PULP(AD)*0.9*STEAM/TON OF PULP

    12SALABLE PULP (BD) (SCREW PULP+PD SHEET)*0,91137116270801100.006.89Steam for salable pulp + steam for PD sheet

    13Pulp for Paper(10-12)70646011402765820.004.605.6Total Pulp - Salable Pulp,i.e(10-12)

    Paper14Process Stream for Paper92277781705058660.006.507.25(9-8-12)

    NOTE:TARGETS ARE FIXED ON THE BASIS OF MAY 2000 PERFORMANCE WHICH IS BEST

    Kg/CM2DEG.CK.cal/Kg

    HP STEAM354107751

    MP STEAM92206860.89( MEASURED AFTER INJECTION )

    LP STEAM2.82106880.89( MEASURED BEFORE INJECTION )

    LOSS DUE TO POOR(OLD) INSULATION

    Gen. Manager (Power Block)

    AVE.AMB.TEMP. 28

    AVE.EXP.TEMP.AFT.INS. 38

    SL.NOLOCATIONAREA (APPOX)AVE.SKIN TEMP.PRESENT EXTRA TEMP.MONEY LOSS/DAYCOST OF INS.PAY BACK

    12.5 MWTG

    H P HEADER20592114000

    2M P HEADER256931

    3L P HEADER306224

    5.4MWTG

    4H P HEADER205517

    5L P HEADER205618

    6CFB 1&2

    H P LINE1005618

    7CFB-4 HP LINE

    AFTER R/V707638

    8CFB-1&2

    STEAM DRUM306729

    9CFB 2&5

    ESP90

    10TOTAL405

    &R&F

    &L&F&T&D

    water

    J.K.PAPER MILLS , JAYKAYPUR

    POWER BLOCK

    WATER BALANCE FOR APRIL TO JULY 2000 AVERAGE PER DAY

    BASESI.NOPARTCULARSPRODNACTUALTARGETWATER CONSUMED (M3)RECLAMATIONEFFLUENTLOSSESREMARKS

    MTM3/TM3/TFRESHRECYCLEDM3%M3%M3%

    PAPER1Total water286135.61130387803473289.56404810.44

    2To Colony28617.602050304778952525

    3To Mills286118110337502995488.75379611.25

    PULP4For Pulp25778.2200989B+9C1+9C3+10E+10F+10G+10I+10J+10K+10L+10M

    5For saleable Pulp29992868Salaeable pulp*water per Ton of pulp*

    PAPER6For Power2867.862247112557625.6155969.49C2+9C4

    7For Paper Machines28637.781080589688312951254259A+10A+10B+10C+10D

    8For Process286100.1228635(3)-(5)-(6)

    921" Pipe13035

    PAPER9APM-11003245269383389121635

    PULP9BSR Plant2575561141134865031374534953486M3 Water from EVP CT to Pulp Mill HW Tank

    PAPER9CPower Block42292026202632.4251840.25171127.35

    PULP9C1DM Plant19821914191449194250401Back wash=250,Return con.1914,make up1732

    PAPER9C2Cooling Tower217411255032315597223% CBD=0.7% Circu.,72%Evp.&Wid.=2.2% Circu.

    PULP9C3Ash Conditioner112112100coal*0.4*0.5

    9C4CBD Losses73731% of steam

    1018" Pipe Line20715

    10APM-215720598838612365

    10BPM-3843120258983374121575

    10CPM-429180014948321612905

    10DPM-558192015948323012965

    10EFiber Line54051149416054958455

    10FClo2 Plant60057095305

    10GChemical Plant48045695245

    10HPD Plant60057095305

    10ICompressor House14401411982921411 M3 Water to EVP cooling Tower

    10JET Plant48045695245

    10KReclimation1440141195295

    10LOthers27102575951355

    10MChipper96091295485

    NOTE:SI No 1 to 8 only fresh water considered.

    SI No 9A onwards Fresh water and recycled water considered.

    Losses = evaporation, windage,seapage , moiture in products ie. Paper,pulp,slurry etc.

    Pm/c 1,2,3,4,5,Clo2,NFL and DM Plant make up are having Flow Meters and rest are assumption.Gen. Manager (Power Block)

    J.K.PAPER MILLS , JAYKAYPURFormat No. QF / 030 / WS / 04

    POWER BLOCKRev. No. 000

    WATER BALANCE FOR THE MONTH OFDate : 1.09.2000

    BASESI.NOPARTCULARSPRODNACTUALTARGETWATER CONSUMED (M3)RECLAMATIONEFFLUENTLOSSESREMARKS

    MTM3/TM3/TFRESHRECYCLEDM3%M3%M3%

    PAPER1Total water

    2To Colony

    3To Mills

    PULP4For Pulp9B+9C1+9C3+10E+10F+10G+10I+10J+10K+10L+10M

    5For saleable PulpSalaeable pulp*water per Ton of pulp*

    PAPER6For Power9C2+9C4

    7For Paper Machines9A+10A+10B+10C+10D

    8For Process(3)-(5)-(6)

    921" Pipe

    PAPER9APM-1

    PULP9BSR PlantM3 Water from EVP CT to Pulp Mill HW Tank

    PAPER9CPower Block

    PULP9C1DM PlantBack wash=250,Return con.1914,make up1732

    PAPER9C2Cooling Tower23% CBD=0.7% Circu.,72%Evp.&Wid.=2.2% Circu.

