Purchase Order To, Purchase Order No. ZEN/PO/1516/008--01 M/s Sai Krupa Group, Nellore Andhra Pradesh. Purchase Order Date 23.01.2016 Ref No. Email dated:21.01.2016 Ref. Date 21.01.2016 Kind Attn Mr. Garlapati Suresh Naidu We are pleased to place the order for the Man Power Supply in Kamuthi Solar Power Project. Order Details S. No Designation Quanti ty Delivery Date Rate/head for 12 hrs 1 Fitter 15 26/01/2016 550 2 Jr. Fitter 24 26/01/2016 475 3 Rigger 4 26/01/2016 475 4 Helper 57 26/01/2016 375 Terms & Conditions Terms and conditions 1 Above mentioned rates are of 12hrs duty 2 Accommodation (Labour camp) and transportation will be provided in free cost 3 Safety PPE will be provided in free cost 4 The Contractor shall ensure that their staff is well behaved & maintain plant discipline. If it is observed that any individual or group of workmen engaged by the Contractor do not obey the instructions of the Employer's EIC or misbehave, then penalty shall be applicable. The amount of penalty applicable shall be @ Rs.1, 000/- (Rupees One Thousand only) per

Upload: ganesh-eshwar

Post on 14-Apr-2016

3 views

Category:

Documents


0 download

DESCRIPTION

PO

TRANSCRIPT

Page 1: Purchase Order-Zen to SK

Purchase Order

To, Purchase Order No. ZEN/PO/1516/008--01 M/s Sai Krupa Group,NelloreAndhra Pradesh. Purchase Order Date 23.01.2016

Ref No.  Email dated:21.01.2016Ref. Date 21.01.2016

 Kind Attn Mr. Garlapati Suresh NaiduWe are pleased to place the order for the Man Power Supply in Kamuthi Solar Power Project.

Order Details

S. No Designation Quantity Delivery Date Rate/head for 12 hrs

1 Fitter 15 26/01/2016 5502 Jr. Fitter 24 26/01/2016 4753 Rigger 4 26/01/2016 4754 Helper 57 26/01/2016 375

Terms & Conditions

Terms and conditions

1 Above mentioned rates are of 12hrs duty

2Accommodation (Labour camp) and transportation will be provided in free cost

3 Safety PPE will be provided in free cost

4

The Contractor shall ensure that their staff is well behaved & maintain plant discipline. If it is observed that any individual or group of workmen engaged by the Contractor do not obey the instructions of the Employer's EIC or misbehave, then penalty shall be applicable. The amount of penalty applicable shall be @ Rs.1, 000/- (Rupees One Thousand only) per instance. The penalty amount shall be recovered from the Contractor's monthly RA bills. In case of repeated incidences of such indiscipline & improper working/ behavior, the Contract can be terminated by the Employer at their sole discretion.

5

The Contractor shall fulfill the OHS requirements of the Employer in totality. In case of violation of any OHS norm, penalty shall be imposed as prescribed in the Employer's OHS Manual and the amount shall be deducted from the Contractor's RA bills.

Page 2: Purchase Order-Zen to SK

6

Payment will be made on 21 days cycle withing 10 days after submitting the RA Bills.Payment ratio will be the same as above (0.15+

7

Contractor shall take utmost care during handling of Module Mounting Structure, solar modules, clamps and screws shall comply the manufactures guidelines for storage, stacking, handling & erection of modules. Incase due to mishandling of modules or on account of negligence by Contractor during at any of the operations of loading, transportation, stacking at site and erection, if the modules get damaged, the landed cost of each module shall be recovered from Contractor at below mentioned rate (a. Module Mounting Structure: Rs.1, 50, 000/- per MT & b. Solar Module: Rs.15, 000/- per number)

For Zenland Infra

 Ganesan.ECEO