Presentation to the Portfolio Committee on Water and Environmental Affairs on 1 st Quarter Performance against the 2010/11 Strategic Plan Department of Water Affairs 4 August 2010. 1. Outline of the Presentation. OUTLINE OF THE PRESENTATION MEA PERFORMANCE REPORT WTE PERFORMANCE REPORT - PowerPoint PPT PresentationTRANSCRIPT
Presentation to the Portfolio Committee on Water and Environmental Affairs
on 1st Quarter Performanceagainst the 2010/11 Strategic Plan
Department of Water Affairs
4 August 2010
1
Outline of the Presentation
OUTLINE OF THE PRESENTATION
• MEA PERFORMANCE REPORT
• WTE PERFORMANCE REPORT
• ROADMAP FOR THE REDUCTION OF VACANCY RATE
2
PURPOSE OF THE PRESENTATION
To provide the actual performance information
against the 2010/11 Strategic Plan.
3
PART A
PerformanceAgainst the 2010/11 strategic plan
(MAIN EXCHEQUER ACCOUNT)
4
1st Quarter Performance Report
Strategic Priority 1: Contribution to effective economic growth and social development
Strategic Objectives: Ensure strategies and feasibility plans exist to reconcile water requirements and availability
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Strategies and feasibility plans to reconcile water requirements and available resources
Number of strategies and feasibility plans completed
Reconciliation strategies completed in 3 areas
2 strategies and 1 plan produced
Development of 2 Strategies (Algoa system (Stage 2), and Mzimvubu Catchments area) continued
ON TARGET: Development of reconciliation Strategies for Algoa system (Stage 2), and Mzimvubu Catchments area continued
Implementation of the desalination and recycling strategies
Finalised desalination strategy
Desalination and Recycling Strategy Concept note developed
Desalination Strategy finalised and approved
Development of a Desalination Strategy started
ON TARGET: Draft desalination strategy developed for internal comment
5
1st Quarter Performance Report
Strategic Priority 1 : Contribution to effective economic growth and social development
Strategic Objectives: Effective creation of decent employment through infrastructure delivery
Outputs Performance Indicator
Baseline informati
on
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Creation of decent employment through regional bulk programme
Number of decent jobs created
5908 1105 200 BEHIND TARGET: 145 (Only 1 project is operational in cluster 2 Chris Hani DM)
Strategic Objectives: Ensure the provision of regional bulk water
Implementation of the Regional Bulk schemes to support access to water and sanitation programmes
Number of bulk infrastructure schemes implemented per year
45 54 35 under construction
ON TARGET: 35 regional bulk schemes under construction
6
1st Quarter Performance Report
Strategic Priority 1 : Contribution to effective economic growth and social development
Strategic Objectives: Development, maintenance and rehabilitation of bulk water infrastructure
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target 1st quarter milestone
Actual achievement
Rehabilitation and refurbishment of the transferred water services schemes
Number of transferred schemes refurbished
1000 130 To be reported on the Second Quarter
Number of staff transferred
5200 1000 To be reported on the Second Quarter
7
1st Quarter Performance Report
Strategic Priority 1 : Contribution to effective economic growth and social development
Strategic Objectives: Development, maintenance and rehabilitation of bulk water infrastructure
Outputs Performance Indicator
Baseline informatio
n
2010 Performance against targets
2010/11 Target 1st quarter milestone
Actual achievement
Reviewing the pricing strategy and infrastructure funding model
Percentage implementation of the milestones in the pricing strategy
As-Is” situation analysis of water pricing and funding model has been done
80% Implementation of the milestones in the pricing strategy and funding model
Infrastructure Asset Management strategy finalised
BEHIND TARGET:5% completion of work.
Report on the current status of infrastructure funding prepared.