    PULP9C3Ash Conditionercoal*0.4*0.5

    9C4CBD Losses1% of steam

    1018" Pipe Line

    10APM-2

    10BPM-3

    10CPM-4

    10DPM-5

    10EFiber Line

    10FClo2 Plant

    10GChemical Plant

    10HPD Plant

    10ICompressor HouseM3 Water to EVP cooling Tower

    10JET Plant

    10KReclimation

    10LOthers

    10MChipper

    NOTE:SI No 1 to 8 only fresh water considered.

    SI No 9A onwards Fresh water and recycled water considered.

    Losses = evaporation, windage,seapage , moiture in products ie. Paper,pulp,slurry etc.

    Pm/c 1,2,3,4,5,Clo2,NFL and DM Plant make up are having Flow Meters and rest are assumption.Gen. Manager (Power Block)

    Flow Diagram

    Date : 19.12.05

    J.K. PAPER MILLS : JAYKAPUR

    POWER BLOCK

    DAILY RETURN CONDENSATE BALANCE IN M3

    DM Plant

    2888

    Regeneration,ClO2,SPRD etcG.C.Tanks4092Boilers for Steam Generation

    1204

    41

    CBD / IBD4051

    Steam Supplied954369765912151662132970315

    Paper MachinesPD PlantCoating PlantPulp MillCausticizing PlantEvaporators ( I & III)LFB-4&5CFB InternalTurbinesSteam Blow

    Return Condensate

    %%%%%%%%%

    1) Expected84688.6792452833495929540361463848193.217054263627744.605475040331395.1367781155703100

    2) Actual7988425706870265400043985.077519379827744.605475040331395.1367781155703100

    3) Deviation4859252425138214638.0165289256428000000

    RETURN CONDENSATE

    2888

    Steam Generated = 4051 M3/Day

    Expected Condensate = 3195 M3/Day ( 68.28 % )

    Actual Condensate received = 2888 M3/Day ( 82.40 % )

    Deviation of Condensate = 307 M3/Day ( 14.13 % )

    Make up Water = 1276 M3/Day ( 31.41% )

    Total CBD/IBD = 41 M3/Day

    Total Feed Water = 4092 M3/Day

    72

    1204

    1276

    Sheet3

    Sheet2

    Sheet4

    Date : 16.08.03

    J.K.PAPER MILLS : JAYKAYPUR

    POWER BLOCK

    EFFECT OF BLEACH LIQUOR ADDITION IN MILL WATER

    Daily about 2400Lts of Bleach liquor is used at water supply.Due to the addition of bleach liquor, the calcium hardness and Total hardness is increased in mill water.Following are the observations .

    Date & TimeTotal hardness (ppm)Calcium hardness (ppm)

    BeforeAfterDifferenceBeforeAfterDifference

    13.08.03

    7.30 A.M4449528335

    8.00A.M4349627336

    8.30A.M4449527.5335.5

    9.00A.M4448.54.527325

    2.30P.M4348530333

    3.30P.M4649330322

    4.00P.M4348.55.529345

    Average43.8648.714.8628.3632.864.5

    After addition of bleach liqour there is a increase of 4.5 ppm of calcium hardness and 4.86 ppm of Total hardness.

    Drinking water standard (IS 10500:1991)Desirable limit

    1.Total hardness300 ppm

    2.Calcium as Ca75 ppm

    Both parameters are within the limit.

    cond-June-03

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR JULY 02.

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I9619866875385744075.06568Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II1731691662901496791197Dandy shower 4%

    CP M/C III7977807897957502704738Dandy shower 1%

    DP M/C IV4818145467395443965.03037Dandy shower 3%

    EP M/C V5008701430785366160.02584Dandy shower 2%,starch prep.12%

    TOTAL M/C291531861272922453818124

    2PD PLANT27220272295258645.01225

    3PULP MILL

    ARDH1153901153985980833.53870

    BFIBRE LINE544754470

    CCHLORINE GASSIFIER120912090

    DClO2 PLANT930682248

    P/MILL TOTAL

    4S.R. PLANT

    ACSP50185018

    BEVAPORATORS11757011757951116968.28021

    CLFB 46842

    ia) S/B161216120

    iib) B/L HEATER155015500

    iiic) DEAERATOR176701767951679951679

    ivd) AIR HEATER170501705951620951620

    ve) LINE FLUSHING2082080

    DLFB 57756

    ia) S/B186018600

    iib) B/L HEATER170517050

    iiic) DEAERATOR176701767951679851679

    ivd) AIR HEATER180001800951710851710

    ve) LINE FLUSHING6246240

    TOTAL SRP

    5CFB INTERNAL860008600958170958170

    6TURBINE214150214151002141510021415

    7CBD112501125556556

    8STEAM BLOW1471470

    GRAND TOTAL11366021923917378443067569

    Water used for Steam Generation =Steam Generated + CBD Losses

    1136601125113660

    Expected Return Condensate =84430 M3

    Actual Return Condensate =67569 m359.45%

    Actual DM Water Make up =46091 m340.55%

    Targeted DM Water Make up =39781 m335%

    Pm/c 1 & EVP 3 (not working) are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen Manager (Power Block)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR AUGUST- 02.

