Table of Contents
Introduction Rochester High School
Doors
Definitions and Symbols Exterior
Gymnasiums
Administration Building Auditorium
Doors Interior
Exterior Mechanical
Interior Electrical
Mechanical Parking and Hardscapes
Electrical Athletic FieldsParking and Hardscapes
Rochester Learning Center
Columbia Elementary School Doors
Doors Exterior
Exterior Interior
Gymnasium Mechanical
Interior Electrical
Mechanical Parking and Hardscapes
Electrical
Parking and Hardscapes Rochester Middle School
Playgrounds DoorsExterior
Riddle Elementary School Gymnasium / Natatorium
Doors Interior
Exterior Mechanical
Gymnasium Electrical
Interior Parking and Hardscapes
Mechanical
Electrical Facility Asbestos Report
Parking and Hardscapes
Playground Probable Cost Outline
Product Data
Table of Contents
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 3/560
May 20, 2013
Mr. Daniel Ronk, Superintendent
Rochester Community School Corporation
690 Zebra Lane
Rochester, Indiana 46975
Dear Mr. Ronk,
Respectfully submitted,
Terry W. Thornsbury, AIA
President
Viridian Architectural Desi n Inc.
During the spring of 2013, Primary Engineering, Inc. and Viridian Architectural Design, Inc., were tasked
with examining the existing building envelope, parking lots, hardscapes, playgrounds, interior, mechanical,
electrical and plumbing systems for all the Rochester Community School Corporation facilities. The
following documents are the observations and recommendations from multiple site visits and
examinations of each building. As noted, many of the existing systems have exceeded their typical life
expectancy. There are, however, a few existing systems still in fair to good condition. The probable costs
of the recommended systems replacement, as outlined at the end of this report, are based upon Spring
2013 pricing. (Please note that this pricing excludes any additional contingency funds for unforeseen
issues during the systems replacement process.)
Thank you for the opportunity to examine the existing building conditions of Rochester Community School
Corporation. Please find the full RCSC Facility Assessment Report in the following documents for your
reference. If you have any question about the report, please contact Viridian Architectural Design, Inc. at
your convenience.
Introduction
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 4/560
Building Conditions:
Good
Fair
Poor
Failed
Definitions:
Good Building Condition - A building system that may last another fifteen (15) plus years
with fair maintenance practices.
Fair Building Condition -A building system that may last another five to seven (5-7) years
with good maintenance practices.
Poor Building Condition - A building system that needs immediate maintenance attention
and may be harming the surrounding building systems. Poor building systems need to be
replaced within the next two (2) years.
Failed Building Condition - A failed building system may be potentially harming the
surrounding building systems. Failed building systems need immediate maintenance
attention and need to be replaced as soon as possible.
A-Lamp – A type of socket on a light fixture. The socket is a screw in socket that can receive
an incandescent light or a compact fluorescent bulb.
Air Handling Unit (AHU) – Primary source of conditioned air in a heating, ventilation, and air
conditioning system. These units contain a blower section (fan) which pressurizes a mixture
of circulated and outside air through filter sections as well as heating and or cooling
elements (typically hot and chilled water coils).
Chiller – The central piece of cooling equipment. Typical facilities will have a cooling plant
consisting of one or more air- or water-cooled chillers (RHS has one of each in combination
with a cooling tower). These machines produce the chilled water for cooling for the entire
buildin .
Direct Digital Control (DDC) – The computerized automation system which processes digital
and analog inputs and outputs in order to manage HVAC equipment. Sensors within rooms,
ductwork, pipes, and equipment relay information to the building management system.
Computer programs process this information and send electronic control signals to the HVAC
equipment for operational instruction.
Aluminum Door System – Primary entry door system allowing entry and egress through a
building. Door frame and door system consist of extruded aluminum members.
Definitions and Symbols
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 5/560
Definitions:
Outside Air (OA) – Fresh outside air that is drawn into the AHU for conditioning. Outside air
is critical for environmental comfort indoor as well as the well-being of the occupants.
Paging System – A paging system or intercom system is a way of either one-way or two-way
communication. In the case of this report the communication is between the main office
and a classroom or zone of classrooms and hallways.
Double Pane Glazing – Windows and Doors containing double pane glass typically reach an
R-Value of 1.5 to 3. The two panes of glass are seperated by an air space or other gas that
increases the efficiency of the window or door system.
Galvanized (galv.) – Galvanized steel piping common in older construction for plumbing.
Over time, this piping material breaks-down and is prone to leaks and scale accumulation,
depending on water quality.
Musko Sports Lighting – A manufacture of sports arena lighting. Lighting is specifically
designed for sports applications. One of the most popular sport lighting manufactures.
Internet Protocol (IP) – A communication protocol for routing information across a network.
Instant Start Ballast – An instant start ballast does not preheat the electrodes instead uses
high voltage to start the light fixture. When paired with occupancy sensors can shorten the
life of the ballast and/or lamps.
Pan Tilt Zoom (PTZ) – Refers to a security camera that can pan, tilt, or zoom from one
position to another.
Door Closers – A mechanical device that automatically closes a door from an open position.
Hollow Metal Doors –Door system that consist of hollow metal door frames and door slabs.
Doors are primed and painted steel.
Heating, Ventilation, and Air-Conditioning (HVAC) – The technology, processes, and systems
associated with indoor environmental comfort.
Definitions and Symbols
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 6/560
Definitions:
Single Pane Glazing – Windows and Doors containing a single pane of glass typically reach an
R-Value of approximately .85.
Supply Air (SA) – Pressurized, filtered, and conditioned air that comes from the AHU and is
delivered to living spaces through supply air ductwork. In a forced air system, the supply air
is what conditions the space.
T-12 Lamp – A fluorescent lamp that is being phased out in the market for newer lamps such
as T-8 and T-5 lamps which both are more efficient than the T-12 lamp. It will become
harder and harder to purchase T-12 lamps as they are being phased out by manufactures.
Transient Voltage Surge Suppressor (TVSS) – TVSS is another name for surge suppressor.
TVSS in the case of this report is installed on the electrical panel to provide surge protection
to electrical devices that are plugged into receptacles that are fed from the electrical panel.
Triple Pane Glazing – Windows and Doors containing double pane glass typically reach an R-
Value up to 9. The three panes of glass are seperated by an air space or other gas that
increases the efficiency of the window or door system.
Plant - The central equipment for primary heating and cooling within a building. For
example, the heating plant in an older facility will often consist of one or two large gas-fired
steam or hot water boilers designed to produce all of the heating for the entire building.
Power over Ethernet (POE) – Allows power (low voltage) to be transferred on Ethernet data
cabling. This allows devices such as wireless access points, security cameras, and security
access control to be installed without requiring a 120V electrical connection. Power is
provided by the network switch or a POE injector.
Program Start Ballast – A newer version of the rapid start ballast. This ballast give thelongest start/stop cycle life of ballasts and is the best option to use with an occupancy
sensor.
Return Air (RA) – Air that is drawn into the AHU from the living space, either through return
air ductwork or through a return air plenum. Return air is recirculated back to the AHU to be
conditioned.
Definitions and Symbols
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 7/560
Definitions:
Voice Over Internet Protocol (VOIP) – Telephone communication over an IP network.
Variable Speed/Frequency Drive (VSD/VFD) – An electrical control device that increases and
adjusts the speed a motor is spinning by manipulating the supply voltage. By changing the
speed of the motor, a VSD can change the amount of energy being used by a system, leading
to better control and electrical energy savings.
Vestibule / Air Lock – The space between the exterior of the building and the interior spaces.
This space provides a thermal break between the exterior elements and the controlled
interior air temperature. This space is required by the current building code at all primary
entry's to the building.
Weather Stripping – Weather stripping is installed to seal a door and the frame from the
exterior elements. These seals create a thermal break between the door and frame
increasing the efficiency of the overall door system.
Unit Ventilator (UV) – An HVAC device used to draw fresh, outside air through a louver and
condition it using heating and/or cooling coils. These are widely used in classrooms and
hotels due to their ability to deliver conditioned fresh air to individual rooms or zones.
Variable Air Volume Terminal Unit (VAV) – A piece of equipment that provides further
control and conditioning to primary air delivered by an AHU. A typical AHU/VAV system has
one AHU combined with several VAV’s to modulate and control the amount of airflow,
heating, and cooling to each individual room or zone. VAV’s can consist of one damper
controlled via thermostat, or contain fans, filters, and heating coils.
Definitions and Symbols
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 8/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 9/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S1Door Material: Aluminum
Weather Stripping: Good
Door Closers: Good
Door Glazing: Double-Pane
Sidelites: N/A
1. Door sweeps are in good condition and need to be maintained.
Vestibule: N/A
Size: 3'-0" x 6'-8"
Overall Condition: Good
Replacement Cost: $3,500.00*
General Notes:Recommended to maintain a consistent cleaning
and maintenance program to prolong the doors life
expectancy.
Image Legend:
Insert Image
2. Aluminum door is in good condition and is aging appropriately.3. Double-pane glass, when sealed properly, will prevent air infiltration.
4. Aluminum door frame is in good condition and is aging appropriately.
5. Door weather stripping is in good condition and needs to be maintained.
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 10/560
Insert Image
2. Aluminum door is in good condition and is aging appropriately.3. Double-pane glass, when sealed properly, will prevent air infiltration.
4. Aluminum door frame is in good condition and is aging appropriately.
5. Door weather stripping is in good condition and needs to be maintained.
1. Door sweeps are in good condition and need to be maintained.
Vestibule: N/A
Size: 3'-0" x 6'-8"
Overall Condition: Good
Replacement Cost: $3,500.00*
General Notes:Recommended to maintain a consistent cleaning
and maintenance program to prolong the doors life
expectancy.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N2Door Material: Aluminum
Weather Stripping: Good
Door Closers: Good
Door Glazing: Double-Pane
Sidelites: N/A
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 11/560
Insert Image
2. Overhead door is in good condition and is aging appropriately.3. Double-pane glass, when sealed properly, will prevent air infiltration.
4. Overhead door frame is in good condition and is aging appropriately.
1. Door threshold seals are in good condition and need to be maintained.
Vestibule: N/A
Size: 9'-0" x 6'-8"
Overall Condition: Good
Replacement Cost: $2,000.00*
General Notes:Recommended to maintain a consistent cleaning
and maintenance program to prolong the doors life
expectancy.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E3 (Overhead)Door Material: Metal
Weather Stripping: Good
Door Closers: Good
Door Glazing: Double-Pane
Sidelites: N/A
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 12/560
Insert Image
2. Hollow metal door is in good condition and is aging appropriately.3. Door weather stripping is in good condition and needs to be maintained.
4. Wood frame is in good condition and is aging appropriately.
1. Door sweeps are in good condition and need to be maintained.
Vestibule: N/A
Size: 3'-0" x 6'-8"
Overall Condition: Good
Replacement Cost: $2,000.00*
General Notes:Recommended to maintain a consistent cleaning
and maintenance program to prolong the doors life
expectancy.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E4Door Material: Hollow Metal
Weather Stripping: Good
Door Closers: Good
Door Glazing: N/A
Sidelites: N/A
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 13/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: Fair
Flashing / Trim: Good
Glazing: N/A
Caulking / Sealant: Good
1. Concrete retaining wall is moving independently of Administration Building and should be caulked.
Soffit / Canopy: Good
Overall Condition: Good
Repair Cost: $1,500.00 - $2,000.00*
General Notes:Recommended to maintain consistent caulking and
sealants throughout the building envelope to
prevent moisture penetration.
Image Legend:
Insert Image Insert Image
2. Decorative stone is moving away from the Administration Building and may be allowing water topenetrate the building foundation.
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 14/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: Fair
Flashing / Trim: Good
Glazing: N/A
Caulking / Sealant: Good
1. Maintain a regular cleaning and maintenance program to maintain lighting efficiencies.
Soffit / Canopy: Good
Overall Condition: Good
Repair Cost: $2,000.00 - $3,000.00*
General Notes:Recommended to maintain consistent cleaning and
maintenance program throughout the building
envelope to maintain efficiencies.
Image Legend:
Insert Image Insert Image
2. Changing exterior lighting to LED fixtures will improve lighting efficiencies. See electrical data foradditional information.
3. Maintain metal flashing edge to keep storm water away from entry.
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 15/560
Insert Image Insert Image
2. LED light fixtures are more efficient than existing lighting. See electrical documents for additionalinformation.
3. Carpet is showing some signs of aging and wear.
4. Office furniture appears to be in good condition.
1. Gypsum ceiling is in good condition.
Fixtures: Good
Interior Area: 2564 SF / Floor
Overall Condition: Good
Total Repair Cost: $60,000.00 - $75,000.00*
General Notes:Recommended to clean and maintain the building
in its entirety to extend its life expectancy.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: OfficesFlooring: Carpet
Flooring Condition: Good
Walls: Studs
Ceiling: Gypsum Board
Doors: Wood
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 16/560
Insert Image Insert Image
2. LED light fixtures are more efficient than existing lighting. See electrical documents for additionalinformation.
3. Carpet is showing signs of aging and wear.
4. Office furniture appears to be in good condition.
5. Projector and power lines are in fair condition. See electrical documents for additional information.
1. Gypsum ceiling is in good condition.
Fixtures: Good
Interior Area: 2564 SF / Floor
Overall Condition: Good
Total Repair Cost: $60,000.00 - $75,000.00*
General Notes:Recommended to clean and maintain the building
in its entirety to extend its life expectancy.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Offices (Cont.)Flooring: Carpet
Flooring Condition: Good
Walls: Studs
Ceiling: Gypsum Board
Doors: Wood
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 17/560
ceiling mounted grilles.
Image Legend:
1. Round taps route supply air between floor joists to floor mounted grilles.
2. Ductwork is uninsulated and unsealed with holes/punctures leaking air.
3. Floor mounted grilles provide supply air throughout the building. Return air is collected through
Insert Key Plan or
Additional Image
BasementFloor Grilles
Ductwork is typical of residential construction.
Insulating and sealing would improve operating
efficiency. New branches can be installed to add
more heating/cooling throughout the building.
Location:
Replacement Cost:
Terminal Units:
Insert Image Insert Image
Plenum/Ducted
Galvanized Steel
Fair
Ductwork
General Notes:
Overall Condition:
Construction:
Return Air Path:
$3,000.00 - $5,000.00*
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 18/560
3. Air-cooled condensers have a typical life expectancy of 20 years.
Image Legend:
Insert Key Plan or
Additional Image
Lennox Residential Gas/DXBasement
Furnace/AC
General Notes:
Condenser:
Overall Condition:
Installation Date:
Location:Furnace:
Replacement Cost:
Overall Condition:
Installation Date:
Insert Image Insert Image
1988
Poor
Ruud AC UAKA-048
North Exterior
2003
Fair
$10,000.00 - $15,000.00
The heating and cooling equipment is nearing or
beyond life expectancy and should be replaced. The
capacity should be reevaluated to determine if more
or less heating/cooling is required with the
renovated building.
1. Undercooled spaces may require new ductwork to supply more air flow.
2. Residential furnaces have a typical life expectancy of 15-20 years. Replacing with a new gas/DX
furnace will increase efficiency and may be necessary to meet increased building cooling demand.
Location:
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 19/560
Insert Key Plan or
Additional Image
3-Ton Fujitsu Split UnitWest Exterior
$15,000.00*
Equipment is new and in good condition but should
be serviced regularly to ensure proper cooling in the
server room and avoid overheating equipment.
Image Legend:
Server Room
2009
Good
HVAC Unit
Overall condition:
Installation Date:
Evaporator Location:
Condenser Location:Type:
1. Indoor evaporator life expectancy is >15 years with proper maintenance.
2. Outdoor condenser life expectancy is >15 years with proper maintenance.
Insert Image Insert Image
General Notes:
Replacement Cost:
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 20/560
Insert Key Plan or
Additional Image
Floor-Mounted Flush TankManual Flush Lever
$5,000.00 - $7,500.00*
Recently renovated plumbing fixtures are in good
condition and comply with modern ADA and water
efficiency standards.
Yes
Good
Drop-In China/Stainless
Manual Lever Handle
Plumbing Fixtures
Lavatories/Sinks
Overall Condition:
ADA Compliant:
Actuation:Water Closets:
Actuation:
Insert Image Insert Image
Yes
General Notes:
Replacement Cost:
Overall Condition:
Image Legend:
1. Older fixture should be replaced if it is still in use.
2. Casework allows for greater accessibility and conceals supply plumbing.
Good
3. Grab-bar and fixture clearances allow for greater accessibility. Supply piping is in good condition.
ADA Compliant:
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 21/560
Insert Key Plan or
Additional Image
High Pressure SodiumFair
$1,000.00*
Building lighting has been retrofitted with screw in
compact fluorescent lamps. An overhaul of the
existing exterior lighting would decrease energy
consumption.
Image Legend:
Photocell
Soffit Cans
Fair
Wall Switch
Exterior Lighting
Condition:
Building Lighting:
Controls:
Condition:Site Lighting:
Controls:
1. Site lighting is provided by one pole mounted high pressure sodium fixture.
2. Exterior can incandescent lighting fixture installed in soffit.
Upgrade to LED
Insert Image Intentionally LeftBlank
$10,000.00*
General Notes:
Building Lighting:
Upgrade To LED
Site Lighting:
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 22/560
Image Legend:
1. An EST Vigilant Fire Alarm System is an example of a system that would meet the needs of
a building the size of the Administration Building.
Insert Key Plan or
Additional Image
N/A
Currently there isn't a centrally monitored fire alarm
system installed at the Administration Building.
Note: Fire Alarm systems can reduce insurance costs.
System:
Fire Alarm System:
Cost to Install
Proposed Fire Alarm
Insert Image Intentionally LeftBlank
EST Vigilant
Fire Alarm System
General Notes:
System:
$15,000.00*
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 23/560
Insert Image Insert Image
Fluorescent ***
Fair
Incandescent and CFL**
Fair
N/A
$2,000.00*
$2,000.00*LED Cans:
Occupancy Sensors:
Occupancy Sensors:
3. An occupancy sensor should be added to the bathroom fixture and exhaust fan.
4. Occupancy sensors should be added to each office and corridors.
** CFL - Screw in Compact Fluorescent
Insert Key Plan or
Additional Image
A-Lamp and FluorescentPoor
Interior Lighting
General Notes:
Can Lighting:
Condition:
Office Lighting:
$2,500.00*
Existing can fixtures can be converted to LED can
fixtures relatively easily and would increase energy
efficiency especially over incandescent cans.
Condition:
Condition:Basement Lighting:
Fluorescent Fixtures:
*** The ballasts in the fluorescent fixtures would need to be changed to Program Start for Occupancy Sensors.
Image Legend:
1. T-12 8' fixture in basement stairwell. Fixture should be replaced for a more energy efficient fixture.
T-12 fixtures are being phased out and will become harder to obtain especially 8' lengths.
2. For safety and energy efficiency open a-lamp fixtures should be replaced with fluorescent in basement.
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 24/560
Insert Key Plan or
Additional Image
120/240V Single Phase200A
$0.00*
Electrical service is in good condition. A few
maintenance items should be performed to avoid
any issues in the future. A few of these items are
outlined below.
Good
Power Distribution
Condition:
Panel Size:Electric Service:
Intentionally LeftBlank
General Notes:
Replacement Cost:
3. Electrical receptacles should be moved from ground up to the wall to avoid any possible moisture.
4. Panels are located in the basement.
Image Legend:
1. 200A 120/240V Main Electrical Panel. Cover should be reinstalled.
2. 100A subpanel fed from main electrical panel. Previously served district servers and network
before being moved to the Learning Center.
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 25/560
Insert Image Intentionally LeftBlank
PremiSys
$10,000.00 - $12,000.00*
A security access control system can be added to the
building with some modifications to the door
hardware for door strike release installation. A
complete rekey of the exterior doors should be done
as people with keys could bypass the card access
system.
1. Potential location for card access door release on front entrance.
2. Potential location for card access door release on basement entrance.
3. Example of card access readers.
Insert Key Plan or
Additional Image
N/AIdentiCard
Security Access Control
General Notes:
System:
Manufacture:Type:
Installation Cost:
* Rekey of exterior doors is not included in this number.
Image Legend:
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 26/560
4. Potential location of a fixed ceiling mounted camera covering the front entrance.
5. Potential location of a fixed ceiling mounted camera covering the rear entrance.
6. Potential location of a fixed ceiling mounted camera covering the lower level entrance and garage
door.
Insert Key Plan or
Additional Image
N/AIP POE Cameras
Insert Image Insert Image
1
$6,000.00 - $10,000.00*
Currently there are not any security cameras
installed at the Administration Building. We would
propose adding cameras in the locations of numbers
3-6.
Estimated Cost:
3. Potential location of an exterior PTZ camera.
Image Legend:
Quantity:
1. Example of an exterior PTZ POE camera.
2. Example of a fixed ceiling mounted POE camera.
General Notes:
Axis
P3304
3
Q6034-EPTZ Model:
Security Cameras
Quantity:
Proposed Cameras:Type:
Fixed Dome Model:
Brand:
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 27/560
Insert Image Intentionally LeftBlank
Epson Ceiling Mount
Good
Cisco POE
Good
Good
Condition:
Good
Cabling is new and was installed within the last 5
years. Projector is new and in good condition.
1. Category 6 patch panels. Category 6 cabling is the current installed cabling standard.
2. Category 6 cabling is being supported using electrical cable staples. These staple should be
VOIP
supported like this will either not perform correctly or will fail.
Insert Key Plan or
Additional Image
Category 6Fair
Technology
General Notes:
Wireless:
Condition:
Projector:
Condition:Data:
Overall Condition:
Telephones:
Projector Power:
3. Location of telecommunications rack in basement.
Image Legend:
removed and the cabling should be supported using either j-hooks or bridal rings. Cabling that is
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 28/560
Insert Image Insert Image
2. Major cracking has been filled with sealant to prevent further deterioration. Continued maintenance willhelp prolong the life expectancy of the asphalt.
3 Ponding on the surface is a sign of improper grading and installation.
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Paving
Replacement Cost: $60,000.00-$75,000.00*
Total Hardscape
Replacement Cost: $10,000.00-$15,000.00*
General Notes:Recommended to replace and repair sidewalk that
is pitted and excessively deteriorated, properly
edge all sidewalk and asphalt to prolong its life
expectancy, and installation of ADA compliant ramp
for visitors.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: AsphaltParking Condition: Poor
Driveway Condition: Fair
Bus Parking Condition: N/A
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 29/560
Insert Image Insert Image
2. Major cracking has been filled with sealant to prevent further deterioration. Continued maintenance willhelp prolong the life expectancy of the asphalt.
3. Proper edging around sidewalks may prolong its life expectancy.
4. Concrete staircase is showings signs of aging and rust from steel reinforcement.
5. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate over
time.
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Paving
Replacement Cost: $60,000.00-$75,000.00*
Total Hardscape
Replacement Cost: $10,000.00-$15,000.00*
General Notes:Recommended to replace and repair sidewalk that
is pitted and excessively deteriorated, properly
edge all sidewalk and asphalt to prolong its life
expectancy, and installation of ADA compliant ramp
for visitors.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Poor
Driveway Condition: Fair
Bus Parking Condition: N/A
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 30/560
Insert Image Insert Image
2. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate overtime.
3. Concrete staircase is showings signs of aging and rust from steel.
1. Sidewalk ramps do not meet ADA requirements and should be updated when replaced.
Total Paving
Replacement Cost: $60,000.00-$75,000.00*
Total Hardscape
Replacement Cost: $10,000.00-$15,000.00*
General Notes:Recommended to replace and repair sidewalk that
is pitted and excessively deteriorated and properly
edge all sidewalk and asphalt to prolong its life
expectancy.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Poor
Driveway Condition: Fair
Bus Parking Condition: N/A
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 31/560
Insert Image Insert Image
time.2. Ponding on the surface is a sign of improper grading and installation.
3. Proper edging around sidewalks may prolong its life expectancy.
1. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate over
Total Paving
Replacement Cost: $60,000.00-$75,000.00*
Total Hardscape
Replacement Cost: $10,000.00-$15,000.00*
General Notes:Recommended to replace and repair sidewalk that
is pitted and excessively deteriorated and properly
edge all sidewalk and asphalt to prolong its life
expectancy.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Poor
Driveway Condition: Fair
Bus Parking Condition: N/A
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Administration Building
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 32/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 33/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W1Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: (2) 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $12,500.00*
General Notes:Recommended replacement of hollow metal door
system with aluminum door system with double
pane glass to improve aesthetics, functionality, and
efficiency.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Multiple penetrations are causing protective paint to peal and chip.
4. Hollow metal door and frame are showing signs of aging and wear.
5. Single-pane glass is allowing exterior temperature to influence the interior.
6. Hinges are showing signs of aging and wear and need to be addressed.
7. Door closers and pulls are different colors and finishes.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 34/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W1 (Cont.)Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: (2) 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $12,500.00*
General Notes:Recommended replacement of hollow metal door
system with aluminum door system with double
pane glass to improve aesthetics, functionality, and
efficiency.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Single-pane glass is allowing exterior temperature to influence the interior.
4. Hollow metal door and frame are showing signs of aging and wear.
5. Carpet is showing signs of deterioration and needs to be addressed with a more durable material.
6. Would recommend installation of walk off mat / carpet tile.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 35/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W2Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites: N/A
1. Single pane-glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $4,500.00*
General Notes:Recommendation to remove and replace all
window weather seals to prevent water and air
from penetrating the building system.
Image Legend:
Insert Image Insert Image
2. Sealant around door frames are missing and may be allowing water to penetrate the building systems.3. Hinges are showing signs of aging and wear and need to be addressed.
4. Weather stripping is missing or worn and may be allowing air infiltration.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 36/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W3Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
1. Single pane-glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $6,500.00*
General Notes:Recommendation to remove and replace all
window weather seals to prevent water and air
from penetrating the building system.
Image Legend:
Insert Image Insert Image
2. Aluminum door is rubbing on brick corner.3. Hinges are showing signs of aging and wear and need to be addressed.
4. Double-pane sidelites, when properly sealed, will prevent air infiltration.
5. Seals are expanding and contracting and are not performing efficiently.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 37/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W4Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
1. Single pane-glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 3'-4" x 8'-0"
Overall Condition: Fair
Replacement Cost: $6,500.00*
General Notes:Recommendation to install a door stop to stop the
grinding of aluminum. Replace and maintain
closers.
Image Legend:
Insert Image Insert Image
2. Aluminum door is rubbing on brick corner.3. Hinges are showing signs of aging and wear and need to be addressed.
4. Double-pane sidelites, when properly sealed, will prevent air infiltration.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 38/560
Insert Image Insert Image
2. Seals are expanding and contracting and are not performing efficiently.
1. Double-pane sidelites, when properly sealed, will prevent air infiltration.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $6,500.00*
General Notes:Recommendation to install a door stop to stop the
grinding of aluminum. Replace and maintain
closers.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W4 (Cont.)Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 39/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W5Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites: N/A
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $3,500.00*
General Notes:Recommendation to install a door stop to stop the
grinding of aluminum. Replace and maintain
closers.
Image Legend:
2. Aluminum door is rubbing on concrete ledge.3. Hinges are showing signs of aging and wear and need to be addressed.
4. Paint on lintel is showing signs of wear and should be cleaned, primed and painted to maintain the lintel.
5. Door closer bolts and washers have been replaced leaving wear marks.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 40/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W5 (Cont.)Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites: N/A
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $3,500.00*
General Notes:Recommendation to install a door stop to stop the
grinding of aluminum. Replace and maintain
closers.
Image Legend:
2. Door closer is showing signs of aging and corrosion.3. Drywall return has been damaged and needs to be addressed.
4. Door frame is showing signs of sealant failure and may be allowing water to penetrate the door system.
5. Door sealant is worn or missing and may be allowing water to penetrate the door system.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 41/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W6Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites: N/A
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $3,500.00*
General Notes:Recommendation to install a door stop to stop the
grinding of aluminum. Replace and maintain
closers.
