Page 2 of 4 Cement pointing 1:4 - Unit 1 sq.m - Take 100 sq.m. ITEM DESCRIPTION QUANTITY UNIT RATE(Rs) A Material per 100 m2 cement -4 bags 0.13 m3 4,410.00 sand-local 0.51 m3 150.00 TOTAL MATERIAL per 100 sqm= B Labour per 100 m2 Head mason 0.33 nos/day 500.00 mason 10 nos/day 450.00 Helper 10 nos/day 250.00 Curing 0.5 nos/day 250.00 TOTAL LABOUR per 100 sqm= C Tools and plant, 100 sqm= 2% of labour 2% transportaion charge scaffolding sundries D Total of material, labour and T&P A+B+C= E Water charges, 3% 3% F Contractor profit, 10% 10% GRAND TOTAL= RATE PER SQM IS Rs. 9,137/100 = Rs. 91.36/Sq.m, say TOTAL T&P, SCAFFOLDING, SUNDRIES, 100 sqm=

Upload: padmanabhdixit

Post on 11-Nov-2015

12 views

Category:

Documents


0 download

DESCRIPTION

quantity surveying

TRANSCRIPT

Sheet1Cement pointing 1:4 - Unit 1 sq.m - Take 100 sq.m.ITEMDESCRIPTIONQUANTITYUNIT RATE(Rs)TOTAL(Rs)AMaterial per 100 m2cement -4 bags0.13m34,410.00573.30sand-local0.51m3150.0076.50TOTAL MATERIAL per 100 sqm=649.80BLabour per 100 m2Head mason0.33nos/day500.00165.00mason10nos/day450.004,500.00Helper10nos/day250.002,500.00Curing0.5nos/day250.00125.00TOTAL LABOUR per 100 sqm=7,290.00CTools and plant, 100 sqm= 2% of labour2%145.80transportaion chargeincludedscaffoldingincludedsundries includedTOTAL T&P, SCAFFOLDING, SUNDRIES, 100 sqm=145.80

DTotal of material, labour and T&PA+B+C=8,085.60EWater charges, 3%3%242.57FContractor profit, 10%10%808.56GRAND TOTAL= 9,136.73

for 100sqm

RATE PER SQM IS Rs. 9,137/100 = Rs. 91.36/Sq.m, say 91Rs/Sq.mPage 2 of 412mm thick cement plaster in ceiling 1:4 with coarse sand, Unit 1 sqm, take 100 sqmITEMDESCRIPTIONQUANTITYUNIT RATE(Rs)TOTAL(Rs)AMaterial per 100 m2cement -12 bags0.4m34,410.001,764.00sand-local1.6m3150.00240.00TOTAL MATERIAL per 100 sqm=2,004.00BLabour per 100 m2Head mason0.25nos/day500.00125.00mason10nos/day450.004,500.00Helper10nos/day250.002,500.00Curing2nos/day250.00500.00TOTAL LABOUR per 100 sqm=7,625.00CTools and plant, 100 sqm= 2% of labour3%228.75transportaion chargeincludedscaffoldingincludedsundries includedTOTAL T&P, SCAFFOLDING, SUNDRIES, 100 sqm=228.75

DTotal of material, labour and T&PA+B+C=9,857.75EWater charges, 3%3%295.73FContractor profit, 10%10%985.78GRAND TOTAL= 11,139.26

for 100sqm

RATE PER SQM IS Rs. 11,139/100 = Rs. 111.39/Sq.m, say 111Rs/Sq.mPage 4 of 4