pt truba alam manunggal engineering (tame) filept. rapp 5,340,000,000 jan-14 3 maintenance and...
TRANSCRIPT
TAME has 37 years of proven Tack Record having participated or involved in most
of the Major Industrial Projects in Indonesia. Major projects include 45 power
plants, 6 pulp & paper factories, 9 cement plants, 6 fertilizer plants, steel mill, nickel
plant, countless chemical & petrochemical plants ever built in the country.
TAME is gaining foothold in the Middle East market since 2002 and is focused in
developing its reputation in Saudi Arabia power generation sector. TAME has
already mobilized 800 workers to 9 various projects in the Middle East.
TAME QA System complies with ISO 9001:2008 and was the first construction
company in Indonesia to receive certification in 1993.
TAME is accredited by ASME for Stamp “S” and Stamp “R” by the National Board
of Pressure Vessels & Inspection (USA) and, further for ISO 14000 and OHSAS
18000
Company Overview
Business Activities
CONSTRUCTION, MAINTENANCE & ENGINEERING
Construction Maintenance EPC
* Contractor of Mechanical,
Electrical & Instrumentation tasks
* Supervising Projects, Sparepart
Procurement and Work Force,
Implementing total Restoration
(shut-down)
* Structure Design of Mechanical
& Electrical Installation Tasks
(Pipe & Tank)
* Implementing all tasks in Power
Generation, Industrial Plant, Oil &
Gas, Mining Plant Constructions
* Pre/ Post - Weld Heat
Treatment, Cleaning Chemical
Substances
* Structure Design, Managing
Procurement of Raw Materials,
and Implementing Power
Generation Construction
Development
* Implementing supporting tasks
(Civil, Pipe, Tank, Steel, Structure)
* Sole expertise in doing
maintenance shut down for large
size boilers in Indonesia
* Providing Design Images and
Details.
Awarded Projects In 2014
S/N Pekerjaan Tipe Lokasi Klien
Nilai
Kontrak
USD
Nilai Kontrak
Rp Awarded
1
Perjanjian Sewa Menyewa
Kapal 3 Unit Tug Boat dan 1
Lot Lubrication dan
Maintenance
MaintenancePangkalan Kerinci,
Pelalawan, RiauPT. RAPP 2,616,000,000 Jan-14
2
Perjanjian Borongan
Pemeliharaan Rutin
Operasional Ferry Langgam I
MaintenancePangkalan Kerinci,
Pelalawan, RiauPT. RAPP 5,340,000,000 Jan-14
3
Maintenance and
Miscellaneous Works of
RAPP, IKPP, LPPPI, TPL &
Others (Operational &
Maintenance Ferry Langgam
of RAPP (1 Unit Ponton and 3
Units Tug Boat), Annual Mill
Shutdown LPPPI Jambi)
Maintenance Kerinci - Riau PT. RAPP 7,956,000,000 Jan-14
4RB-11 Rebuild Install All New
& Repair DuctingKonstruksi
Perawang - Riau
Sumatera
PT. Indah Kiat
Pulp & Paper
Tbk
443,000,000 Feb-14
5 Fabrication Silo KonstruksiBabelan, Bekasi - West
Java
PT. Valmet
Indonesia14,729,719,852 Feb-14
6 Inland Transportation KonstruksiBabelan, Bekasi - West
Java
PT. Valmet
Indonesia8,940,272,500 Feb-14
Awarded Projects In 2014
S/N Pekerjaan Tipe Lokasi Klien
Nilai
Kontrak
USD
Nilai Kontrak
RpMulai
7Refractory Transportation Cost
(40 Feet - Approx 33 Containers)Konstruksi
Babelan, Bekasi - West
Java
PT. Valmet
Indonesia170,775,000 Feb-14
8
Returning Back of Empty
Container from Babelan Site to
Container Storage (70% of
Container Trailer Cost)
KonstruksiBabelan, Bekasi - West
Java
PT. Valmet
Indonesia3,079,125,000 Feb-14
9
Movement to cakung for
Storage, Loading, Unloading for
78 Containers (First 2
Shipments) - Including retruning
of 76 empty container =
movement to site after one
month)
KonstruksiBabelan, Bekasi - West
Java
PT. Valmet
Indonesia1,413,668,480 Feb-14