A draft project charter developed. Five work streams developed
8
Strategic Priority 1 : Contribution to effective economic growth and social development
Strategic Objectives: Development, maintenance and rehabilitation of bulk water infrastructure
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target 1st quarter milestone
Actual achievement
Implementation of the Strategy for the operations and maintenance of water services infrastructure
Finalised strategy for operations and maintenance of water services infrastructure
Draft strategy in place
Finalisation of the strategy for operations and maintenance of water services infrastructure
Infrastructure Asset Management strategy finalised
ON TARGET: Infrastructure Asset Management strategy finalised
9
1st Quarter Performance Report
Strategic Priority 1: Contribution to effective economic growth and social development
Strategic Objectives: Ensure effective implementation of the Pricing strategy and funding model
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target 1st quarter milestone
Actual achievement
Strategic Priority 2: Contribution to rural development, food security and land reform
Strategic Objectives: Create sustainable rural livelihoods
Implementation of the rain water harvesting programme
Number of additional rainwater harvesting tanks distributed for food production
500 5000 1280 ON TARGET:1587 (Additional roll over funds were available)
10
1st Quarter Performance Report
Strategic Priority 2: Contribution to rural development, food security and land reform
Strategic Objectives: Create sustainable rural livelihoods
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Provision of adequate support to poorly resourced farmers
Number of job opportunities created by Working for Water (WfW) per year
23 700 25 300 7770ON TARGET: 8 539 (Regions)
Implementation of the Natural Resource Management Programmes to support EPWP
Number of job opportunities created by Working on Fire (WoF) per year
1669 2221 1200 ON TARGET 2 032 (Regions)
Number of SMMEs established through Working for Water (WfW) programme
1442 1650 495 ON TARGET 903 (Regions)
11
1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management
Strategic Objectives: Improve equity in water allocation
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Eradicate license application backlogs
Percentage reduction in licensing backlog
3462 current estimated backlog
100% 20% ON TARGET:29% Accelerated effort on the Letsema Project and capacity building)
Allocation of water to Historically Disadvantaged Individuals (HDIs)
Number of water licenses issued per year
200 250 50 ON TARGET: 165 issued 1 Declined(Accelerated effort on theLetsema Project)
Number of new water management areas in which compulsory licensing processes have been completed
0 2 Gazette compulsory licensing process for 2 WMA
BEHIND TARGET:Submission prepared for the approval of call for compulsory licensing
12
1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management
Strategic Objectives: Ensure sustainable water use
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target 1st quarter milestone
Actual achievement
Improved water use efficiency
Revised National Water resources Strategy in place
1st edition NWRS (2004
2nd edition NWRS gazette for public consultation
Overarching framework and communication strategy developed
ON TARGET Overarching framework and communication strategy developed
Strategic Objectives: Improve equity in water services and management
Amendment of the water related legislations
Water Services Amendment Bill gazetted for consultation
First draft completed of the Amendment Bill
Public consultation on the Amendment Bill
Submission for approval to review
ON TARGET Submitted for approval to review.
13
1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management
Strategic Objectives: Protection and improvement of water quality
Outputs Performance Indicator Baseline information
2010 Performance against targets
2010/11 Target 1st quarter milestone Actual achievement
Ensure the improvement of water quality
Water resources Classifications Regulations classified
Draft water resources classification regulations
Finalised and Implemented Water resources Classifications Regulations
Stakeholder consultation report compiled and regulations revised.
ON TARGET Stakeholder consultation report compiled and regulations revised accordingly and submitted to Chief State Law Advisor for final approval.
Number of Water Management Areas (WMAs) in which water resources have been classified
0 2 Scoping phase completed.
