Puesta Del Sol II

Progress and Update Report

May, June, & July, 2000

The Stainless Steel Ladder $2,100 US

Side View Top View

Guards uniforms & security

Uniform Hat Days.......Rafael Nights.....Tolentino Sundays..

Rafael

Tolentino

Luis

No Glass Containers

Pool Maintenance

Pressure wash monthly

Ordered 5 new lightsOrdered tile to fix

small damaged tilesTo regrout in

September

Wind Turbines

Installed 4 Wind Turbines on sewer vents

Act as wind powered extractors creating a negative pressure on sewer vents

Reduce odor on windy days in the condos

AC Leak on Roof.....7 South

Leaking roof 7 North

Old leak coming through AC plumbing

Fiberglassed panels on roof and side

To do similar work on South side to prevent future leak

Attic Tour...TV....OTIS

Water Meters ......16 installed

Spiral Stairs to be repainted

The Box on the side

September 16 to 23....closed

POOL AREA regrout pool replace pool lights replace glass install barrier I and II install Jacuzzi pump rewire pool room

BUILDING• clean cistern• replumb water pump• elevator, tile floor. paint

shaft. & cable repairs• paint spiral stairs• general cleaning &

painting