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I9557860869785739284.57350Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II1709681641901477801313Dandy shower 4%

    CP M/C III7136717065956715805654Dandy shower 1%

    DP M/C IV4918147477195453280.03817Dandy shower 3%

    EP M/C V4904687421785358480.03374Dandy shower 2%,starch prep.12%

    TOTAL M/C282241833263912370021508

    2PD PLANT30050300595285570.02104

    3PULP MILL

    ARDH11925011925851013634.34093

    BFIBRE LINE575557550

    CCHLORINE GASSIFIER120912090

    DClO2 PLANT930682248

    P/MILL TOTAL

    4S.R. PLANT

    ACSP51085108

    BEVAPORATORS13372013372951270364.38598

    CLFB 47344

    ia) S/B173617360

    iib) B/L HEATER161216120

    iiic) DEAERATOR180001800951710951710

    ivd) AIR HEATER176701767951679951679

    ve) LINE FLUSHING4294290

    DLFB 57904

    ia) S/B186018600

    iib) B/L HEATER170517050

    iiic) DEAERATOR204602046951944951944

    ivd) AIR HEATER179801798951708951708

    ve) LINE FLUSHING4954950

    TOTAL SRP

    5CFB INTERNAL860508605958175958175

    6TURBINE212570212571002125710021257

    7CBD115001150557557

    8STEAM BLOW3203200

    GRAND TOTAL11610822744933648592472833

    Water used for Steam Generation =Steam Generated + CBD Losses

    1149581150116108

    Expected Return Condensate =85924 M3

    Actual Return Condensate =72833 m363.07%

    Actual DM Water Make up =43275 m336.93%

    Targeted DM Water Make up =40638 m335%

    Pm/c 1 & EVP 3 (not working) are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen Manager (Power Block)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR SEPT- 02.

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I9584863872185741380.06977Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II1904761828901645901645Dandy shower 4%

    CP M/C III7684777607957227906864Dandy shower 1%

    DP M/C IV4798144465495442190.04189Dandy shower 3%

    EP M/C V4554638391685332980.03133Dandy shower 2%,starch prep.12%

    TOTAL M/C285241798267262403522808

    2PD PLANT22840228495217079.21809

    3PULP MILL

    ARDH11911011911851012436.84379

    BFIBRE LINE565256520

    CCHLORINE GASSIFIER117011700

    DClO2 PLANT900660240

    P/MILL TOTAL

    4S.R. PLANT

    ACSP45474547

    BEVAPORATORS12614012614951198372.99190

    CLFB 47372

    ia) S/B173617360

    iib) B/L HEATER161216120

    iiic) DEAERATOR180001800951710951710

    ivd) AIR HEATER176701767951679951679

    ve) LINE FLUSHING4574570

    DLFB 57590

    ia) S/B186018600

    iib) B/L HEATER170517050

    iiic) DEAERATOR176701767951679951679

    ivd) AIR HEATER180001800951710951710

    ve) LINE FLUSHING4584580

    TOTAL SRP

    5CFB INTERNAL752407524957148957148

    6TURBINE152830152831001528310015283

    7CBD105701057553553

    8STEAM BLOW3543540

    GRAND TOTAL10678222009847737757467448

    Water used for Steam Generation =Steam Generated + CBD Losses

    1057251057106782

    Expected Return Condensate =77574 M3

    Actual Return Condensate =67448 m363.16%

    Actual DM Water Make up =39334 m336.84%

    Targeted DM Water Make up =37374 m335%

    Pm/c 1 & EVP 3 (not working) are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen Manager (Power Block)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR NOV- 02.

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I8542769777385660483.46484Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II2060821978901780801582Dandy shower 4%

    CP M/C III7038706968956620805574Dandy shower 1%

    DP M/C IV4942148479495455480.03835Dandy shower 3%

    EP M/C V4499630386985328980.03095Dandy shower 2%,starch prep.12%

    TOTAL M/C270811699253822284720570

    2PD PLANT25720257295244380.02058

    3PULP MILL

    ARDH11957011957851016349.35897

    BFIBRE LINE623562350

    CCHLORINE GASSIFIER115311530

    DClO2 PLANT890650240

    P/MILL TOTAL

    4S.R. PLANT

    ACSP47704770

    BEVAPORATORS12912012912951226668.48828

    CLFB 47432

    ia) S/B186018600

    iib) B/L HEATER180018000

    iiic) DEAERATOR180001800951710951710

    ivd) AIR HEATER176701767951679951679

    ve) LINE FLUSHING2052050

    DLFB 57630

    ia) S/B186018600

    iib) B/L HEATER170517050

    iiic) DEAERATOR176701767951679951679

    ivd) AIR HEATER180001800951710951710

    ve) LINE FLUSHING4984980

    TOTAL SRP

    5CFB INTERNAL882608826958385958385

    6TURBINE191020191021001910210019102

    7CBD111001110556556

    8STEAM BLOW4074070

    GRAND TOTAL11207722842892358204063.9571674

    Water used for Steam Generation =Steam Generated + CBD Losses

    1109671110112077

    Expected Return Condensate =82040 M3

    Actual Return Condensate =71674 m363.95%

    Actual DM Water Make up =40403 m336.05%

    Targeted DM Water Make up =39227 m335%

    Pm/c 1 & EVP 3 (not working) are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen Manager (Power Block)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR DEC- 02.