ON TARGET Project scoping phase completed
14
1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management
Strategic Objectives: Protection and improvement of water quality
Outputs Performance Indicator Baseline information
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Implementation of the Waste Discharge Charge System (WDCS)
Number of catchments where WDCS is implemented
0 WDCS implemented in 2 catchments
Inception report developed
BEHIND TARGET: Inception report not achieved (as planned for Q1) due to delays in the procurement process
15
1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management
Strategic Objectives: Protection and improvement of water quality
Outputs Performance Indicator
Baseline informat
ion
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Implementation of the river health programmes
Number of river health projects implemented
4 9 projects (one per region)
2 projects in 2 regions
ON TARGET:EC - Monitoring was done in 7 rivers, Kowie, Kouga/Gamtoos, Baviaans, Mbashe, Buffalo, Great Kei, Keiskamma Rivers.GP:Monitoring of water quality on Vaal river took place. Study on “Fisk Kill in Vaal river” has been completed and awaiting final report.FS:Modder, Riet and Caledon Rivers, mostly FAII, RVI, Geomorphology and Physi-chemical parameters were done and a State of Modder River Was produced by the University of Free State: CEM for Bloemwater.
16
1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management
Strategic Objectives: Protection and improvement of water quality
Outputs Performance Indicator
Baseline info
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Implementation of the river health programmes cont…
Number of river health projects implemented
4 9 projects (one per region
1 per region cont….
NC: Lower Vaal River, MIRAI, Harts River only one site, MIRAI. Lower Orange River downstream Vanderkloof Dam as part of the Reserve was done.WC:Finalisation of the comprehensive Berg Winter sampling on G2 and G1 sites
Implementation of the Compliance Monitoring and Enforcement (CME) Programmes
Number of cases successfully addressed
40 45 5 BEHIND TARGET: To be reported 2nd quarter0 achievement due to the complexity of cases. Administrative and criminal proceedings dependent on law enforcement agencies
17
1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management
Strategic Objectives: Protection and improvement of water quality
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Implementation of the Compliance Monitoring and Enforcement (CME) Programmes
Number of notices issued
29 35 10 BEHIND TARGET: To be reported 2nd quarter
Number of directives issued
23 25 10 BEHIND TARGET: To be reported 2nd quarter
18
1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management
Strategic Objectives: Protection and improvement of water quality
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Reduction in invasive plants cleared through Working for Water Programme
Hectares of land cleared per year
684 777 715 400 156 340 BEHIND TARGET:98 607 – delays caused by putting out order numbers which is now finalised and therefore the process will be fast tracked in the second quarter.
Woodlands Restored through Working for Woodlands Programme
Hectares of land converted woodlots per year
990 1655 680 BEHIND TARGET:As a result of the review of the restructuring process
19
1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management
Strategic Objectives: Protection and improvement of water quality
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Ensure implementation of Integrated Veldt and Forest Fire Management
Number of fires attended to
900 820 41 ON TARGET:196 (More fire incidents were reported than anticipated)
Hectares veldt fires attended to per year
500 000 447 000 22 350 BEHIND TARGET:9 310
20
1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management
Strategic Objectives: Ensuring adequate information and knowledge to sustainably manage water resources
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Provision of water resources information
Number of prioritised catchments optimally monitored
2 catchments optimally monitored
5 priority catchments
High level Implementation Plan developed
ON TARGET: Development of High level implementation plan completed
Strategic Priority 4: Effective support to local government
Strategic Objectives: Implementation of the Local Government Turnaround Strategy
Effective Support Provided to all municipalities
Number of municipalities that received support interventions
80 169 169 BEHIND TARGET : 124 municipalities were supported with the assessment of IDPs. (WC and NW were not assessed and indicated readiness with effect from 25 July and 3 August respectively).
