PUB - POWS FrontEnd Manual Public Utilities Board of Singapore

Upload: others

Post on 05-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Public Utilities Board of Singapore

PUB - POWS FrontEnd Manual

Public Utilities Board of Singapore

Page 2: Public Utilities Board of Singapore

2

CONTENTS

1 Login ............................................................................................................................................... 4

2 Create New Project ......................................................................................................................... 5

3 Create New Submission .................................................................................................................. 6

3.1 Add Project Members ............................................................................................................. 6

3.1.1 Choose Applicant/Contractor ......................................................................................... 8

3.2 QP/PE and Contractor Details ................................................................................................. 8

3.3 Corridor Details and Activities .............................................................................................. 10

3.3.1 Corridor Details: ............................................................................................................ 10

3.3.2 Activities: ....................................................................................................................... 10

3.4 Project Details ....................................................................................................................... 11

3.4.1 Activity Details 1............................................................................................................ 11

3.4.2 Activity Details 2............................................................................................................ 11

3.4.3 Activity Details 3............................................................................................................ 12

3.4.4 Contractor Details for the Activities: ............................................................................ 13

3.4.5 Features of Map ............................................................................................................ 14

3.5 Attachments .......................................................................................................................... 15

3.6 Summary ............................................................................................................................... 15

3.7 Acknowledgement ................................................................................................................ 18

4 Manage Existing Projects .............................................................................................................. 18

4.1 Manage Existing Project ........................................................................................................ 19

4.2 Set Actual Completion Date .................................................................................................. 20

4.3 Change Estimated Completion Date ..................................................................................... 20

4.4 Change Applicant .................................................................................................................. 20

4.5 Send Correspondence ........................................................................................................... 21

4.6 Manage Approved Project .................................................................................................... 22

4.6.1 Upload Instrumentation Record ................................................................................... 22

4.6.2 Close Submission ........................................................................................................... 22

5 Manage Draft Submissions ........................................................................................................... 24

5.1 Draft Details .......................................................................................................................... 25

Page 3: Public Utilities Board of Singapore

3

6 Close Completed Submissions ...................................................................................................... 26

7 Archived Submissions ................................................................................................................... 28

8 New Messages .............................................................................................................................. 30

9 Logout ........................................................................................................................................... 31

Page 4: Public Utilities Board of Singapore

4

1 Login

Click on “SingPass Login” button to login with SingPass

SingPass Login:

Enter the user’s SingPass ID and password to login to the system

Page 5: Public Utilities Board of Singapore

5

2 Create New Project

User can create a new project by filling in the following details:

1. Click on Create New Project link on the left panel

2. Enter the Project Ref No.

3. Type in the Project Title

4. Type in the NRIC/FIN number

5. Choose the Member Type from the drop down list

6. Enter the UEN number, Name of the member will be auto populated.

7. Enter the Company name

8. Type in the email address

9. Click on “Done” button, user will be added in the table shown in the page

10. Click on “+Add Member” – to add any number of members

11. Once done, do the declaration

12. Click on “Edit” button to edit the details of the member

13. Click on “Remove” button to remove the member from the project

14. Click Save, project will be created successfully

Page 6: Public Utilities Board of Singapore

6

3 Create New Submission A project can have any number of submissions. Once a project has been created, a project

submission can be created.

1. Click on “Create New Submission” link on the left panel.

2. A list of all projects that have already been created is displayed. The column headers are

sortable.

3. Click on the “Sort” icon in the column headers: Project Ref No., Title and the Your Role field.

All the projects will be shown in ascending or descending order respectively.

4. Type a search term in the search box – only the submissions matching the search query will

be shown.

5. Click on the page no. link to navigate between pages.

6. Click on any row to select the project to create a new submission for that project. First page

of project submission page opens.

3.1 Add Project Members The Applicant can select users who will be involved in the submission. The applicant must select at

least one contractor. The “Click here” link allows users to navigate to the page where a New

Member can be added to the specific Project

Page 7: Public Utilities Board of Singapore

7

The User can add new members on this page during the new Submission.