Image Legend:
2. Aluminum door is rubbing on concrete ledge.3. Hinges are showing signs of aging and wear and need to be addressed.
4. Weather stripping appears to be worn or displaced and may be allowing air infiltration.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 42/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W7Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites: N/A
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $3,500.00*
General Notes:Recommendation to install a door stop to stop the
grinding of aluminum. Replace and maintain
closers.
Image Legend:
Insert Image
2. Aluminum door is rubbing on concrete ledge.3. Hinges are showing signs of aging and wear and need to be addressed.
4. Closer needs to be maintained and removed of debris.
5. Weather stripping appears to be worn or displaced and may be allowing air infiltration.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 43/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W8Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites: N/A
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $3,500.00*
General Notes:Recommendation to install a door stop to stop the
grinding of aluminum. Replace and maintain
closers.
Image Legend:
Insert Image Insert Image
2. Aluminum door is rubbing on concrete ledge.3. Hinges are showing signs of aging and wear and need to be addressed.
4. Closer is showing signs of aging and corrosion.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 44/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W8 (Cont.)Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites: N/A
1. Hinges are showing signs of aging and wear and need to be addressed.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $3,500.00*
General Notes:Recommendation to install a door stop to stop the
grinding of aluminum. Replace and maintain
closers.
Image Legend:
Insert Image Insert Image
2. Aluminum door is rubbing on concrete ledge.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 45/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W9 (2 Sets of Doors)Door Material: Aluminum
Weather Stripping: Good
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: 10'-3" x 7'-7"
Size: (2) 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $24,500.00*
General Notes:Recommendation to close interior set of door to
allow vestibule to function efficiently and properly.
Image Legend:
Insert Image Insert Image
2. Double-pane sidelights, when properly sealed, will prevent air infiltration.3. Door is propped open preventing the vestibule from functioning properly.
4. Aluminum door is showing signs of wear and damage.
5. Transit ceiling panel may contain asbestos. See asbestos report for additional information.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 46/560
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Hollow metal doors and frame are showing signs of Sun / UV damage.
4. Hollow metal doors and frame are showing signs of aging and wear.
5. Screws are missing in weather stripping.
6. Protective bollards are showings signs of aging, Sun / UV damage, and corrosive.
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $4,500.00*
General Notes:Recommended to remove and replace all weather
seals and stripping. Door system and bollards need
to be protected from additional Sun / UV damage.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S10Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 47/560
Insert Image
2. Protective bollards are showings signs of aging, Sun / UV damage, and corrosion.3. Hollow metal doors and frame are showing signs of Sun / UV damage.
4. Hollow metal doors and frame are showing signs of aging and wear.
5. Screws from door sweeps are showing signs of aging, wear and corrosion.
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $2,500.00*
General Notes:Recommended to remove and replace all weather
seals and stripping. Door system and bollards need
to be protected from additional Sun / UV damage.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S11Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 48/560
Insert Image
2. Protective bollards are showings signs of aging and Sun / UV damage.3. Hollow metal doors and frame are showing signs of Sun / UV damage.
4. Hollow metal doors and frame are showing signs of aging and wear.
5. Screws from door sweeps are showing signs of aging, wear, and corrosion.
6. Sealant around door frame is showing signs of aging and wear.
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $2,500.00*
General Notes:Recommended to remove and replace all weather
seals and stripping. Door system needs to be
protected from additional Sun / UV damage.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S12Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 49/560
Insert Image
2. Double-pane sidelights, when properly sealed, will prevent air infiltration.3. Closer is showing signs of aging, wear, corrosion.
4. Window seals are expanding and contracting and are not performing efficiently.
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $16,500.00*
General Notes:Recommended to remove and replace window
seals. Maintain overall door system.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S13Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 50/560
Insert Image
2. Double-pane sidelights, when properly sealed, will prevent air infiltration.3. Door sweeps are missing or worn and may be allowing air infiltration.
4. Window seals are expanding and contracting and are not performing efficiently.
5. Tile is showing the signs of excessive moisture issues.
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $16,500.00*
General Notes:Recommended to remove and replace window
seals. After addressing the moisture concerns
remove and replace floor tiles.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S14Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 51/560
Insert Image
2. Double-pane sidelights, when properly sealed, will prevent air infiltration.3. Door handle is broken and is currently supported by duck tape.
4. Closer is showing signs of aging, corrosion, and wear.
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $16,500.00*
General Notes:Recommended to remove and replace window
seals. After addressing the moisture concerns
remove and replace floor tiles.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S14 (Cont.)Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 52/560
2. Double-pane sidelights, when properly sealed, will prevent air infiltration.3. Door push bar is showing signs of aging and wear.
4. Door sweeps are missing or worn and may be allowing air infiltration.
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: 10'-9" x 8'-0"
Size: (2) 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $18,500.00*
General Notes:Recommendation to address excessive push bar
wear and tear. Doors are being propped open by
walk off mats and are preventing the air lock from
working efficiently.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S15 (2 Sets of Doors)Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 53/560
2. Double-pane sidelights, when properly sealed, will prevent air infiltration.3. Door push bar is showing signs of aging and wear.
4. Door sweeps are missing or worn and may be allowing air infiltration.
5. Doors are propped open by walk off mats and are preventing the air lock from working efficiently.
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: 10'-9" x 8'-0"
Size: (2) 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $18,500.00*
General Notes:Recommendation to address excessive push bar
wear and tear. Doors are being propped open by
walk off mats and are preventing the air lock from
working efficiently.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S15 (2 Sets of Doors) (Cont.)Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 54/560
2. Sealant around door frame is showing signs of aging and wear.
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $2,500.00*
General Notes:Recommendation to address door sweeps and
weather seals.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E16Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 55/560
2. Hollow metal doors and frame are showing signs of Sun / UV damage.3. Door sweeps are missing or worn and may be allowing air infiltration.
1. Hinges are showing signs of aging and wear and need to be addressed.
Vestibule: N/A
Size: 3'-0" x 8'-0"
Overall Condition: Fair
Replacement Cost: $2,500.00*
General Notes:Recommendation to address door sweeps and
weather seals.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E17Door Material: Hollow Metal
Weather Stripping: Fair
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 56/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N18 (2 Sets of Doors)Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: 15'-2" x 7'-6"
Size: (3) 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $35,000.00*
General Notes:Recommendation to replace door system in its
entirety to improve aesthetics, functionality, and
efficiency.
Image Legend:
2. Hinges are showing signs of aging and wear.3. Door sweeps are missing or worn and may be allowing air infiltration.
4. Hollow metal door and frame are showing signs of aging and wear.
5. Light fixture is unsecured and should be addressed.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 57/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N18 (2 Sets of Doors) (Cont.)Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: 15'-2" x 7'-6"
Size: (3) 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $35,000.00*
General Notes:Recommendation to replace door system in its
entirety to improve aesthetics, functionality, and
efficiency.
Image Legend:
2. Vestibule walls are cracking and showing signs of aging.3. Door sweeps are missing or worn and may be allowing air infiltration.
4. Hollow metal door and frame are showing signs of aging and wear.
5. Light fixture is unsecure and should be addressed.
6. Holes in the wall under the radiator may be causing damage to the building systems surround it.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 58/560
2. Lintel sealant is showing signs of aging and wear and needs to be addressed.3. Door frames are showing signs of aging and wear and needs to be addressed.
1. Maintain quality of door sweeps.
Vestibule: N/A
Size: 3'-0"-7'-0"
Overall Condition: Fair
Replacement Cost: $2,500.00*
General Notes:Maintain weather seals, door sweeps, and sealant
around door and frame.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N19Door Material: Hollow Metal
Weather Stripping: Good
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 59/560
2. Hollow metal doors and frame are showing signs of aging, wear and Sun / UV damage.3. Door frames are showing signs of aging and wear and need to be addressed.
1. Hinges are showing signs of aging and wear and need to be addressed.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Failed
Replacement Cost: $4,500.00*
General Notes:Recommendation to remove and replace door
system in its entirety.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N20Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: Failed
Door Glazing: N/A
Sidelites: N/A
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 60/560
2. Hollow metal doors and frame are showing signs of aging, wear and Sun / UV damage.3. Door closer is no longer attached to door and is showings signs of aging, wear, and corrosion.
4. Door frame and wall are settling and separating and need to be addressed.
1. Hinges are showing signs of aging and wear and need to be addressed.
Vestibule: N/A
Size: N/A
Overall Condition: Failed
Replacement Cost: $4,500.00*
General Notes:Recommendation to remove and replace door
system in its entirety.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N20 (Cont.)Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: Failed
Door Glazing: N/A
Sidelites: N/A
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 61/560
Insert Image Insert Image
2. Brick has broken apart near window and may be allowing water to penetrate the building envelope.
3. Recaulk, prime, paint, and reseal steel lintel system to protect from water and corrosion.
1. Recaulk and seal expansion joint to protect building from the elements.
Soffit / Canopy: Poor
Overall Condition: Poor
Total Sealant
Replacement Cost: $20,000.00 - $30,000.00*
General Notes:Maintain consistent caulking and sealants
throughout the building envelope to prevent
moisture penetration.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: N/A
Flashing / Trim: Poor
Glazing: N/A
Caulking / Sealant: Failed
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 62/560
Insert Image Insert Image
2. Clean, prime, and paint the parapet cap to protect from further damage.3. Seal hole in exterior envelope to prevent water and pests from entering the building.
4. Transite panel may contain asbestos and should be removed as work permits.
1. Recaulk and seal window and brick joint.
Soffit / Canopy: Poor
Overall Condition: Poor
Total Sealant
Replacement Cost: $20,000.00 - $30,000.00*
General Notes:Maintain consistent caulking and sealants
throughout the building envelope to prevent
moisture penetration.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: N/A
Flashing / Trim: Poor
Glazing: N/A
Caulking / Sealant: Failed
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 63/560
Insert Image Insert Image
envelope.2. Hole in parapet cap may be allowing water to penetrate the building envelope.
1. Sealant is missing or worn and needs to be addressed to prevent water from penetrating the building
Soffit / Canopy: Poor
Overall Condition: Poor
Total Sealant
Replacement Cost: $20,000.00 - $30,000.00*
General Notes:Maintain a regular maintenance program to clean,
paint and seal the building envelope.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: N/A
Flashing / Trim: Poor
Glazing: N/A
Caulking / Sealant: Failed
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 64/560
Insert Image Insert Image
building envelope.2. Masonry façade needs to be maintained and cleaned and sealed regularly.
3. Sealant is missing or worn and needs to be addressed to prevent water from draining near the building
foundation.
1. Expansion join sealant is missing or worn and needs to be addressed to prevent water from penetrating
Soffit / Canopy: Poor
Overall Condition: Poor
Total Sealant
Replacement Cost: $20,000.00 - $30,000.00*
General Notes:Maintain a regular maintenance program to clean,
paint and seal the building envelope.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: N/A
Flashing / Trim: Poor
Glazing: N/A
Caulking / Sealant: Failed
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 65/560
Insert Image
2. Sealant is missing or worn between concrete lintel and masonry.3. Exterior electrical receptacle is exposed to the elements.
4. Sealant is missing or worn and needs to be addressed to prevent water from draining near the building
foundation.
5. Sealant is missing or worn and needs to be addressed to prevent water from penetrating the building
envelope.
1. Bollards is showings signs of aging and wear.
Soffit / Canopy: Poor
Overall Condition: Poor
Total Sealant
Replacement Cost: $20,000.00 - $30,000.00*
General Notes:Maintain a regular maintenance program to clean,
paint and seal the building envelope.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: N/A
Flashing / Trim: Poor
Glazing: N/A
Caulking / Sealant: Failed
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 66/560
Insert Image
information.2. Sealant is missing or worn and needs to be addressed to prevent water from penetrating the building
system.
3. Transite panel may contain asbestos and should be removed as work permits.
4. Single pane glass is allowing exterior temperature to influence the interior.
1. Repair light fixture. LED light fixture will save energy. See Electrical documents for additional
Soffit / Canopy: Poor
Overall Condition: Poor
Replacement Cost: $20,000.00 - $30,000.00*
General Notes:Recommended to remove Transite panel as work
permits and replace with new canopy system.
Address broken light fixture system.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: N/A
Flashing / Trim: Poor
Glazing: N/A
Caulking / Sealant: Failed
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 67/560
Insert Image
envelope.2. Mold buildup needs to be address and cleaned. A regular cleaning plan should be implemented to
prolong the life expectancy of the building envelope.
3. Masonry has shifted and has caused a gap to open. Building shift needs to be addressed to prevent
further damage.
4. Door N20 should be replaced in its entirety.
1. Hole in exterior wall needs to be addressed to prevent water or pests from entering the building
Soffit / Canopy: Poor
Overall Condition: Poor
Replacement Cost: $20,000.00 - $30,000.00*
General Notes:Maintain a regular maintenance program to clean,
paint and seal the building envelope. Building shift
should be addressed to ensure the building doesn’t
shift further.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: N/A
Flashing / Trim: Poor
Glazing: N/A
Caulking / Sealant: Failed
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 68/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: N/A
Flashing / Trim: Poor
Glazing: N/A
Caulking / Sealant: Failed
1. Repair light fixture. LED light fixture will save energy. See Electrical documents for additional information.
Soffit / Canopy: Poor
Overall Condition: Poor
Total Canopy
Replacement Cost: $5,500.00 - $10,000.00*
General Notes:Maintain a regular maintenance program to clean,
paint and seal the building envelope.
Image Legend:
Insert Image Insert Image
information.2. Columns are showings signs of aging and corrosion.
3. Transite panel may contain asbestos and should be removed as work permits.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 69/560
Insert Image
2. Masonry has shifted and has moved away from building. Shifted brick needs to be addressed to avoidfurther damage to the building envelope.
3. Sealant and mortar joints are missing or worn. Joints may be allowing water to penetrate the building
envelope.
1. Masonry has shifted and has sheared the mortar joints.
Soffit / Canopy: Poor
Overall Condition: Poor
Replacement Cost: $2,000.00 - $3,000.00*
General Notes:Recommended to repair and tuck point all joints
associated with masonry shifting.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: N/A
Flashing / Trim: Poor
Glazing: N/A
Caulking / Sealant: Failed
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 70/560
Insert Image
2. Masonry has shifted and has moved away from building. Shifted brick needs to be addressed to avoidfurther damage to the building envelope.
3. Sealant and mortar joints are missing or worn. Joints may be allowing water to penetrate the building
envelope.
1. Masonry has shifted and has sheared the mortar joints.
Soffit / Canopy: Poor
Overall Condition: Poor
Replacement Cost: $2,000.00 - $3,000.00*
General Notes:Recommended to repair and tuck point all joints
associated with masonry shifting.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: N/A
Flashing / Trim: Poor
Glazing: N/A
Caulking / Sealant: Failed
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 71/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Gym. Wall Above Roof Masonry: Poor
Cladding: N/A
Flashing / Trim: Failed
Glazing: N/A
Caulking / Sealant: Failed
1. Masonry has spalled off of brick façade and may be allowing water to penetrate the building envelope.
Soffit / Canopy: N/A
Overall Condition: Poor
Replacement Cost: $50,000.00 - $75,000.00*
General Notes:Recommended to repair and tuck point all joints
associated with the affected area to prevent further
damage to the building envelope. Masonry wall is
lacking thru-wall flashing which would prevent
water from getting down into first floor wall.
Image Legend:
Insert Image
2. Sealant and mortar joints are missing or worn. Joints may be allowing water to penetrate the buildingenvelope.
3. Sealant and mortar joints need to be addressed to prevent further damage to the building envelope.
4. Masonry wall and roof connection needs thru-wall flashing to allow water back out of wall. Wall needs
weeps at roofline and vents at top of masonry wall.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 72/560
Gymnasium Data
Insert Key Plan or
Additional Image
Gym Location: ColumbiaFloor Material: All Purpose
Seating Capacity 360
Score Board: None
Equipment: Good
Lighting: Poor
1. Seating capacity of 360. Maintain and clean bleachers regularly.
Size: 70'-0" x 60'-0"
Overall Condition: Fair
Replacement Cost: $65,000.00 - $85,000.00*
General Notes:Overall condition of gymnasium is good. Existing
lighting systems are inefficient and light levels are
poor. Recommend new high efficiency lighting
system. See lighting Data for additional
information.
Image Legend:
Insert Image Insert Image
2. Maintain all purpose flooring. Clean floor regularly.3. Maintain basketball rims and backboards, currently in good condition.
4. Gymnasium door systems are showing signs of aging and wear.
5. Stage is showing signs of aging and wear.
6. Lighting is dim throughout Gymnasium. See lighting data for additional information.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 73/560
Insert Image Insert Image
2. Maintain all purpose flooring. Clean floor regularly.3. Maintain basketball rims and backboards, currently in good condition.
4. Gymnasium door systems are showing signs of aging and wear.
5. Lighting is dim throughout Gymnasium. See lighting data for additional information.
1. Seating capacity of 360. Maintain and clean bleachers regularly.
Size: 70'-0" x 60'-0"
Overall Condition: Fair
Replacement Cost: $65,000.00 - $85,000.00*
General Notes:Overall condition of gymnasium is good. Existing
lighting systems are inefficient and light levels are
poor. Recommend new high efficiency lighting
system. See lighting Data for additional
information.
Image Legend:
Gymnasium Data
Insert Key Plan or
Additional Image
Gym Location: Columbia (Cont.)Floor Material: All Purpose
Seating Capacity 360
Score Board: None
Equipment: Good
Lighting: Poor
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 74/560
Insert Image
2. Inspect, clean, and maintain existing quarry tile.3. Equipment is in good condition and should be maintained.
1. Moisture resistance acoustical ceiling tile and grid.
Freezer / Cooler: Fair
Overall Condition: Fair
Replacement Cost: $250,000.00-$450,000.00*
General Notes:The Columbia Elementary School Kitchen is in fair
condition overall. The kitchen, storage, and serving
areas should be cleaned and maintained regularly.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: KitchenFlooring Material: Quarry Tile
Ceiling Material Moisture Resistant ACT
Wall: Painted CMU Block
Storage: Fair
Equipment: Good
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 75/560
Insert Image
2. Inspect, clean, and maintain existing quarry tile.3. Equipment is in good condition and should be maintained.
1. Moisture resistance acoustical ceiling tile and grid.
Freezer / Cooler: Fair
Overall Condition: Fair
Replacement Cost: $250,000.00-$450,000.00*
General Notes:The Columbia Elementary School Kitchen is in fair
condition overall. The kitchen, storage, and serving
areas should be cleaned and maintained regularly.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Kitchen (Cont.)Flooring Material: Quarry Tile
Ceiling Material Moisture Resistant ACT
Wall: Painted CMU Block
Storage: Fair
Equipment: Good
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 76/560
Insert Image
2. Inspect, clean, and maintain existing quarry tile.3. Equipment is in good condition and should be maintained.
1. Moisture resistance acoustical ceiling tile and grid.
Freezer / Cooler: Fair
Overall Condition: Fair
Replacement Cost: $250,000.00-$450,000.00*
General Notes:The Columbia Elementary School Kitchen is in fair
condition overall. The kitchen, storage, and serving
areas should be cleaned and maintained regularly.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Kitchen (Cont.)Flooring Material: Quarry Tile
Ceiling Material Moisture Resistant ACT
Wall: Painted CMU Block
Storage: Fair
Equipment: Good
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 77/560
Insert Image Insert Image
2. Acoustical ceiling tile is in good condition and should be replaced as needed.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Carpet is showing signs of deterioration and needs to be addressed with a more durable material.
1. Columbia Elementary contains approximately 27 Cathode Ray Tube TV's.
Fixtures: Fair
Interior Area
Overall Condition: Fair
Replacement Cost: $150,000.00-$180,000.00*
General Notes:Columbia Elementary School contains
approximately 27 (CRT) TVs that use more energy
than the common modern TVs. The carpet flooring
may have exceeded its life expectancy and may
need to be addressed.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: ClassroomsTVs: 27 Approximately
Flooring: Carpet
Walls: CMU / Stud
Ceiling: Acoustical Ceiling Tile
Doors: Wood
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 78/560
Insert Image Insert Image
2. Acoustical ceiling tile is in good condition and should be replaced as needed.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
1. Carpet is showing signs of deterioration and needs to be addressed with a more durable material. .
Fixtures: Fair
Interior Area
Overall Condition: Fair
Replacement Cost: $150,000.00-$180,000.00*
General Notes:Columbia Elementary School contains
approximately 27 (CRT) TVs that use more energy
than the common modern TVs. The carpet flooring
may have exceeded its life expectancy and may
need to be addressed.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Classrooms (Cont.)TVs: 27 Approximately
Flooring: Carpet
Walls: CMU / Stud
Ceiling: Acoustical Ceiling Tile
Doors: Wood
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 79/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: HallsFlooring: Carpet
Flooring Condition: Poor
Walls: Glazed CMU Block
Ceiling: Acoustical Ceiling Tile
Casework: N/A
1. Hallway carpet is showing signs of aging and wear. Carpet is also dirty and may cause air quality issues.
Fixtures: Fair
Baseboard: Rubber Base
Overall Condition: Fair
Replacement Cost: $150,000.00-$180,000.00*
General Notes:It is recommended that all hallway carpet be
removed and replace with a more durable material.
Sheet good flooring would be a durable and low
maintenance cost option.
Image Legend:
Insert Image Insert Image
2. Carpet is showing signs of deterioration and needs to be addressed with a more durable material.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 80/560
Insert Image Insert Image
2. Carpet is showing signs of deterioration and seams are separating. Carpet needs to be addressed with a mdurable material.
1. Hallway carpet is showing signs of aging and wear. Carpet is also dirty and may cause air quality issues.
Fixtures: Fair
Baseboard: Rubber Base
Overall Condition: Fair
Replacement Cost: $150,000.00-$180,000.00*
General Notes:It is recommended that all hallway carpet be
removed and replace with a more durable material.
Sheet good flooring would be a durable and low
maintenance cost option.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Halls (Cont.)Flooring: Carpet
Flooring Condition: Poor
Walls: Glazed CMU Block
Ceiling: Acoustical Ceiling Tile
Casework: N/A
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 81/560
Insert Image Insert Image
2. Acoustical ceiling tile is in good condition and should be replaced as needed.3. CMU wall is in fair condition and should be maintained.
4. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
1. Carpet is showing signs of deterioration and needs to be addressed with a more durable material.
Fixtures: Fair
Baseboard: Rubber Base
Overall Condition: Fair
Replacement Cost: $150,000.00-$180,000.00*
General Notes:It is recommended that all hallway carpet be
removed and replace with a more durable material.
Sheet good flooring would be a durable and low
maintenance cost option.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Halls (Cont.)Flooring: Carpet
Flooring Condition: Poor
Walls: Glazed CMU Block
Ceiling: Acoustical Ceiling Tile
Casework: N/A
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 82/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: Casework
1. Casework is showing signs of aging and wear and need to be replaced in the near future.
Overall Condition: Poor
Total Casework
Replacement Cost: $120,000.00-$150,000.00*
General Notes:Recommended to replace existing casework in its
entirety.
Image Legend:
Insert Image Insert Image
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 83/560
Insert Image Insert Image
Mechanical Courtyard
1994
Fair
(1) Base Mounted
1994
Pump:
$200,000.00 - $225,000.00*
Chiller is serviceable but should be replaced within
the next ten years. New piping and pumps with
VFD's will increase energy efficiency and control.
1. Open mechanical courtyard will facilitate replacement of chiller.
2. Condenser fans exhibit signs of aging and corrosion. Chiller's energy efficiency will decrease over
Fair
3. Exterior chilled water piping is properly insulated and jacketed for exposed conditions.
Insert Key Plan or
Additional Image
Trane RTAA125Air-Cooled Scroll
Chilled Water Plant
General Notes:
Overall Condition:
Installation Date:
Location:
Type:Chiller:
Replacement Cost:
Overall Condition:
Installation Date:
Image Legend:
time.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 84/560
Insert Image Insert Image
Mechanical Courtyard
1994
Fair
(1) Base Mounted
1994
Pump:
$200,000.00 - $225,000.00*
Chiller is serviceable but should be replaced within
the next ten years. New piping and pumps with
VFD's will increase energy efficiency and control.
1. Trane air-cooled scroll chiller.
2. Glycol fill station injects glycol into the chilled-water loop and maintains system fill volume as leaks
FairInsert Key Plan or
Additional Image
Trane RTAA125 (Cont.)Air-Cooled Scroll
Chilled Water Plant
General Notes:
Overall Condition:
Installation Date:
Location:
Type:Chiller:
Replacement Cost:
Overall Condition:
Installation Date:
Image Legend:
occur.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 85/560
Insert Key Plan or
Additional Image
(2) Herman Nelson SCSGymnasium Mezzanine
$50,000.00 - $75,000.00*
Large mechanical mezzanine space and limited
ductwork will allow for easy replacement of
gymnasium AHU's. New ductwork should be
properly insulated.
Image Legend:
1957
Constant Speed, No VFD
Plenum Below Stage
Poor
Gymnasium AHU's
Return Air:
Fan Motor:
Installation Date:
Location:AHU:
Overall Condition:
1. Heavy dust accumulation on gymnasium return air damper.
2. Gymnasium return air path flows through grilles mounted on storage doors below the stage.
Insert Image Insert Image
General Notes:
Replacement Cost:
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 86/560
3. Mechanical piping and valves are in good condition and can be reused by new equipment.
Image Legend:
Insert Key Plan or
Additional Image
(2) Herman Nelson SCS (Cont.)Gymnasium Mezzanine
Gymnasium AHU's
General Notes:
Return Air:
Fan Motor:
Installation Date:
Location:AHU:
Replacement Cost:
Insert Image Insert Image
1957
Constant Speed, No VFD
Plenum Below Stage
Poor
$50,000.00 - $75,000.00*
Large mechanical mezzanine space and limited
ductwork will allow for easy replacement of
gymnasium AHU's. New ductwork should be
properly insulated.
1. AHU's are noisy and beyond service life and should be replaced.
2. Outside air and supply air ductwork should be replaced and properly insulated to increase longevity
and energy efficiency.
Overall Condition:
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 87/560
Insert Key Plan or
Additional Image
(2) Bryan CL2101989
$200,000.00 - $250,000.00*
Hot water plant is nearing end of service life. Older
non-condensing boilers should be replaced with new
hot water condensing boilers to increase energy
efficiency.
DDC
Poor
(2) Base Mounted
1994
Hot Water Plant
Pumps:
Overall Condition:
Controls:
Installation Date:Boilers:
Installation Date:
Insert Image Insert Image
Constant Speed, No VFD
General Notes:
Replacement Cost:
Overall Condition:
condensing boilers would result in increased operating efficiency.
3. Hot water pumps are relatively new and should be serviceable for several more years (typically up to
20 years for based mounted pumps) but should be replaced with the boilers.
Image Legend:
1. Leaks and condensation have caused rust to form on boiler flues. Flues should be replaced along
with boilers.
Fair
2. Boilers typically need the be replace every 20-25 years depending on maintenance. New modulating
Motor:
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 88/560
Insert Image Insert Image
(2) Upblast Aluminum Fans
Ansul R-102 Wet Chemical
Fair
Stainless Steel Gas/Electric
Fair
Appliances:
$50,000.00 - $75,000.00*
Kitchen equipment and hood appear in good
condition. Rooftop Master Air system is likely
nearing the end of service life and should be
replaced.
1. Centrifugal upblast exhaust fans for heat/grease producing kitchen equipment.
2. Code required make-up air for ventilation system. Gas-fired rooftop unit and piping show signs of
1994
3. Grease and heat producing equipment properly located under hood. Appliances appear well-
Insert Key Plan or
Additional Image
Master Air
Gas-Fired Rooftop Unit
Kitchen
General Notes:
Overall Condition:
Fire Suppression:
Exhaust Air:
Make-up Air:
Ventilation System:
Replacement Cost:
Installation Date:
Overall Condition:
maintained. Supply plumbing to fixtures and appliances is fed from tunnels below.