21
1st Quarter Performance Report
Strategic Priority 4: Effective support to local government
Strategic Objectives: Implementation of the Local Government Turnaround Strategy
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Effective Support Provided to all municipalities CONT…
Total number of municipalities supported in implementing water conservation/ water demand management
80 4 1 ON TARGET: 1 City of Cape Town
Effective participation in Provincial and National Intergovernmental structures
Number of Provincial Indaba action plans implemented
9 Indaba action plans developed
9 Consolidation of nine action plans
BEHIND TARGET : 7 Action plans in place in regions where the Provincial Water Indabas has taken place. GP and NC Water Indabas to be conducted on 19 – 20 August and 2 September2010 respectively
22
1st Quarter Performance Report
Strategic Priority 5: Contribute to global relations
Strategic Objectives: Strategic leadership and engagements of the Department in multilateral forums
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target 1st quarter milestone
Actual achievement
Provide effective leadership of AMCOW and strategic multilateral forums
Effective function of AMCOW Secretariat
South Africa as current Chair of AMCOW for the next two years
Strengthening all organs of AMCOW
2 seconded officials on board
BEHIND TARGET: Recruitment process initiated for both posts.1 Selection process completed for one post, awaiting HR to finalise appointment.
Re-advertisement in process (quality of applicants poor)
23
1st Quarter Performance Report
Strategic Priority 5: Contribute to global relations
Strategic Objectives: Forging strategic relationships with countries in Africa and the world (North-South, South-South)
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target 1st quarter milestone
Actual achievement
Supporting PCRD countries to move away from their status
Number of bilateral co-operation agreements with African countries implemented
2 agreements in place
4 Engagement of 4 Africa bilateral countries – Post Conflict and Reconstruction and Development (PCRD)
1 BEHIND TARGET: DRC Cooperation Agreement in the legal process for finalisation. Rwanda: action plan was drafted on SA/Rwanda capacity building. Resources will mobilised to implement the action plan.Russia: formalised the working group. Action plan drafted by both parties
24
1st Quarter Performance Report
Strategic Priority: Strategic Priority 5: Contribute to global relations
Strategic Objectives: Strategic leadership and engagements of the Department in multilateral forums
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target 1st quarter milestone
Actual achievement
Sharing knowledge and expertise on water related issues
Number of multilateral engagements international countries
2 multilateral agreements in place (North-South and South-South)
1 Engagement on multilateral relations with India, Brazil and South Africa (IBSA)
1 Engagement
ON TARGET: Engagement on high level meeting of developing and donor agencies aimed at ensuring that new developing nations meet their MDG targets under the auspices of AMCOW
DWA contributed to the United Nations Commission on Sustainable Development (UNCSTD) process on sustainable development (water quality, sanitation, etc)
25
1st Quarter Performance Report
Strategic Priority: Strategic Priority 5: Contribute to global relations
Strategic Objectives: Ensure effective implementation of regional cooperation agreements
Outputs Performance Indicator
Baseline information
2010 Performance against targets
2010/11 Target 1st quarter milestone
Actual achievement
Provide coordination on regional (Southern African Development Community (SADC) and continental water issues
Level of effectiveness of the functioning of the water structures
Implementation of the SADC Protocol on water
Finalisation of the Memorandum of Understanding (MoU) for the SADC Hydrological Cycle Observing system (HYCOS) Project Phase III
DWA participates in all SADC water structures
ON TARGET:MoU went through the legal process and finalised. DWA participated in the SADC Annual Ministers’ to review progress / made within SADC of Water. Report was approved by Ministers.
DWA has also participated in the Sectoral and Inter-Sectoral SADC Ministers responsible for infrastructure and development. A report on water issues was adopted.
26
1st Quarter Performance Report
Strategic Priority 5: Contribute to global relations
Strategic Objectives: Ensure support to Water Sector Institutions within SADC
Outputs Performance Indicator
Baseline info
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Documentation of best practice case studies
Number of best practice case studies documented
0 3 1 Agreement signed with Swaziland
ON TARGET:
Preparatory work on the agreement with Swaziland was completed for signing in July.