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I8882799808385687076.86204Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II1991801911901720801529Dandy shower 4%

    CP M/C III7676777599957219806079Dandy shower 1%

    DP M/C IV5107153495495470680.03963Dandy shower 3%

    EP M/C V4799672412785350880.03302Dandy shower 2%,starch prep.12%

    TOTAL M/C284551781266742402321077

    2PD PLANT26300263095249865.01710

    3PULP MILL

    ARDH12498012498851062355.56930

    BFIBRE LINE664966490

    CCHLORINE GASSIFIER120912090

    DClO2 PLANT930682248

    P/MILL TOTAL

    4S.R. PLANT

    ACSP47104710

    BEVAPORATORS12922012922951227670.99158

    CLFB 47444

    ia) S/B186018600

    iib) B/L HEATER180018000

    iiic) DEAERATOR180001800951710951710

    ivd) AIR HEATER176701767951679951679

    ve) LINE FLUSHING2172170

    DLFB 58040

    ia) S/B200020000

    iib) B/L HEATER180018000

    iiic) DEAERATOR180001800951710951710

    ivd) AIR HEATER176701767951679951679

    ve) LINE FLUSHING6736730

    TOTAL SRP

    5CFB INTERNAL893308933958486958486

    6TURBINE203220203221002032210020322

    7CBD115001150558558

    8STEAM BLOW2462460

    GRAND TOTAL11613823627925118506464.1674519

    Water used for Steam Generation =Steam Generated + CBD Losses

    1161381149881150

    Expected Return Condensate =85064 M3

    Actual Return Condensate =74519 m364.16%

    Actual DM Water Make up =41619 m335.84%

    Targeted DM Water Make up =40649 m335%

    Pm/c 1 ( not working )& EVP 3 are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen Manager (Power Block)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR DEC- 02.

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I8882799808385687076.86204Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II1991801911901720801529Dandy shower 4%

    CP M/C III7676777599957219806079Dandy shower 1%

    DP M/C IV5107153495495470680.03963Dandy shower 3%

    EP M/C V4799672412785350880.03302Dandy shower 2%,starch prep.12%

    TOTAL M/C284551781266742402321077

    2PD PLANT26300263095249865.01710

    3PULP MILL

    ARDH12498012498851062355.56930

    BFIBRE LINE664966490

    CCHLORINE GASSIFIER120912090

    DClO2 PLANT930682248

    P/MILL TOTAL

    4S.R. PLANT

    ACSP47104710

    BEVAPORATORS12922012922951227670.99158

    CLFB 47444

    ia) S/B186018600

    iib) B/L HEATER180018000

    iiic) DEAERATOR180001800951710951710

    ivd) AIR HEATER176701767951679951679

    ve) LINE FLUSHING2172170

    DLFB 58040

    ia) S/B200020000

    iib) B/L HEATER180018000

    iiic) DEAERATOR180001800951710951710

    ivd) AIR HEATER176701767951679951679

    ve) LINE FLUSHING6736730

    TOTAL SRP

    5CFB INTERNAL893308933958486958486

    6TURBINE203220203221002032210020322

    7CBD115001150558558

    8STEAM BLOW2462460

    GRAND TOTAL11613823627925118506464.1674519

    Water used for Steam Generation =Steam Generated + CBD Losses

    1161381149881150

    Expected Return Condensate =85064 M3

    Actual Return Condensate =74519 m364.16%

    Actual DM Water Make up =41619 m335.84%

    Targeted DM Water Make up =40649 m335%

    Pm/c 1 ( not working )& EVP 3 are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR JAN- 03.

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I9021812820985697880.06567Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II2281912190901971851862Dandy shower 4%

    CP M/C III7639767563957185806050Dandy shower 1%

    DP M/C IV4946148479895455882.03934Dandy shower 3%

    EP M/C V4653558409585348185.03481Dandy shower 2%,starch prep.12%

    TOTAL M/C285401685268552417321894

    2PD PLANT20140201495191380.01611

    3PULP MILL

    ARDH12229012229851039558.77172

    BFIBRE LINE678267820

    CCHLORINE GASSIFIER120912090

    DClO2 PLANT930682248

    P/MILL TOTAL

    4S.R. PLANT

    ACSP48634863

    BEVAPORATORS13181013181951252269.48684

    CLFB 47622

    ia) S/B201520150

    iib) B/L HEATER182918290

    iiic) DEAERATOR201502015951914951914

    ivd) AIR HEATER155101551951473951473

    ve) LINE FLUSHING2122120

    DLFB 58027

    ia) S/B182918290

    iib) B/L HEATER201520150

    iiic) DEAERATOR195301953951855951855

    ivd) AIR HEATER201502015951914951914

    ve) LINE FLUSHING2152150

    TOTAL SRP

    5CFB INTERNAL898608986958537958537

    6TURBINE206290206291002062910020629

    7CBD115301153558558

    8STEAM BLOW3353350

    GRAND TOTAL11650023671928298538365.0175741

    Water used for Steam Generation =Steam Generated + CBD Losses

    1165001153471153

    Expected Return Condensate =85383 M3

    Actual Return Condensate =75741 m365.01%

    Actual DM Water Make up =40759 m334.99%

    Targeted DM Water Make up =40775 m335%

    Pm/c 1 ( not working )& EVP 3 are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen.Manager (PB)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR FEB- 03.