Image Legend:
aging and should eventually be replaced with new modulating equipment to improve efficiency.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 89/560
Insert Image Insert Image
3.5 GPF
Drop-In Sinks w/ Bubbler
Copper/Galv. (Tunnel)
Poor
Insert Key Plan or
Additional Image
1957No
Original Plumbing Fixtures
General Notes:
Supply Plumbing:
Classrooms:
Valve Flow Rates:
$30,000.00 - $50,000.00*
Original plumbing fixtures are beyond service life
and will require continual maintenance. General
issues exist with ADA compliance and leaky
galvanized pipes and fittings.
Overall Condition:
ADA Compliance:Installation Date:
Replacement Cost:
Image Legend:
1. Art room faucets have non-ADA compliant cross handles and have become difficult to operate.
2. Drain pipe connection has become corroded and will eventually fail.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 90/560
1. Classroom bubblers have become prone to leaks. Many have been disconnected.
Insert Key Plan or
Additional Image
1957 (Cont.)No
Original Plumbing Fixtures
Installation Date:
Replacement Cost:
3.5 GPF
Drop-In Sinks w/ Bubbler
Copper/Galvanized (Tunnel)
Poor
Supply Plumbing:
Classrooms:
Valve Flow Rates:
ADA Compliance:
Original plumbing fixtures are beyond service life
and will require continual maintenance. General
issues exist with ADA compliance and leaky
galvanized pipes and fittings.
2. Chrome p-trap exhibits corrosion.
3. Fixtures are generally supplied with original galvanized plumbing pipes through tunnels.
Overall Condition:
Insert Image Insert Image
General Notes:
$30,000.00 - $50,000.00*
Image Legend:
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 91/560
3. Renovation fixtures generally have lever handle or IR sensing faucets.
Image Legend:
1. Bathroom renovation fixtures are in good condition. IR sensing fixtures and valves reduce spread of
germs.
2. Trap insulation should be repaired as needed to maintain ADA compliance.
Insert Key Plan or
Additional Image
1994 and NewerYes
Renovation Plumbing Fixtures
General Notes:
Actuation:
ADA Compliance:
Recently renovated restrooms contain newer
fixtures in good condition that conform to modern
ADA standards.
Insert Image Insert Image
Floor-Mounted Flush Valve
Wall-Hung Flush Valve
Manual, IR Sensing
Good
Urinals:
Water Closets:
$25,000.00 - $35,000.00*
Overall Condition:
Installation Date:
Replacement Cost:
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 92/560
Insert Image Insert Image
Honeywell Sensors
15 years
Fair
Newer JACE board operates DDC system through
Niagara AX framework. Newer valves and actuators
receive digital signals from JACE board to control
existing building HVAC equipment.
1. JACE control board serves as the computer for building HVAC equipment. Board sends and receives
digital and analogue control signals to/from various sensors and actuators.
2. Honeywell sensors report temperature to the JACE control board which commands the equipment
Insert Key Plan or
Additional Image
JACENiagara AX
Thermostats & Controls
General Notes:
Overall Condition:
Life Expectancy:
Thermostats:
$100,000.00 - $125,000.00*
Control Board:
Replacement Cost:
Operating System:
in that space to turn on or off.
Image Legend:
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 93/560
Insert Key Plan or
Additional Image
Trane1994
$250,000.00 - $300,000.00
Unit ventilators typically remain serviceable >25
years with proper maintenance.
36
Classrooms
4-Pipe Heating and Cooling
Yes
Unit Ventilators
Type:
Location:
Quantity:
Installation Date:Manufacturer:
Louvers:
Insert Image Insert Image
Good
General Notes:
Replacement Cost:
Image Legend:
1. Unit ventilator condensate drains from the cooling coils into plastic drain pans.
2. Ventilation air is brought in to each space through intake louvers installed on exterior walls.
Overall Condition:
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 94/560
Image Legend:
1. UV casework is in good condition.
2. Mechanical piping is properly insulated and does not show signs of leaks or corrosion.
3. Valves are relatively new and in good condition.
Insert Key Plan or
Additional Image
Trane (Cont.)1994
Unit ventilators typically remain serviceable >25
years with proper maintenance.
Louvers:
Manufacturer:
Replacement Cost:
Overall Condition:
Installation Date:
Insert Image Insert Image
36
Classrooms
4-Pipe Heating and Cooling
Yes
Good
Unit Ventilators
General Notes:
Type:
Location:
Quantity:
$250,000.00 - $300,000.00
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 95/560
** Retrofitted LED exit signs should be replaced.
*** There is not any exterior egress lighting as required by current code.
Image Legend:
Insert Key Plan or
Additional Image
NoneNew And Retrofitted LED
Emergency Power System
General Notes:
Condition:
Egress Lighting:
Condition:
Exit Signs:Generator:
Replacement Cost:
Overall Condition:
Insert Image Insert Image
Poor **
Battery Wall Packs
Fair
Failed ***
Fair
$1,500.00*
Emergency power is provided by batteries at this
school. A generator for this school would cost
approximately $50,000.00. We recommend
continued battery maintenance and fixture
replacement as required instead of purchasing a
generator at this time.
1. A new red letter exit sign.
2. Battery wall pack emergency egress lighting installed in hallway.
Meets Current Code:
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 96/560
Image Legend:
3. High pressure sodium exterior pole mounted fixture for parking lot and drive. Fixtures are
Insert Key Plan or
Additional Image
High Pressure SodiumGood
Exterior Lighting
General Notes:
Controls:
Condition:
Building Lighting:
Condition:Site Lighting:
LED Canopy:
LED Building:
LED Parking Lot:
Condition:
Insert Image Insert Image
High Pressure Sodium
Fair
Photocell
Incandescent
Poor
Canopy Lighting:
$15,000.00*
$7,000.00*
Parking lot lighting is in good condition. Building
lights should be replace with newer more energy
efficient fixtures and rewired through the building to
reduce the amount of surface conduit on the
exterior of the building.
1. High pressure sodium exterior fixture mounted on the building controlled by photocell.
2. Incandescent canopy light controlled by wall switch in school.
$12,000.00*
controlled by photocell.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 97/560
1. Main fire alarm panel installed in the main office.
2. Older smoke detector installed in corridor.
Meets Current ADA:
Insert Image Insert Image
Failed **
General Notes:
Fix ADA Issues:
Overall Condition:
** Fire Alarm pull stations do not meet current ADA code.
Image Legend:
New/Existing
Fair
New/Existing
Fair
Fire Alarm System
Cabling:
Condition:
Devices:
Condition:Head End:
Condition:
Insert Key Plan or
Additional Image
Simplex 4100U and HoneywellGood
Fair
$6,000.00 - $9,000.00*
There are visuals installed in classrooms, public
spaces, and restrooms. The Simplex 4100U is a new
panel and would have been installed in the last few
years.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 98/560
Image Legend:
1. New Bogen Paging System installed the end of 2011. Located in the main office.
2. Ceiling mounted speaker reused from previous paging system. Speakers are in fair condition and
would only need to be replaced if they fail. In multiple locations speakers have begun sagging the
Insert Key Plan or
Additional Image
Bogen Multicom 2000Good
Paging / Intercom System
General Notes:
Cabling:
Condition:
Speakers:
$1,500.00*
A new paging head end with amplifier was installed
at the end of 2011. Existing speakers and cabling
were reused.
Condition:
Condition:Head End:
Re-support Speakers:
Insert Image Insert Image
New/Existing
Fair
Existing
Fair
None Installed
FairOverall Condition:
Push to Call:
ceiling grid. The speaker should be re-supported from structural steel independent of the ceiling
grid.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 99/560
1. Metal halide fixtures in the gym. High bay fluorescence can be installed to provide energy savings.
2. Existing fluorescent emergency lighting in gym.
3. Existing occupancy sensor in the boys and girls recently renovated restrooms.
Occupancy Sensors:
Insert Image Insert Image
Boys and Girls RR Only
$17,500.00*
General Notes:
Change Ballast:
Occupancy Sensors:
Fluorescent Fixture:
4. Incandescent fixtures in classrooms above sink. These should be removed.
5. Occupancy sensors should be added to classrooms, offices, corridors, and restrooms.
6. For safety and energy efficiency open a-lamp fixtures should be replaced with fluorescent in the tunnel.
** The ballasts in the fluorescent fixtures would need to be changed to Program Start for Occupancy Sensors.
Image Legend:
Fluorescent **
Fair
Fluorescent **
Fair
Interior Lighting
Hall Lighting:
Condition:
Classroom Lighting:
Condition:Tunnel Lighting:
Condition:
Insert Key Plan or
Additional Image
Open A-LampFailed
$10,000.00*
$35,000.00*
Adding occupancy sensors to the building would
provide energy savings. Changing gym lighting to
fluorescent would allow for energy savings and also
almost instant on performance. Incandescent
fixtures should be removed and/or replaced.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 100/560
1. Estimate for a Master Clock System is based on approximately 42 room clocks and 14 hallway
clocks. A wireless transmitter would be installed in the office and transmit to all the clocks in the
building.
Intentional LeftBlank
Intentionally LeftBlank
General Notes:
For a Clock System:
Estimated Cost
2. Example of a wireless clock controller.
Image Legend:
Bogen Time Systems
42
14
Master Clock System
Hallway Clocks:
Classroom Clocks:
Proposed Clock Systems:Clock System:
Insert Key Plan or
Additional Image
N/AAmerican Time and Signal
$17,500.00*
There is not a master clock system installed at this
school. All clocks are local battery operated or 120V
plug in.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 101/560
Insert Image Insert Image
Poor
General Electric
Good
Fair
Power Distribution
General Notes:
Condition:
New Panels:
Condition:
$50,000.00 - $60,000.00*
Insert Key Plan or
Additional Image
120/208V Three PhaseSquare D
The original electrical gear and panels are obsolete
and getting circuit breakers will continue to become
a harder task. A full replacement of the original
electrical gear and panels should be done in the next
few years.
Electrical Service:
Replacement Cost:
Overall Condition:
Original Panels:
4. Panel on stage has open spaces that could allow a person to touch the energized bus and be
electrocuted. This should be repaired ASAP.
5. Main distribution is in the boiler room.
Image Legend:
1. General Electric new electrical panels.
2. General Electric 120/208V panels have TVSS surge protection.
3. Original Square D electrical panels. These should be replaced and consolidated.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 102/560
1. Potential locations for card access door releases.
2. Example of card access readers.
Insert Image Intentionally LeftBlank
General Notes:
Installation Cost:
* Rekey of exterior doors is not included in this number.
Image Legend:
PremiSys
Security Access Control
System:
Manufacture:Type:
Insert Key Plan or
Additional Image
N/AIdentiCard
$20,000.00 - $25,000.00*
A security access control system can be added to the
school with some modifications to the door
hardware for door strike release installation. A
complete rekey of the exterior doors should be done
as people with keys could bypass the card access
system.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 103/560
Image Legend:
Insert Key Plan or
Additional Image
IP Digital Cameras
Cisco
Security Cameras
General Notes:
Condition:
Manufacture:
Condition:
Manufacture:
Type:
Replacement Cost:
Condition:
Insert Image Insert Image
Poor
Axis
Fair
Cisco
Poor
$50,000.00 - $75,000.00
The CCTV head end is CISCO. Support for this system
is hard to find. CISCO cameras are from their
residential line. It is recommended to switch to
another CCTV system that is compatible with more
cameras and that has support readily available.
1. Interior POE dome camera.
2. Interior wall mount camera. The wall mounted cameras in this school are not POE.
Head End:
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 104/560
4. There are multiple locations in the school where an extension cord is ran above ceiling to power a
projector.
Image Legend:
Insert Key Plan or
Additional Image
Category 6Good
Technology
General Notes:
Wireless:
Condition:
Projectors:
$3,000.00 - $5,000.00*
Condition:
Data:
Replacement Cost:
Overall Condition:
Condition:
Insert Image Insert Image
Epson Ceiling Mount
Good
Cisco POE
Good
Failed
VOIP
Good
Cabling is new and was installed within the last 2
years. Projectors and wireless are new and in good
condition. Power to projectors are fed using an
extension cord ran above the ceiling. This is a code
violation. To add a receptacle at the projector would
be approx. $150.00 per location.
1. Power cord entering into plenum space. Code violation.
2. New category 6 patch panels. Category 6 cabling is the current installed cabling standard.
3. Epson ceiling mounted projectors.
Telephones:
Projector Power:
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 105/560
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: AsphaltParking Condition: Fair
Driveway Condition: Fair
Bus Parking Condition: Fair
Sidewalk Material: Concrete
Sidewalk Condition: Poor
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Paving
Replacement Cost: $185,000.00-$225,000.00*
Total Hardscape
Replacement Cost: $45,000.00 - $65,000.00*
General Notes:Recommended to inspect, maintain, and clean the
paved areas. The ADA curb cuts do not meet
current ADA Codes and should be replace during
renovation.
Image Legend:
Insert Image Insert Image
2. Cracking has been filled with sealant to prevent further deterioration. Continued maintenance willhelp prolong the life expectancy of the asphalt.
3. Sidewalk ramps do not meet ADA requirements and should be updated when replaced.
4. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 106/560
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Fair
Driveway Condition: Fair
Bus Parking Condition: Fair
Sidewalk Material: Concrete
Sidewalk Condition: Poor
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Paving
Replacement Cost: $185,000.00-$225,000.00*
Total Hardscape
Replacement Cost: $45,000.00 - $65,000.00*
General Notes:Recommended to inspect, maintain, and clean the
paved areas. The ADA curb cuts do not meet
current ADA Codes and should be replace during
renovation.
Image Legend:
Insert Image Insert Image
2. Pounding on the surface is a sign of improper grading and installation.3. Cracking has been filled with sealant to prevent further deterioration. Continued maintenance
will help prolong the life expectancy of the asphalt.
4. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 107/560
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Fair
Driveway Condition: Fair
Bus Parking Condition: Fair
Sidewalk Material: Concrete
Sidewalk Condition: Poor
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Paving
Replacement Cost: $185,000.00-$225,000.00*
Total Hardscape
Replacement Cost: $45,000.00 - $65,000.00*
General Notes:Recommended to inspect, maintain, and clean the
paved areas. The ADA curb cuts do not meet
current ADA Codes and should be replace during
renovation.
Image Legend:
Insert Image Insert Image
2. Pounding on the surface is a sign of improper grading and installation.3. Sidewalk ramps do not meet ADA requirements and should be updated when replaced.
4. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 108/560
Insert Image Insert Image
expectancy of the equipment.2. Ground material is in good condition.
1. Plastic playground equipment is in good condition and continued maintenance will help prolong the life
Overall Condition: Good
Total Playground
Replacement Cost: $200,000.00-$300,00.00*
General Notes:Recommended to inspect, maintain, and clean
playground equipment regularly. Playground
equipment appears to be in good condition and
should be maintained to prolong its life expectancy.
Image Legend:
Playground
Insert Key Plan or
Additional Image
Ground Material: VariesPlayground Equip.: Plastic / Metal
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 109/560
Playground
Insert Key Plan or
Additional Image
Ground Material: Varies (Cont.)Playground Equip.: Plastic / Metal
1. Plastic playground equipment is in good condition and continued maintenance will help prolong the life
Overall Condition: Good
Total Playground
Replacement Cost: $200,000.00-$300,00.00*
General Notes:Recommended to inspect, maintain, and clean
playground equipment regularly. Playground
equipment appears to be in good condition and
should be maintained to prolong its life expectancy.
Image Legend:
Insert Image Insert Image
expectancy of the equipment.2. Ground material is in good condition.
3. Ground material for this playground is dirt. Recommended approved playground surface infill.
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 110/560
Insert Image Insert Image
2. Wood post and metal fence is showing signs of aging.3. Fence back stop has begun to pull off of posts.
1. Metal playground equipment is in good condition, but is showing signs of aging and rust.
Overall Condition: Good
Total Playground
Replacement Cost: $200,000.00-$300,00.00*
General Notes:Recommended to inspect, maintain, and clean
playground equipment regularly. Playground
equipment appears to be in good condition and
should be maintained to prolong its life expectancy.
Image Legend:
Playground
Insert Key Plan or
Additional Image
Ground Material: Varies (Cont.)Playground Equip.: Plastic / Metal
Columbia Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 111/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 112/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W1 (2 Sets of Doors)Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: 10'-0" x 6'-2"
Size: 6'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $13,500.00*
General Notes:Single pane glass provides an R-Value of .85. New
door system with weather stripping, seals, and
double pane glass would provide an R-Value of 1.5
to 3.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Sealant around ceiling is broken and cracked possibly allowing water to penetrate the envelope.
4. Sealant around supports is missing or worn possibly allowing water to penetrate the envelope.
5. Maintain a regular pest control maintenance plan.
6. Single pane glass is allowing exterior temperature to influence the interior.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 113/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W1 (2 Sets of Doors) (Cont.)Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: 10'-0" x 6'-2"
Size: 6'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $13,500.00*
General Notes:Single pane glass provides an R-Value of .85. New
door system with weather stripping, seals, and
double pane glass would provide an R-Value of 1.5
to 3.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Evidence of water damage is present in the Vestibule ceiling.
4. Light is inefficient and should be replaced with a more efficient light fixture. See electrical drawings
for additional information.
5. Single pane glass is allowing exterior temperature to influence the interior.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 114/560
Insert Image Insert Image
2. Single pane glass is allowing exterior temperature to influence the interior.3. Door systems sealants are broken and cracked possibly allowing water to penetrate the building
envelope.
4. Maintain a regular pest control maintenance plan.
1. Weather stripping is missing or worn and may be allowing air infiltration.
Vestibule: 10'-0" x 6'-3"
Size: 6'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $13,500.00*
General Notes:Single pane glass provides an R-Value of .85. New
door system with weather stripping, seals, and
double pane glass would provide an R-Value of 1.5
to 3.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S2 (2 Sets of Doors)Door Material: Aluminum
Weather Stripping: Good
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 115/560
Insert Image
2. Building has shifted or settled and caused stress cracks to appear in masonry.3. Door frame and door are showing signs of Sun / UV damage.
4. Maintain quality of seals around door frame and masonry.
1. Single pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $4,500.00*
General Notes:Single pane glass provides an R-Value of .85. New
door system with weather stripping, seals, and
double pane glass would provide an R-Value of 1.5
to 3.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S3Door Material: Aluminum
Weather Stripping: Good
Door Closers: Fair
Door Glazing: Single-Pane
Transom: Single-Pane
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 116/560
2. Door frame and door are showing signs of Sun UV damage.3. Door hinges are showing signs of aging and deterioration and need to be addressed.
4. Maintain quality of seals around door frame and masonry.
1. Single pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 3'-0" x 7"-0"
Overall Condition: Fair
Replacement Cost: $4,500.00*
General Notes:Single pane glass provides an R-Value of .85. New
door system with weather stripping, seals, and
double pane glass would provide an R-Value of 1.5
to 3.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S4Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Transom: Single-Pane
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 117/560
2. Door frame and door are showing signs of Sun / UV damage.3. Weather stripping is missing or worn and may be allowing air infiltration.
4. Door sweeps are missing or worn and may be allowing air infiltration.
1. Single pane glass is allowing exterior temperature to influence the interior.
Vestibule: 10'-0" x 6'-3 1/2"
Size: 6'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $13,500.00*
General Notes:Single pane glass provides an R-Value of .85. New
door system with weather stripping, seals, and
double pane glass would provide an R-Value of 1.5
to 3.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S5 (2 Sets of Doors)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 118/560
3. Door frame is showing signs of aging and wear and may be allowing air infiltration.
Replacement Cost: $3,500.00*
General Notes:Recommended to replace and repair weather
stripping and seals around overhead door to
prevent air infiltration.
Image Legend:
1. Weather stripping and seals are missing or worn and may be allowing air infiltration.
2. Maintain a regular pest control maintenance plan.
4. Door frame and door are showing signs of Sun / UV damage.
Vestibule: N/A
Size: 10'-0" x 8'-8"
Overall Condition: Fair
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S6 (Overhead)Door Material: Metal
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 119/560
2. Sealant around supports is missing or worn possibly allowing water to penetrate the buildingenvelope.
3. Weather stripping is missing or worn and may be allowing air infiltration.
4. Door sweeps are missing or worn and may be allowing air infiltration.
5. Transit ceiling panel may contain asbestos. See asbestos report for additional information.
1. Door frame and door are showing signs of Sun / UV damage.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $6,500.00*
General Notes:Recommended to replace all weather stripping and
door sweeps. Replace and repair all sealant around
door and door frame to prevent water from
penetrating the building envelope.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S7Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites: N/A
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 120/560
2. Door sweeps are missing or worn and may be allowing air infiltration.3. Door frame and door are showing signs of Sun / UV damage.
1. Weather stripping is missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $6,500.00*
General Notes:Recommended to replace all weather stripping and
door sweeps. Replace and repair all sealant around
door and door frame to prevent water from
penetrating the building envelope.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S7 (Cont.)Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites: N/A
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 121/560
2. Door sweeps are missing or worn and may be allowing air infiltration.3. Sealant around supports is missing or worn possibly allowing water to penetrate the building
envelope.
4. Sealant around supports is missing or worn possibly allowing water to penetrate the building
envelope.
1. Weather stripping is missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $6,500.00*
General Notes:Recommended to replace all weather stripping and
door sweeps. Replace and repair all sealant around
door and door frame to prevent water from
penetrating the building envelope.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S8Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites: N/A
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 122/560
Replacement Cost: $6,500.00*
General Notes:Recommended to replace all weather stripping and
door sweeps. Replace and repair all sealant around
door and door frame to prevent water from
penetrating the building envelope.
Image Legend:
1. Sealant around supports is missing or worn and may be allowing water to penetrate the building
envelope.2. Sealant around light fixture is missing or worn and may be allowing water to penetrate the building
envelope.
3. Transit ceiling panel may contain asbestos. See asbestos report for additional information.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S8 (Cont.)Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites: N/A
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 123/560
2. Door pulls and bars are showing signs of aging and wear.3. Door closers are showing signs of aging and wear and need to be addressed.
4. Door hinges are showing signs of aging and wear and need to be addressed.
5. LED light fixtures are more efficient than existing lighting fixtures. See electrical data for additional
information.
1. Single pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: (2) 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $28,000.00*
General Notes:Recommended to replace door and window system
in its entirety to improve aesthetics, functionality,
and efficiency.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E9Door Material: Hollow Metal
Weather Stripping: Fair
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 124/560
2. Door pulls and bars are showing signs of aging and wear.3. Door is showing signs of aging and wear and needs to be addressed.
4. Door hinges are showing signs of aging and wear and need to be addressed.
5. LED light fixtures are more efficient than existing lighting fixtures. See electrical data for additional
information.
6. Door sweeps are missing or worn and may be allowing air infiltration.
1. Single pane glass is allowing exterior temperature to influence the interior.
Vestibule: 13'-0" x 7'-0"
Size: (3) 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $34,000.00*
General Notes:Recommended to replace door and window system
in its entirety to improve aesthetics, functionality,
and efficiency.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E10 (2 Sets of Doors)Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 125/560
2. Door sweeps are missing or worn and may be allowing air infiltration.3. Door is showing signs of aging and wear and needs to be addressed.
4. Door frame is showing signs of aging and wear and needs to be addressed.
5. LED light fixtures are more efficient than existing lighting fixtures. See electrical data for additional
information.
6. Light fixture is displaced and needs to be addressed.
1. Single pane glass is allowing exterior temperature to influence the interior.
Vestibule: 13'-0" x 7'-0"
Size: (3) 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $34,000.00*
General Notes:Recommended to replace door and window system
in its entirety to improve aesthetics, functionality,
and efficiency.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E10 (2 Sets of Doors) (Cont.)Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 126/560
2. Door sweeps are missing or worn and may be allowing air infiltration.3. Door is showing signs of aging and wear and needs to be addressed.
4. Door frame is showing signs of aging and wear and needs to be addressed.
5. Carpet is showing signs of aging and wear and may have exceeded the life expectancy of the carpet.
6 Would recommend installation of walk off mat / carpet tile.
1. Single pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: (2) 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $11,500.00*
General Notes:Recommended to replace door and window system
in its entirety to improve aesthetics, functionality,
and efficiency.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E11Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 127/560
2. Door closers are showing signs of aging and wear and need to be addressed.3. Door pulls and push bars are showing signs of aging and wear.
4. Door is showing signs of aging and wear and needs to be addressed.
1. Single pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: (2) 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $11,500.00*
General Notes:Recommended to replace door and window system
in its entirety to improve aesthetics, functionality,
and efficiency.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E11 (Cont.)Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites: Yes
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 128/560
2. Door closer has been disconnected.3. Door louvers are allowing air to pass through door to allow for natural ventilation.
1. Single pane glass is allowing exterior temperature to influence the interior.
Vestibule: None
Size: 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $2,500.00*
General Notes:Recommended to replace door system in its
entirety.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N12Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Failed
Door Glazing: Single-Pane
Sidelites: N/A
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 129/560
2. Doors are showing signs of aging and wear and need to be addressed.3. Door frame is showing signs of corrosion.
1. Door frame are showings signs of aging and wear and needs to addressed.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Failed
Replacement Cost: $4,500.00*
General Notes:Recommended to replace door system in its
entirety to improve aesthetics, functionality, and
efficiency.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N13Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: N/A
Sidelites: N/A
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 130/560
2. Exterior wall has shifted or settled and has produced large stress cracks. Wall needs to be address assoon as possible to prevent further damage.
3. Water spigot is showing signs of aging and wear.
4. LED light fixtures are more efficient than existing lighting fixtures. See electrical data for additional
information.
5. Spacing around exterior wall is may allow storm water to flow near the foundation.
1. Double-Pane glass when properly sealed and maintained can operate efficiently.
Vestibule: N/A
Size: (2) 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $19,500.00*
General Notes:Recommended to install a interior set of doors to
create a entry vestibule to prevent air infiltration.
Address the exterior wall issue as soon as possible
to prevent further damage.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N14Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Double-Pane
Sidelites / Transoms: Double-Pane
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 131/560
Insert Image Insert Image
prolong the life expectancy of the building envelope.2. Hole in exterior wall needs to be addressed to prevent water or pests from entering the building
envelope.
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
1. Mold buildup needs to be address and cleaned. A regular cleaning plan should be implemented to
Soffit / Canopy: Poor
Overall Condition: Fair
Replacement Cost: $2,500.00 - $3000.00*
General Notes:Maintain consistent caulking and sealants
throughout the building envelope to prevent
moisture penetration.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: N/A
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Poor
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 132/560
Insert Image Insert Image
building envelope.2. Pests are attaching to the building envelope and should be removed regularly to prevent damage to the
building envelope.
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
off and needs to be addressed to secure the asbestos remains intact.
1. Sealant is missing or worn and should be addressed to prevent water or pests from penetrating the
Soffit / Canopy: Poor
Overall Condition: Fair
Replacement Cost: $10,000.00-$15,000.00*
General Notes:Recommended to maintain consistent caulking and
sealants throughout the building envelope to
prevent moisture penetration.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: N/A
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Poor
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 133/560
Insert Image Insert Image
off and needs to be addressed to secure the asbestos remains intact.2. Sealant is missing between soffit and masonry wall and may be allowing water to penetrate the building
envelope.
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
1. Transite panel may contain asbestos and should be removed as work permits. Paint / Sealant is peeling
Soffit / Canopy: Poor
Overall Condition: Fair
Replacement Cost: $10,000.00-$15,000.00*
General Notes:Recommended to maintain consistent caulking and
sealants throughout the building envelope to
prevent moisture penetration.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: N/A
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Poor
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 134/560
Insert Image Insert Image
off and needs to be addressed to secure the asbestos remains intact.2. Sealant is missing between soffit and masonry wall and may be allowing water to penetrate the building
envelope.
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
building envelope.
4. Sealant between masonry and concrete lintel is missing or worn.
1. Transite panel may contain asbestos and should be removed as work permits. Paint / Sealant is peeling
Soffit / Canopy: Poor
Overall Condition: Fair
Replacement Cost: $10,000.00-$15,000.00*
General Notes:Recommended to maintain consistent caulking and
sealants throughout the building envelope to
prevent moisture penetration.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: N/A
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Poor
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 135/560
Insert Image Insert Image
off and needs to be addressed to secure the asbestos remains intact.2. Sealant is missing between soffit and masonry wall and may be allowing water to penetrate the building
envelope.