Hosted the Senior\ Officials meeting on ORASECOM in May 2010 with a view to manage the shared water courses between the 4 countries (Lesotho, Namibia, SA and Botswana)
-DWA secured office space for ORASECOM
27
1st Quarter Performance Report
Strategic Priority 6: Improve the Department’s capacity to deliver quality services
Strategic Objectives: To ensure alignment of institutions to meet legislative mandates
Outputs Performance Indicator
Baseline informatio
n
2010 Performance against targets
2010/11 Target 1st quarter milestone
Actual achievement
Compliance to legislative mandates by institutions
Percentage compliance to legislative requirements by all institutions
100 100 100 ON TARGET: 100%Business Plans, SCs of 13 Water Boards, TCTA, WRC and CMAs
28
1st Quarter Performance Report
Strategic Priority 6: Improve the Department’s capacity to deliver quality services
Strategic Objectives: Ensure effective organisational performance management
Outputs Performance Indicator
Baseline info
2010 Performance against targets
2010/11 Target 1st quarter milestone
Actual achievement
Implementation of an organization performance monitoring and Evaluation system
Automated Organisational Performance Monitoring and Evaluation system in place
Manual system is available
Automated Organisational Performance M&E system implemented
First draft of the scorecard content of the system produced
ON TARGET: First draft of the scorecard content of the system produced
29
1st Quarter Performance Report
Strategic Priority 6: Improve the Department’s capacity to deliver quality services
Strategic Objectives: Ensure effective organisational performance management
Outputs Performance Indicator
Baseline info
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Implementation of the Risk Management Framework
Approved Risk Management Framework in place and implemented
Draft Framework in place
Risk Management Framework approved and implemented
Compile risk register
ON TARGET:Risk register in place and framework approved. Three workshops held in WC, NW,GP
30
1st Quarter Performance Report
Strategic Priority 6: Improve the Department’s capacity to deliver quality services
Strategic Objectives: Ensure effective organisational performance management
Outputs Performance Indicator
Baseline info 2010 Performance against targets
2010/11 Target 1st quarter milestone Actual achievement
Implementation of the 3 year Internal Audit Strategic Plan as approved by Audit Committee
Percentage implementation of the Internal Audit Coverage Plan
50% of the Internal Audit Coverage Plan implemented
100% implementation of the Internal Audit Coverage Plan
Approved three year strategic plan and implementation thereof.
ON TARGET: Three year strategic plan approved and implementation at 25%
Strategic Objectives: Improve financial management capacity
Effective implementation of the Financial Improvement Plan
Percentage achievement of milestones as contained in the plan
100% of the milestones implemented
100% 80% of milestones in the financial improvement action plan achieved
ON TARGET:90%
31
1st Quarter Performance Report
Strategic Priority 6:Improve the Department’s capacity to deliver quality services
Strategic Objectives: Improve financial management capacity
Outputs Performance Indicator Baseline info
2010 Performance against targets
2010/11 Target
1st quarter milestone
Actual achievement
Improvement of revenue management
Number of days in which debts remain uncollected
120 days 60 days 120 days BEHIND TARGET: 192 days
Strategic Objectives: Development of appropriate skills to address the sector needs
Development of graduate trainees for placement into permanent positions through the learning Academy
Percentage of graduate trainees developed and into permanent positions
0 30% of the 2007 intake
- To be reported on in the 2nd quarter
Number of learnerships implemented
86 100 learnerships
- 50 learnerships will be implemented in the 2nd quarter
32
1st Quarter Performance Report
Strategic Priority:Improve the Department’s capacity to deliver quality services
Strategic Objectives:Improve the Department’s capacity to deliver quality services
Outputs Performance Indicator
Baseline info
2010 Performance against targets
2010/11 Target 1st quarter milestone
Actual achievement
Development of graduate trainees continued
Number of internships implemented
128 50 internships 50 implemented
BEHIND TARGET:The internship programme was put on hold pending ascertainment and confirmation of the vacancy rate.