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I8100729737185626580.05897Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II2041821959901763851665Dandy shower 4%

    CP M/C III6292636229958768804983Dandy shower 1%

    DP M/C IV4308129417995397082.03427Dandy shower 3%

    EP M/C V4195587360885306784.03031Dandy shower 2%,starch prep.12%

    TOTAL M/C249361590233462383319003

    2PD PLANT29200292095277485.02482

    3PULP MILL

    ARDH1083701083785921153.05742

    BFIBRE LINE597559750

    CCHLORINE GASSIFIER106910690

    DClO2 PLANT822626196

    P/MILL TOTAL

    4S.R. PLANT

    ACSP416941690

    BEVAPORATORS11485011485951091175.08613

    CLFB 46888

    ia) S/B173617360

    iib) B/L HEATER173217320

    iiic) DEAERATOR148401484951410951410

    ivd) AIR HEATER168001680951596951596

    ve) LINE FLUSHING2562560

    DLFB 57224

    ia) S/B193619360

    iib) B/L HEATER168016800

    iiic) DEAERATOR168001680951596951596

    ivd) AIR HEATER176401764951676951676

    ve) LINE FLUSHING1641640

    TOTAL SRP

    5CFB INTERNAL804008040957638957638

    6TURBINE194960194961001949610019496

    7CBD104101041552552

    8STEAM BLOW2702700

    GRAND TOTAL10517221203839698019365.9069304

    Water used for Steam Generation =Steam Generated + CBD Losses

    1051721041311041

    Expected Return Condensate =80193 M376.25%

    Actual Return Condensate =69304 m365.90%

    Actual DM Water Make up =35868 m334.10%

    Targeted DM Water Make up =36810 m335%

    Pm/c 1 ( not working )& EVP 3 are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen.Manager (PB)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR MARCH- 03.

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I8580.0Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II9085Dandy shower 4%

    CP M/C III9580Dandy shower 1%

    DP M/C IV9582.0Dandy shower 3%

    EP M/C V8584.0Dandy shower 2%,starch prep.12%

    TOTAL M/C

    2PD PLANT9585.0

    3PULP MILL

    ARDH8553.0

    BFIBRE LINE

    CCHLORINE GASSIFIER

    DClO2 PLANT

    P/MILL TOTAL

    4S.R. PLANT

    ACSP

    BEVAPORATORS9575.0

    CLFB 4

    ia) S/B

    iib) B/L HEATER

    iiic) DEAERATOR9595

    ivd) AIR HEATER9595

    ve) LINE FLUSHING

    DLFB 5

    ia) S/B

    iib) B/L HEATER

    iiic) DEAERATOR9595

    ivd) AIR HEATER9595

    ve) LINE FLUSHING

    TOTAL SRP

    5CFB INTERNAL9595

    6TURBINE100100

    7CBD55

    8STEAM BLOW

    GRAND TOTAL1051720065.90

    Water used for Steam Generation =Steam Generated + CBD Losses

    1051721041311041

    Expected Return Condensate =80193 M376.25%

    Actual Return Condensate =69304 m365.90%

    Actual DM Water Make up =35868 m334.10%

    Targeted DM Water Make up =36810 m335%

    Pm/c 1 ( not working )& EVP 3 are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen.Manager (PB)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR OCT- 02.

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I9536858867885737680.06942Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II2134852049901844801639Dandy shower 4%

    CP M/C III7637767561957183806049Dandy shower 1%

    DP M/C IV4835145469095445680.03752Dandy shower 3%

    EP M/C V4798672412685350780.03301Dandy shower 2%,starch prep.12%

    TOTAL M/C2894018362710421683

    2PD PLANT35740357495339540.01430

    3PULP MILL

    ARDH12494012494851062036.74584

    BFIBRE LINE575857580

    CCHLORINE GASSIFIER120912090

    DClO2 PLANT930682248

    P/MILL TOTAL

    4S.R. PLANT

    ACSP48514851

    BEVAPORATORS14173014173951346468.49701

    CLFB 47669

    ia) S/B186018600

    iib) B/L HEATER170517050

    iiic) DEAERATOR176701767951679951679

    ivd) AIR HEATER180001800951710951710

    ve) LINE FLUSHING5375370

    DLFB 57872

    ia) S/B200020000

    iib) B/L HEATER180018000

    iiic) DEAERATOR180001800951710951710

    ivd) AIR HEATER176701767951679951679

    ve) LINE FLUSHING5055050

    TOTAL SRP

    5CFB INTERNAL888708887958443958443

    6TURBINE213780213781002137810021378

    7CBD117901179559559

    8STEAM BLOW1441440

    GRAND TOTAL11905822887961718850362.2074056

    Water used for Steam Generation =Steam Generated + CBD Losses

    1178791179119058

    Expected Return Condensate =88503 M383.73%

    Actual Return Condensate =74056 m362.20%

    Actual DM Water Make up =43427 m337.48%

    Targeted DM Water Make up =41670 m335%

    Pm/c 1 & EVP 3 (not working) are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen Manager (Power Block)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR MARCH- 03.

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I8491764772785656880.05254Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II1744701674901507801206Dandy shower 4%

    CP M/C III7537757462957089805671Dandy shower 1%

    DP M/C IV4903147475695451880.03614Dandy shower 3%

    EP M/C V4676655402185341880.02734Dandy shower 2%,starch prep.12%

    TOTAL M/C273511711256402310018479

    2PD PLANT28020280295266291.02423

    3PULP MILL

    ARDH12119012119851030180.09695

    BFIBRE LINE597359730

    CCHLORINE GASSIFIER120912090

    DClO2 PLANT930682248

    P/MILL TOTAL

    4S.R. PLANT

    ACSP377837780

    BEVAPORATORS15516015516951474060.49373

    CLFB 47662

    ia) S/B201520150

    iib) B/L HEATER182918290

    iiic) DEAERATOR201502015951914951914

    ivd) AIR HEATER155101551951473951473

    ve) LINE FLUSHING2522520

    DLFB 58069

    ia) S/B182918290

    iib) B/L HEATER201520150

    iiic) DEAERATOR195301953951855951855

    ivd) AIR HEATER201502015951914951914

    ve) LINE FLUSHING2572570

    TOTAL SRP

    5CFB INTERNAL883008830958389958389

    6TURBINE212710212711002127110021271

    7CBD130901309565565

    8STEAM BLOW4474470

    GRAND TOTAL11726621997952698768465.5476851

    Water used for Steam Generation =Steam Generated + CBD Losses

    1159571309117266

    Expected Return Condensate =87684 M374.77%

    Actual Return Condensate =76851 m365.54%

    Actual DM Water Make up =40415 m334.46%

    Targeted DM Water Make up =41043 m335%

    Pm/c 1 ( not working ) & EVP 3 are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen Manager (Power Block)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR JUNE - 03