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
4. Cleaning of the building exterior should become a regular part of the maintenance plan.
1. Transite panel may contain asbestos and should be removed as work permits. Paint / Sealant is peeling
Soffit / Canopy: Poor
Overall Condition: Fair
Canopy
Replacement Cost: $5,500.00-$10,000.00*
General Notes:Recommended to maintain a consistent cleaning
and maintenance program.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: N/A
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Poor
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 136/560
Insert Image Insert Image
2. Masonry has broken away from the structural wall and has exposed the building envelope.3. Cleaning of the building exterior should become a regular part of the maintenance plan.
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
1. Roof membrane cap has separated and may be exposing the building envelope.
Soffit / Canopy: Poor
Overall Condition: Fair
Replacement Cost: $5,000.00 - $7,000.00*
General Notes:Recommended to maintain a consistent cleaning
and maintenance program.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: N/A
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Poor
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 137/560
Insert Image Insert Image
2. Hose bib is showings signs of aging and corrosion.3. Sealant is missing or worn and may be allowing water to drain near the building foundation.
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
1. Vent cover has be displaced and may be allowing pest to enter into the ventilation system.
Soffit / Canopy: Poor
Overall Condition: Fair
Replacement Cost: $1,000.00 - $2,500.00*
General Notes:Recommended to maintain a consistent cleaning
and maintenance program.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: N/A
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Poor
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 138/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: N/A
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Poor
1. Steel lintel is showing signs of aging and corrosion. Clean, prime, paint lintel as needed.
Soffit / Canopy: Poor
Overall Condition: Fair
Replacement Cost: $1,000.00 - $1,500.00*
General Notes:Recommended to maintain a consistent cleaning
and maintenance program. Clean, prime, paint, and
seal lintel and window system as needed.
Image Legend:
Insert Image Insert Image
2. Transite panel may contain asbestos and should be removed as work permits. Paint / Sealant is peeling of off and needs to be addressed to secure the asbestos remains intact.
3. Pests are attaching to the building envelope and should be removed regularly to prevent damage to the
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 139/560
Insert Image Insert Image
2. Transite panel may contain asbestos and should be removed as work permits. Paint / sealant is peelingoff and needs to be addressed to secure the asbestos remains intact.
3. Ladder leaning against building may potential create a safety risk.
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
1. Concrete slab has ponding and does not drain effectively.
Soffit / Canopy: Poor
Overall Condition: Fair
Concrete and Ladder
Replacement Cost: $22,000.00 - $28,000.00*
General Notes:Recommended to maintain a consistent cleaning
and maintenance program. Clean, prime, paint, and
seal lintel and window system as needed.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: N/A
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Poor
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 140/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Poor
Cladding: N/A
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Poor
1. Masonry has shifted, exposing joints and mortar. Openings may be allowing water to penetrate the
Soffit / Canopy: Poor
Overall Condition: Fair
Replacement Cost: $2,500.00 - $3,000.00*
General Notes:Recommended to address masonry shift to prevent
further damage to building envelope.
Image Legend:
Insert Image Insert Image
building envelope.2. Hose bib is showings sign of aging and corrosion.
3. Double pane window system when sealed properly will work efficiently.
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 141/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Poor
Cladding: N/A
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Poor
1. Masonry has shifted, exposing joints and mortar. Openings may be allowing water to penetrate the
Soffit / Canopy: Poor
Overall Condition: Fair
Replacement Cost: $2,500.00 - $3,000.00*
General Notes:Recommended to address masonry shift to prevent
further damage to building envelope.
Image Legend:
Insert Image Insert Image
building envelope.2. Masonry has cracked and may be exposing the building envelope to water penetration.
3. Sealant is missing or worn and should be addressed to prevent water or pests from penetrating the
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 142/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Poor
Cladding: N/A
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Poor
1. Masonry has shifted, exposing joints and mortar. Openings may be allowing water to penetrate the
Soffit / Canopy: Poor
Overall Condition: Fair
Replacement Cost: $1,000.00 - $1,500.00*
General Notes:Recommended to address masonry shift to prevent
further damage to building envelope.
Image Legend:
Insert Image Insert Image
building envelope.2. Sealant and flashing are missing or worn and should be addressed to prevent water from penetrate the
building envelope.
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 143/560
Insert Image Insert Image
building envelope.2. Sealant is missing or worn and needs to be addressed to prevent water from penetrating the building
system.
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
1. Masonry has shifted, exposing joints and mortar. Openings may be allowing water to penetrate the
Soffit / Canopy: Poor
Overall Condition: Fair
Replacement Cost: $500.00 -$1,000.00*
General Notes:Maintain consistent caulking and sealants
throughout the building envelope to prevent
moisture penetration.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: N/A
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Poor
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 144/560
Multipurpose Room Data
Insert Key Plan or
Additional Image
Gym Location: MainFloor Material: All Purpose
Seating Capacity 168
Score Board: Fair
Equipment: Good
Lighting: Poor
1. Rollout bleacher seating capacity is 168.
Size 115'-0" x 130'-0"
Overall Condition: Fair
Replacement Cost: $65,000.00 - $85,000.00*
General Notes:Overall condition of gymnasium is good. Existing
lighting systems are inefficient and light levels are
poor. Recommend new high efficiency lighting
system. See lighting Data for additional
information.
Image Legend:
Insert Image Insert Image
2. Inspect, clean, and maintain all purpose flooring regularly.3. Maintain basketball rims and backboards, currently in good condition.
4. Maintain score board and lights, currently in good condition. Replace bulbs as needed.
5. Lighting is creating highlights and lowlights throughout Gymnasium. See electrical data for additional
information.
6. Ceiling is showings signs of roof damage.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 145/560
Insert Image Insert Image
2. Inspect, clean, and maintain all purpose flooring regularly.3. Maintain basketball rims and backboards, currently in good condition.
4. Ceiling is showings signs of roof damage.
5. Lighting is creating highlights and lowlights throughout Gymnasium. See electrical data for additional
information.
1. Rollout bleacher seating capacity is 168.
Size 115'-0" x 130'-0"
Overall Condition: Fair
Replacement Cost: $65,000.00 - $85,000.00*
General Notes:Overall condition of gymnasium is good. Existing
lighting systems are inefficient and light levels are
poor. Recommend new high efficiency lighting
system. See lighting Data for additional
information.
Image Legend:
Multipurpose Room Data
Insert Key Plan or
Additional Image
Gym Location: Main (Cont.)Floor Material: All Purpose
Seating Capacity 168
Score Board: Fair
Equipment: Good
Lighting: Poor
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 146/560
Insert Image Insert Image
2. Inspect, clean, and maintain all purpose flooring regularly.3. Hanging banners are preventing light from even distribution, but are helping mitigate sound
reverberation.
4. Lighting is creating highlights and lowlights throughout Gymnasium. See electrical data for additional
information.
1. Ceiling is showings signs of roof damage and needs to be addressed.
Size 70'-0" x 60'-0"
Overall Condition: Fair
Replacement Cost: $65,000.00 - $85,000.00*
General Notes:Overall condition of gymnasium is good. Existing
lighting systems are inefficient and light levels are
poor. Recommend new high efficiency lighting
system. See lighting Data for additional
information.
Image Legend:
Gymnasium Data
Insert Key Plan or
Additional Image
Gym Location: AuxiliaryFloor Material: All Purpose
Seating Capacity N/A
Score Board: N/A
Equipment: Good
Lighting: Poor
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 147/560
Insert Image Insert Image
2. Inspect, clean, and maintain all purpose flooring regularly.3. Hanging banners are preventing light from even distribution, but are helping mitigate sound
reverberation.
4. Lighting is creating highlights and lowlights throughout Gymnasium. See electrical data for additional
information.
1. Ceiling is showings signs of roof damage and needs to be addressed.
Size 70'-0" x 60'-0"
Overall Condition: Fair
Replacement Cost: $65,000.00 - $85,000.00*
General Notes:Overall condition of gymnasium is good. Existing
lighting systems are inefficient and light levels are
poor. Recommend new high efficiency lighting
system. See lighting Data for additional
information.
Image Legend:
Gymnasium Data
Insert Key Plan or
Additional Image
Gym Location: Auxiliary (Cont.)Floor Material: All Purpose
Seating Capacity N/A
Score Board: N/A
Equipment: Good
Lighting: Poor
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 148/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: KitchenFlooring Material: Quarry Tile
Ceiling Material Moisture Resistant ACT
Wall: CMU Block
Storage: Insufficient Storage
Equipment: Good
1. Moisture resistance acoustical ceiling tile and grid.
Freezer / Cooler: Good
Overall Condition: Fair
Replacement Cost: $250,000.00-$350,000.00*
General Notes:The Riddle Elementary Kitchen has inefficient
lighting and should be replaced with more efficient
lighting system. The Kitchen would benefit from a
more efficient layout.
Image Legend:
Insert Image Insert Image
2. Inspect, clean and maintain quarry tile flooring regularly.3. Lighting is inefficient throughout Kitchen. See lighting data for additional information.
4. Maintain and clean durable CMU block wall.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 149/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: ClassroomsTVs: 26 Approximately
Flooring: Carpet
Walls: Stud Wall
Ceiling: Acoustical Ceiling Tile
Doors: Wood
1. Riddle Elementary contains approximately 26 Cathode Ray Tube TV's.
Fixtures: Fair
Overall Condition: Fair
Total Carpet
Replacement Cost: $175,000.00-$225,000.00*
General Notes:Riddle Elementary contains approximately 26 (CRT)
TVs that use more energy than the common
modern TVs. The carpet flooring may have
exceeded the life expectancy and may need
replaced. Sheet good flooring would be a durable
and low maintenance cost option.
Image Legend:
Insert Image Insert Image
2. Acoustical ceiling tile is in fair condition and should be replaced as needed.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Projector and power lines are in fair condition. See electrical documents for additional information.
5. Carpet is showing signs of aging and wear. Carpet is dirty and may cause air quality issues.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 150/560
Insert Image Insert Image
2. Acoustical ceiling tile is in fair condition and should be replaced as needed.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Projector and power lines are in fair condition. See electrical documents for additional information
1. Carpet is showing signs of aging and wear. Carpet is dirty and may cause air quality issues.
Fixtures: Fair
Overall Condition: Fair
Total Carpet
Replacement Cost: $175,000.00-$225,000.00*
General Notes:Riddle Elementary contains approximately 26 (CRT)
TVs that use more energy than the common
modern TVs. The carpet flooring may have
exceeded the life expectancy and may need
replaced. Sheet good flooring would be a durable
and low maintenance cost option.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Classrooms (Cont.)TVs: 26 Approximately
Flooring: Carpet
Walls: Stud Wall
Ceiling: Acoustical Ceiling Tile
Doors: Wood
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 151/560
Insert Image Insert Image
2. CMU wall is in fair condition and should be maintained.3. Carpet in hallways are showing signs of aging and wear. Carpet is dirty and may cause air quality issues.
4. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
5. Acoustical ceiling tile is in fair condition and should be replaced as needed.
1. Door handles do not meet ADA standards and should be replace during renovation.
Fixtures: Fair
Overall Condition: Fair
Total Carpet
Replacement Cost: $175,000.00-$225,000.00*
General Notes:Recommended to remove carpet tile with a more
durable and cleanable material. Sheet good
flooring would be a durable and low maintenance
cost option.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: HallwaysFlooring: Carpet
Flooring Condition: CMU Block
Walls: CMU Block
Ceiling: Acoustical Ceiling Tile
Casework: N/A
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 152/560
Insert Image Insert Image
2. CMU wall is in fair condition and should be maintained.3. Carpet in hallways are showing signs of aging and wear. Carpet is dirty and may cause air quality issues.
4. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
1. Acoustical ceiling tile is in fair condition and should be replaced as needed.
Fixtures: Fair
Overall Condition: Fair
Total Carpet
Replacement Cost: $175,000.00-$225,000.00*
General Notes:Recommended to remove carpet tile with a more
durable and cleanable material. Sheet good
flooring would be a durable and low maintenance
cost option.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Hallways (Cont.)Flooring: Carpet
Flooring Condition: CMU Block
Walls: CMU Block
Ceiling: Acoustical Ceiling Tile
Casework: N/A
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 153/560
Insert Image Insert Image
ceiling tile as needed.2. CMU wall is in fair condition and should be maintained.
3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
1. Water has pooled on the acoustical ceiling tile. The water issue should be addressed and replace
Fixtures: Fair
Overall Condition: Fair
Replacement Cost: $400.00*
General Notes:Recommended to address the water penetration
issue and replace acoustical ceiling tiles as needed.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Hallways (Cont.)Flooring: Carpet
Flooring Condition: CMU Block
Walls: CMU Block
Ceiling: Acoustical Ceiling Tile
Casework: N/A
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 154/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: Casework
1. Casework is showing signs of aging and wear and need to be replaced in the near future.
Overall Condition: Poor
Total Casework
Replacement Cost: $120,000.00-$150,000.00*
General Notes:Recommended to replace existing casework in its
entirety.
Image Legend:
Insert Image Insert Image
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 155/560
Insert Key Plan or
Additional Image
(1) Herman Nelson SCSCafeteria Mezzanine
$30,000.00 - $40,000.00*
The capacity of the existing AHU should be re-
evaluated for updated space usage (gymnasium to
cafeteria).
Image Legend:
1957
Constant Speed, No VFD
Single Zone, HW/CHW
Poor
Cafeteria AHU
Type:
Fan Motor:
Installation Date:
Location:AHU:
Overall Condition:
1. Unsealed and uninsulated ductwork is energy inefficient and should be updated when the unit is
replaced.2. Mechanical piping and control valves are in good condition and can be reused.
Insert Image Insert Image
General Notes:
Replacement Cost:
3. AHU is beyond service life.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 156/560
1. Single CHW pump should be replaced with (2) for system redundancy and serviceability.
Insert Key Plan or
Additional Image
Trane RTAA110Air-Cooled Scroll
Chilled Water Plant
Chiller:
Replacement Cost:
Overall Condition:
Installation Date:
Mechanical Courtyard
1994
Fair
(1) Base Mounted
Overall Condition:
Installation Date:
Location:
Type:
Chilled water plant is aging but serviceable. Should
be replaced within the next 5-10 years. It is
recommended that an extra chilled water pump be
added during replacement so that the pumps can be
serviced without shutting down the chilled water
plant.
2. Rust indicates improper insulation on piping and should be replaced with chilled water plant.
Pump:
Insert Image Insert Image
1994
Fair
General Notes:
$200,000.00 - $225,000.00*
Image Legend:
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 157/560
Image Legend:
1. Outdoor packaged equipment is well beyond typical service life and shows signs of rust/aging. Life
expectancy is 15 years.2. Gymnasium ductwork and relief caps can be reused with new RTU.
Insert Key Plan or
Additional Image
(2) Governair TL-10 10141988
The condensers and fans in these rooftop units have
reached the end of their expected service life and
are likely not operating at their original efficiency
levels. It is recommended that new RTU's be
installed in place of these and reuse the existing
ductwork.
RTU:
Replacement Cost:
Installation Date:
Insert Image Insert Image
Gymnasium Rooftop
DX
Poor
Gymnasium RTU
General Notes:
Overall Condition:
Cooling Type:
Location:
$50,000.00 - $75,000.00*
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 158/560
Insert Key Plan or
Additional Image
(2) Bryan CL2101989
$200,000.00 - $250,000.00*
Similar to Columbia, the hot water plant is nearing
end of service life. Older non-condensing boilers
should be replaced with new hot water condensing
boilers to increase energy efficiency. In-line pumps
do not last as long as base mounted.
Image Legend:
DDC
Poor
(2) In-Line
1994
Hot Water Plant
Pumps:
Overall Condition:
Controls:
Installation Date:Boilers:
Installation Date:
1. Hot water plant is nearly identical to that of Columbia in terms of overall condition.
2. These in-line pumps exhibit high levels of corrosion and rust.
Motor:
Insert Image Insert Image
Constant Speed, No VFD
Poor
General Notes:
Replacement Cost:
Overall Condition:
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 159/560
Insert Key Plan or
Additional Image
1957 and NewerClassrooms
$40,000.00 - $60,000.00*
Older faucets and fixtures have begun to leak and
fail. Fixtures are dated and should be replaced with
new ADA compliant fixtures.
Image Legend:
No
Compression Cartridge
Drop-in Stainless, Bubbler
Copper, Galv, PVC
Original Plumbing Fixtures
Sinks:
Faucets:
ADA Compliance:
Location:Installation Date:
Plumbing:
1. Classroom bubblers have become prone to leaks. Many have been disconnected.
2. Older faucets leak heavily and should be replaced.
Overall Condition:
Insert Image Insert Image
Poor
General Notes:
Replacement Cost:
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 160/560
Insert Key Plan or
Additional Image
1994 and NewerWall-Hung
$40,000.00 - $60,000.00*
Renovated fixtures are in fair condition and have
many ADA compliant features.
Image Legend:
IR/Manual 1.6 GPF
Wall-Hung
IR/Manual 1.0 GPF
Yes
Renovation Plumbing Fixtures
Valves:
Urinals:
Valves:
Water Closets:Installation Date:
ADA Compliance:
1. IR sensing flush valve urinals.
2. Grab bars allow for improved accessibility.3. IR sensing wash fountain.
Overall Condition:
Insert Image Insert Image
Fair
General Notes:
Replacement Cost:
4. Lavatory piping insulation meets ADA requirements.
5. Lavatory wing-blade faucet handles meet ADA requirements.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 161/560
1. Honeywell sensors report temperature to the JACE control board which commands the equipment
in that space to turn on or off.2. Newer controls turn on and off the buildings heating and cooling plant automatically.
Insert Key Plan or
Additional Image
JACENiagara AX
Thermostats & Controls
General Notes:
Overall Condition:
Life Expectancy:
Thermostats:
$100,000.00 - $125,000.00*
Newer JACE board operates DDC system through
Niagara AX framework. Newer valves and actuators
receive digital signals from JACE board to control
existing building HVAC equipment.
Replacement Cost:
Insert Image
Image Legend:
Insert Image
Honeywell Sensors
15 years
Fair
Operating System:Control Board:
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 162/560
Insert Image Insert Image
28
4-Pipe Heating/Cooling
Trane
Fair
$175,000.00 - $200,000.00*
Unit ventilators typically remain serviceable >25
years with proper maintenance.
1. Classroom UV's have a bottom air inlet for return air and top outlet for supply air.
2. UV casework is in good condition.3. Fans blow mixed return and outside air across the heating and cooling coils. Coils appear in good
Overall Condition:
Insert Key Plan or
Additional Image
1994Classrooms
Unit Ventilators
General Notes:
Manufacturer:
Type:
Quantity:
Location:Installation Date:
Replacement Cost:
condition.
4. Valves and pipe insulation are in good condition. Condensate drain pans should be checked for blockages.
Image Legend:
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 163/560
** Retrofitted LED exit signs should be replaced.
*** There is not any exterior egress lighting as required by current code.
Image Legend:
Insert Key Plan or
Additional Image
NoneNew And Retrofitted LED
Emergency Power System
General Notes:
Condition:
Egress Lighting:
Condition:
Exit Signs:Generator:
Replacement Cost:
Overall Condition:
Insert Image Intentionally LeftBlank
Poor **
Battery Wall Packs
Fair
Failed ***
Fair
$2,500.00 *
Emergency power is provided by batteries at this
school. A generator for this school would cost
approximately $50,000.00. We recommend
continued battery maintenance and fixture
replacement as required instead of purchasing a
generator at this time.
1. A new red letter exit sign.
Meets Current Code:
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 164/560
Insert Image Insert Image
High Pressure Sodium
Fair
Incandescent
Poor
$25,000.00*
$10,000.00*LED Building:
LED Parking Lot:
3. Incandescent canopy light controlled by wall switch in school.
4. High pressure sodium exterior light fixture mounted on the building.
Insert Key Plan or
Additional Image
High Pressure SodiumFair
Exterior Lighting
General Notes:
Canopy Lighting:
Condition:
Building Lighting:
$6,000.00*
Currently there are no parking lot lights for the front
parking area. Building lights should be replace with
newer more energy efficient fixtures and rewired
through the building to reduce the amount of
surface conduit on the exterior of the building.
Condition:
Condition:Site Lighting:
LED Canopy:
Image Legend:
1. There are no front parking lot lights installed. The only lighting would be from street lighting and off
the school building.
2. High pressure sodium light fixture mounted on a wood pole for parking lot and drive lighting.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 165/560
Insert Image Insert Image
New/Existing
Fair
New/Existing
Fair
Failed **
Condition:
Fair
$25,000.00 - $45,000.00*
Needs visuals installed in the classrooms, public
spaces, and all restrooms. Simplex 4002 fire alarm
panel is an older panel. Parts for this panel may
become obsolete or at the least expensive to obtain.
Replacement cost depends on actual condition of
existing cabling.
1. There are no fire alarm devices in the enclosed court yard to indicate a fire alarm condition. Horn
strobe devices should be installed.
3. Older smoke detector installed in corridor.
Insert Key Plan or
Additional Image
Simplex 4002 and HoneywellFair
Fire Alarm System
General Notes:
Cabling:
Condition:
Devices:
Condition:Head End:
Replacement Cost:
Overall Condition:
Meets Current ADA:
** Fire Alarm pull stations do not meet current ADA code.
Image Legend:
2. Main fire alarm panel installed in the main office.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 166/560
Image Legend:
1. New Bogen Paging System installed the end of 2011. Located in the main office.
2. Existing speaker cabling reused.
Insert Key Plan or
Additional Image
Bogen Multicom 2000Good
A new paging head end with amplifier was installed
at the end of 2011. Existing speakers and cabling
were reused.
Condition:
Head End:
Replacement Cost:
Overall Condition:
Push to Call:
Condition:
Insert Image Insert Image
New/Existing
Fair
Existing
Good
None Installed
Good
Paging / Intercom System
General Notes:
Cabling:
Condition:
Speakers:
$0.00*
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 167/560
3. Existing occupancy sensor in the boys and girls recently renovated restrooms.
4. Occupancy sensors should be added to classrooms, offices, corridors, and restrooms.
5. For safety and energy efficiency open a-lamp fixtures should be replaced with fluorescent in the tunnel.
Insert Key Plan or
Additional Image
Open A-LampFailed
Interior Lighting
General Notes:
Hall Lighting:
Condition:
Classroom Lighting:
Condition:Tunnel Lighting:
Change Ballast:
Occupancy Sensors:
Fluorescent Fixture:
Occupancy Sensors:
Fluorescent **
Fair
Fluorescent **
FairCondition:
Insert Image Insert Image
Boys and Girls RR Only
$20,000.00*
$12,500.00*
$40,000.00*
Adding occupancy sensors to the building would
provide energy savings. Changing gym and cafeteria
lighting to fluorescent would allow for energy
savings and also almost instant on performance.
Incandescent fixtures should be removed and/or
replaced.
1. Metal halide fixtures in the gym. High bay fluorescence can be installed to provide energy savings.
Lighting levels are poor in this area.
** The ballasts in the fluorescent fixtures would need to be changed to Program Start for Occupancy Sensors.
Image Legend:
2. Ceiling fan with incandescent lights. These lights should be removed as they are not efficient.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 168/560
Insert Image Intentionally LeftBlank
Bogen Time Systems
37
16
Estimated Cost
2. Example of a wireless clock controller.
Insert Key Plan or
Additional Image
N/AAmerican Time and Signal
Master Clock System
General Notes:
Hallway Clocks:
Classroom Clocks:
$17,500.00*
There is not a master clock system installed at this
school. All clocks are local battery operated or 120V
plug in.
Proposed Clock Systems:Clock System:
For a Clock System:
Image Legend:
1. Estimate for a Master Clock System is based on approximately 37 room clocks and 16 hallway
clocks. A wireless transmitter would be installed in the office and transmit to all the clocks in the
building.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 169/560
Insert Key Plan or
Additional Image
120/208V Three PhaseSquare D
Fair
$50,000.00 - $60,000.00*
The original electrical gear and panels are obsolete
and getting circuit breakers will continue to become
a harder task. A full replacement of the original
electrical gear and panels should be done in the next
few years.
Poor
General Electric
Good
Power Distribution
Condition:
New Panels:
Condition:
Original Panels:Electrical Service:
Insert Image Insert Image
General Notes:
Replacement Cost:
Overall Condition:
Image Legend:
1. Original Square D electrical panels. These should be replaced and consolidated.
2. Location of Main distribution in the boiler room.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 170/560
Insert Key Plan or
Additional Image
N/AIdentiCard
$20,000.00 - $25,000.00*
A security access control system can be added to the
school with some modifications to the door
hardware for door strike release installation. A
complete rekey of the exterior doors should be done
as people with keys could bypass the card access
system.
Image Legend:
PremiSys
Security Access Control
System:
Manufacture:Type:
1. Potential locations for card access door releases.
2. Example of card access readers.
Insert Image Intentionally LeftBlank
General Notes:
Installation Cost:
* Rekey of exterior doors is not included in this number.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 171/560
Insert ImageIntentionally Left
Blank
Poor
Axis
Fair
Cisco
Poor
$75,000.00 - 125,000.00
The CCTV head end is CISCO. Support for this system
is hard to find. CISCO cameras are from their
residential line. It is recommended to switch to
another CCTV system that is compatible with more
cameras and that has support readily available.
1. Exterior building mounted camera in exterior housing.
Head End:
Insert Key Plan or
Additional Image
IP Digital Cameras
Cisco
Security Cameras
General Notes:
Condition:
Manufacture:
Condition:
Manufacture:
Type:
Replacement Cost:
Condition:
Image Legend:
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 172/560
3. Incoming fiber optic backbone.
4. Wall mounted telecommunications enclosure located in a hallway.
Image Legend:
1. There are multiple locations in the school where an extension cord is ran above ceiling to power a
projector.
2. New category 6 cabling. Category 6 cabling is the current installed cabling standard.
Overall Condition:
Telephones:
Projector Power: Insert Key Plan or
Additional Image
Category 6Good
Technology
General Notes:
Wireless:
Condition:
Cabling is new and was installed within the last 2
years. Projectors and wireless are new and in good
condition. Power to projectors are fed using an
extension cord ran above the ceiling. This is a code
violation. To add a receptacle at the projector would
be approx $150 per location.
Insert Image Insert Image
Epson Ceiling Mount
Good
Cisco POE
Good
Failed
VOIP
Good
Condition:
Projectors:
$3,000.00 - $5,000.00*
Condition:
Data:
Replacement Cost:
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 173/560
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: AsphaltParking Condition: Fair
Driveway Condition: Fair
Bus Parking Conditions Fair
Sidewalk Material: Concrete
Sidewalk Condition: Fair
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Paving
Replacement Cost: $175,000.00-$200,000.00*
Total Hardscapes
Replacement Cost: $30,000.00-$40,000.00*
General Notes:Recommended to replace and repair sidewalk that
is pitted and excessively deteriorated and properly
edge all sidewalk and asphalt to prolong its life
expectancy. Asphalt parking space have minor
ponding issues and should be addressed.
Image Legend:
Insert Image Insert Image
2. Cracking has been filled with sealant to prevent further deterioration. Continued maintenance willhelp prolong the life expectancy of the asphalt.
3. Asphalt has shifted away from the building allowing water to drain near the building foundation.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 174/560
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Fair
Driveway Condition: Fair
Bus Parking Conditions Fair
Sidewalk Material: Concrete
Sidewalk Condition: Fair
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Paving
Replacement Cost: $175,000.00-$200,000.00*
Total Hardscapes
Replacement Cost: $30,000.00-$40,000.00*
General Notes:Recommended to replace and repair sidewalk that
is pitted and excessively deteriorated and properly
edge all sidewalk and asphalt to prolong its life
expectancy. Asphalt parking space have minor
ponding issues and should be addressed.