Conduct skills gap analysis for the water sector
Report with findings on sector skills gaps produced
0 Conduct sector skills gap analysis and produce a report
- To be reported on in the second quarter
33
1st Quarter Performance Report
Strategic Priority 6:Improve the Department’s capacity to deliver quality services
Strategic Objectives: Implementation of Gender and Disability Mainstreaming Programmes
Outputs Performance Indicator Baseline info
2010 Performance against targets
2010/11 Target 1st quarter milestone
Actual achievement
Implement woman empowerment projects
Number of women empowerment projects implemented
0 2 projects developed and implemented
2 projects proposals developed and approved
ON TARGET:2 project proposals developed and approved
Strategic objective: Improved Public Understanding and appreciation of the Value of Water by All South Africans
Implementation of Public Education and Awareness Plan
Number of public education Awareness interventions implemented as per the plan
4 4 interventions 1 joint campaign held and report submitted
ON TARGET:2 Joint campaigns undertaken with WISA and Ekurhuleni
34
PART B
PerformanceAgainst the 2010/11 strategic plan
(Water Trading Entity)
35
Strategic Priority 1 : Contribution to economic growth and social development
Strategic Objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure
Output (s) Performance Indicator (s)
Baseline information
Performance against targets
20010/11Targets
1st quarter milestone
Actual achieve
ment
Implementation of new bulk water infrastructure to meet social water needs, economic growth and development
Percentage completion of the project as per project plan
De Hoop Dam 44% complete
De Hoop Dam 73% complete 50%
BEHIND TARGET49% complete
Percentage completion of the project as per project plan
Nandoni Water Treatment Works 95% complete
Nandoni Water Treatment Works 100% complete
98%
BEHIND TARGET95% complete
36
Strategic Priority 1 : Contribution to economic growth and social development
Strategic Objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure
Output (s) Performance Indicator (s)
Baseline information
Performance against targets
20010/11Targets
1st quarter milestone
Actual achievement
Implementation of new bulk water infrastructure to meet social water needs, economic growth and development
Percentage completion of the project as per project plan
Nandoni Distribution 38% complete
Nandoni Distribution 51% complete
66%
BEHIND TARGET:38 % complete
Percentage completion of the project as per project plan
Inyaka Water Treatment Works 62% complete
Inyaka Water Treatment Works 81% complete
68%ON TARGET:68% complete
37
Strategic Priority 1 : Contribution to economic growth and social development
Strategic Objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure
Output (s) Performance Indicator (s)
Baseline information
Performance against targets
20010/11Targets
1st quarter milestone
Actual achievement
Implementation of new bulk water infrastructure to meet social water needs, economic growth and development
Percentage completion of the project as per project plan
MCWAP 1: Mokolo and Crocodile River Water Augmentation 5%
10%
6% Directive issued. RID issued.WSA signed.
BEHIND TARGET5%
KWSAP: Komati Water supply Augmentation
35% 10%BEHIND TARGET9.5%
MMTS-2 Mooi-Mgeni Transfer Scheme 5%
35% 10%BEHIND TARGET7.5%
38
Strategic Priority 1 : Contribution to economic growth and social development
Strategic Objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure
Output (s) Performance Indicator (s)
Baseline information
Performance against targets
20010/11
Targets
1st quarter milestone Actual achievement
Implementation of new bulk water infrastructure to meet social water needs, economic growth and development
Percentage completion of the project as per project plan
Raising of Clanwilliam Capital Project 0% complete
5% 1%BEHIND TARGET:0.5%
VRESAP: Vaal River Eastern Sub-system Augmentation Project 99%
100% 99.2%
BEHIND TARGET:The Contractor achieved no progress on site. After following contractual procedures the Contract VO21 was terminated and Contractor handed over site to TCTA
39
Strategic Priority 1 : Contribution to economic growth and social development
Output (s) Performance Indicator (s)
Baseline information
Performance against targets
20010/11Targets
1st quarter
milestone
Actual achievement
Implementation of new bulk water infrastructure to meet social water needs, economic growth and development cont….