Page 8: Public Utilities Board of Singapore

8

3.1.1 Choose Applicant/Contractor

1. Choose the appropriate person/Professional Engineer/contractor for the submission of the

project.

2. Click on “Save” button, submission gets saved as a Draft

3. Click on “Next” button, the next step in submission is shown. Corridor Details and Activities

page is displayed.

3.2 QP/PE and Contractor Details Applicant’s Details and Contractor Details must be provided here. If a QP/QE is chosen, Applicant’s

details must be entered. At any step, click on “Back” button to go back to the previous step. Click on

“Save” button to save the submission as a draft before exit.

1. For an Applicant, QP/PE’s Registration No and Name are auto populated. They cannot be

edited

2. Company and Email values are auto populated but they can be edited

3. Fill in all the other details.

Page 9: Public Utilities Board of Singapore

9

If a contractor is chosen, Contractor details must be entered . UEN and Company name are auto

populated and are not editable. Applicant’s Name and Email Address fields are auto populated and

editable.

Page 10: Public Utilities Board of Singapore

10

3.3 Corridor Details and Activities The User is allowed to choose one or all of the corridors and activities related to the chosen

corridors. Select by clicking on the checkbox. Choose the corridor and click “Next” button to proceed

3.3.1 Corridor Details:

3.3.2 Activities:

Choose one or more of the activities and proceed to next step by clicking “Next”. Select the activities

by clicking on the checkbox

Page 11: Public Utilities Board of Singapore

11

3.4 Project Details Users must enter the activities details, which were selected based on the Corridor details. There are

three Activities Details pages.

3.4.1 Activity Details 1

The user can enter the following details:

1. Choose the Sewer Pipe Dia Affected(mm) and Raw/Water Pipe Type from the drop down list

2. Click on “+” button to add a new row of pipe details

3. Click on Delete icon to delete a row

4. Select “Yes/No” for: Has the depth of sewer/water pipe confirmed on site?

5. Fill in the details for the other fields

6. Click “Next” to proceed

3.4.2 Activity Details 2

The User must enter the following details in Activities Details (2) page based on the activities

selected earlier in Corridor Details and Activities step.

1. Type the values for “Depth of Filling” and “Depth of Evacuation” fields and then click on

“Next” to proceed.

Page 12: Public Utilities Board of Singapore

12

3.4.3 Activity Details 3

The User must enter the details in the Activities Details (3) page based on the Corridor details and

Activities chosen. Enter the “No. of layer of container box” field and proceed by clicking on “Next”

button.

Page 13: Public Utilities Board of Singapore

13

3.4.4 Contractor Details for the Activities:

Choose the contractor Details for the chosen activities. User is allowed to choose the Mukim/Lot No.

from the map shown. The Project Ref No. and Title are auto populated. The following details are toe

be provided

1. Click on Map icon and choose a Mukim/Lot No. from the Map. User can also type in the

Mukim No. in the Mukim Field.

2. Based on the chosen Mukim/Lot No., the Addresses (Road Name) are auto populated.

Choose one or more address from the drop down list

3. Based on the chosen Mukim/Lot No. Sewerage and Water Catchment fields are auto

populated (not editable by the user)

4. Fill in all the mandatory details (fields marked with ‘*’ are mandatory) and click on “Next”

button

Page 14: Public Utilities Board of Singapore

14

3.4.5 Features of Map

The User can use the map to select mukim lots.

1. Type a Mukim/Lot No as a search term in the search box, the address is filtered and shown.

When an address is selected, the area is drawn automatically on the map.

2. Zoom In and Zoom Out controls that appear in the up right hand corner of the map.

3. To draw an area manually, User can use Polygon, Rectangle or Marker icons. The

corresponding mukim lots are shown based on the area drawn.

4. The Marked Area can be edited using this icon.

5. Selected or drawn areas can removed using “Delete” icon.

Page 15: Public Utilities Board of Singapore

15

3.5 Attachments Water Pipe and Public Sewer Attachments are shown as 2 tabs. The User can upload any number of

files. Choose the necessary files for Water Pipe and Public Sewer pipes and add them as attachments

to this submission.