Image Legend:
Insert Image Insert Image
2. Pounding on the surface is a sign of improper grading and installation.3. Sidewalk ramps do not meet ADA requirements and should be updated when replaced.
4. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 175/560
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Fair
Driveway Condition: Fair
Bus Parking Conditions Fair
Sidewalk Material: Concrete
Sidewalk Condition: Fair
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Paving
Replacement Cost: $175,000.00-$200,000.00*
Total Hardscapes
Replacement Cost: $30,000.00-$40,000.00*
General Notes:Recommended to replace and repair sidewalk that
is pitted and excessively deteriorated and properly
edge all sidewalk and asphalt to prolong its life
expectancy. Asphalt parking space have minor
ponding issues and should be addressed.
Image Legend:
Insert Image Insert Image
2. Pounding on the surface is a sign of improper grading and installation.3. Sidewalk ramps do not meet ADA requirements and should be updated when replaced.
4. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 176/560
Insert Image Insert Image
2. Metal side is taller than allowable for playground equipment by national safety standards.3. Corrosion has begun to form on the metal playground equipment.
1. Plastic playground equipment is in good condition.
Overall Condition: Good
Replacement Cost: $200,000.00-$300,000.00*
General Notes:Recommended to inspect, maintain, and clean
playground equipment regularly. Playground
equipment appears to be in good condition and
should be maintained to prolong its life expectancy.
Image Legend:
Playground
Insert Key Plan or
Additional Image
Ground Material: Pea GravelPlayground Equip.: Plastic / Metal
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 177/560
Playground
Insert Key Plan or
Additional Image
Ground Material: Pea Gravel (Cont.)Playground Equip.: Plastic / Metal
1. Plastic playground equipment is in good condition.
Overall Condition: Good
Replacement Cost: $200,000.00-$300,000.00*
General Notes:Recommended to inspect, maintain, and clean
playground equipment regularly. Playground
equipment appears to be in good condition and
should be maintained to prolong its life expectancy.
Image Legend:
Insert Image Insert Image
2. Metal side is taller than allowable for playground equipment by national safety standards.3. Corrosion has begun to form on the metal playground equipment.
4. Paint and finishes are showing signs of wear and aging.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 178/560
Playground
Insert Key Plan or
Additional Image
Ground Material: Pea Gravel (Cont.)Playground Equip.: Plastic / Metal
1. Basketball backboard and post are showing signs of aging and corrosion.
Overall Condition: Good
Replacement Cost: $200,000.00-$300,000.00*
General Notes:Recommended to inspect, maintain, and clean
playground equipment regularly. Playground
equipment appears to be in good condition and
should be maintained to prolong its life expectancy.
Image Legend:
Insert Image Insert Image
2. Asphalt around hoop is showing signs of aging and cracking.
Riddle Elementary School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 179/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 180/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W1 (2 Sets of Doors)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: 22'-0" x 18'-10"
Size: (2) 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $61,000.00*
General Notes:Single pane glass provides an R-Value of .85. New
door system with weather stripping, seals, and
double pane glass would provide an R-Value of 1.5
to 3.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Sealant around doors are broken and cracked possibly allowing water to penetrate the envelope.
4. Aluminum door and frame are showing signs of aging and wear.
5. Single-pane glass is allowing exterior temperature to influence the interior.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 181/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W1 (2 Sets of Doors) (Cont)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: 22'-0" x 18'-10"
Size: (2) 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $61,000.00*
General Notes:Single pane glass provides an R-Value of .85. New
door system with weather stripping, seals, and
double pane glass would provide an R-Value of 1.5
to 3.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Louvers above doors are preventing the air lock from working effectively.
4. Aluminum door and frame are showing signs of aging and wear.
5. Single pane glass is allowing exterior temperature to influence the interior.
6. ADA door opens without the approval of front desk causing a potential security hazard.
7. Debris is causing door to rub and is preventing door from operating efficiently.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 182/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S2Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Transoms: Single-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: (2) 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $16,500.00*
General Notes:Single pane glass provides an R-Value of .85. New
door system with weather stripping, seals, and
double pane glass would provide an R-Value of 1.5
to 3.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Door hardware is showing signs of wear and aging.
4. Removable mullion is showing signs of aging and missing screws.
5. Doors need to be adjusted and are rubbing causing wear.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 183/560
Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Door hardware is not compliant with ADA Codes.
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $2,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Replace door hardware with code compliant
hardware during renovation.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S3Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Good
Door Glazing: Screen
Sidelites: N/A
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 184/560
Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Door screen has been damaged and needs to be replaced.
4. Door hinges are showing signs of aging and wear.
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $6,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Replace screen to prevent further damaging door.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S4Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Good
Door Glazing: Single-Pane
Transom: Single-Pane
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 185/560
Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Door is showing signs of aging and wear and needs to be addressed.
4. paint on door and frame has been nicked or damaged and is beginning to peal away from material.
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $6,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Replace screen to prevent from further damaging
door.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S4 (Cont.)Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Good
Door Glazing: Single-Pane
Sidelites: Single-Pane
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 186/560
Insert Image
2. Door hardware is not compliant with ADA Codes.
1. Door frame is missing hinge covers and may be allowing water into the door frame.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $2,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Replace screen to prevent further damaging door.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S5Door Material: Hollow Metal
Weather Stripping: Fair
Door Closers: Good
Door Glazing: Single-Pane
Sidelites: N/A
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 187/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S6Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites: N/A
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $4,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Replace closers and maintain to prevent future
excess wear and corrosion. Replace door hardware
with code compliant hardware during renovation.
Image Legend:
Insert Image
2. Door hardware is not compliant with ADA Codes.3. Single pane glass is allowing exterior temperature to influence the interior.
4. Door closer is showing signs of wear and corrosion.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 188/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S6 (Cont.)Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites: N/A
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $4,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Replace closers and maintain to prevent future
excess wear and rusting. Replace door hardware
with code compliant hardware during renovation.
Image Legend:
Insert Image
2. Door seals are showing signs of damage and need to be addressed.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 189/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S7Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Transoms: Single-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: (3) 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $26,500.00*
General Notes:Recommended to replace the door system in its
entirety with energy efficient double-pane glazing,
door sweeps, and weather seals. The addition of an
entry vestibule will prevent excessive air
infiltration.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Sealant around door is broken and cracked possibly allowing water to penetrate the envelope.
4. Aluminum door and frame are showing signs of aging and wear and need to be addressed.
5. Single-pane glass is allowing exterior temperature to influence the interior.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 190/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S7 (Cont.)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Transoms: Single-Pane
1. Door seals are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: (3) 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $26,000.00*
General Notes:Recommended to replace the door system in its
entirety with energy efficient double-pane glazing,
door sweeps, and weather seals. The addition of an
entry vestibule will prevent excessive temperature
transfer.
Image Legend:
Insert Image Insert Image
2. Aluminum door and frame are showing signs of aging and wear.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 191/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S8Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Transoms: Single-Pane
1. Door operator is showing signs of wear and corrosion and needs to be addressed.
Vestibule: N/A
Size: (2) 3'-0" x 7'-0"
Overall Condition: Failed
Replacement Cost: $6,500.00*
General Notes:Recommended to replace entire door system in its
entirety with energy efficient double-pane glazing,
door sweeps, and weather seals.
Image Legend:
Insert Image Insert Image
2. Door closer is showing signs of wear and corrosion and needs to be addressed.3. Door hinges are showing signs of wear and corrosion and need to be addressed.
4. Corrosion has worn through door creating a void for pests and water to enter the building envelope.
5. Weather strips need to be adjusted or added to door.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 192/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S9Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Transoms: Single-Pane
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: (2) 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $6,500.00*
General Notes:Recommended to replace door system in its
entirety.
Image Legend:
Insert Image Insert Image
2. Doors are showing signs of Sun / UV damage and aging.3. Door sweeps are missing or worn and may be allowing air infiltration.
4. Corrosion has begun to wear through the door creating a void for pests and water to enter the building
envelope.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 193/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S9 (Cont.)Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Transoms: Single-Pane
1. Single pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: (2) 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $6,500.00*
General Notes:Recommended to replace door system in its
entirety.
Image Legend:
Insert Image Insert Image
2. Door closers are showing signs of corrosion and are missing protective covers.3. Door sweeps are missing or worn and may be allowing air infiltration.
4. Corrosion has begun to wear through the door creating a void for pests and water to enter the building
envelope.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 194/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S10Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: N/A
Sidelites: N/A
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $2,500.00*
General Notes:Recommended maintain door and replace sealant
around door frame.
Image Legend:
2. Door closers are showing signs wear and damage.3. Door seals are showing signs of wear and light is coming through the seals.
4. Door and door frame are showing signs of wear and damage.
5. Door is showing the signs of Sun / UV damage and needs to be addressed.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 195/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S11Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: N/A
Sidelites: N/A
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $2,500.00*
General Notes:Recommended maintain door and replace sealant
around door frame.
Image Legend:
2. Door closers are showing signs wear and damage and need to be addressed.3. Door seals are showing signs of wear and light is coming in through seals.
4. Door and door frame are showing signs of wear and damage.
5. Door is showing the signs of Sun / UV damage and needs to be addressed.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 196/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E12 (Overhead)Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
1. Door and door frame are showing signs of wear and damage.
Vestibule: N/A
Size: 12'-0" x 12'-0"
Overall Condition: Fair
Replacement Cost: $4,000.00*
General Notes:Recommended to paint and maintain overhead
door frame.
Image Legend:
2. Door sweeps are missing or worn and may be allowing air infiltration.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 197/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E13Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Double-Pane
Sidelites / Transoms: Double-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: 12'-3" x 11'-1"
Size: (5) 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $61,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Black tape is covering holes and bolts. Water potentially is entering the building envelope.
4. Door is continuously unlocked and may become a security concern.
5. Double-pane sidelights, when properly sealed, will prevent air infiltration.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 198/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E13 (Cont.)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Double-Pane
Sidelites / Transoms: Double-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: (5) 12'-3" x 11'-1"
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $61,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Image Legend:
Insert Image Insert Image
2. Door hinges are showing signs of aging and corrosion.3. Window seals are not installed to cover the entire length of window and are not working efficiently.
4. Double-pane sidelights, when properly sealed, will prevent air infiltration.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 199/560
Insert Image Insert Image
2. Door seals are worn and are not sealing properly.3. Single pane glass is allowing exterior temperature to influence the interior.
4. Aluminum door system is showing signs of aging and wear.
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: 12'-3" x 11'-1"
Size: (5) 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $61,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E13 (Cont.)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Double-Pane
Sidelites / Transoms: Double-Pane
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 200/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E14 (2 Sets of Doors)Door Material: Hollow Metal
Weather Stripping: Fair
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
1. Door and door frame are showing signs of wear and damage.
Vestibule: 8'-6" x 7'-9"
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $4,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Image Legend:
2. Door sweeps are missing or worn and may be allowing air infiltration.3. Masonry wall is showing signs of wear and damage and needs to be addressed.
4. Seals on exterior vestibule are showings signs of aging and wear.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 201/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E15 (2 Sets of Doors)Door Material: Hollow Metal
Weather Stripping: Fair
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
1. Door and door frame are showing signs of wear and damage.
Vestibule: 8'-6" x 7'-9"
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $4,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Remove freezer from egress path.
Image Legend:
2. Door sweeps are missing or worn and may be allowing air infiltration.3. Seals on exterior vestibule are showings signs of aging and wear.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 202/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E15 (2 Sets of Doors) (Cont.)Door Material: Hollow Metal
Weather Stripping: Fair
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
1. Door and door frame are showing signs of wear and damage.
Vestibule: 8'-6" x 7'-9"
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $4,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Remove freezer from egress path.
Image Legend:
2. Door sweeps are missing or worn and may be allowing air infiltration.3. Freezer is obstructing the path of egress and should be removed and relocated as soon as possible.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 203/560
2. Door sweeps are missing or worn and may be allowing air infiltration.3. Single pane glass is allowing exterior temperature to influence the interior.
4. Maintain a regular pest control plan.
1. Door seals are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Good
Replacement Cost: $3,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Remove freezer from egress path.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E16Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Good
Door Glazing: Double-Pane
Transoms: Double-Pane
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 204/560
2. Door sweeps are missing or worn and may be allowing air infiltration.3. Double pane window system, when sealed properly, will work efficiently.
1. Door glazing seals are broken and are preventing the door from performing efficiently.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $3,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Adjust door position and closer to ensure the door
to close properly. Replace broken double pane
glass with properly sealed window.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E17Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Good
Door Glazing: Double-Pane
Transoms: Double-Pane
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 205/560
2. Sealant around door frame is showing the signs of aging and wear.
1. Aluminum door grinds on frame preventing door from closing properly.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $3,500.00*
General Notes:Recommended to replace weather stripping and
door sweeps to improve temperature control.
Adjust door position and closer to ensure the door
to close properly. Replace broken double pane
glass with properly sealed window.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E17 (Cont.)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Good
Door Glazing: Double-Pane
Transoms: Double-Pane
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 206/560
2. Door hinges are showing the signs of aging and wear and need to be addressed.3. Paint is chipping away from frame and need to be addressed.
1. Hollow metal doors are showings signs of aging and wear.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $2,500.00*
General Notes:Recommended to replace hinges and repaint door
and door frame.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E18Door Material: Hollow Metal
Weather Stripping: Fair
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites: N/A
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 207/560
2. Door hinges are showing the signs of aging and wear.3. Paint is chipping away from frame and need to be addressed.
4. Sealant around door frame is broken and may allow moisture to penetrate the building envelope.
1. Hollow metal doors are showings signs of aging and wear.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $2,500.00*
General Notes:Recommended to replace hinges and repaint door
and door frame.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E19Door Material: Hollow Metal
Weather Stripping: Fair
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites: N/A
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 208/560
2. Door seals are missing or worn and may be allowing air infiltration.3. Overhead doors are showing signs of aging and wear and need to be addressed.
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 18'-0" x 14'-0"
Overall Condition: Fair
Replacement Cost: $5,000.00*
General Notes:Recommended to prime and paint steel angle to
extend the life expectancy of the overhead door
system.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N20 (Overhead)Door Material: Hollow Metal
Weather Stripping: Fair
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 209/560
2. Door seals are missing or worn and may be allowing air infiltration.3. Overhead doors are showing signs of aging and wear and need to be addressed.
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 18'-0" x 14'-0"
Overall Condition: Fair
Replacement Cost: $5,000.00*
General Notes:Recommended to prime and paint steel angle.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N21Door Material: Hollow Metal
Weather Stripping: Fair
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 210/560
2. Flashing is showing signs of aging and wear and need to be addressed.3. Door stops are showing signs of wear and corrosion.
4. Single pane glass is allowing exterior temperature to influence the interior.
1. Door sweeps are showing signs of wear and may be allowing air infiltration.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $2,500.00*
General Notes:Recommended to replace flashing and address door
stop and door sweeps issue.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N22Door Material: Hollow Metal
Weather Stripping: Fair
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites: N/A
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 211/560
2. Metal Flashing is showing signs of wear and corrosion and may be allowing water to penetrate thebuilding system.
3. Door stops are showing signs of wear and corrosion.
1. Door sweeps are showing signs of aging and wear and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $4,500.00*
General Notes:Recommended to replace flashing and address door
stop and door sweeps issue.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N23Door Material: Hollow Metal
Weather Stripping: Fair
Door Closers: Fair
Door Glazing: N/A
Sidelites: N/A
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 212/560
2. Door seals are showing signs of aging and wear and may be allowing air infiltration.
3. Door pull is showing signs of aging and wear and needs to be addressed.
1. Door sweeps are showing signs of aging and wear and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $4,500.00*
General Notes:Recommended to replace door in its entirety with
proper weather seals, door sweeps, and flashing.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N24Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: Poor
Door Glazing: N/A
Sidelites: N/A
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 213/560
2. Door pull is showing signs of aging and wear and needs to be addressed.3. Door lockset is showing signs of aging and wear and needs to be addressed.
1. Door sweeps are showing signs of aging and wear and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $4,500.00*
General Notes:Recommended to replace door in its entirety with
proper weather seals, door sweeps, and flashing.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N24 (Cont.)Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: Poor
Door Glazing: N/A
Sidelites: N/A
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 214/560
2. Door pull is showing signs of aging and wear and needs to be addressed.3. Metal door and door frame are showing the signs of wear and aging.
1. Door seals are showing signs of aging and wear and may be allowing air infiltration.
Vestibule: N/A
Size: 4'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $3,000.00*
General Notes:Recommended to replace door in its entirety with
proper weather seals, door sweeps, and flashing.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N25Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: Poor
Door Glazing: N/A
Sidelites: N/A
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 215/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N26Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: None
Door Glazing: Single-Pane
Sidelites / Transoms:
1. Hollow metal door is showing heavy wear and needs to be addressed.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Failed
Replacement Cost: $11.500.00*
General Notes:Large openings in the door are allowing heat and
cool air to seep into and out of the building. This
6'-0 x 3/4" space below the door is allow for
excessive air infiltration.
Image Legend:
Insert Image Insert Image
2. Door sweeps are needed to mitigate large air opening and needs to be addressed.3. Paint is pealing from door and cover above.
4. Corrosion is appearing around frames and door edges.
5. Hinges are showing signs of wear and corrosion.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 216/560
Insert Image Insert Image
2. Door sweeps are needed to mitigate large air opening and need to be addressed.3. Paint is pealing from door and cover above and needs to be addressed.
4. Surface corrosion is appearing around frames and door edges.
5. Hinges are showing signs of wear and corrosion.
1. Hollow metal door is showing heavy wear and needs to be addressed.
Vestibule: N/A
Size: 7'-0" x 7'-0"
Overall Condition: Failed
Replacement Cost: $5,500.00*
General Notes:Large openings in the door are allowing heat and
cool air to seep into and out of the building.
Recommended to replace door system in its
entirety.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N27Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: N/A
Door Glazing: N/A
Sidelites: N/A
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 217/560
2. Aluminum doors and door frames are showing the signs of aging and wear.3. Door stops are showing signs of wear and are missing bolts.
4. Single pane glass is allowing exterior temperature to influence the interior.
5. Door frame sealant is showing signs of aging and wear.
1. Door sweeps are showing signs of aging and wear and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $16,500.00*
General Notes:Recommended addition of an entry vestibule onto
the exterior of the building will prevent excessive
air infiltration.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N28Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites: Single-Pane
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 218/560
Insert Image
2. Door sweeps are needed to mitigate large air opening and needs to be addressed.3. Paint is pealing from door and cover above.
4. Corrosion is appearing around frames and door edges.
5. Hinges are showing signs of wear and corrosion.
1. Hollow metal door is showing heavy wear and needs to be addressed.
Vestibule: N/A
Size: 8'-4" x 12'-0"
Overall Condition: Failed
Replacement Cost: $9,500.00*
General Notes:Large openings in the door are allowing heat and
cool air to seep into and out of the building.
Recommended to replace door system in its
entirety.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N29Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: N/A
Door Glazing: N/A
Sidelites: N/A
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 219/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: 1D1 (North)Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: N/A
Door Glazing: Single-Pane
Sidelites: N/A
1. Hollow metal door and frame are showing signs of corrosion
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Failed
Replacement Cost: $7,500.00*
General Notes:This door system is allowing weather, animals, and
insects into the building through the rusted opening
in the door frame. Recommended to replace door
in its entirety with proper weather seals, door
sweeps, and flashing.
Image Legend:
Insert Image Insert Image
2. Corrosion has worn through door creating a void for pests and water to enter the building envelope.3. Hinges are showings signs of wear and corrosion.
4. Protective screen has been damaged and may allow pests to enter the building envelope.
5. Debris is partially blocking the door and allow pest a place to hide.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 220/560
Insert Image Insert Image
2. Caulk and seal planter base to prevent erosion.
1. Caulk and seal planter top plate.
Soffit / Canopy: Fair
Overall Condition: Fair
Replacement Cost: $500.00 - $700.00*
General Notes:Recommended to maintain consistent caulking and
sealants throughout the building envelope to
prevent moisture penetration.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 221/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
1. Replace concrete planters as needed to prevent additional cracking and breaking.
Soffit / Canopy: Fair
Overall Condition: Fair
Replacement Cost: $500.00 - $700.00*
General Notes:Recommended to maintain consistent caulking and
sealants throughout the building envelope to
prevent moisture penetration.
Image Legend:
Insert Image Insert Image
2. Caulk and seal planter top plate to prevent erosion.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 222/560
Insert Image Insert Image
2. Caulk and seal to prevent water from penetrating the envelope.3. Remove and replace sealant to prevent moisture damage.
4. Maintain consistent caulking and sealant to prevent moisture from penetrating the envelope.
1. Caulk and seal to prevent pests from penetrating the envelope.
Soffit / Canopy: Fair
Overall Condition: Fair
Total Sealant
Replacement Cost: $10,000.00 - $15,000.00*
General Notes:Maintain consistent caulking and sealants
throughout the building envelope to prevent
moisture penetration.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 223/560
Insert Image Insert Image
2. Moisture has promoted growth in between window panes.3. Remove and replace flashing sealant to prevent moisture from penetrating the building envelope.
4. Clean debris from the exterior of building.
1. Window seals are broken and moisture has penetrated the building envelope.
Soffit / Canopy: Fair
Overall Condition: Fair
Total Sealant
Replacement Cost: $10,000.00 - $15,000.00*
General Notes:Maintain consistent caulking and sealants
throughout the building envelope to prevent
moisture penetration. Clean all masonry to
maintain integrity of building envelope.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 224/560
Insert Image Insert Image
foundation.2. Clean debris from the exterior of building.
3. Exterior electrical receptacle is exposed.
1. Sealant between concrete sidewalk and building has broken and is allowing drainage near the
Soffit / Canopy: Fair
Overall Condition: Fair
Total Sealant
Replacement Cost: $10,000.00 - $15,000.00*
General Notes:Maintain consistent caulking and sealants
throughout the building envelope to prevent
moisture penetration. Clean all masonry to
maintain integrity of building envelope.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 225/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
1. Sealant between window frame and masonry has broken and may be allowing water to penetrate
Soffit / Canopy: Fair
Overall Condition: Fair
Total Sealant
Replacement Cost: $10,000.00 - $15,000.00*
General Notes:Recommended to remove and replace sealant
around window system. Maintain a regular
maintenance program to monitor the building
envelope as it changes throughout the seasons.
Replace door system N26 in its entirety.
Image Legend:
Insert Image Insert Image
the building envelope.2. Double-pane sidelights, when properly sealed, will prevent air infiltration.
3. Paint on the entry canopy is peeling and may allow water to damage the material.
4. Recommended to replace entry system in its entirety.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 226/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
1. Sealant between canopy and masonry has been has broken and may be allowing water to
Soffit / Canopy: Fair
Overall Condition: Fair
Total Sealant
Replacement Cost: $10,000.00 - $15,000.00*
General Notes:Recommended to reseal and reflash canopy as
needed to prevent water from penetrating the
building envelope. Replace missing cap to prevent
pest and moisture from entering the building
envelope.
Image Legend:
Insert Image Insert Image
penetrate the building envelope.2. Flashing and sealant may be broken and may be allowing water to penetrate the building
envelope.
3. Parapet cap is open from below and may be allowing water or pests to enter the building
envelope.
4. Recommended regular cleaning program to remove building envelope of debris.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 227/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
1. Ventilation cover has been damaged and displaced. This may be allowing pests or debris to enter
Soffit / Canopy: Fair
Overall Condition: Fair
Replacement Cost: $500.00 - $1,000.00*
General Notes:Recommended to reseal and reflash canopy as
needed to prevent water from penetrating the
building envelope. Replace missing cap to prevent
pest and moisture from entering the building
envelope.
Image Legend:
Insert Image Insert Image
the building ventilation system.2. Sealant between concrete sidewalk and building has broken and is allowing drainage near
the foundation.
3. Exterior electrical receptacle has been removed, leaving exposed electrical wires.
4. Extra piping or fencing has been left near building.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 228/560
Insert Image Insert Image
envelope.2. Canopy is showings signs of aging and corrosion.
3. Seals on double pane glazed glass has been broken and will not perform efficiently until seals
are fixed.
4. Seals in door and window system need to be adjusted and maintained to perform thermally
efficient.
1. Caulk and seal all through wall penetrations to prevent moisture from penetrating the building
Soffit / Canopy: Fair
Overall Condition: Fair
Replacement Cost: $1,500.00 - $3,000.00*
General Notes:Recommended to replace broken or worn seals on
all windows. Clean, prime and paint all area of
canopy that show signs of rust.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 229/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
1. Transite panel may contain asbestos and should be removed as work permits.
Soffit / Canopy: Fair
Overall Condition: Fair
Overall Canopy
Replacement Cost: $10,500.00 - $17,000.00*
General Notes:Recommended to remove Transite panel as work
permits and replace with new canopy system.
Image Legend:
Insert Image Insert Image
2. Existing lighting system may be renovated with LED lights. See electrical documents foradditional information.
3. Structural column is showing signs of corrosion and deterioration.
4. Canopy roof is showing signs of aging and damage.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 230/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
1. Transite panel may contain asbestos and should be removed as work permits.
Soffit / Canopy: Fair
Overall Condition: Fair
Replacement Cost: $1,500.00 - $3,000.00*
General Notes:Recommended to remove Transite panel as work
permits and replace with new canopy system. Door
system N27 and N29 to be removed and replaced in
their entirety.
Image Legend:
Insert Image Insert Image
2. Existing lighting system may be renovated with LED lights. See electrical documents foradditional information.
3. Structural column is showing signs of corrosion and deterioration.
4. Recommended to replace entry system in its entirety.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 231/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
1. Transite panel may contain asbestos and should be removed as work permits.
Soffit / Canopy: Fair
Overall Condition: Fair
Replacement Cost: $2,500.00 - $5,000.00*
General Notes:Recommended to remove Transite panel as work
permits and replace with new canopy system.
Image Legend:
Insert Image Insert Image
2. Steel railing system is showing sings of damage and aging.3. Structural column is showing signs of corrosion and deterioration.
4. Truck dock is showings signs of aging and deterioration.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 232/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
1. Dumpster is colliding with masonry wall and causing surface damage.
Soffit / Canopy: Fair
Overall Condition: Fair
Replacement Cost: $1,000.00 - $1,500.00*
General Notes:Recommended to move dumpster away from wall
to prevent further damage to masonry. Maintain a
regular cleaning program of the building exterior.
Image Legend:
Insert Image Insert Image
2. Dumpster is colliding with expansion joint and may be causing damage to sealant.3. Exhaust fan is causing staining of masonry. Recommended to perform a regular cleaning
program.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 233/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: Fair
Flashing / Trim: Poor
Glazing: Fair
Caulking / Sealant: Poor
1. Fasteners are corroding and causing masonry to be stained.
Soffit / Canopy: Fair
Overall Condition: Fair
Replacement Cost: $500.00 - $1,000.00*
General Notes:Recommended paint all fasteners to prevent
corrosion and clean brick regularly.
Image Legend:
Insert Image Insert Image
2. New soffit and overhang are in good condition. Canopy system needs regular cleaning andmaintenance performed.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 234/560
Gymnasium Data
Insert Key Plan or
Additional Image
Gym Location: Main RHSFloor Material: Hardwood
Seating Capacity 1697
Score Board: Good
Equipment: Good
Lighting: Poor
1. Seating capacity of rollout bleachers is 1697.
Size 115'-0" x 130'-0"
Overall Condition: Fair
Total LED Light Fixture
Replacement Cost: $150,000.00-$200,000.00*
General Notes:Overall condition of gymnasium is good. Existing
lighting systems are inefficent and light levels are
poor. Recommend new high efficiency lighting
system. See lighting Data for additional
information.
Image Legend:
Insert Image Insert Image
2. Maintain and clean hardwood floor regularly to extend its life expectancy.3. Maintain basketball rims and backboards, currently in good condition.