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I8410757765385650570.05357Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II1806721734901561801387Dandy shower 4%

    CP M/C III7485757410957040805928Dandy shower 1%

    DP M/C IV3643109353495335760.02120Dandy shower 3%

    EP M/C V4491629386285328380.03090Dandy shower 2%,starch prep.12%

    TOTAL M/C258351642241932174617882

    2PD PLANT25910259195246130.0738

    3PULP MILL

    ARDH89250892585758639.63006

    BFIBRE LINE664166410

    CCHLORINE GASSIFIER117011700

    DClO2 PLANT900660240

    P/MILL TOTAL

    4S.R. PLANT

    ACSP367336730

    BEVAPORATORS14525014525951379975.010352

    CLFB 47402

    ia) S/B201520150

    iib) B/L HEATER192219220

    iiic) DEAERATOR155101551951473951473

    ivd) AIR HEATER170501705951620951620

    ve) LINE FLUSHING2092090

    DLFB 57835

    ia) S/B192219220

    iib) B/L HEATER198419840

    iiic) DEAERATOR213902139952032952032

    ivd) AIR HEATER155101551951473951473

    ve) LINE FLUSHING2392390

    TOTAL SRP

    5CFB INTERNAL740807408957038957038

    6TURBINE171220171221001712210017122

    7CBD104601046552552

    8STEAM BLOW6176170

    GRAND TOTAL10569022694829967640259.4162788

    Water used for Steam Generation =Steam Generated + CBD Losses

    1046441046105690

    Expected Return Condensate =76402 M372.28%

    Actual Return Condensate =62788 m359.41%

    Actual DM Water Make up =42902 m340.59%

    Targeted DM Water Make up =36992 m335%

    Pm/c 1 ( not working ) & EVP 3 are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen Manager (Power Block)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR MAY-03

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I8631777785485667680.06283Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II1931771854901669801483Dandy shower 4%

    CP M/C III5739575682955398804546Dandy shower 1%

    DP M/C IV4811144466795443460.02800Dandy shower 3%

    EP M/C V4727662406585345580.03252Dandy shower 2%,starch prep.12%

    TOTAL M/C258391717241222163218364

    2PD PLANT28980289895275330.0867

    3PULP MILL

    ARDH1108201108285942034.23795

    BFIBRE LINE609160910

    CCHLORINE GASSIFIER120912090

    DClO2 PLANT930682248

    P/MILL TOTAL

    4S.R. PLANT

    ACSP371037100

    BEVAPORATORS13499013499951282470.19998

    CLFB 47657

    ia) S/B150015000

    iib) B/L HEATER210021000

    iiic) DEAERATOR207002070951967951967

    ivd) AIR HEATER186001860951767951767

    ve) LINE FLUSHING1271270

    DLFB 56815

    ia) S/B150015000

    iib) B/L HEATER159015900

    iiic) DEAERATOR177001770951682951682

    ivd) AIR HEATER156001560951482951482

    ve) LINE FLUSHING3933950

    TOTAL SRP

    5CFB INTERNAL950509505959030959030

    6TURBINE233700233701002337010023370

    7CBD21750217551095109

    8STEAM BLOW107810780

    GRAND TOTAL11585821699941598603662.5272431

    Water used for Steam Generation =Steam Generated + CBD Losses

    1136832175115858

    Expected Return Condensate =86036 M374.25%

    Actual Return Condensate =72431 m362.52%

    Actual DM Water Make up =43427 m337.48%

    Targeted DM Water Make up =40550 m335%

    Pm/c 1 ( not working ) & EVP 3 are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen Manager (Power Block)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR THE MONTH OF NOV-05

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I85Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II90Dandy shower 4%

    CP M/C III95Dandy shower 1%

    DP M/C IV95Dandy shower 3%

    EP M/C V85Dandy shower 2%,starch prep.12%

    TOTAL M/C

    2PD PLANT95

    3PULP MILL

    ARDH85

    BFIBRE LINE

    CCHLORINE GASSIFIER

    DClO2 PLANT

    P/MILL TOTAL

    4S.R. PLANT

    ACSP

    BEVAPORATORS95

    CLFB 4

    ia) S/B

    iib) B/L HEATER

    iiic) DEAERATOR95

    ivd) AIR HEATER95

    ve) LINE FLUSHING

    DLFB 5

    ia) S/B

    iib) B/L HEATER

    iiic) DEAERATOR95

    ivd) AIR HEATER95

    ve) LINE FLUSHING

    TOTAL SRP

    5CFB INTERNAL95

    6TURBINE100

    7CBD5

    8STEAM BLOW

    GRAND TOTAL

    Water used for Steam Generation =Steam Generated + CBD Losses

    Expected Return Condensate =

    Actual Return Condensate =

    Actual DM Water Make up =

    Targeted DM Water Make up =

    Pm/c 1 ( not working ) & EVP 3 are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen Manager (Power Block)

    check list

    Gen.Manager ( PB)

