Prishtina, 24th February 2009.
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
IPF
• Infrastructure Project Facilty is EC funded project, to support infrastructure development in seven Western Balkan countries - Albania, Bosnia and Herzegovina, Croatia, FYRMAC, Kosovo, Monte Negro and Serbia
• IPF is project to be implemented over 48 months ( June 2008-June 2012)
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
IPF Objectives
• To support infrastructure development creating the conditions for regional and national sustainable development in:
transport, environment, energy and social sector
• To support preparation of projects that may be financed trough grants and loans provided by:
IFIs, IPA resources, bilateral donors, beneficiaries countries
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
Expected results
• Quality investment proposals for infrastructure development, reconstruction and upgrade
• Transfer of know how and capacity building at local and international level
• Enhanced collaboration with IFIs
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
Selection Criteria (1/2)Eligibility Projects Criteria
• Part of the National Strategy
• Sectors - energy, transport,environment and social sector
• Complementarities with IPA Nacional Programs
• Level of readiness ( land permits, geotechnical studies,etc.),
• Impacts on economy, environment, human rights, society ,....
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
Selection Criteria (2/2)
• Financing perspective ( loans, grants)• Social,environment, regional/cross border impact, • Economic and financial assesment • Balanced use of resources among the sectors• Geographical spread of resources • Part of regional networks
Prioritisation Criteria
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
Sectors
•Energy: renewable energy, interconnection systems, transmission, energy efficiency and savings, co-generation, hydro, gas pipelines, etc....
•Transport: roads, railways, inland waterways, airports,..
• Social sector: schools, hospitals and health centers, housing, reclusion centers, etc...,
•Environment: water supply, waste water treatment, sewage systems, solid waste management, emission control, etc.
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
Sector Strategies
Environment
•Projects in nacional sectors strategies
•In line with environmental acquis
•Inclusion in regional pipelines
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
Sector Strategies
• In line with guidelines for trans-European networks
• Among priority projects of the “Energy Community”
• Preference accorded :- electricity interconnection- electricity generation with regional significance- gastransmission networks and LNG terminals
Energy
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
Sector Strategies
Transport• Focus on the “SEE Core Regional Transport Network” and SEETP
MAP 2008-2012
• Priority to railways and inland waterways on regional corridors
Social• Projects in national sector strategies• Full complementarities with IPA national programs
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
IPF governing Structure
Beneficiaries
IPF Secreteriat
Tehnical assistance Grants,....
Beneficiaries
IPF Stearing Committee(EC,IFIs,beneficiaries)
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
TA Window process
NIPAC IPF Secreteriat IPF SC
DG
WYG-Order of
TA services
WYG-Order of
TA services
WYG-Order of
TA services
TA projects presented by beneficiaries and sponsors(IFIs, others)
prioritisation of projects
projects proposals
projects approval
-intern. consultants-local consultants
-intern. consultants-local consultants
-intern. consultants-local consultants
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
TA - Project Preparation Services
TA to beneficiaries during project preparation and cycle:
• Pre-feasibility and Feasibility studies (pre- FS and FS)-Financial affordability analyses-Budgetary planning-Environmrntal and Social Impact Assessments
• Completed design (CD) with- technical specifications and bill of quantities
Tender proces (TP), - tender documents - assistance to evaluation
• Supervision of implementation works (IW)
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
First round projects -Transport Sector
TA-BIH-06 Corridor Vc: two sections Up-date of feasibility study and management consultancy
TA-BIH-08 Construction of Foca-Hum road
Feasibility Study
TA-ALB-06 Improvements to the Albanian Rail Network
Feasibility Study
TA-KOS-02 Rehabilitation of railwayroute 10
Pre-Feasibility Study
TA-SER-15 Railway reconstrction Nis-Presevo
Feasibility Study
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
First round projects -Environment Sector
TA-BIH-03 Water Supply: Plava VodaBiH
Review of feasibility study and detailed design, management support
TA-KOS-01 Water Supply: PristinaKosovo
FS, EIA
TA-MON-05 Water Supply: PodgoricaMontenegro
FS, EIA
TA-MON-07 Waste Water: PodgoricaMontenegro
FS, EIA
TA-SER-17 Waste water: Vranje & Uzice ,Serbia
FS, EIA,
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
First round projects -Social Sector
TA-ALB-04 Tirana Univ. Hospital CentreAlbania
Feasibility Study and Detailed Design
TA-ALB-10 Tirana Schools 2nd PhaseAlbania
Feasibility Study
TA-BIH-01 State Prison BIH
Feasibility Study and Detailed Design
TA-FYRMAC-01 Idrizovo PrisonfYR Macedonia
Pre-Feasibility Study and Detailed Design
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
First round projects - Energy Sector
TA-ALB-11 Upgrade of transmission system
Preliminary design
TA-FYRMAC-02 Pilot project wind park development
Feasibility Study
TA-MON-05 Electricity network development program
Pre-Feasibility Study
TA-SER-19 400 kV Serbia-Hungary transmission line
Pre-Feasibility
………………………………………………………………………….
……………………………………………………..……………WYG International
part of the WYG group
• Thank you for your attention
Alush GroshaCountry ManagerWestern Balkans Infrastructure Projects FacilityWYG International, PrishtinaPhone: + 381 38 247 960Fax: + 381 38 247 961E-mail: [email protected]