4. Maintain score board and lights, currently in good condition. Replace bulbs as needed.
5. Lighting is dim throughout Gymnasium. See electrical data for additional information.
6. Gymnasium ceiling is in poor condition and needs to be addressed.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 235/560
Gymnasium Data
Insert Key Plan or
Additional Image
Gym Location: Main RHS (Cont.)Floor Material: Hardwood
Seating Capacity 1697
Score Board: Good
Equipment: Good
Lighting: Poor
1. Seating capacity of rollout bleachers is 1697.
Size 115'-0" x 130'-0"
Overall Condition: Fair
Total LED Light Fixture
Replacement Cost: $150,000.00-$200,000.00*
General Notes:Overall condition of gymnasium is good. Existing
lighting systems are inefficent and light levels are
poor. Recommend new high efficiency lighting
system. See lighting Data for additional
information.
Image Legend:
Insert Image Insert Image
2. Maintain and clean hardwood floor regularly to extend its life expectancy.3. Maintain basketball rims and backboards, currently in good condition.
4. Maintain score board and lights, currently in good condition. Replace bulbs as needed.
5. Lighting is dim throughout Gymnasium. See electrical data for additional information.
6. Gymnasium ceiling is in poor condition and needs to be addressed.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 236/560
Gymnasium Data
Insert Key Plan or
Additional Image
Gym Location: Auxiliary RHSFloor Material: Hardwood
Seating Capacity 352
Score Board: Good
Equipment: Good
Lighting: Poor
1. Seating capacity of 352, installed in 1998. Clean bleacher regularly.
Size 115'-0" x 89'-0"
Overall Condition: Good
Total LED Light Fixture
Replacement Cost: $100,000.00-$150,000.00*
General Notes:Overall condition of gymnasium is good. Existing
lighting systems are inefficent and light levels are
poor. Recommend new high efficiency lighting
system. See lighting Data for additional
information.
Image Legend:
Insert Image Insert Image
2. Maintain hardwood floor, installed in 1998. Clean floor regularly.3. Lighting is dim throughout Gymnasium. See lighting data for additional information.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 237/560
Gymnasium Data
Insert Key Plan or
Additional Image
Gym Location: Auxiliary RHS (Cont.)Floor Material: Hardwood
Seating Capacity 352
Score Board: Good
Equipment: Good
Lighting: Poor
1. Lighting is dim throughout Gymnasium. See lighting data for additional information.
Size 115'-0" x 89'-0"
Overall Condition: Good
Total LED Light Fixture
Replacement Cost: $100,000.00-$150,000.00*
General Notes:Overall condition of gymnasium is good. Existing
lighting systems are inefficent and light levels are
poor. Recommend new high efficiency lighting
system. See lighting Data for additional
information.
Image Legend:
Insert Image Insert Image
2. Maintain hardwood floor, installed in 1998. Clean floor regularly.3. Maintain basketball rims and backboarrds, currently in good condition.
4. Maintain score board and lights, currently in good condition. Replace bulbs as needed.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 238/560
Auditorium Data
Insert Key Plan or
Additional Image
Auditorium Locations: AuditoriumPlatform: Hardwood
Seating Capacity 591
Acoustics: Fair
Wall Covering: Acoustical Plaster
Lighting: See Lighting Data
1. Seating capacity of 591 was recently reupholstered and renovated.
Overall Conditions: Fair
Total Auditorium
Replacement Cost: $755,000.00-$880,000.00*
General Notes:Complete renovation of space would provide better
sound, lighting and overall acoustical performance.
Image Legend:
Insert Image Insert Image
2. 3,600 square feet of acoustical plaster contain asbestos and should be removed during renovation.3. See electrical data for additional for more information.
4. Many chair handrails have scratches and nicks and need to be addressed.
5. Approximately 30% of chairs name tags are missing.
6. Emergency exit doors have significant air spaces allowing for excessive transfer of sound.
7. Electrical wiring for stage lights contains asbestos. (Approximately 100 linear feet)
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 239/560
Auditorium Data
Insert Key Plan or
Additional Image
Auditorium Locations: Auditorium (Cont.)Platform: Hardwood
Seating Capacity 591
Acoustics: Fair
Wall Covering: Acoustical Plaster
Lighting: See Lighting Data
1. Stage spot lighting is showing signs of aging and wear. See electrical data for additional information.
Overall Conditions: Fair
Total Auditorium
Replacement Cost: $755,000.00-$880,000.00*
General Notes:The stage lighting is outdated and should be
addressed with new down lighting. The 591 seats
have recently been recently replace /
reupholstered.
Image Legend:
Insert Image Insert Image
2. Electrical wiring for stage lights contains asbestos. (Approximately 100 linear feet)3. Acoustical curtain is showing sign of aging and wear.
4. Emergency exit doors have significant air spaces allowing for excessive transfer of sound and light.
5. Emergency exit hardware is showing signs of aging and wear.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 240/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: KitchenFlooring Material: Terrazzo
Ceiling Material Moisture Resistant ACT
Wall: Glazed CMU Block
Storage: Insufficient Storage
Equipment: Fair
1. Maintain and inspect moisture resistance acoustical ceiling tile and grid regularly.
Freezer / Cooler: Fair
Overall Condition: Fair
Replacement Cost: $250,000.00-$450,000.00*
General Notes:The RHS Kitchen contains two servings lines to
serve four grades throughout the day. Serving lines
and preparation area is extremely crowed. Storage
room is very full and contains three additional
freezer / coolers due to insufficient room in
Kitchen.
Image Legend:
Insert Image Insert Image
2. Regularly inspect, maintain, and clean Terrazzo flooring .3. Walk-in freezer. See mechanical data for additional information.
4. Inadequate space for dry and wet food storage racks. Storage area requirements needs to be addressed.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 241/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: ClassroomsTVs: 32 Approximately
Flooring: Carpet / Tile
Walls: CMU / Studs
Ceiling: Acoustical Tile
Doors: Wood
1. Rochester High School contains approximately 32 Cathode Ray Tube TV's.
Fixtures: Fair
Overall Condition: Fair
Total Carpet and TV
Replacement Cost: $150,000.00-$200,000.00*
General Notes:Rochester High School contains 32 (CRT) TVs that
use more energy than the common modern TVs.
The tile flooring should be maintained to extend the
life expectancy of the material. Carpet flooring may
need to be replaced with a more durable material.
Image Legend:
Insert Image Insert Image
2. Acoustical ceiling tile is in fair condition and should be replaced as needed.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Carpet is showing signs of deterioration and needs to be addressed with a more durable material.
5. Desks appear to be in fair condition. Desks should be cleaned and maintained to extend their life
expectancy.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 242/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: Classrooms (Cont.)TVs: 32 Approximately
Flooring: Carpet / Tile
Walls: CMU / Studs
Ceiling: Acoustical Tile
Doors: Wood
1. Rochester High School contains approximately 32 Cathode Ray Tube TV's.
Fixtures: Fair
Overall Condition: Fair
Total Carpet and TV
Replacement Cost: $150,000.00-$200,000.00*
General Notes:Rochester High School contains 32 (CRT) TVs that
use more energy than the common modern TVs.
The tile flooring should be maintained to extend the
life expectancy of the material. Carpet flooring may
need to be replaced with a more durable material.
Image Legend:
Insert Image Insert Image
2. Acoustical ceiling tile is in fair condition and should be replaced as needed.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Tile flooring is in good condition and should be maintained.
5. Desks appear to be in fair condition. Desks should be cleaned and maintained to extend their life
expectancy.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 243/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: Classrooms (Cont.)TVs: 32 Approximately
Flooring: Carpet / Tile
Walls: CMU / Studs
Ceiling: Acoustical Tile
Doors: Wood
1. Rochester High School contains approximately 32 Cathode Ray Tube TV's.
Fixtures: Fair
Overall Condition: Fair
Total Carpet and TV
Replacement Cost: $150,000.00-$200,000.00*
General Notes:Rochester High School contains 32 (CRT) TVs that
use more energy than the common modern TVs.
The tile flooring should be maintained to extend the
life expectancy of the material. Carpet flooring may
need to be replaced with a more durable material.
Image Legend:
Insert Image Insert Image
2. Acoustical ceiling tile is in fair condition and should be replaced as needed.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Carpet is showing signs of deterioration and needs to be addressed with a more durable material.
5. Desks appear to be in fair condition. Desks should be cleaned and maintained to extend their life
expectancy.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 244/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: LibraryFlooring: Carpet
Walls: Studs
Ceiling: Acoustical Tile
Doors: Wood
Fixtures: Fair
1. Rochester High School contains approximately 32 Cathode Ray Tube TV's.
Furniture: Fair
Overall Condition: Fair
Total Carpet and TV
Replacement Cost: $150,000.00-$200,000.00*
General Notes:Recommended to inspect, maintain, and clean
regularly to extend the life expectancy of the
Library materials.
Image Legend:
Insert Image Insert Image
2. Acoustical ceiling tile is in fair condition and should be replaced as needed.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Carpet is showing signs of deterioration and needs to be addressed with a more durable material.
5. Desks appear to be in fair condition. Desks should be cleaned and maintained to extend their life
expectancy.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 245/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: Library (Cont.)Flooring: Carpet
Walls: Studs
Ceiling: Acoustical Tile
Doors: Wood
Fixtures: Fair
1. Rochester High School contains approximately 32 Cathode Ray Tube TV's.
Furniture: Fair
Overall Condition: Fair
Total Carpet and TV
Replacement Cost: $150,000.00-$200,000.00*
General Notes:Recommended to inspect, maintain, and clean
regularly to extend the life expectancy of the
Library materials.
Image Legend:
Insert Image Insert Image
2. Acoustical ceiling tile is in fair condition and should be replaced as needed.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Carpet is showing signs of deterioration and needs to be addressed with a more durable material.
5. Desks appear to be in fair condition. Desks should be cleaned and maintained to extend their life
expectancy.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 246/560
Insert Image Insert Image
2. Acoustical ceiling tile is in good condition and should be replaced as needed.3. Stud walls are in fair condition and should be maintained.
4. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
1. Terrazzo in the hallways appear to be in good condition and should be maintained.
Fixtures: Fair
Overall Condition: Fair
Replacement Cost: $275,000.00-$350,000.00*
General Notes:The terrazzo flooring is recommended to be
regularly maintained to extend the life of the
flooring.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: HallwaysFlooring: Terrazzo
Flooring Condition: Fair
Walls: CMU Block / Stud
Ceiling: Acoustical Ceiling Tile
Casework: Wood / Glass
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 247/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: Hallways (Cont.)Flooring: Terrazzo
Flooring Condition: Fair
Walls: CMU Block / Stud
Ceiling: Acoustical Ceiling Tile
Casework: Wood / Glass
1. Terrazzo in the hallways appear to be in good condition and should be maintained.
Fixtures: Fair
Overall Condition: Fair
Replacement Cost: $275,000.00-$350,000.00*
General Notes:The terrazzo flooring is recommended to be
regularly maintained to extend the life of the
flooring.
Image Legend:
Insert Image Insert Image
2. Acoustical ceiling tile is in good condition and should be replaced as needed.3. CMU / Stud walls are in fair condition and should be maintained.
4. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
5. Lockers appear to be in good condition and should be inspected, maintained, and cleaned regularly.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 248/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: Casework
1. Casework hardware is showing signs of aging and wear. Some hardware is broken and should be
Overall Condition: Failed
Total Casework
Replacement Cost: $250,000.00-325,000.00*
General Notes:Recommended to replace existing casework in its
entirety. Tile flooring needs to be addressed during
the renovation.
Image Legend:
Insert Image Insert Image
replaced soon.
2. Casework door and panels are showing signs of aging and wear. Many panels are splitting and cracking
and should be replaced in the near future.
3. Tile flooring is showing signs of aging and wear and needs to be addressed.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 249/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: Casework (Cont.)
1. Casework hardware is showing signs of aging and wear. Some hardware is broken and should be
Overall Condition: Failed
Total Casework
Replacement Cost: $250,000.00-325,000.00*
General Notes:Recommended to replace existing casework in its
entirety. Tile flooring needs to be addressed during
the renovation.
Image Legend:
Insert Image Insert Image
replaced soon.
2. Casework door and panels are showing signs of aging and wear. Many panels are splitting and cracking
and should be replaced in the near future.
3. Tile flooring is showing signs of aging and wear and needs to be addressed.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 250/560
Insert Image Insert Image
1998
Economizer
Heat Only, Single Speed
HW/CHW, VFD
DDC
Fair
Addition HVAC equipment is in good condition and
well-maintained. Ductwork is sealed and insulated,
equipment has economizer and DDC controls with
one VFD.
1. Heating only gymnasium AHU.
2. Locker room ducted fan coil units.
Overall Condition:
Controls: Insert Key Plan or
Additional Image
Mech RoomsSingle Zone, AHU/VAV
Addition Air Handlers, VAV's
General Notes:
Gymnasium:
Features:
Installation Date:
$250,000.00*
Classrooms:
Location:
Replacement cost:
Type:
Image Legend:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 251/560
Image Legend:
1. Metering IR faucets with ADA accessible fixtures.
2. IR sensing valves and fixtures are in good condition.
Overall Condition:
ADA Compliance: Insert Key Plan or
Additional Image
AdditionWall-Hung, Am. Std.
Addition Plumbing
General Notes:
Actuation:
Water Closets:
Addition plumbing fixtures ADA accessible, low
flow/metering faucets and valves. Plumbing well
insulated.
Insert Image Insert Image
IR Sensing
Wall-Hung, Am. Std.
IR Sensing
1.6/1.0 GPF
Yes
Good
Urinals:
Actuation:
$50,000.00 - $75,000.00*
Valve Flow Rates:
Location:
Replacement Cost:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 252/560
Image Legend:
1. The cooling plant utilizes (7) aging constant speed pumps. Simplicity and efficiency would be
increased by replacing these pumps with (2) new VFD pumps.2. Cooling tower pumps are old and in poor condition.
Overall Condition:
Insert Key Plan or
Additional Image
Trane RTAA1101998
Chilled Water Plant
General Notes:
Installation Date:
Water-Cooled Chiller:
Cooling Tower
Fair
$500,000.00*
Ease of maintenance and operating efficiency could
be increased by renovating the chilled water
distribution to use one chiller and two VFD pumps.
System currently has three cooling devices and five
pumps with corroded and rusty piping.
Insert Image Insert Image
Fair
Carrier HXC271
2005
Good
Marley NC4011
1994
Overall Condition:
Installation Date:Air-cooled Chiller:
Replacement Cost:
Overall Condition:
Installation Date:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 253/560
Image Legend:
Overall Condition:
$500,000.00*
Ease of maintenance and operating efficiency could
be increased by renovating the chilled water
distribution to use one chiller and two VFD pumps.
System currently has three cooling devices and five
pumps with corroded and rusty piping.
1. Typical service life for cooling towers is >25 years. Over time, corrosion will decrease heat transfer and
1994Insert Key Plan or
Additional Image
Trane RTAA110 (Cont.)1998
Chilled Water Plant
General Notes:
Installation Date:
Water-Cooled Chiller:
Fair
Installation Date:Air-cooled Chiller:
Replacement Cost:
Overall Condition:
Installation Date:
Cooling Tower
2. Poor or incomplete insulation causes condensation on mechanical piping, which leads to rust and
Insert Image Insert Image
Fair
Carrier HXC271
2005
Good
Marley NC4011
Overall Condition:
corrosion. Rusted pipes/valves will eventually fail and need to be replaced and properly insulated.
overall operating efficiency.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 254/560
Insert Image Insert Image
Underground Clay Pipe
Tunnel AHU's (2)
Poor
It is recommended that the classroom HVAC
terminals be replaced with new four-pipe unit
ventilators. This would require new intake louvers
be installed through existing curtain wall.
1. AHU's deliver conditioned air through tunnels to unit ventilators.
Primary Air Source:
$250,000.00*
2. Covered vents typically indicate the room is receiving either too much heating or cooling airflow.
Image Legend:
General Notes:
Ductwork:
Replacement Cost:
DDC/Pneumatic
30 ±
Hot Water Coil
1965
Location:
Heating:
Quantity:
Installation Date:
Insert Key Plan or
Additional Image
Original ClassroomsForced Air "Unit Vent"
Classroom Terminal Units
Controls:
Type:
Overall Condition:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 255/560
contain dust and old asbestos insulation.
4. Vitrified clay pipe is used as underground ductwork. Over time these pipes can crack and fail,
which causes air blockages. The pipes are also uninsulated, which is not energy efficient.
Insert Image Insert Image
Underground Clay Pipe
Tunnel AHU's (2)
Poor
$250,000.00*
It is recommended that the classroom HVAC
terminals be replaced with new four-pipe unit
ventilators. This would require new intake louvers
be installed through existing curtain wall.
1. Existing curtain wall does not have intake louvers for unit ventilators. New louvers would need
to be installed for ventilation.
3. Conditioned air is blown through the tunnels to classroom UV's. This is not ideal as tunnels
Image Legend:
2. Hot water coils are located below UV casework. Piping is in good condition.
DDC/Pneumatic
30 ±
Hot Water Coil
1965Installation Date:
Insert Key Plan or
Additional Image
Original Classrooms (Cont.)Forced Air "Unit Vent"
Classroom Terminal Units
General Notes:
Heating:
Quantity:
Controls:
Type:Location:
Replacement Cost:
Overall Condition:
Primary Air Source:
Ductwork:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 256/560
Insert Key Plan or
Additional Image
(6) HydroTherm KN-30Hot Water Condensing
Good
$500,000.00
With proper maintenance, the hot water plant will
not need to be replaced for >20 years. System and
controls are designed to consume minimum
amounts of natural gas and electrical energy.
Image Legend:
>92%
2011
DDC
Good
Hot Water Plant
Controls:
Installation Date:
Thermal Efficiency:
Type:Boilers:
Overall Condition:
1. Condensing boilers and DDC controls operate at high levels of efficiency.
2. Modern hydronic design focuses on proper insulation, air control, and pump efficiency tominimize energy loss.
Pumps:
Insert Image Insert Image
(2) New Primary Pumps
ABB Drives
General Notes:
Replacement Cost:
Overall Condition:
Controls:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 257/560
Image Legend:
Insert Key Plan or
Additional Image
(6) HydroTherm KN-30 (Cont.)Hot Water Condensing
Hot Water Plant
General Notes:
Controls:
Installation Date:
Thermal Efficiency:
Type:Boilers:
Replacement Cost:
Overall Condition:
Controls:
Pumps:
Insert Image Insert Image
>92%
2011
DDC
Good
(2) New Primary Pumps
ABB Drives
Good
$500,000.00
With proper maintenance, the hot water plant will
not need to be replaced for >20 years. System and
controls are designed to consume minimum
amounts of natural gas and electrical energy.
1. Recently installed pumps draw heating return water through the condensing boilers.
2. VSD's vary the speed at which these heating pumps operate.3. Coalescing air separator removes unwanted dirt and air from the heating water loop.
Overall Condition:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 258/560
Insert Key Plan or
Additional Image
All ElectricAnsul Wet Chemical
$75,000.00 - $100,000.00*
Kitchen appliances and equipment appear to be in
acceptable condition. Supply piping under
counters/casework is corroded and in poor
condition.
Hot Water Heater
Original Galv/Copper
Fair
Kitchen
Overall Condition:
Supply Plumbing:
Sanitization:
Fire Suppression:Appliances:
Insert Image Insert Image
General Notes:
Replacement Cost:
Image Legend:
1. Supply piping from tunnels is original to many of the kitchen appliances. Piping should be
repaired as leaks occur.2. Loop vent to island fixture is again. Rust is visible around floor penetrations.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 259/560
Insert Image Insert Image
DDC/Pneumatic
1965
Ductwork, Tunnels/Pipe
PoorOverall Condition:
$700,000.00*
It is recommended that all original air handlers be
removed replaced with combinations of unit
ventilators, AHU's, and AHU/VAV systems and new
insulated sheet metal.
1. The pneumatic actuators are beyond service life. A new AHU/VAV system with DDC controls
would increase control and energy efficiency.
3. AHU's utilize tunnels and plenums for supply and return. Current board of health requirements
Insert Key Plan or
Additional Image
Tunnels, Mech. RoomsMultizone
Original Air Handlers
General Notes:
Conveyance:
Installation Date:
Controls:
Type:Location:
Replacement Cost:
for education require ducted supply/return for new systems.
Image Legend:
2. Supply ductwork is mostly uninsulated and not sealed, which results in energy loss.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 260/560
Insert Image Insert Image
DDC/Pneumatic
1965
Ductwork, Tunnels/Pipe
PoorOverall Condition:
$700,000.00*
It is recommended that all original air handlers be
removed replaced with combinations of unit
ventilators, AHU's, and AHU/VAV systems and new
insulated sheet metal.
1. The pneumatic actuators are beyond service life. A new AHU/VAV system with DDC controls
would increase control and energy efficiency.
3. Manual dampers should be replaced with automated DDC controls and actuators (AHU/VAV
Insert Key Plan or
Additional Image
Tunnels, Mech. Rooms (Cont.)Multizone
Original Air Handlers
General Notes:
Conveyance:
Installation Date:
Controls:
Type:Location:
Replacement Cost:
system) to decrease maintenance and increase efficiency.
Image Legend:
2. Supply ductwork is mostly uninsulated and not sealed, which results in energy loss.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 261/560
Overall Condition: Poor
Hot and Chilled Water
Installation Date:Location:
Type:
Insert Image Insert Image
$300,000.00 - $500,000.00*
The mechanical piping is mostly original, and a lack
of complete insulation has lead to areas of severe
corrosion. It is recommended that all original
mechanical piping be replaced.
1. Incomplete insulation has resulted in pipe corrosion and rust.
2. Insulation does not extend through wall penetrations, leading to condensation and rust.3. Mold growth on insulation likely due to improper insulation.
Replacement Cost:
Image Legend:
Insert Key Plan or
Additional Image
Tunnels, Mech. RoomsOriginal
Original Mechanical Piping
General Notes:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 262/560
Overall Condition: Poor
Hot and Chilled Water
Installation Date:
Image Legend:
Insert Image Insert Image
$300,000.00 - $500,000.00*
1. Incomplete insulation has resulted in pipe corrosion and rust.
2. Insulation does not extend through wall penetrations, leading to condensation and rust.3. Mold growth on insulation likely due to improper insulation.
Replacement Cost:
The mechanical piping is mostly original, and a lack
of complete insulation has lead to areas of severe
corrosion. It is recommended that all original
mechanical piping be replaced.
Insert Key Plan or
Additional Image
Tunnels, Mech. Rooms (Cont.)Original
Original Mechanical Piping
General Notes:
Type:
Location:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 263/560
Insert Image Insert Image
1965 and Newer
Fair
Non-ADA Compliant
3.5 Gal/Flush
1965 and Newer
Valve Flow Rates:
$400,000.00 - $500,000.00*
The plumbing fixtures are in fair condition but will
need to be brought up to current standards for
accessibility and water flow rates when they are
replaced. Galvanized piping will eventually need to
be replaced to reduce leaks.
1. Galvanized pipes are susceptible to scale build-up and corrosion and can decrease water flow and
pressure.
FairInsert Key Plan or
Additional Image
Original BuildingOriginal Copper/Galv
Original Plumbing
General Notes:
Plumbing Fixtures:
Overall Condition:
Installation Date:
Piping Material:Location:
Replacement Cost:
Overall Condition:
Installation Date:
Image Legend:
2. Cold water piping should be insulated to prevent corrosion due to condensation.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 264/560
Insert Image Insert Image
1965 and Newer
Fair
Non-ADA Compliant
3.5 Gal/Flush
1965 and Newer
FairOverall Condition:
Installation Date:
valves. Replacing fixtures will decrease overall water consumption and cost.
Insert Key Plan or
Additional Image
Original Building (Cont.)Original Copper/Galv
Original Plumbing
General Notes:
Plumbing Fixtures:
Overall Condition:
Installation Date:
$400,000.00 - $500,000.00*
The plumbing fixtures are in fair condition but will
need to be brought up to current standards for
accessibility and water flow rates when they are
replaced. Galvanized piping will eventually need to
be replaced to reduce leaks.
Valve Flow Rates:
Piping Material:Location:
Replacement Cost:
Image Legend:
1. Many plumbing fixtures do not meet current ADA requirements and should be updated when
replaced.2. Restroom flush valves are generally high flow and consume more water than modern fixtures and
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 265/560
Overall Condition: Poor
1965 and Newer
Type:Location:
Installation Date:
Insert Image Insert Image
$75,000.00*
It is recommended that rooftop equipment be
removed, replaced, and consolidated as roofs are
repaired to minimize maintenance and roof
penetrations.
1. Active and inactive rooftop ventilation equipment
2. Typical service life for rooftop ventilators is 15-20 years.
Replacement Cost:
Image Legend:
Insert Key Plan or
Additional Image
Original Roof Gravity and Powered
Rooftop Ventilation Equipment
General Notes:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 266/560
Overall Condition: Poor
1965 and Newer
Type:Location:
Installation Date:
Insert Image Insert Image
$75,000.00*
It is recommended that rooftop equipment be
removed, replaced, and consolidated as roofs are
repaired to minimize maintenance and roof
penetrations.
1. Active and inactive rooftop ventilation equipment
2. Typical service life for rooftop ventilators is 15-20 years.
Replacement Cost:
Image Legend:
Insert Key Plan or
Additional Image
Original Roof (Cont.)Gravity and Powered
Rooftop Ventilation Equipment
General Notes:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 267/560
the original air handlers.
Image Legend:
1. JACE control board serves as the computer for building HVAC equipment. Board sends and receives
digital and analogue control signals to/from various sensors and actuators.2. Original pneumatic actuators have been retro-fitted with newer Honeywell controls to operate
Insert Key Plan or
Additional Image
JACENiagara AX
Thermostats & Controls
General Notes:
Overall Condition:
Life Expectancy:
Thermostats:
Operating System:
Newer JACE board operates DDC system through
Niagara AX framework. Newer valves and actuators
receive digital signals from JACE board to control
existing building HVAC equipment.
Insert Image Insert Image
Honeywell Sensors
15 Years
Fair
$250,000.00 - $300,000.00*
Control Board:
Replacement Cost:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 268/560
Insert Key Plan or
Additional Image
StrandCD 80 Supervisor
20 x 2 = 40
15 Years
Poor
Auditorium - Theatrical Lighting
Condition:
Approx. Age:
Dimmer Modules:
Model:Stage Lighting:
2. Existing stage lighting that was installed prior to the current dimming system. There are a fewtheatrical fixtures that are older than the current dimming system and may need to be
Insert Image Insert Image
General Notes:
New Dimming System:
Rebuild Dimming System:
replaced soon.
3. Dimming system rack installed on mezzanine platform above stage.
Image Legend:
$35,000.00 - $50,000.00*
$125,000.00*
The stage lighting is approximately 15 years in age.
The life expectancy is 10-15 years on a dimming
system. As the system gets older, parts will be
harder to obtain. A possible rebuild of the dimming
system could save money over a complete
replacement.
1. Existing theatrical lighting board controller. Was installed with dimming system.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 269/560
Insert Key Plan or
Additional Image
Incandescent Dimmingand Fluorescent
Poor
Auditorium - House Lighting
Condition:
House Lighting:
2. Existing house lighting consists of incandescent cans and fluorescent strip fixtures. Fluorescent
fixtures are mounted in the ceiling on the side of the bulk head.
Insert Image Insert Image
LED Retrofit Cans
General Notes:
Replacement Cost:
Replacement:
Image Legend:
with Dimming.
$100,000.00*
The house lighting system is original. The dimming
panel for the house lighting is original and well past
its end of life. A new system would consist of
dimmable LED cans. The system would be tied into
the existing theatrical dimming system.
1. Existing house lighting dimmer rack. Original to building.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 270/560
floor instead of the upstairs control booth. This is actually a better location for operating a sound
board and gives the operator the ability to hear what the audience is hearing.
QSC Amplifiers
Good
Fair
Insert Image Intentionally LeftBlank
$45,000.00*
The sound systems seems to have been either
installed or upgraded in the last 5 - 10 years. While
doing our field investigation there appeared to be a
short in either the microphone cord being tested or
the snake connection between the stage and sound
board.