    J.K.PAPER MILLS:JAYKAYPUR

    POWER BLOCK

    FRESH WATER WASTAGES,LOSSESS & LEAKAGES CHECK LIST

    SL NOCHECKING POINTSOVER FLOWSDRAINAGELEAKAGESREMARKS

    21" Pipe line

    112 mw cooling tower

    25.4 mw cooling tower

    3Dm plant (old) degassor sump

    4Dm plant (new) degassor sump

    5Evaporator -3 cooling tower

    6Pm/c no: 1 ADKA

    7Pm/c no: 1 Hydropulper

    8Pm/c no: 2 Hydropulper

    9Singapur road railway station

    10Mist chamber

    18" pipe line

    1Pm/c no:3 warm water tank

    2Pm/c no:3 Hydropulper

    3Pm/c no: 4 warm water tank

    4Pm/c no: 4 Hydropulper

    5Pm/c no: 5 warm water tank

    6Pm/c no: 5 Hydropulper

    7PD plant ( new) warm water tank

    8PD plant vacuum pump

    9Clo2 plant cooling tower : 1

    10Clo2 plant cooling tower : 2

    11Clo2 plant filters and storage tank

    12Clo2 plant chilled tank

    13Reclaimation plant old reservoir

    14Reclaimation plant new reservoir

    15Fiber line warm water tank

    16Atlas capco compressor

    17Admn building & Gardening

    18techincal building

    19Drinking water make up

    20Bada chandili

    Signature

    Date :Time :

    Blank

    POWER BLOCK

    9/11/00

    ACTION PLAN FOR MONITORING THERMAL EFFICIENCY OF INDIVIDUAL BOILERS

    DESCRIPTIONTARGET

    1) INSTALLATION OF WEIGHTOMETERDEC.2000

    ON CONVEYOR BELT BC -4A

    2) INDIVIDUAL BOILER EFFICIENCYJan-01

    CALCULATIONS

    Gen.Manager (Power Block)

    POWER BLOCK

    9/12/00

    ACTION PLAN FOR REDUCING BOILER HOUSE DISCHRGE WATER TEMP.

    WE HAVE REDUCED THE BOILER BLODOWN WATER FROM 3% TO 1%

    BY IMPROVING QUALITY OF D M WATER ,BY PROCESSING OLD DM PLANT

    WATER THROW NEW DM PLANT MIXED BED FROM 17-07-2000.

    HENCE THE TEMPERATURE OF THE WATER GOING OUT OF BOILER

    HOUSE REDUCED TO 38 DEG.C FROM 40 DEG.C

    Gen.Manager(Power Block)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR THE YEAR 2001 - 2002

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I12331711098112219859538668.076265Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II19881795190869017177499393Dandy shower 4%

    CP M/C III909879109007795855734641495Dandy shower 1%

    DP M/C IV50385151248873954642944.021509Dandy shower 3%

    EP M/C V59437832151116854344951.026216Dandy shower 2%,starch prep.12%

    TOTAL M/C34400722636321371288014174878

    2PD PLANT36996036996953514641.515335

    3PULP MILL

    ARDH14090401409048511976831.043672

    BFIBRE LINE77681776810

    CCHLORINE GASSIFIER14066140660

    DClO2 PLANT1078179202861

    P/MILL TOTAL

    4S.R. PLANT

    ACSP6009360093

    BEVAPORATORS15458501545859514685663.998781

    CLFB 471162

    ia) S/B16839168390

    iib) B/L HEATER16755167550

    iiic) DEAERATOR1590001590095151058513515

    ivd) AIR HEATER1709801709895162438514533

    ve) LINE FLUSHING457045700

    DLFB 586446

    ia) S/B17406174060

    iib) B/L HEATER21664216640

    iiic) DEAERATOR2119302119395201338518014

    ivd) AIR HEATER2101002101095199598517858

    ve) LINE FLUSHING517351730

    TOTAL SRP

    5CFB INTERNAL9914209914295941859594185

    6TURBINE2581270258127100258127100258127

    7CBD1390001390056955695

    8STEAM BLOW638763870

    GRAND TOTAL137427727119011030871014231749593

    Water used for Steam Generation =Steam Generated + CBD Losses

    1374277136037713900

    Expected Return Condensate =1014231 M3

    Actual Return Condensate =749593 m354.54%

    Actual DM Water Make up =624684 m345.46%

    Targeted DM Water Make up =618425 m345%

    Pm/c 1 & EVP 3 (not working) are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    J.K.PAPER MILLS, JAYKAYPUR

    POWER BLOCK

    RETURN CONDENSATE BALANCE FOR

    S.NO.PARTICULARSSTEAMCONDENSATEREMARKS

    TOTALDIRECTINDIRECTEXPECTEDACTUAL

    1PAPER MACHINES%m3%m3

    AP M/C I85Dandy 1%,calender0.5%starch prep.7.5%

    BP M/C II90Dandy shower 4%

    CP M/C III95Dandy shower 1%

    DP M/C IV95Dandy shower 3%

    EP M/C V85Dandy shower 2%,starch prep.12%

    TOTAL M/C

    2PD PLANT95

    3PULP MILL

    ARDH85

    BFIBRE LINE

    CCHLORINE GASSIFIER

    DClO2 PLANT

    P/MILL TOTAL

    4S.R. PLANT

    ACSP

    BEVAPORATORS95

    CLFB 4

    ia) S/B

    iib) B/L HEATER

    iiic) DEAERATOR95

    ivd) AIR HEATER95

    ve) LINE FLUSHING

    DLFB 5

    ia) S/B

    iib) B/L HEATER

    iiic) DEAERATOR95

    ivd) AIR HEATER95

    ve) LINE FLUSHING

    TOTAL SRP

    5CFB INTERNAL95

    6TURBINE100

    7CBD5

    8STEAM BLOW

    GRAND TOTAL

    Water used for Steam Generation =Steam Generated + CBD Losses

    1159571309117266

    Expected Return Condensate =87684 M374.77%

    Actual Return Condensate =76851 m365.54%

    Actual DM Water Make up =40415 m334.46%

    Targeted DM Water Make up =41043 m335%

    Pm/c 1 ( not working ) & EVP 3 are having Flow Meters and rest on assumptions.