10Repair Welding Interbed cooler
& Process Gas CoolerKonstruksi Purwakarta, West Java
PT South
Pacific Viscose791,470,000 Feb-14
11
Package-B P14 Indocement
Plant (Mechanical Equipment,
Steel Structure, Piping,
Refractory, Insulation, Roofing &
Clading)
Konstruksi Citeureup, West Java
PT. Sinoma
Engineering
Indonesa
121,280,000,00
0Feb-14
12 Fabrication of Atmosphire Tank EPCBabelan, Bekasi - West
Java
PT. Cikarang
Listrindo16,999,686,000 Feb-14
Awarded Projects In 2014
S/N Pekerjaan Tipe Lokasi Klien Nilai
Kontrak
USD
Nilai Kontrak
Rp
Mulai
13
150 KV GIS Extension
Project of PLTU 2
Pelabuhan ratu 3x350
MW Power Plant
Konstruksi Pelabuhan Ratu - West JavaShanghai
Electric Corp1,421,000 Feb-14
14
Perjanjian Borongan
Temporary Bridge &
Pipe Construction
Protection for Crossing
Pipe KPSA
MaintenancePangkalan Kerinci, Pelalawan,
RiauPT. RAPP 417,423,667 Feb-14
15
PLC Dryer #1 & #2;
Upgrade Installation
Work
KonstruksiSoroako Nickel Production
Facility, South Sulawesi
PT. Vale
Indonesia Tbk. 45,099.18 Mar-14
16
Diagonal Screen &
Scaffolding - Digister
PM
Maintenance Tanjung Jabung Barat, Jambi
PT. Lontar
Payrus Pulp &
Paper Industry
1,039,949,304 Mar-14
17
Annual Shutdown RB#1,
Shutdown RB#2,
Shutdown VE#1 PF1B-
PF1D Replacement by
Pass Vapor & Automatic
Cleaning RB
Maintenance Tanjung Jabung Barat, Jambi
PT. Lontar
Payrus Pulp &
Paper Industry
3,984,646,179 Mar-14
S/N Pekerjaan Tipe Lokasi Klien Nilai
Kontrak
USD
Nilai Kontrak
Rp
Mulai
18
Pipe Line PM &
Expansion Joint RB#1
Replacement
Maintenance Tanjung Jabung Barat, Jambi
PT. Lontar
Payrus Pulp &
Paper Industry
1,350,000,000 Mar-14
19Natural Gas Piping
InstallationMaintenance Tanjung Jabung Barat, Jambi
PT. Lontar
Payrus Pulp &
Paper Industry
308,096,315 Mar-14
20
Pile Driving and
Foundation
Oleochemical Plant
Project;
Konstruksi Lubuk Gaung - Dumai, Riau
Energi
Sejahtera Mas
(Sinar Mas
Group)
64,000,000,000 Mar-14
21 Shutdown Kiln Job MaintenanceSoroako Nickel Production
Facility, South Sulawesi
PT. Vale
Indonesia Tbk.4,802,851,694 Mar-14
22 Shutdown Furnace Job MaintenanceSoroako Nickel Production
Facility, South Sulawesi
PT. Vale
Indonesia Tbk.3,811,896,663 Mar-14
23Shutdown Converter
JobMaintenance
Soroako Nickel Production
Facility, South Sulawesi
PT. Vale
Indonesia Tbk.2,647,875,930 Mar-14
24Furnace Roof
ReplacementMaintenance
Soroako Nickel Production
Facility, South Sulawesi
PT. Vale
Indonesia Tbk.23,436,097,520 Mar-14
Awarded Projects In 2014
S/N Pekerjaan Tipe Lokasi Klien Nilai
Kontrak
USD
Nilai Kontrak
Rp
Mulai
25
Addendum no. 1 to agreement of
installation and dismantle of
scaffolding for shelter clinker hopper
work Holcim, Tuban project
KonstruksiTuban, East
Java
PT Holcim
Indonesia245,767,500 Apr-14
26
Construction Work of RAM Transport
Package (Raw & Additive Materials
Storage & Transport Systems) for P-14
Project (Part 3CP5.04)
Construction Citeureup
PT. Indocement
Tunggal
Prakarsa
149,250,000,000 Apr-14
27
Amandment 1 Rental & maintenance
Welding Engine Miller 500 Amp oleh PT
Tripatra Engineers & Construction 10
unit @Rp.6,600,000,- selama 3 bulan,
dari Rp.795,000,000,- ke
Rp.199,500,000,- maksimal
Rp.994,500,000,-
Welding
Engine
Rental
Banyu Urip
project
PT Tripatra
Engineers &
Construction
199,500,000 Apr-14
28
Engineering and Installation of cooling
tower facilities with capacity 3,300m3/h
and 11,440m3/h at ASC Factory, Desa
Gunung Sugih, Cilegon, Banten
EPC Cilegon BantenPT. ASAHIMAS
CHEMICAL 17,250,000,000 Apr-14