1. Three sound reinforcement speakers hanging from the ceiling. There are two subwoofers located
in the left and right wings of the auditorium.
2. Floor monitor speakers for sound reinforcement for performers.
3. Location of Allen Heath Sound Board. Sound board is located in the rear of the auditorium on the
Image Legend:
Insert Key Plan or
Additional Image
Allen HeathGood
Auditorium - Sound System
General Notes:
Cabling Condition:
Condition:
Amplifiers:
Condition:Sound Board:
Replacement Cost:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 271/560
4. Football field is located to the east of the High School.
5. The baseball field is located to the east of the middle school. At this time there wouldn't be a need
for sports lighting at the baseball field due to Indiana observing daylights saving.
Image Legend:
1. MUSCO Sports Lighting heads. Recently installed at the football field.
2. Existing wood poles reused for new MUSCO Sports Lighting at the football field.
3. New 120/240V panel and electrical service for MUSCO Sports Lighting.
Insert Key Plan or
Additional Image
MUSCO Sports LightingGood
In the last few years a new MUSCO sports lighting
package was installed at the football field. The
existing wood poles were reused. A new 120/240V
service was installed just to provide power for the
football field lighting.
Football Field:
Replacement Cost:
Condition:
Insert Image Insert Image
No Sports Lighting
N/A
Athletic Field Lighting
General Notes:
Condition:
Baseball Field:
$0.00*
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 272/560
** Retrofitted LED exit signs should be replaced.
*** There is not any exterior egress lighting as required by current code.
Image Legend:
1. Existing Onan 30 KW natural gas generator.
2. Emergency generator is located on the mezzanine above the boiler room.
Insert Key Plan or
Additional Image
Onan30 KW
The generator is currently exercised once a month
by maintenance personnel. The transfer from
normal power to emergency power is a manual
operation.
Condition:
Generator:
Replacement Cost:
Overall Condition:
Meets Current Code:
Size:
Insert Image Intentionally LeftBlank
Natural Gas
Poor
New And Retrofitted LED
Poor **
Failed ***
Failed
Emergency Power System
General Notes:
Exit Signs:
Condition:
Fuel:
$50,000.00*
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 273/560
Image Legend:
1. High pressure sodium pole mounted light fixtures for parking lot and drive.
2. High pressure sodium ground lights to illuminate the exterior of the building.
3. Incandescent canopy light controlled by wall switch in school.
LED Building:
LED Parking Lot:Insert Key Plan or
Additional Image
High Pressure SodiumFair
Exterior Lighting
General Notes:
Canopy Lighting:
Condition:
Parking lot lighting is in fair condition. Building lights
should be replace with newer more energy efficient
fixtures and rewired through the building to reduce
the amount of surface conduit on the exterior of the
building.
Insert Image Insert Image
High Pressure Sodium
Fair
Incandescent
Poor
$60,000.00*
$25,000.00*
Condition:
Building Lighting:
$12,000.00*
Condition:
Site Lighting:
LED Canopy:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 274/560
Insert Image Insert Image
Fluorescent **
Fair
Fluorescent **
Fair
$150,000.00*
$40,000*
Insert Key Plan or
Additional Image
Open A-LampFailed
Interior Lighting
General Notes:
Hall Lighting:
Condition:
Classroom Lighting:
$120,000.00*
Adding occupancy sensors to the building would
provide energy savings. Changing gym lighting to
fluorescent would allow for energy savings and also
almost instant on performance. Incandescent
fixtures should be removed and/or replaced.
Condition:
Condition:Mechanical Lighting:
Change Ballast:
Occupancy Sensors:
Fluorescent Fixture:
to fluorescent fixtures. For safety and energy efficiency open a-lamp fixtures should be replaced
with fluorescent fixtures.
4. Occupancy sensors should be added to classrooms, offices, corridors, and restrooms.
** The ballasts in the fluorescent fixtures would need to be changed to Program Start for Occupancy Sensors.
Image Legend:
1. Metal halide fixtures in the gym. High bay fluorescence can be installed to provide energy savings.
2. Fluorescent lighting installed in corridors with out occupancy sensors.
3. Incandescent fixture installed in some mechanical spaces. Some areas have been converted
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 275/560
Insert Image Insert Image
New/Existing
Fair
New/Existing
Fair
Failed **
Condition:
Fair
$8,000.00 - $13,000.00*
Need visuals in the classrooms and public spaces.
Pull stations in the building do not meet current ADA
guidelines for access.
1. Existing fire alarm smoke detector. Smoke detectors should be replaced as they fail.
2. Existing fire alarm pull station.
Insert Key Plan or
Additional Image
Simplex 4100UGood
Fire Alarm System
General Notes:
Cabling:
Condition:
Devices:
Condition:Head End:
Fix ADA Issue:
Overall Condition:
Meets Current ADA:
** Fire Alarm pull stations do not meet current ADA code.
Image Legend:
3. New fire alarm strobe unit.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 276/560
Insert Image Insert Image
Square D
Poor
Square D
Good
Fair
Insert Key Plan or
Additional Image
277/480V Three Phase2000 A
Power Distribution
General Notes:
New Panels:
Condition:
Original Panels:
$50,000.00 - $60,000.00*
Condition:
Electrical Service:
Replacement Cost:
Overall Condition:
Size:
The original electrical gear and panels are obsolete
and getting circuit breakers will continue to become
a harder task. A full replacement of the original
electrical gear and panels should be done in the next
few years.
1. Main distribution panel has been rebuilt with new circuit breakers.
2. Existing obsolete 277/480V electrical panel. Spare parts including circuit breakers will become
even harder to find in the near future.
3. Main distribution is in the boiler room.
4. New Square D 120/208V electrical panels have been installed throughout the school to provide
power for computer labs and computers in the classrooms.
Image Legend:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 277/560
battery powered.
Insert Key Plan or
Additional Image
Bogen BCMA WirelessBogen 16" Clocks
Master Clock System
General Notes:
Condition:
Classroom Clocks:
Condition:
Insert Image
Image Legend:
Insert Image
electrical tape.
2. New Bogen wireless clocks installed in corridor with built in receiver and repeater. Clocks are
$30,000.00 - $40,000.00*
Clocks in the corridors are Bogen 16" double sided.
Clocks in the classroom are battery powered
standalone clocks without master synchronization.
In a high school environment synchronized clocks
are recommended.
1. Remove old 120V wiring behind clocks in classrooms. Wires are spliced together using
New Clocks:
Good
Battery Standalone
Poor
Electrical HazardClassroom Back Box:
Corridor Clocks:Head End:
Condition: Failed
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 278/560
Insert Key Plan or
Additional Image
Bogen Multicom 2000Good
New/Existing
Fair
Existing
Fair
Paging / Intercom System
Cabling:
Condition:
Speakers/Push to Call:
Condition:Head End:
between the office and the classroom.
2. New Bogen Paging System installed the end of 2011.
Insert Image Insert Image
General Notes:
Replacement Cost:
Overall Condition:
3. Ceiling mounted speaker reused from previous paging system. Speakers are in fair condition and
would only need to be replaced if they fail.
4. Paging head end is installed in the front office.
Image Legend:
Condition:
Fair
$0.00*
A new paging head end with amplifier was installed
at the end of 2011. Existing speakers and cabling
were reused. There are push to call buttons.
1. Main paging telephone installed with new paging system. Telephone provided two way
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 279/560
Insert Image Intentionally LeftBlank
PremiSys
Insert Key Plan or
Additional Image
N/AIdentiCard
Security Access Control
General Notes:
System:
$25,000.00 - $30,000.00*
Type:
Installation Cost:
Manufacture:
A security access control system can be added to the
school with some modifications to the door
hardware for door strike release installation. A
complete rekey of the exterior doors should be done
as people with keys could bypass the card access
system.
1. Potential locations for card access door releases.
2. Example of card access readers.
* Rekey of exterior doors is not included in this number.
Image Legend:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 280/560
Image Legend:
Insert Key Plan or
Additional Image
IP Digital Cameras
Cisco
Security Cameras
General Notes:
Condition:
Head End:
Condition:
Manufacture:
Type:
Replacement Cost:
Insert Image Insert Image
Poor
Cisco
Poor
$150,000.00 - 200,000.00
The CCTV head end is CISCO. Support for this system
is hard to find. CISCO cameras are from their
residential line. It is recommended to switch to
another CCTV system that is compatible with more
cameras and that has support readily available.
1. Interior dome POE camera.
2. Exterior wall mount camera with exterior weather housing.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 281/560
4. Power cord entering into plenum space. Code violation.
Image Legend:
1. New category 6 patch panels. Category 6 cabling is the current installed cabling standard.
2. New Cisco wireless access points.
3. Epson ceiling mounted projectors.
Overall Condition:
Telephones:
Projector Power: Insert Key Plan or
Additional Image
Category 6Good
Technology
General Notes:
Wireless:
Condition:
Cabling is new and was installed within the last 2
years. Projectors and wireless are new and in good
condition. Power to projectors are fed using an
extension cord ran above the ceiling. This is a code
violation. To add a receptacle at the projector would
be approx $150 per location.
Insert Image Insert Image
Epson Ceiling Mount
Good
Cisco POE
Good
Failed
VOIP
Good
Condition:
Projectors:
$6,000.00 - $10,000.00*
Condition:
Data:
Replacement Cost:
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 282/560
Insert Image Insert Image
2. Major cracking has been filled with sealant to prevent further deterioration. Continued maintenancewill help prolong the life expectancy of the asphalt.
3. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Sidewalk
Replacement Cost: $100,000.00-$125,000.00*
Total Paving
Replacement Cost: $1,650,000.00-$1,850,000.00*
General Notes:Recommended to install parking stalls for
employees cars and continued maintenance and
sealing of asphalt to maintain its life expectancy.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: AsphaltParking Condition Poor
Driveway Condition: Fair
Bus Parking Condition: Fair
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 283/560
Insert Image Insert Image
2. Major cracking has been filled with sealant to prevent further deterioration. Continued maintenancewill help prolong the life expectancy of the asphalt.
3. Asphalt is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
4. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Sidewalk
Replacement Cost: $100,000.00-$125,000.00*
Total Paving
Replacement Cost: $1,650,000.00-$1,850,000.00*
General Notes:Recommended to replace and repair sidewalk that
is pitted and excessively deteriorated, properly
edge all sidewalk and asphalt to prolong its life
expectancy, and installation of ADA compliant ramp
for visitors.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Poor
Driveway Condition: Fair
Bus Parking Condition: Fair
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 284/560
Insert Image Insert Image
2. Major cracking has been filled with sealant to prevent further deterioration. Continued maintenancewill help prolong the life expectancy of the asphalt.
3. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
4. Concrete curb is showing signs of aging and deterioration.
5. Sidewalk ramps do not meet ADA requirements and should be updated when replaced.
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Sidewalk
Replacement Cost: $100,000.00-$125,000.00*
Total Paving
Replacement Cost: $1,650,000.00-$1,850,000.00*
General Notes:Recommended to replace and repair sidewalk that
is pitted and excessively deteriorated and properly
edge all sidewalk and asphalt to prolong its life
expectancy.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Poor
Driveway Condition: Fair
Bus Parking Condition: Fair
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 285/560
Insert Image Insert Image
2. Major cracking has been filled with sealant to prevent further deterioration. Continued maintenancewill help prolong the life expectancy of the asphalt.
3. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
4. Concrete curb is showing signs of aging and deterioration.
5. Sidewalk ramps do not meet ADA requirements and should be updated when replaced.
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Sidewalk
Replacement Cost: $100,000.00-$125,000.00*
Total Paving
Replacement Cost: $1,650,000.00-$1,850,000.00*
General Notes:Recommended to replace and repair sidewalk that
is pitted and excessively deteriorated and properly
edge all sidewalk and asphalt to prolong its life
expectancy.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Poor
Driveway Condition: Fair
Bus Parking Condition: Fair
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 286/560
Insert Image Insert Image
cracking and pitting.2. Proper edging around sidewalks may prolong its life expectancy.
3. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
4. Concrete curb is showing signs of aging and deterioration.
1. Ponding on the surface is a sign of improper grading and installation that may cause additional
Total Sidewalk
Replacement Cost: $100,000.00-$125,000.00*
Total Paving
Replacement Cost: $1,650,000.00-$1,850,000.00*
General Notes:Recommended to clean, prime and paint fence
posts and supports to prolong its life expectancy,
replace and repair sidewalk that is pitted and
excessively deteriorated, and properly edge all
sidewalk and asphalt to prolong its life expectancy.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Poor
Driveway Condition: Fair
Bus Parking Condition: Fair
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 287/560
Insert Image Insert Image
2. Proper edging around sidewalks may prolong its life expectancy.3. Concrete curb is showing signs of aging and deterioration.
4. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
5. Press boxes are showing signs of aging and need to be equipped with handrails.
1. Fence posts and supports are showing signs of aging and corrosion.
Total Fence
Replacement Cost: $6,000.00 - $13,000.00*
General Notes:Recommended to clean, prime and paint fence
posts and supports to prolong its life expectancy,
replace and repair sidewalk that is pitted and
excessively deteriorated, and properly edge all
sidewalk and asphalt to prolong its life expectancy.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: AsphaltParking Condition: Poor
Driveway Condition: Fair
Bus Parking Condition: Fair
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 288/560
Insert Image Insert Image
2. Proper edging around sidewalks may prolong its life expectancy.3. Concrete curb is showing signs of aging and deterioration.
4. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
5. Asphalt parking lot is showing the signs of aging and cracking.
1. Fence posts and supports are showing signs of aging and corrosion.
Total Fence
Replacement Cost: $6,000.00 - $13,000.00*
General Notes:Recommended to clean, prime and paint fence
posts and supports to prolong its life expectancy,
replace and repair sidewalk that is pitted and
excessively deteriorated, and properly edge all
sidewalk and asphalt to prolong its life expectancy.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Poor
Driveway Condition: Fair
Bus Parking Condition: Fair
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 289/560
Insert Image Insert Image
2. Football field is in good condition and should continue to be maintained.
3. Scoreboard is in fair condition and should continue to be maintained.
4. Overall the track is in fair condition, however the patches are in poor condition. Areas of heavy traffic
(starting blocks, lane one on the curves, all field events) are in poor to failed condition.
5. Goal posts are in fair condition and should continue to be maintained.
1. Stadium bleachers are in fair condition and are showing signs of aging and corrosion.
Fence: Poor
Location: East of High School
Overall Condition: Fair
Replacement Cost: $25,000.00 - $50,000.00*
General Notes:Recommended to resurface most to all of the track
and field area. Bleachers will need to be
maintained to meet their life expectancy.
Image Legend:
Football / Track
Insert Key Plan or
Additional Image
Football FieldCondition: Good
Track Size: 400 M
Condition: Poor
Field Events Condition: Poor
Stands / Bleachers: Fair
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 290/560
Insert Image Insert Image
2. Football field is in good condition and should continue to be maintained.
3. High jump pad is in poor to failed condition and should be addressed in the near future. Areas of the
high jump pad are bare and are exposing the underlayment.
4. Overall the track is in fair condition, however the patches are in poor condition. Areas of heavy traffic
(starting blocks, lane one on the curves, all field events) are in poor to failed condition.
5. Goal posts are in fair condition and should continue to be maintained.
1. Stadium bleachers are in fair condition and are showing signs of aging and corrosion.
Fence: Poor
Location: East of High School
Overall Condition: Fair
Replacement Cost: $25,000.00 - $50,000.00*
General Notes:Recommended to resurface most to all of the track
and field area. Bleachers will need to be
maintained to meet their life expectancy.
Image Legend:
Football / Track
Insert Key Plan or
Additional Image
Football Field (Cont.)Condition: Good
Track Size: 400 M
Condition: Poor
Field Events Condition: Poor
Stands / Bleachers: Fair
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 291/560
Insert Image Insert Image
2. Heavy use has worn down lane one to the underlayment. Curves and field events need to be
addressed in the near future.
1. Heavy use has worn down lane one on the curves and need to be addressed.
Fence: Poor
Location: East of High School
Overall Condition: Fair
Replacement Cost: $25,000.00 - $50,000.00*
General Notes:Recommended to resurface most to all of the track
and field area. Bleachers will need to be
maintained to meet their life expectancy.
Image Legend:
Football / Track
Insert Key Plan or
Additional Image
Football Field (Cont.)Condition: Good
Track Size: 400 M
Condition: Poor
Field Events Condition: Poor
Stands / Bleachers: Fair
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 292/560
Insert Image Insert Image
2. The second patch is no longer adhering to the surface and is becoming brittle.
3. The pole vault runway has areas of excessive wear and is showing signs of bare underlayment.
1. Track patch is uneven and may become a tripping hazard. Track patches need to be addressed.
Fence: Poor
Location: East of High School
Overall Condition: Fair
Replacement Cost: $25,000.00 - $50,000.00*
General Notes:Recommended to resurface most to all of the track
and field area. Bleachers will need to be
maintained to meet their life expectancy.
Image Legend:
Football / Track
Insert Key Plan or
Additional Image
Football Field (Cont.)Condition: Good
Track Size: 400 M
Condition: Poor
Field Events Condition: Poor
Stands / Bleachers: Fair
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 293/560
Insert Image Insert Image
2. Patches are uneven and have a different texture than the rest of the track. Track patches need to be
addressed.
1. Starting lines see more wear than the rest of the track and need to be regularly maintained.
Fence: Poor
Location: East of High School
Overall Condition: Fair
Replacement Cost: $25,000.00 - $50,000.00*
General Notes:Recommended to resurface most to all of the track
and field area. Bleachers will need to be
maintained to meet their life expectancy.
Image Legend:
Football / Track
Insert Key Plan or
Additional Image
Football Field (Cont.)Condition: Good
Track Size: 400 M
Condition: Poor
Field Events Condition: Poor
Stands / Bleachers: Fair
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 294/560
Insert Image Insert Image
2. Patch has not been painted to match the rest of the running lane and need to be addressed.
3. Patch has loose material and peels off when running across. The track patch needs to be addressed.
1. Track patch is uneven and made of a have a different texture than the rest of the track.
Fence: Poor
Location: East of High School
Overall Condition: Fair
Replacement Cost: $25,000.00 - $50,000.00*
General Notes:Recommended to resurface most to all of the track
and field area. Bleachers will need to be
maintained to meet their life expectancy.
Image Legend:
Football / Track
Insert Key Plan or
Additional Image
Football Field (Cont.)Condition: Good
Track Size: 400 M
Condition: Poor
Field Events Condition: Poor
Stands / Bleachers: Fair
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 295/560
Football / Track
Insert Key Plan or
Additional Image
Football Field (Cont.)Condition: Good
Track Size: 400 M
Condition: Poor
Field Events Condition: Poor
Stands / Bleachers: Fair
1. Storage shed and ticket booth is showing signs of aging.
Fence: Poor
Location: East of High School
Overall Condition: Fair
Replacement Cost: $7,000.00 - $15,000.00*
General Notes:Recommended to renovate fan entry to include
signage / way finding and new entry ticket booth.
Image Legend:
Insert Image Insert Image
2. Fan entry is showing signs of aging and is underwhelming.
3. Entry signage is missing and should be added to improve way finding.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 296/560
Baseball / Softball Field
Insert Key Plan or
Additional Image
Baseball / SoftballField Condition: Good
Dugouts Conditions: Poor
Restroom / Press Box: Failed
Stands / Bleachers: Poor
Fence: Poor
1. Baseball / softball field is in good condition and should continued to be maintained.
Location: East of Middle School
Overall Condition: Fair
Total Field and Stands
Replacement Cost: $10,000.00 - $20,000.00*
General Notes:Recommended to address rusted fence, dugouts,
and press box. The home and away dugout rafters
and roof need to be addressed. The restrooms
below the press box are in failed condition and do
not meet ADA Codes.
Image Legend:
Insert Image Insert Image
2. Both dugouts are in poor condition and will need to be addressed in the near future.
3. The score box / restrooms are in failed condition and need to be addressed.
4. The bleachers / stands are in good condition and were recently replaced.
5. The baseball / softball fence is in poor condition and should be addressed in the near future.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 297/560
Baseball / Softball Field
Insert Key Plan or
Additional Image
Baseball / Softball (Cont.)Field Condition: Good
Dugouts Conditions: Poor
Restroom / Press Box: Failed
Stands / Bleachers: Poor
Fence: Poor
1. Dugout entry frame is sloped and needs to be addressed.
Location: East of Middle School
Overall Condition: Fair
Total Field and Stands
Replacement Cost: $10,000.00 - $20,000.00*
General Notes:Recommended to address rusted fence, dugouts,
and press box. The home and away dugout rafters
and roof need to be addressed. The restrooms
below the press box are in failed condition and do
not meet ADA Codes.
Image Legend:
Insert Image Insert Image
2. Dugout is showings signs of aging and paint is fading.
3. Masonry is showing signs of aging and water damage.
4. Shingled roof is lower than the manufacturers lowest suggests. (3:12)
5. The baseball / softball fence is in poor condition and should be addressed in the near future.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 298/560
Baseball / Softball Field
Insert Key Plan or
Additional Image
Baseball / Softball (Cont.)Field Condition: Good
Dugouts Conditions: Poor
Restroom / Press Box: Failed
Stands / Bleachers: Poor
Fence: Poor
1. Dugout rafters are showing signs of aging and water damage and needs to be addressed.
Location: East of Middle School
Overall Condition: Fair
Total Field and Stands
Replacement Cost: $10,000.00 - $20,000.00*
General Notes:Recommended to address rusted fence, dugouts,
and press box. The home and away dugout rafters
and roof need to be addressed. The restrooms
below the press box are in failed condition and do
not meet ADA Codes.
Image Legend:
Insert Image Insert Image
2. Concrete floor appears to be in good conditions and needs to be maintained.
3. Masonry is showing signs of aging and water damage.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 299/560
Baseball / Softball Field
Insert Key Plan or
Additional Image
Baseball / Softball (Cont.)Field Condition: Good
Dugouts Conditions: Poor
Restroom / Press Box: Failed
Stands / Bleachers: Poor
Fence: Poor
1. The baseball / softball fence is in poor condition and should be addressed in the near future.
Location: East of Middle School
Overall Condition: Fair
Total Field and Stands
Replacement Cost: $10,000.00 - $20,000.00*
General Notes:Recommended to address rusted fence, dugouts,
and press box. The home and away dugout rafters
and roof need to be addressed. The restrooms
below the press box are in failed condition and do
not meet ADA Codes.
Image Legend:
Insert Image Insert Image
2. Baseball / softball field is in good condition and should continued to be maintained.
3. Scoreboard is in good condition. In the future a new LED scoreboard may be needed.
4. The bleachers / stands are in good condition and were recently replaced.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 300/560
Baseball / Softball Field
Insert Key Plan or
Additional Image
Baseball / SoftballField Condition: Good
Dugouts Conditions: Poor
Restroom / Press Box: Failed
Stands / Bleachers: Poor
Fence: Poor
1. The baseball / softball fence is in poor condition and should be addressed in the near future.
Location: East of Middle School
Overall Condition: Fair
Total Restroom
Replacement Cost: $20,000.00 - $30,000.00*
General Notes:Recommended to address rusted fence, dugouts,
and press box. The home and away dugout rafters
and roof need to be addressed. The restrooms
below the press box are in failed condition and do
not meet ADA Codes.
Image Legend:
Insert Image Insert Image
2. Baseball / softball field is in good condition and should continued to be maintained.
3. The score box / restrooms are in failed condition and need to be addressed.
4. Concrete pathway is showings signs of aging and cracking.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 301/560
Baseball / Softball Field
Insert Key Plan or
Additional Image
Baseball / Softball (Cont.)Field Condition: Good
Dugouts Conditions: Poor
Restroom / Press Box: Failed
Stands / Bleachers: Poor
Fence: Poor
1. These plumbing fixtures do not meet ADA requirement and should be updated when replaced.
Location: East of Middle School
Overall Condition: Fair
Total Restroom
Replacement Cost: $20,000.00 - $30,000.00*
General Notes:Recommended to renovate / replace the score box
/ restroom facility to comply with present codes.
Image Legend:
Insert Image Insert Image
2. Restroom sizes do not meet ADA requirements and should be addressed when updated.
3. Restroom is not installed with ADA grab rails and rails should be installed when updated.
4. Paint is peeling and should be addressed when updated.
4. The bleachers / stands are in good condition and were recently replaced.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 302/560
Tennis Court
Insert Key Plan or
Additional Image
Overall Tennis CourtCondition: Good
Net Conditions: Good
Fence Condition: Good
Number of Courts: 6
Location: South of High School
1. Perimeter fence is in good condition and has been recently replaced.
Overall Condition: Good
Replacement Cost: $80,000.00 - $100,000.00*
General Notes:Recommended to clean and maintain Tennis Court
and equipment.
Image Legend:
Insert Image Insert Image
2. Tennis court is in good condition and is beginning to show wear.
3. Tennis nets and posts are in good condition and regular maintenance should continue.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 303/560
Tennis Court
Insert Key Plan or
Additional Image
Overall Tennis Court (Cont.)Condition: Good
Net Conditions: Good
Fence Condition: Good
Number of Courts: 6
Location: South of High School
1. Minor cracking has begun to appear in court surface.
Overall Condition: Good
Replacement Cost: $80,000.00 - $100,000.00*
General Notes:Recommended to clean and maintain Tennis Court
and equipment.
Image Legend:
Insert Image Insert Image
2. Significant cracking has begun to appear the expansion joints in-between courts.
3. Tennis nets and posts are in good condition and regular maintenance should continue.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 304/560
Tennis Court
Insert Key Plan or
Additional Image
Overall Tennis Court (Cont.)Condition: Good
Net Conditions: Good
Fence Condition: Good
Number of Courts: 6
Location: South of High School
1. Minor cracking has begun to appear in court surface.
Overall Condition: Good
Replacement Cost: $80,000.00 - $100,000.00*
General Notes:Recommended to clean and maintain Tennis Court
and equipment.
Image Legend:
Insert Image Insert Image
2. Significant cracking has begun to appear the expansion joints in-between courts.
3. Tennis nets and posts are in good condition and regular maintenance should continue.
Rochester High School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 305/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 306/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E1 (2 Sets of Doors)Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Good
Door Glazing: Double / Single
Sidelites: N/A
1. Door sweeps are in good condition and need to be maintained.
Vestibule: 8'-0" x 8'-4"
Size: 6'-0" x 7'-0"
Overall Condition: Good
Replacement Cost: $8,500.00*
General Notes:Recommended to add door sweeps and weather
seals to interior vestibule doors.
Image Legend:
Insert Image Insert Image
2. Door sweeps and weather stripping are missing.3. Double-pane glass, when properly sealed, will prevent air infiltration.
4. Aluminum door and frame are in good condition.
5. Single pane glass is allowing vestibule temperature to influence the interior.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 307/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E2 (2 Sets of Doors)Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Good
Door Glazing: Double / Single
Sidelites: N/A
1. Door sweeps are in good condition and need to be maintained.
Vestibule: 8'-0" x 8'-6"
Size: 6'-0" x 7'-0"
Overall Condition: Good
Replacement Cost: $8,500.00*
General Notes:Recommended to add door sweeps and weather
seals to interior vestibule doors.
Image Legend:
Insert Image Insert Image
2. Door sweeps and weather stripping are missing.3. Double pane glass, when sealed properly, will prevent air infiltration.
4. Aluminum door and frame are in good condition.
5. Single pane glass is allowing vestibule temperature to influence the interior.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 308/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W3 (2 Sets of Doors)Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Good
Door Glazing: Double / Single
Sidelites: N/A
1. Door sweeps are in good condition and need to be maintained.
Vestibule: 7'-1" x 8'-0"
Size: 6'-0" x 7'-0"
Overall Condition: Good
Replacement Cost: $8,500.00*
General Notes:Recommended to add door sweeps and weather
seals to interior vestibule doors.
Image Legend:
Insert Image Insert Image
2. Door sweeps and weather stripping are missing.3. Double pane glass, when sealed properly, will prevent air infiltration.