Percentage completion of the project as per project plan
Hluhluwe Regional Water Scheme 67% complete
Hluhluwe Regional Water Scheme 87% complete
74%BEHIND TARGET:66% complete
Percentage completion of the project as per project plan
Mdloti River Development (Raising of Hazelmere dam) 5% complete
Mdloti River Development (Raising of Hazelmere Dam) 40% complete
10%BEHIND TARGET:8% complete
Percentage completion of the project as per project plan
Groot Letaba RWRP (N’wamitwa Dam and raising of Tzaneen Dam) 5% complete
Groot Letaba RWRP (Nwamitwa Dam and raising of Tzaneen Dam) 10% complete
6%ON TARGET6% complete
40
Strategic Priority 1 : Contribution to economic growth and social development
Strategic objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure
Output (s) Performance Indicator (s)
Baseline information
Performance against targets
20010/11Targets
1st quarter milestone Actual achievement
Supply of Water to usersPercentage level of assurance of supply
100% compliance to levels of assurance of supply for different user group
100% level of assurance of supply for different user group
100%
BEHIND TARGET:80% compliance to levels of assurance of supply for different user groups
41
Strategic Priority 1 : Contribution to economic growth and social development
Strategic objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure
Output (s) Performance Indicator (s)
Baseline information
Performance against targets
20010/11Targets
1st quarter
milestoneActual achievement
Maintenance of infrastructure as per maintenance plan and procedures required to ensure infrastructure availability
Percentage infrastructure availability
70% availability
80% availability
70% ON TARGET:80% availability
Maintain infrastructure according to maintenance plan
65% Planned work completed
70% 20% ON TARGET:20%
42
Strategic Priority 1 : Contribution to economic growth and social development
Strategic objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure
Output (s) Performance Indicator (s)
Baseline informati
on
Performance against targets
20010/11Targets
1st quarter milestone
Actual achievemen
t
Resources Management Plans (RMPs) developed
Number of RMPs completed Nil
Complete RMP implementation Action plan for NWRI only
1st draft of action plan completed
5% of Action Plan completed
Existing RMPs implemented
Number of existing RMPs implemented Nil RMP operational within 12
months -
To be reported in the 2nd quarter
43
Strategic Priority 1 : Contribution to economic growth and social development
Strategic objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure
Output (s)Performance Indicator
(s)Baseline
information
Performance against targets
20010/11Targets
1st quarter milestone
Actual achievement
Dam safety rehabilitation programme
Number of dams rehabilitated
24 dams rehabilitated
0 dams rehabilitated
2 dams to be under rehabilitation
ON TARGET: 1 dam rehabilitated and second dam rehabilitation in progress
Number of dams under construction
7 dams under construction
1 dam under construction 11
BEHIND TARGET: 1 dam
Number of dams in design phase
14 dams in design phase
1 dam 1 dam ON TARGET:1 dam
44
Strategic Priority 1 : Contribution to economic growth and social development
Strategic objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure
Output (s) Performance Indicator (s) Baseline information
Performance against targets
20010/11Targets
1st quarter milestone
Actual achievement
Strategy for the conversion of single to multi-purpose dams developed
Strategy for the conversion of single to multi-purpose dams developed
Nil Approved strategy
1st draft of strategy