29Rante LGS-Concrete Sheet Pile
Installation Konstruksi
Soroako Nickel
Production
Facility, South
Sulawesi
PT Vale
Indonesia1,585,180,900 Jun-14
Awarded Projects In 2014
S/N Pekerjaan Tipe Lokasi Klien Nilai
Kontrak
USD
Nilai Kontrak
Rp
Mulai
30
Dismantling of mechanical and steel
structures of big bag packing facilities
at P6 and P8 Cement Packing for
Citereup PCC Improvement and
Capacity Expantion Project - Part#70
Konstruksi CiteureupPT. Indocement
Tunggal Prakarsa1,163,000,000 Jun-14
31 Service Contract - Additional Platform MaintenancePaiton,
ProbolinggoPT. IPMOMI 4,000 Jul-14
32 Maintenance Services for Tuban Plant MaintenanceTuban, East
JavaPT. Holcim Tbk. 2,000,000,000 Aug-14
33
Mechanical, Electrical and Instrument
Installation Work Package-1 Recovery
Boiler
KonstruksiOKI -
Palembang
PT. OKI Pulp &
Paper Mill203,000,000,000 Aug-14
34Service Contract - To Install Mist
Eliminator to Seal Well unit #8Maintenance
Paiton,
ProbolinggoPT. IPMOMI 28,002 Aug-14
35
Service Contract - Provide Resources
for Absorber Water Pump C Inspection,
Testing and Commissioning, CFC-P-
600C
MaintenancePaiton,
ProbolinggoPT. IPMOMI 20,510 Aug-14
36 SLO CMTF Pit Construction-Package A KonstruksiPekanbaru,
Riau
PT. Chevron
Pasific Indonesia33,939,950,369 Aug-14
Awarded Projects In 2014
S/N Pekerjaan Tipe Lokasi Klien Nilai
Kontrak
USD
Nilai Kontrak
Rp
Mulai
37
Coal Transportation Project (CTP)
Port Upgrade Civil, Electrical
Construction & Crane Assembly
Soroako Nickel Production Facility,
South Sulawesi.
Konstruksi Sulawesi SelatanPT Vale
Indonesia49,124,623,575 Aug-14
38Piling Work for Cooling Tower 3,300
m3/hKonstruksi Cilegon Banten
PT. ASAHIMAS
CHEMICAL 440,000,000 Aug-14
39Civil Work For WK System Facility
for Phase VI ProjectKonstruksi Cilegon Banten
PT. ASAHIMAS
CHEMICAL 5,800,000,000 Aug-14
40Electrical & Instrumentation
Package "B" P14, Indocement PlantKonstruksi Citeureup, West Java
PT. Sinoma
Engineering
Indonesa
27,964,000,000 Sep-14
41
Piping Construction and Mechanical
Equipment Installation Work for
Cooling Water System of PH-6
Project
Konstruksi Cilegon BantenPT. ASAHIMAS
CHEMICAL 1,220,000 9,500,000,000 Sep-14
Awarded Projects In 2014
(in billion Rupiah) 6M14 6M13
Revenues 602 787
Cost of Revenues 628 712
Gross Income (26) 75
Operating Income (88) (31)
EBITDA (28) 93
Other Income (Charges) 14 (2)
Net Income (163) (52)
Total Asset 2,635 2,784
Total Liabilities 2,961 2,341
6M14 6M13
Gross Profit Margin (4%) 10%
EBITDA Margin (5%) 12%
Operating Margin (15 %) 4%
6M14 Financial Highlights
ProjectMWCustomer
2X330
3X330
3X600
1,180
4X400
1,500
740
2X400
2X660
1X800
IPP Labun BantenChengda
IPP IndramayuCNCEC
PLN Suralaya
PLN Tanjung Priok
Marubeni
PLN Suralaya
PLN Gresik
PLN Cilegon
Mitsubishi
PLN Paiton
IPP Paiton
ABB
IPP Paiton IIITaihei Dengyo
Kaisha,LTD
SELECTED INDUSTRIAL PROJECTSSELECTED POWER PLANT PROJECTSSELECTED POWER PLANT PROJECTS
CustomerIndustry
Pertamina, Aromatic Plant
Petro-chemical
PT Pupulk Kaltim, Urea Fertilizer Storage
Fertilizer
INCO, Nickel Smelter Plant
Minerals Processing
Exxon Mobil NSO Phase A Field Development
Oil
CustomerLocation
Laem Chabang, Gantry Cranes
Thailand
Qatar Petroleum, Tank Works
Qatar
Siemens, Structural Works
Singapore
Arabian Bemco, Installation of Gas Turbine
Saudi Arabia
Major Customers of Truba Jaya:
Established Operating Track Records
Mechanical Erection CoalMining
PT Kaltim Prima CoalSumitomo Corp 2X660 Tanjung Jati B unit 3 & 4