    (Flash losses=10%,Trap losses=5% consedered)

    Gen Manager (Power Block)

    2,5 MWTG

    J.K PAPER MILLS : JAYKAYPUR

    POWER BLOCK

    TURBINE EFFICIENCY FOR 2.5 MWTG FOR THE MONTH OFAPRIL 2001

    TARGETEfficency: 46.5 + / - 1.5 %

    Steam / KWh: 8.0 + / - 0.5 Kg / Kwh

    INPUT DATA

    STEAMPressureTemperatureEnthalpyQuantity

    UNITKg / Cm2oCKCal / KgMT

    H.P3540877413855

    L.P3.219067711427

    Condensate-0.850502428

    Power Generated :1533000KWh

    ENERGY INPUT

    By L.P Extraction :(774-677)*11427*1000/860=1288859KWh

    Equivalent H.P Steam :1288859*860 / 774*1000=1440Tons

    By Condesate :(774-50)*2428*1000/860=2044037KWh

    Total :=3332897KWh

    EFFICIENCY

    Efficiency =1533000=46.00%

    3332897

    STEAM / KWh

    Steam / KWh =13855000=9.04Kg / KWH

    1533000

    5.4 MWTG

    J.K PAPER MILLS : JAYKAYPUR

    POWER BLOCK

    TURBINE EFFICIENCY FOR 5.4 MWTG FOR THE MONTH OFAPRIL 2001

    TARGETEfficency: 42.0 + / - 1.5 %

    Steam / KWh: 9.4 + / - 0.5 Kg / Kwh

    INPUT DATA

    STEAMPressureTemperatureEnthalpyQuantity

    UNITKg / Cm2oCKCal / KgMT

    H.P3540077033112

    M.P10.528071513061

    L.P3.619067711034

    Condensate-0.8250509017

    Power Generated :3486290KWh

    ENERGY INPUT

    By M.P Extraction :(770-715)*13061*1000/860=835297KWh

    Equivalent H.P Steam :835297*860 / 770*1000=933Tons

    By L.P Extraction :(770-677)*11034*1000/860=1193212KWh

    Equivalent H.P Steam :1193212*860 / 770*1000=1333Tons

    By Condesate :(773-50)*9017*1000/860=7549116KWh

    Total :=9577624KWh

    EFFICIENCY

    Efficiency =3486290=36.40%

    9577624

    STEAM / KWh

    Steam / KWh =33112000=9.50Kg / KWH

    3486290

    12 MWTG

    J.K PAPER MILLS : JAYKAYPUR

    POWER BLOCK

    TURBINE EFFICIENCY FOR 12 MWTG FOR THE MONTH OF APRIL 2001

    TARGETEfficency: 42.0 + / - 1.5 %

    Steam / KWh: 9.7 + / - 0.5 Kg / Kwh

    INPUT DATA

    STEAMPressureTemperatureEnthalpyQuantity

    UNITKg / Cm2oCKCal / KgMT

    H.P3440677371042

    M.P1633874513639

    L.P322569542538

    Condensate-0.6757514865

    Power Generated :7223800KWh

    ENERGY INPUT

    By M.P Extraction :(773-745)*13639*1000/860=444060KWh

    Equivalent H.P Steam :444060*860 / 773*1000=494Tons

    By L.P Extraction :(773-695)*42538*1000/860=3858098KWh

    Equivalent H.P Steam :3858098*860 / 773*1000=4292Tons

    By Condesate :(773-75)*14865*1000/860=12064849KWh

    Total :=16367007KWh

    EFFICIENCY

    Efficiency =7223800=44.14%

    16367007

    STEAM / KWh

    Steam / KWh =71042000=9.83Kg / KWH

    7223800

  • Boiler Water Treatment Chemical (Conditioning Chemical) For Boiler water treatment the following Chemicals are used:1. Indion-5203( Filming Amine): used as 8 PPM on Make up Water.2. Indion-5164(pH Booster): used as a Contingency Chemical.Depending on the pH in Boiler water it is dosed as 1 to 2 PPM on Make up Water.3. Hydrazine Hydrate: used as Passivation When Boilers are in Ideal Conditions.

  • Cooling tower Treatment Chemical There are 3 Nos of Cooling towers:Three Cell Cooling towerFour Cell Cooling towerSingle Cell Cooling towerFollowing chemicals are used :Anti scaling & AnticorrosionBio despersentBiocidesSulphuric Acid

    Cooling tower Water quality pH = 7.8 to 8.0 COC = 3 to 5

  • 12MW COOLING TOWER FILL DEPOSIT CLEANING We are planning to remove the fill deposit with NALCO Chemicals :1. Nalco 73550 : This is a Biodetergent . It will remove the deposits through a combination of Chemical solubilization and Physical scrubbing .2. Nalco 90001 : Quaternary ammonium biocide.3. Sodium Hypochlorite : As per the system requirement.

  • END OF THE PRESENTATION