Page 1: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Rank the picture

below the Core

on the template

slideSlide title

36pt

Slide subtitle

18pt

Q1, 2009 presentationApril 22, 2009

Page 2: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

2Q1 report 2009

Continued losses in USA in Q1

• Net sales down to SEK 277.0 million (320.0)

• Operating loss of SEK -21.2 million (-7.0)

• Operating loss fully attributable to USA

– Operating loss in USA of SEK -33.7 million (-13.4)

– Very low capacity utilization in Erwin

– Credit loss of SEK 10.2 million in logistics

– Continued losses in logistics terminated by partnership with R&R Trucking

Page 3: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

3

Status and outlook for Erwin

• Four customer contracts signed to date

– 30 out of 103 nuclear power plants covered by current contracts

– Negotiations with further parties under way

• Waste receipts are expected to pick up in coming quarters

– B/C waste is generated after scheduled revisions in spring and fall

• Erwin remains the only option for B/C waste in the USA

Q1 report 2009

Page 4: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

4

UK recovering after weak Q4

• Low activity in Decommissioning

– Weak order book after closing of Sellafield project

• Risk level reduced in Decommissioning

– Lower costs

– Smaller contracts

– Wider customer base

• The UK revenue budget for 2009 is significantly more diversified

than previous years

– 1/3 Waste treatment, 1/3 Decommissioning, 1/3 Engineering services

Q1 report 2009

Page 5: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

AB SVAFO divested

• Non-commercial company assigned to take care of legacy waste

• Financed by the commercial nuclear plant owners through the

Nuclear Waste Fund

• Transfer to nuclear plant owners at book value

• The R2 reactor will be divested to AB SVAFO

• AB SVAFO’s net sales in 2008 were SEK 72 million

• No future liabilities for legacy waste

5Q1 report 2009

Page 6: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

• Cost reduction program with positive impact 2009 of MSEK 25

• Planned investments 2009 reduced to MSEK 35

– Primarily MRF in the UK and the rest in Sweden

• Salary freeze for Group management

• Continued focus on working capital and cash management

Groupwide measures to restore profitability

6Q1 report 2009

Page 7: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

7

Operating Profit per Segment

SEKm Q1-09 Q1 -08 2008

Sweden 6.7 0.9 30.7

United Kingdom 0.1 2.9 -3.2

Germany 4.9 4.7 23.3

USA -33.7 -13.4 -22.4

Global Services 9.3 4.3 13.0

Other -8.5 -6.4 -28.7

Group eliminations -

Q1 report 2009

Page 8: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

8

Sweden - Q1Waste Treatment for European customers

• Incineration facility operated at

full capacity

• Good utilization in metals

facility and large components

line

• Metals volumes up 35%

• Strong order book

Q1 report 2009

Focus for 2009

• Increase capacity to handle

growing volumes

Page 9: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

United Kingdom – Q1Decommissioning and Waste Treatment

• Waste treatment developed

positively

• Metals Recycling Facility (MRF)

will start operations in Q3

• Low utilization in

Decommissioning

• High sales activity with several

tenders ongoing

9Q1 report 2009

Focus for 2009

• Decommissioning order book

• MRF in operation Q3

Page 10: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

10

Germany – Q1Decommissioning and Engineering & Services

• Good utilization in Engineering &

services

• Projected revisions at 2008 level

• Continued strong demand for

Engineering & services

• Decommissioning project won for

Belgian MOX plant valued at MSEK 64

• French office shows small profit

Q1 report 2009

Focus for 2009

• Grow in engineering consulting

• Careful expansion in France

Page 11: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

USA – Q1Waste Treatment including Logistics

• Erwin main loss maker

– Only minor volumes processed

• Expected minor loss in Memphis

due to seasonality

• Continued but reduced loss in

Logistics

– Client loss of SEK 10.2 million

– Partnership with R&R Trucking

11Q1 report 2009

Focus for 2009

• Grow customer base for Erwin

• Grow non-utility customer base

for Memphis

Page 12: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

12

Global Services – Q1In-core fuel management software and Materials technology

• Materials technology continued to

develop well

– Order book remains strong

– Fuel shipments from BE scheduled

for Q2

– Consultancy continued to grow

• Strong results for software

– Japanese order for Gardel

Q1 report 2009

Focus for 2009

• Capitalize on strong order book

and prospect pipeline

Page 13: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

13

Studsvik GroupKey Figures and Ratios

SEKm Q1 -09 Q1-08 2008

Net sales for the Group, SEKm 277.0 320.0 1,285.9

Operating profit, SEKm -21.2 -7.0 12.7

Profit after tax, SEKm -19.8 -7.0 1.1

Earnings per share, SEK -2.41 -0.99 -0.05

Operating margin, % neg neg 1.0

Cash flow from operations -6.4 -18.2 29.5

Average number of Employees 1,112 1,158 1,130

Q1 report 2009

Page 14: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

14

Studsvik GroupKey Figures and Ratios

Q109 Q108 YE08

Capital employed, SEKm 1,016.2 831.2 999.00

Equity, SEKm 615.3 535.6 610.8

Cash & cash equivalents, SEKm 108.7 130.8 147.7

Net interest-bearing debt 292.3 165.0 240.5

Equity-assets ratio, % 39.7 42.3 40.4

Equity per share, SEK 74.82 65.17 74.32

Q1 report 2009

Page 15: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

15Q1 report 2009

USAReturn to

profitabilitySEKm 315

Turn-around

SwedenMaintain margins on

increasing volumes

GermanyGrow in engineering consultancy

Global ServicesCapitalize on strong order book

SEKm 735

Ongoing businesses

UKOpen MRF

Improve order

book

SEKm 150

Rapid growth

Page 16: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

16

• Modernization and upgrading programs are underway in several

countries

• Decommissioning of nuclear facilitites is expected to continue at

least at similar level as 2008

• Demand for the type of services Studsvik offers is strong

• Studsvik’s operations are only marginally affected by fluctuations in

the economic cycle

• With the exception of parts of the US operations, the financial

turbulence has not affected Studsvik’s operations

Outlook

Q1 report 2009

Page 17: Q4, 2008 presentationinvestors.studsvik.com/files/Studsvik_presentation_slidesQ1_2009.pdf · •Metals Recycling Facility (MRF) will start operations in Q3 •Low utilization in Decommissioning

Slide title

pt

Text

24 pt

Bullets level 2

20 pt

17Q1 report 2009