rainscreen cladding systems
TRANSCRIPT
1
Central Artery/Tunnel Project - Ventilation Building No. 7 by TAMS/Wallace/Floyd Associates/Stull Associates
Rainscreen Cladding Systems Richard Keleher
Presentation Agenda
Principles
History● Historical projects● Local projects
Video
Applications● Curtain wall details● Other Details
- What not to do- The window problem- Window details- Curtain wall details
● A case study project
Summary
Presenter:
Founder and Chair, BuildingEnclosure Council, Boston
Chair, AIA Building ScienceKnowledge CommunityAdvisory Group
Board Member, BETEC(Building Enclosure Technology &Environment Council)
Technical Quality & BuildingEnclosure Consultant
© Richard Keleher AIA CSI LEED
2
Take-Away Messages1.
2.
3.
Cavity walls, or two-stage weather-tightening as it iscalled in Europe, are the only way to obtain durable,dependable weather-tightness.
The importance of the air barrier to prevention of: ● Water penetration (performance of rainscreens) ● Mold, mildew, rot, and corrosion.Canadians: “cherchez le trou,” or “find the hole.”
The term “rainscreen” has been bandied-about oflate; hopefully this workshop will clarify what arainscreen is and how it may be used to advantageon your projects.
Sealants
Causes ofDeterioration
• Ozone• Sunlight• Ultraviolet radiation• Rain• Snow• Temperature extremes• Differential thermal
movement
InstallationRequirements
• Proper surface preparation• Compatible sealant and• substrate• Proper backer rod type and
position• Properly tooled joints
3
Sealant Geometry Requirements for Proper Performance
Forces Driving Air Through the Wall Air Pressure Differences
video clip 1 inch Video clip
4
Air movement(not pressure-equalized)
No air movement(possibly pressure-equalized)
Pressuresat Corners
Weeped and Vented Pressure-EqualizedDrained and Vented
Note: block off excessive cavity sizeTypes of Rainscreens
5
Pressure-Equalized (above)Non-Pressure-Equalized (below)
Pressure-Equalization Compartment Sizes
Asymmetrical venting: locate inletstoward center of façade to ensure complete pressure-equalization
• Rapid pressure-equalization and cavity-closers
• Air barrier versus vaporbarrier
• Adequate venting area
Air BarrierDesignRequirements
• Continuous
• Secure and rigid
• Air impermeable
• Durable
• A critical element forpressure-equalization
Principles ofPressureEqualization
6
See next slide forrequired ventingarea.
The Four Planes(from outside to inside)
1. The Rainscreen2. The Drainage Plane3. The Air Barrier4. The Vapor Barrier
Rules of Thumb(with rigid air barriers andnon-gusting winds)
The air barrier shouldhave at least 10x the vaporpermeability of the vaporbarrier.
Leakage of the air barriershould not exceed 0.004cfm/ft2 under a pressuredifferential of 0.3 inches ofwater (1.56 psf)
Vent AreaThe greater of:
Static loads:Vent area ≥ 5 x ELA of the air barrier
plus 10 x ELA of any corner sealsplus 1 x ELA of intermediate compartment seals
ELA = Effective Leakage Area
Dynamic loads:Vent area (m2) ≥ volume of compartment (m3)/ 50m
Note: The Effective Vent Area is limited to by thenarrowest part of the venting path.
7
Examples of Air Barriers
and insulation
Sealants not required
The air barrier is notsubject to:
Thermal movementHeavy wettingUltravioletradiation
Less condensation;cavity breathes anddries
Insulation on outer face ofinner leaf; not bridged bystructure
Complicated panelintersections are possible
Outer panel can be purelyesthetic; freedom from needto seal joints allows fordesign flexibility
Advantages of Rainscreens
8
Concerns About RainscreensThe omission of sealant isn’t a panacea.
Fortunately,there isprogress on thelatter. AAMAhas a TaskGroup, ofwhich I am amember,working onsuch astandard.
Actually, if the joints in the rainscreen are leftunsealed, they can allow large amounts of waterinto the cavity, where they will be on an airbarrier (drainage plane) which now has the fullforce of the wind acting on it.
Lack of clarity about the responsibilityfor water penetration and lack of anational standard to prove performance.
There are many cases where the metal panelmanufacturer/ installer thinks that the air/vaporbarrier/ drainage plane installer is going to takecare of any water that gets past the metal panels.
Take-away MessageYou cannot reliably protect your building from water intrusionwithout using what the Europeans call “two-stage weather-tightening” and the Canadians call “rainscreen.” The Canadiansprefer to use the pressure-equalized variation of this wallconstruction, which they call “PERSIST,” or the Pressure-EqualizedRainscreen Insulated Structure Technique.”
SummaryEssentials
An interior air-tight seal (the airbarrier)
An air chamber or vented cavity
A rain barrier, properly detailedto resist the Forces
ConcernsThe depth of knowledge of:
The A/EThe Contractor and Subs
Lack of national standardsInspection and testing
MockupsQuality control testingInspectionPost-construction testing
9
History ofRainscreenCladding
Historical Sequence:Vapor Issues
• Historically, (several centuries ago and before) large-scale wallswere mass walls whose thermal mass delayed transmission oftemperature, absorbed water, and then dried-out (or in).
• To save energy, we added insulation which, in certain situationsled to severe vapor deposition.
• To prevent this, we added vapor barriers, but in so doing,prevented the drying of walls inward.
• And often we still had air leakage, which transported vaporbehind the vapor barrier.
• Now, finally, we are addressing hygrothermal issues in walldesign , through the use of WUFI and other resources.