1. Files can be either be uploaded as attachments (or downloaded.)

2. Files can be deleted by clicking on delete button

3. Mandatory files are marked as “compulsory”.

Click on “Next” button, Summary of Submission is shown.

3.6 Summary The User is allowed to view the summary before submission. Click on “Edit” button in the Summary

to update or change any data.

Page 16: Public Utilities Board of Singapore

16

Summary continued…

Summary continued…

Page 17: Public Utilities Board of Singapore

17

Summary continued…

1. If user enters comments and clicks on “Send” button, the project submission is routed to the

drafter with comments.

2. Do the declaration in the summary page

3. click on “Submit” button

Page 18: Public Utilities Board of Singapore

18

3.7 Acknowledgement

1. Submission is done successfully and a Submission Ref No. for the project is created as above.

This is a unique number created for every submission

2. User can use this reference number to identify the submission.

4 Manage Existing Projects

The User can manage existing projects he/she is part of. Once a submission is completed, it will be

listed here. Contractors can add/remove Project Members for a project from here. List of

Submissions are shown here.

Page 19: Public Utilities Board of Singapore

19

The status of a submission is shown here. Click on Project Members to add/remove members

4.1 Manage Existing Project

1. Click on “View Submission” button to view the submission

2. Only a Contractor will be allowed to manage applicant. No other member will be allowed to

do it.(Ref-No.4)

3. User can change the Actual completion date, Estimated completion date, Send a

correspondence and Upload instrumentation record (Ref-No.2,No.3,No.5,No.6)

Page 20: Public Utilities Board of Singapore

20

4.2 Set Actual Completion Date User is allowed to Change the Actual Completion Date. Click on “Change” button

4.3 Change Estimated Completion Date The User is allowed to Change the Estimated Completion Date. Click on “Change” button

4.4 Change Applicant

Page 21: Public Utilities Board of Singapore

21

The User is allowed to change the Applicant. Click on the “Browse” button & upload any documents.

4.5 Send Correspondence User can correspond with PUB officers by entering information in the form shown below and clicking

on the “Submit” button. Click on “Back” button to go back to the previous page.

Page 22: Public Utilities Board of Singapore

22

4.6 Manage Approved Project

4.6.1 Upload Instrumentation Record

1. User is allowed to upload/download/delete files.

4.6.2 Close Submission

1. User is allowed to close the approved submission.

2. Select the specific Corridor.

Page 23: Public Utilities Board of Singapore

23

3. Choose all conditions and click on “Submit” button.

Page 24: Public Utilities Board of Singapore

24

5 Manage Draft Submissions

Users are allowed to save a submission as Draft prior to submission. While Creating a New

Submission, user can click on “Save” button and choose to save their work without submission.

1. List of submissions saved as Draft are shown.

2. User can click on any submission and continue from where they left.

3. Select a draft by clicking on it.

Page 25: Public Utilities Board of Singapore

25

5.1 Draft Details Selected Draft Submission Details are shown here in this page. Applicant can Add Comments using

“Comment” button.

Page 26: Public Utilities Board of Singapore

26

6 Close Completed Submissions

If the Submission of a Project is “Approved”, it will be listed here. The User can select this

submission for closure

1. Select any submission for closure by clicking on the row

2. Edit the completion dates and do the declaration

3. User can click on “Submit” button to start the closure process. Corresponding officials

will review and close the submission which is submitted for closure.

4. User can click on “Cancel” button and cancel the Closureprocess.

Page 27: Public Utilities Board of Singapore

27

Page 28: Public Utilities Board of Singapore

28

7 Archived Submissions

1. List of archived submissions are shown.

2. User can click on any submission to view details

3. Select a submission by clicking on it.

Page 29: Public Utilities Board of Singapore

29

Page 30: Public Utilities Board of Singapore

30

8 New Messages Summary of replies which are sent by Officers are shown in here.

Page 31: Public Utilities Board of Singapore

31

9 Logout

Click on Logout on the left panel. User will be successfully logged out of the system.