Embarked consultation process with Regions and Municipalities
45
Strategic Priority 1 : Contribution to economic growth and social development
Strategic Objective: Effective creation of decent employment through infrastructure delivery
Output (s) Performance Indicator (s)
Baseline information
Performance against targets
20010/11Targets
1st quarter milestone Actual achievement
Creation of decent jobs and ensures appropriate training of employees
Number of decent jobs created 4368 220 275
ON TARGET:535
Promotion of SMMEs through procurement of goods and servicesBudget spend on BEE and SMMEs
Percentage of contact value awarded to SMMEs and BEE enterprises
BBBEE Strategy approved 50% 10%
ON TARGET:45%
46
Strategic Priority 2 : Ensuring sustainable and equitable water resources management in all water management areas
Strategic Objective: To provide monitoring and assessing water resources availability and use
Output (s) Performance Indicator (s)
Baseline information
Performance against targets
20010/11Targets
1st quarter milestone Actual achievement
Implementation of hydrology and Geo hydrology monitoring systems and water quality monitoring
Number of operational monitoring programmes implemented
11 15 1 programme implemented
ON TARGET:1 programme implemented
Number of sampling points monitored 100 104
27 sampling points monitored
ON TARGET:890
47
PART C
ROADMAP ON THE FILLING OF FILLING OF VACANT POSTS
48
VACANCY BY BRANCH
BRANCH FILLED VACANT TOTAL VACANCY %
MINISTER / DG / COO / IA 119 41 160 25.63
CORPORATE S. 594 85 679 12.52
FINANCE 318 160 478 33.47
REGIONS 3418 521 3939 13.23
NWRI 2744 346 3090 11.20
POLICY & REG. 500 144 644 22.36
INT. RELATIONS 25 12 37 32.43
Grand Total 7718 1309 9027 14.50
49
GRAPHICAL PRESENTATION
0500
10001500200025003000350040004500
VACANT
FILLED
50
VACANCY BY SALARY LEVEL
BRANCHSALARY LEVEL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 TOTAL
MIN/DG/COO/IA 1 4 3 3 5 4 6 7 3 4 1 41
CORPORATE S. 3 11 2 6 23 8 6 8 5 2 8 2 1 85
FINANCE 1 2 1 36 51 32 3 27 1 5 1 160
REGIONS 51 15 18 26 101 83 92 32 47 21 21 11 3 521
NWRI 26 18 39 62 44 51 43 23 15 8 16 1 346
POLICY & REG. 56 10 11 19 14 9 5 11 7 1 1 144
INT. RELATIONS 1 2 1 4 1 2 1 12
GRAND TOTAL 80 45 62 156 217 209 197 85 113 37 69 27 9 3 1309
51
EMPLOYMENT EQUITY AND VACANCY RATE
BRANCH
AFRICAN INDIAN COLOURED WHITE TOTAL
TOTAL
Male Female Male Female Male Female Male Female Female Male
No. % No. %No. %
No. %
No. %
No. %
No. %
No. %
No. % No. %
MINISTER / DG 39
32.77 70
58.82 0
0.00 0
0.00 0
0.00 2
1.68 5 4.20 3 2.52 75 63.03 44 36.97 119
CORPORATE S. 219
36.87 275
46.30 5
0.84 11
1.85 11
1.85 5
0.84 29 4.88 39 6.57 330 55.56 264 44.44 594
FINANCE108
33.96 141
44.34 1
0.31 4
1.26 5
1.57 1
0.31 14 4.40 44
13.84 190 59.75 128 40.25 318
REGIONS 1573
46.02
1230
35.99 27
0.79 34
0.99
171
5.00
104
3.04
166 4.86
113 3.31 1481 43.33 1937 56.67 3418
NWRI 1681
61.26 378
13.78 13
0.47 6
0.22
196
7.14 43
1.57
318
11.59
109 3.97 536 19.53 2208 80.47 2744
POLICY & REG. 168
33.60 172
34.40 5
1.00 9
1.80 9
1.80 6
1.20 67
13.40 64
12.80 251 50.20 249 49.80 500
INT. RELATIONS 9 1.80 13 2.60 0
0.00 1
0.20 0
0.00 0
0.00 0 0.00 2 0.40 16 64.00 9 36.00 25
TOTAL379
7 227
9 51 65 392
161
599
374
2879 37.30 4839 62.70 7718
Grand Tot. 6076 116 553 973
52
ROADMAP
1. The Department is in the process of developing a recruitment strategy aligned to the HR plan
2. The Department engaged with a tender to procure the services of a PSP to manage response handling for recruitment
3. The Department is in the process of developing a project to align structure, establishment and compensation of employees.
53