10
• Skeletal frames led to the need for sealants, to seal thediscontinuous elements, which could not absorb the quantity ofmoisture that the monolithic bearing wall systems could.
• Difficulty of achieving an adequate and durable seal, evenwith high performance sealants. This defect was not realized forsome time
• Need for a predictable and durable method ofconstruction that was not subject to the need for perfectexecution and that would not be damaged by ultraviolet light.
• Development of the drained cavity wall (back-ventilated anddrained rainscreen) and then the pressure equalizedrainscreen.
Historical Sequence:Water Issues
Log House, Norway – centuries old “open-jointed barn” technique
11
Sparrow House, Plymouth, MA, 1630 Shingles Brick Veneer Brick Veneer
After early work by the Scandinavians andCanadians (Kirby Garden et. al. at the NationalResearch Council/Canada – “The RainscreenPrinciple” published in 1965) and the adoption byAAMA of the rainscreen principle for curtainwalls shortly thereafter, the idea lay fallowexcept for an intuitive leap of faith by Harrisonand Abramovitz in their design of the AlcoaBuilding in 1971.
12
Alcoa Building Pittsburg, PA, 1952 - Harrison & Abramovitz
Interior plaster finish served as the air barrier.Tested in 1971 by AAMA - perfectly weather-tight.
National Aviation Museum Ottawa, Ontario, 1986 Architect: Parkins & Associates
Aluminum Plate Rainscreen(pressure-equalized) by Vicwest Steel
13
Royal Bank of Commerce Edmonton, Alberta, 1991
Calgary Oval Olympic Arena Roof
Xerox Corporation Mississauga, Ontario
Porcelain enamel panelson curve shed dirt
14
Terra Cotta Rainscreen(back-ventilated and drained) by Shildan (MBK, Terreal)
East Boston Savings BankSystem Diagram
Carwill House Vermont William Pederson
Wood Siding Rainscreen(back-ventilated and drained)
15
Recently CompletedLocal ProjectsUtilizing theRainscreen Principle
(also, every curtain wall)
AMGENCAMBRIDGE
◄
DANA-FARBER LABSN.E. DEACONESS
◄
FEDERAL RESERVEBANK OF BOSTON
Federal Reserve Bank of Boston1975 The Stubbins Associates
Double-mullionunitized curtain wallwith 1/8” aluminumplate facing, clearanodized finish
16
125 High Street Jung/Brannen Assoc. Dana-Farber Cancer Institute Smith Research Labs Shepley Bulfinch Richardson and Abbott
Unitizedcurtainwallswith stoneand metalpanelinfill panels
53 State Street WZMH Habib
53 State Street as anexample of a typicalpressure-equalizedcurtain wall system
Details on next slide
17
Typical Spandrel SectionVent Holes in Horizontal Mullion
Alternate: IGU
Amgen
The Stubbins Associates
back-ventilated and drained rainscreen
18
Central Artery/TunnelBuildings Utilizing theRainscreen Principle
VENTILATIONBUILDING NO.4
VENTILATIONBUILDING NO.6
VENTILATIONBUILDING NO.5
VENTILATIONBUILDING NO.1
VENTILATIONBUILDING NO.7
OPERATIONSAND CONTROLCENTER
TOLL PLAZAADMINISTRATIONBUILDING
BigDig Administration Building Wallace, Floyd, Associates / Elkus Manfredi
BigDig Fire & Rescue Station Wallace, Floyd, Associates / Elkus Manfredi
This is the Case Study Building
19
VentilationBuilding No. 5Wallace Floyd Design GroupCWA / MJA Joint Venture
Back-ventilatedrainscreen
Air(vent)
Rigidinsulation
air &vaporbarrier
Ventilation Building No. 6 Wallace Floyd Design Group / Barrientos Associates
20
A message from our sponsorI am available for peer reviews and technical consulting in thefollowing phases:- General: office-wide drafting standards manual
- Schematic Design- Design Development- Construction Documents- Construction Administration- Best practices for high-performance sustainable design
21
Schematic Design• Recommended Systems
• Review SD Set
- Uniformat Outline Specifications for building enclosure- Constructability, sequencing and relative costs- Typical large-scale details that are actually correct! less zooming
• Climate Data Analysis
Schematic Design continued
- Comparisons to MA weather- Comparisons to the comfort zone- Wind roses
22
Design Development• Architectural Sheet List• Cartoon Set Covey• Typical Wall Sections• Project-specific
Typical Details• Complex Details
(e.g. seismic joints)
• Review DD Set
Construction Documents, CA, etc.Construction
Documents: reviewsets for:
– Coordination of drawings– Proper detailing of the
building enclosure
ConstructionAdministration:
– Attend and advise onmock-up and field testing
– Resolution of unforeseenproblems
General:– Develop office-wide drafting
standards manual
23
Construction Administration• Attend and advise on mock-up and field testing
General:• Develop office-wide drafting standards
manual
• Studies of complex conditions• Resolution of unforeseen problems
State-of-the-Art Building Enclosures
• There is much that we have done, but we have muchmore to go!
• Air barriers will be adopted nationally. Issues:– Implementation.– Air pressures.
• Balancing.• Leaks/condensation.
– Over-design of mechanical systems.
• Architects need to take the initiative to save theirpractices (and their shirts)!
24
ConclusionAssistance in best practices for:• High-performance• Sustainabililty• Durability• Creativity!
Herb Garden on Vancouver's Fairmount Waterfront Hotel (courtesy David Walker)
Ventilation Building No.7 TAMS/Wallace Floyd Design Group / Stull & Lee
Video Provided by Centria
25