4. Aluminum door and frame are in good condition.
5. Single pane glass is allowing vestibule temperature to influence the interior.
6. Entry lock was not working properly.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 309/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W4 (2 Sets of Doors)Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Good
Door Glazing: Double / Single
Sidelites: N/A
1. Door sweeps are in good condition and need to be maintained.
Vestibule: 7'-0" x 7'-10-3/4"
Size: 6'-0" x 7'-0"
Overall Condition: Good
Replacement Cost: $8,500.00*
General Notes:Recommended to add door sweeps and weather
seals to interior vestibule doors.
Image Legend:
Insert Image Insert Image
2. Door sweeps and weather stripping are missing.3. Double pane glass, when sealed properly, will prevent air infiltration.
4. Aluminum door and frame are in good condition.
5. Single pane glass is allowing vestibule temperature to influence the interior.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 310/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W4Door Material: Hollow Metal
Weather Stripping: Good
Door Closers: Good
Door Glazing: N/A
Sidelites: N/A
1. Door sweeps are in good condition and need to be maintained.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Good
Replacement Cost: $4,500.00*
General Notes:Recommended to maintain a consistent cleaning
and maintenance program to prolong the doors life
expectancy.
Image Legend:
Insert Image Insert Image
2. Hollow metal door is in good condition and are aging appropriately.3. Hollow metal door frame is in good condition and are aging appropriately.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 311/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N6Door Material: Aluminum
Weather Stripping: Good
Door Closers: Good
Door Glazing: Double-Pane
Sidelites: Double-Pane
1. Door sweeps are in good condition and needs to be maintained.
Vestibule: N/A
Size: 5'-0" x 7'-0"
Overall Condition: Good
Replacement Cost: $4,000.00*
General Notes:Recommended to add door sweeps and weather
seals to interior vestibule doors.
Image Legend:
Insert Image Insert Image
2. Aluminum door is in good condition and is aging appropriately.3. Double pane glass, when sealed properly, will prevent air infiltration.
4. Aluminum door frame is in good condition and is aging appropriately.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 312/560
Insert Image Insert Image
envelope.2. Insulation behind concrete decorative detail is exposed and may cause damage to the building insulation.
3. Recaulk and seal all joints around windows to prevent moisture from penetrating building envelope.
1. Concrete decorative detail joint has broken and may be allowing water to penetrate the building
Soffit / Canopy: Good
Overall Condition: Good
Replacement Cost: $5,000.00 - $10,000.00*
General Notes:Recommended to maintain consistent caulking and
sealants throughout the building envelope to
prevent moisture penetration.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingSiding: Good
Cladding: Good
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Fair
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 313/560
Insert Image Insert Image
envelope.2. Insulation behind concrete decorative detail is exposed and may cause damage to the building
insulation.
1. Concrete decorative detail joint has broken and may be allowing water to penetrate the building
Soffit / Canopy: Good
Overall Condition: Good
Replacement Cost: $5,000.00 - $10,000.00*
General Notes:Recommended to maintain consistent caulking and
sealants throughout the building envelope to
prevent moisture penetration.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Siding: Good
Cladding: Good
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Fair
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 314/560
Insert Image Insert Image
envelope.2. Flashing has fallen off the building and onto the ground. Reinstall and secure all flashing to the building.
3. Sealant is missing or worn and may be allowing water to penetrate the building system.
1. Concrete decorative detail joint has broken and may be allowing water to penetrate the building
Soffit / Canopy: Good
Overall Condition: Good
Replacement Cost: $5,000.00 - $10,000.00*
General Notes:Recommended to maintain consistent caulking and
sealants throughout the building envelope to
prevent moisture penetration.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Siding: Good
Cladding: Good
Flashing / Trim: Fair
Glazing: Good
Caulking / Sealant: Fair
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 315/560
Insert Image Insert Image
2. Ceiling and wall edge have separated.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Carpet appears to be in good condition and should be maintained.
5. Desks appear to be in fair condition. Desks should be cleaned and maintained to extend their life
expectancy.
1. Gypsum ceiling is in good condition and should be maintained.
Overall Condition: Good
tal Painting and Carpet
Replacement Cost: $50,000.00 - $60,000.00*
General Notes:Recommended to clean and maintain the building
in its entirety to extend its life expectancy. In
many of the classrooms the interior walls are
separating from the exterior walls. This issue needs
to be pursued to prevent further damage.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: ClassroomsFlooring: Carpet
Walls: Stud /
Ceiling: Gypsum
Doors: Wood
Fixtures: Good
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 316/560
Insert Image Insert Image
2. Ceiling and wall edge have separated.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Carpet appears to be in good condition and should be maintained.
5. Desks appear to be in fair condition. Desks should be cleaned and maintained to extend their life
expectancy.
1. Gypsum ceiling is in good condition and should be maintained.
Overall Condition: Good
tal Painting and Carpet
Replacement Cost: $50,000.00 - $60,000.00*
General Notes:Recommended to clean and maintain the building
in its entirety to extend its life expectancy. In
many of the classrooms the interior walls are
separating from the exterior walls. This issue needs
to be pursued to prevent further damage.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Classrooms (Cont.)Flooring: Carpet
Walls: Stud /
Ceiling: Gypsum
Doors: Wood
Fixtures: Good
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 317/560
Insert Image Insert Image
2. Ceiling and wall edge have separated and need to be addressed.3. Inner wall and exterior wall have separated and need to be addressed.
1. Gypsum ceiling is in good condition and should be maintained.
Overall Condition: Good
tal Painting and Carpet
Replacement Cost: $50,000.00 - $60,000.00*
General Notes:Recommended to clean and maintain the building
in its entirety to extend its life expectancy. In
many of the classrooms the interior walls are
separating from the exterior walls. This issue needs
to be pursued to prevent further damage.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Classrooms (Cont.)Flooring: Carpet
Walls: Stud /
Ceiling: Gypsum
Doors: Wood
Fixtures: Good
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 318/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: HallwaysFlooring: Carpet
Flooring Condition: Good
Walls: Studs
Ceiling: Gypsum Board
Overall Condition: Good
1. Gypsum ceiling is in good condition and should be maintained.
tal Painting and Carpet
Replacement Cost: $50,000.00 - $60,000.00*
General Notes:Recommended to clean and maintain the building
in its entirety to extend its life expectancy.
Image Legend:
Insert Image Insert Image
2. Carpet appears to be in good condition and should be maintained.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Doors appear to be in good condition and should be maintained.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 319/560
Fan Motors: Supply, Exhaust w/ VFD's
10 Year Core Warranty
Fixed Plate
RenewAire
Good
Manufacturer:
Insert Image Insert Image
$20,000.00 - $30,000.00*
Fixed core ERV's save energy and provide necessary
outside air efficiently while exhausting restroom air.
1. Access panel allows for unit service.
2. Ductwork is well-insulated.
3. ABB drives on both outside air and exhaust air fan motors allow for energy savings and optimum
control of building ventilation.
Image Legend:
Insert Key Plan or
Additional Image
Mechanical Mezzanine (x2)2010
Energy Recovery Ventilators
General Notes:
Type:
Life Expectancy:
Installation Date:Location:
Replacement Cost:
Overall Condition:
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 320/560
Installation Date: 2010
Heat pump terminal units are highly efficient at
heating and cooling when combined with a
geothermal system.
1. Heat pump piping and ductwork is properly insulated and energy efficient.
2. Large mechanical room space will allow for easy replacement of heat pumps.
3. Drain pans capture cooling fluid leaks, unit should be inspected for maintenance.
Replacement Cost:
Mechanical Mezzanine
15 years
GoodOverall Condition:
Heat Pumps:
Insert Image
Image Legend:
Insert Image
Insert Key Plan or
Additional Image
(20) Water CooledWater Furnace
Heat Pumps
General Notes:
Type:
Location:
Manufacturer:
$150,000.00 - $200,000.00*
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 321/560
Lavatories: Undermount
Fixture Carriers: Wall-Hung
Overall Condition: Good
Mens/Womens Restrooms
2010
Image Legend:
Insert Key Plan or
Additional Image
YesIR Sensing / Low Flow
Plumbing Fixtures
Location:
2. Low flow plumbing fixtures decrease overall water consumption and cost.
Faucets and ValvesADA Compliance:
Replacement Cost:
General Notes:
Type:
$15,000.00 - $20,000.00*
New fixtures are in excellent condition and perform
well in terms of water consumption and accessibility.
1. ADA compliant casework allows for greater accessibility
Insert Image Insert Image
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 322/560
Drives: ABB
Insert Key Plan or
Additional Image
Mechanical Room2010
Pumps
General Notes:
Type:
Model:
Installation Date:Location:
Replacement Cost:
Insert Image Insert Image
$15,000.00 - $20,000.00*
Typical life expectancy for inline mounted centrifugal
pumps is around 15 years.
1. Parallel inline pumps circulate a water/glycol mixture through the well field and building heat pump
loop.
2. Piping between ports for this pressure gauge has rusted prematurely.
Image Legend:
B&G 80 BF 9.5
144 GPM Inline Centrifugal
FairOverall Condition:
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 323/560
Newer JACE board operates DDC system through
Niagara AX framework. Newer valves and actuators
receive digital signals from JACE board to control
existing building HVAC equipment.
Insert Key Plan or
Additional Image
JACENiagara AX
Thermostats & Controls
General Notes:
Type:
Thermostats:
Operating System:
Fair
Control Board:
Replacement Cost: $30,000.00 - $50,000.00*
Insert Image
Image Legend:
Insert Image
1. Honeywell sensors report temperature to the JACE control board which commands the heat pumps
in that space to turn on or off.
demand.
2. DDC system uses ABB drives to modulate the pump speed for either more or less flow depending on
Honeywell Sensors
15 years
Overall Condition:
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 324/560
Image Legend:
Insert Key Plan or
Additional Image
NoneNew - Green Signs
Emergency Power System
General Notes:
Condition:
Egress Lighting:
Condition:
Exit Signs:Generator:
Replacement Cost:
Overall Condition:
Insert Image Intentionally LeftBlank
Good
Battery Wall Packs
Good
GoodMeets Current Code:
Good
$0.00*
Emergency power is provided by batteries at this
building. A generator for this building would cost
approximately $50,000.00 - $75,000.00. A generator
may be useful for the district data center located at
the Learning Center. We recommend regular
battery maintenance.
1. Battery wall pack emergency egress lighting.
2. Location of district data center.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 325/560
Insert Image Intentionally LeftBlank
PremiSys
Security Access Control
General Notes:
System:
$15,000.00 - $20,000.00*
Insert Key Plan or
Additional Image
N/AIdentiCard
A security access control system can be added to the
building with some modifications to the door
hardware for door strike release installation. A
complete rekey of the exterior doors should be done
as people with keys could bypass the card access
system.
Type:
Installation Cost:
Manufacture:
* Rekey of exterior doors is not included in this number.
Image Legend:
1. Potential locations for card access door releases.
2. Example of card access readers.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 326/560
Insert Image Insert Image
LED
Good
LED
Good
Photocell / BMS **
Good
$0.00*
All exterior lighting including emergency egress
lighting is provided by LED fixtures. These fixtures
are energy efficient and will most times last longer
than traditional exterior fixtures.
1. Canopy lighting is LED can fixtures.
2. Parking lot lighting is provided by LED pole mounted fixtures.
3. Building lighting is wall mounted LED fixtures.
Condition:
Insert Key Plan or
Additional Image
LED Pole LightingGood
Exterior Lighting
General Notes:
Canopy Lighting:
Condition:
Building Lighting:
Condition:Site Lighting:
Replacement Cost:
Overall Condition:
Controls:
** BMS - Building Management System (Temperature Controls)
Image Legend:
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 327/560
1. Silent Knight fire alarm pull station.
2. Silent Knight fire alarm horn/strobe notification device.
3. Location of Fire Alarm remote annunciator panel in front vestibule.
Meets Current ADA:
Insert Image Intentionally LeftBlank
Good
General Notes:
Replacement Cost:
Overall Condition:
Image Legend:
New
Good
New
Good
Fire Alarm System
Cabling:
Condition:
Devices:
Condition:Fire Alarm System:
Condition:
Insert Key Plan or
Additional Image
Silent KnightGood
Good
$0.00*
Fire Alarm was installed with the building and is
good condition. General preventative maintenance
should be performed according to manufacture's
recommendations.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 328/560
Insert Image Intentionally LeftBlank
Good
New
Good
Paging / Intercom System
General Notes:
Condition:
Cabling:
Condition:
$3,000.00 to $5,000.00*
Insert Key Plan or
Additional Image
N/AAtlas Ceiling Mount
Speakers and cabling were installed when the
building was built. However, a paging system was
not installed. If desired a paging system could be
added relatively easily.
Paging System:
Paging System:
Cost to add
Speakers:
Image Legend:
1. Existing ceiling mounted speakers in classrooms and corridors.
2. Speaker installed in enclosure in attic to protect from insulation contact.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 329/560
1. Fluorescent lighting in classroom spaces. Controlled by occupancy sensor.
2. Fluorescent lighting in hallways. Controlled by wall switch only. Recommended to add
occupancy sensors in hallways to reduce energy use.
Insert Image Insert Image
General Notes:
Occupancy Sensors:
Overall Condition:
3. Ceiling mounted occupancy sensors in classrooms and offices.
Image Legend:
Occupancy Sensor
Fluorescent Surface
Good
Wall Switches
Interior Lighting
Condition:
Hall Lighting:
Control:
Condition:Classroom Lighting:
Control:
Insert Key Plan or
Additional Image
Fluorescent Lay-in / SurfaceGood
Good
$1,000.00*
The majority of lighting is in this building is
controlled by occupancy sensors. Lights in the
mezzanine mechanical space and hallways are
controlled by switches. Recommend installing a
switch with pilot light for attic lighting to indicate
whether the lights are on or off.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 330/560
1. Estimate for a Master Clock System is based on approximately 20 room clocks and 5 hallway
clocks. A wireless transmitter would be installed in the office and transmit to all the clocks in the
building.
Insert Image Intentionally LeftBlank
General Notes:
For a Clock System:
Estimated Cost
2. Example of a wireless clock controller.
Image Legend:
Bogen Time Systems
20
5
Master Clock System
Hallway Clocks:
Classroom Clocks:
Proposed Clock Systems:Clock System:
Insert Key Plan or
Additional Image
N/AAmerican Time and Signal
$8,000.00*
There is not a master clock system installed at this
building.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 331/560
1. Electrical panels installed in mechanical mezzanine.
2. Electrical MDP (main distribution panel) is located in the first floor mechanical room.
3. The MDP main incoming power is metered and tied into the BMS (building management system).
Insert Image Insert Image
General Notes:
Replacement Cost:
4. Two circuits from the MDP are individually metered and tied into the BMS. One meter is for the
Rochester side and the other is for the Ivy Tech side.
Image Legend:
Good
Power Distribution
Condition:
Electrical Gear:Electric Service:
Insert Key Plan or
Additional Image
120/208V Three PhaseEaton
$0.00*
Electrical gear was installed new with the
construction. Gear is in good condition and with
regular manufacture's recommended maintenance
should last for the next 25 - 50 years.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 332/560
1. Example of an exterior PTZ camera.
2. Example of a fixed ceiling mounted camera.
3. Potential location of an exterior PTZ POE camera.
Quantity:
Insert Image Insert Image
1
General Notes:
Estimated Cost:
4. Potential location of a fixed ceiling mounted POE camera covering entrance doors.
Image Legend:
Axis
P3304
4
Q6034-E
Security Cameras
Quantity:
Fixed Dome Model:
Brand:
Proposed Cameras:Type:
PTZ Model:
Insert Key Plan or
Additional Image
N/AIP POE Cameras
$7000.00 - 10,500.00*
Currently there are not any security cameras
installed at the Rochester Learning Center. We
would propose adding cameras in the locations of
numbers 3 and 4.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 333/560
4. Location of district data center and IT operations.
General Notes:
Wireless:
Condition:
Projectors:
Condition:
Insert Image
Image Legend:
1. Epson ceiling mounted projectors.
2. Bose pro-audio speakers.
3. New category 6 patch panels. Category 6 cabling is the current installed cabling standard.
Insert Image
Insert Key Plan or
Additional Image
Category 6Good
Cabling is new and was installed when the building
was built. Projectors and wireless are new and in
good condition.
Condition:
Replacement Cost:
Overall Condition:
Telephones:
Projector Power: Good
VOIP
Good
$0.00*
Technology
Epson Ceiling Mount
Good
Cisco POE
Good
Data:
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 334/560
Insert Image Insert Image
2. Ponding on the surface is a sign of improper grading and installation.3. Concrete curbs are in good condition and are aging properly.
4. Detectable warning surface on ADA curb cut is uneven and is not properly fitting within the cutout.
1. Parking stall stripping may be too light and may need addressed.
Total Sidewalk
Replacement Cost: $10,00.00 - $15,000.00*
Total Hardscape
Replacement Cost: $160,000.00-$180,000.00*
General Notes:Recommended to clean, maintain and stripe the
parking lot as part of a regular maintenance
program.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: AsphaltParking Condition: Good
Driveway Condition: Good
Sidewalk Material: Concrete
Sidewalk Condition: Good
ADA Ramps: Fair
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 335/560
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: AsphaltParking Condition: Good
Driveway Condition: Good
Sidewalk Material: Concrete
Sidewalk Condition: Good
Dumpster Enclosure: Poor
1. Detectable warning surface on ADA curb cut may be retaining water and causing damage to the
ADA Ramps: Fair
Total ADA Ramp
Replacement Cost: $2,000.00 - $2,500.00*
General Notes:Recommended to address water retention under
detectable warning surface .
Image Legend:
Insert Image Insert Image
concrete sidewalk.2. Detectable warning surface on ADA curb cut is uneven and is not properly fitting within the cutout
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 336/560
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: AsphaltParking Condition: Good
Driveway Condition: Good
Sidewalk Material: Concrete
Sidewalk Condition: Good
Dumpster Enclosure: Poor
1. Fence is touching the ground and may be trapping moisture under the panel.
ADA Ramps: Fair
Total Enclosure
Replacement Cost: $6,000.00 - $8,000.00*
General Notes:Recommended to moved fence panels 1-2" off of
the ground to prevent additional water damage.
Image Legend:
Insert Image Insert Image
2. Fence panel is showings signs of aging and moisture damage.3. Corner of fence is missing and is not closed.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 337/560
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Good
Driveway Condition: Good
Sidewalk Material: Concrete
Sidewalk Condition: Good
Dumpster Enclosure: Poor
1. Fence posts are twisting and separating from panels.
ADA Ramps: Fair
Total Enclosure
Replacement Cost: $6,000.00 - $8,000.00*
General Notes:Recommended to moved fence panels 1-2" off of
the ground to prevent additional water damage.
Image Legend:
Insert Image Insert Image
2. Fence post is showings signs of aging and splitting.
Rochester Learning Center
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 338/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 339/560
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Single-pane glass is allowing exterior temperature to influence the interior.
4. Double-pane vestibule, when properly sealed, will prevent air infiltration.
5. Aluminum frame is separating and needs to be addressed.
6. Hinges and handles are corroding and showing signs of wear.
7. Window seals are separating and needs to be adjusted.
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: 14'-5" x 8'-0"
Size: 6'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $33,500.00*
General Notes:The addition / adjustment of window seals, door
sweeps and weather stripping is recommended to
maintain integrity of vestibule. Replace door cover
to protect the door closer mechanism.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W1 (2 Sets of Doors)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 340/560
Insert Image Insert Image
2. Weather stripping is worn and should be adjusted.3. Single-pane glass is allowing exterior temperature to influence the interior.
4. Double-pane vestibule, when properly sealed, will prevent air infiltration.
5. Door hinge is showing signs of corrosion and aging and need to be addressed.
1. Door pull is showing signs of corrosion and aging and need to be addressed.
Vestibule: 14'-5" x 8'-0"
Size: 6'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $33,500.00*
General Notes:The addition / adjustment of window seals, door
sweeps and weather stripping is recommended to
maintain integrity of vestibule. Replace door cover
to protect the door closer mechanism.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W1 (2 Sets of Doors) (Cont.)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 341/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W2Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: 14'-5" x 8'-0"
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $32,500.00*
General Notes:The addition / adjustment of window seals, door
sweeps and weather stripping is recommended to
maintain integrity of vestibule. Replace door cover
to protect the window system. Replace walk-off
floor file as needed.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Single-pane glass is allowing exterior temperature to influence the interior.
4. Double-pane vestibule, when properly sealed, will prevent air infiltration.
5. Window seals are separating and needs to be adjusted.
6. Hinges and handles are corroding and showing signs of wear.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 342/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W2 (Cont.)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: 14'-5" x 8'-0"
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $32,500.00*
General Notes:The addition / adjustment of window seals, door
sweeps and weather stripping is recommended to
maintain integrity of vestibule. Replace door cover
to protect the window system. Replace walk-off
floor file as needed.
Image Legend:
Insert Image Insert Image
2. Walk-off floor tile is worn and damaged. Floor tile needs to be addressed.3. Single-pane glass is allowing exterior temperature to influence the interior.
4. Double-pane vestibule, when properly sealed, will prevent air infiltration.
5. Aluminum window frame is missing and needs to be addressed.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 343/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: W2 (Cont.)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Double-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: 14'-5" x 8'-0"
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $32,500.00*
General Notes:The addition / adjustment of window seals, door
sweeps and weather stripping is recommended to
maintain integrity of vestibule. Replace door cover
to protect the window system. Replace walk-off
floor file as needed.
Image Legend:
Insert Image Insert Image
2. Door closer is showing signs of wear and damage. The damaged door closer needs to be addressed.3. Single-pane glass is allowing exterior temperature to influence the interior.
4. Double-pane vestibule, when properly sealed, will prevent air infiltration.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 344/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S3Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: N/A
Sidelites / Transoms: N/A
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $4,500.00*
General Notes:Recommended to address door flashing, sweeps,
and weather stripping.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Door flashing is showing signs of aging and wear and needs to be addressed.
4. Weather stripping is showing signs of corrosion and needs to be addressed to prevent further corrosion.
5. Hinges are corroded and showing signs of wear.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 345/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S4Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $15,000.00*
General Notes:The addition / adjustment of window seals, door
sweeps and weather stripping is recommended to
maintain integrity of vestibule. Replace door cover
to protect the door closer mechanism.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Single-pane glass is allowing exterior temperature to influence the interior.
4. Hinges and handles are corroded and showing signs of wear.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 346/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S4 (Cont.)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
1. Single-pane glass is allowing exterior temperature to influence the interior.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $15,000.00*
General Notes:The addition / adjustment of window seals, door
sweeps and weather stripping is recommended to
maintain integrity of vestibule. Replace door cover
to protect the door closer mechanism.
Image Legend:
Insert Image Insert Image
2. Hinges and handles are corroded and showing signs of wear.3. Door closer protective cover is missing and needs to be replaced.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 347/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S5Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: N/A
Sidelites / Transoms: N/A
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $4,500.00*
General Notes:Recommended to address door flashing, sweeps,
and weather stripping.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Door flashing is showing signs of aging and wear and needs to be addressed.
4. Door frame is showing signs of aging and corrosion and needs to be addressed.
5. Hinges and handles are corroded and showing signs of wear.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 348/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S6Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: N/A
Sidelites / Transoms: N/A
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $2,500.00*
General Notes:Recommended to replace door system in its
entirety to improve aesthetics, functionality, and
efficiency.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Door flashing is showing signs of aging and wear and need to be addressed.
4. Door frame is showing signs of aging and corrosion and need to be addressed.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 349/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: S7Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Good
Door Glazing: Double-Pane
Sidelites / Transoms: Double-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Good
Replacement Cost: $10,500.00*
General Notes:The addition / adjustment of window seals, door
sweeps and weather stripping is recommended to
maintain integrity of vestibule. Replace door cover
to protect the door closer mechanism.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Double-pane vestibule, when properly sealed, will prevent air infiltration.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 350/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: E8Door Material: Hollow Metal
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: N/A
Sidelites / Transoms: N/A
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $4,500.00*
General Notes:Recommended to replace door system in its
entirety to improve aesthetics, functionality, and
efficiency.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.
3. Door flashing is showing signs of aging and wear and needs to be addressed.
4. Door frame is showing signs of aging and corrosion. Door system needs to be replaced in its entirety.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 351/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N9Door Material: Hollow Metal
Weather Stripping: Failed
Door Closers: Poor
Door Glazing: N/A
Sidelites / Transoms: N/A
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Failed
Replacement Cost: $2,500.00*
General Notes:Recommended to replace door system in its
entirety to improve aesthetics, functionality, and
efficiency.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.
3. Door flashing is showing signs of aging and wear and needs to be addressed.
4. Door frame is showing signs of aging and corrosion. Door system needs to be replaced in its entirety.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 352/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N10Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: 15'-10" x 22'-10"
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $23,500.00*
General Notes:Recommended to replace door system in its
entirety and to address the water issues during
renovation.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Single-pane glass is allowing exterior temperature to influence the interior.
4. Hinges and handles are corroded and showing signs of wear.
5. Holes in the aluminum door system, once covered by duct tape, may be allowing water to penetrate the
door system.
6. Hand rail is showings signs of aging and corrosion and needs to be addressed.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 353/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N10 (Cont.)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Poor
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
1. Acoustical ceiling tile is showing signs of water damage and needs to be addressed.
Vestibule: 15'-10" x 22'-10"
Size: 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $23,500.00*
General Notes:Recommended to replace door system in its
entirety and to address the water issues during
renovation.
Image Legend:
Insert Image Insert Image
2. Single-pane glass is allowing exterior temperature to influence the interior.3. Holes in the aluminum door system, once covered by duct tape, may be allowing water to penetrate the
door system.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 354/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N11 (2 Sets of Doors)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: 22'-0" x 8'-7 1/2"
Size: (2) 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $45,000.00*
General Notes:Single pane glass provides an R-Value of .85. New
door system with weather stripping, seals, and
double pane glass would provide an R-Value of 1.5
to 3.
Image Legend:
Insert Image Insert Image
2. Weather stripping is missing or worn and may be allowing air infiltration.3. Single-pane glass is allowing exterior temperature to influence the interior.
4. Seal around light fixture and light bulb are missing.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 355/560
Insert Image Insert Image
2. A leak in the roof is causing the acoustical tile to discolor and contribute to the moisture issue.3. Single-pane glass is allowing for excessive air infiltration.
4. LED light fixtures are more efficient than existing lighting fixtures. See electrical data for additional
information.
1. Walk-off material is showing excessive dirt and signs of aging and needs to be addressed.
Vestibule: 22'-0" x 8'-7 1/2"
Size: (2) 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $45,000.00*
General Notes:It is recommended to replace the Vestibule flooring
and fix the leaking roof that is contributing to the
moisture issues.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N11 (2 Sets of Doors) (Cont.)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 356/560
Insert Image Insert Image
2. Single-pane glass is allowing exterior temperature to influence the interior.3. Weather stripping is missing or worn and may be allowing air infiltration.
1. Door sweeps are missing or worn and may be allowing air infiltration.
Vestibule: 22'-0" x 8'-7 1/2"
Size: (2) 6'-0" x 7'-0"
Overall Condition: Poor
Replacement Cost: $45,000.00*
General Notes:It is recommended to add doors sweeps and
weather stripping to all doors to prevent air
infiltration.
Image Legend:
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N11 (2 Sets of Doors) (Cont.)Door Material: Aluminum
Weather Stripping: Poor
Door Closers: Fair
Door Glazing: Single-Pane
Sidelites / Transoms: Single-Pane
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 357/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N12Door Material: Hollow Metal
Weather Stripping: Fair
Door Closers: N/A
Door Glazing: N/A
Sidelites / Transoms: N/A
1. Door sweeps are in good condition and need to be maintained.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Fair
Replacement Cost: $2,500.00*
General Notes:Recommended to replace door system in its
entirety to improve aesthetics, functionality, and
efficiency.
Image Legend:
2. Door is showing the signs of aging and appears faded.
3. Door frame is showing signs of aging and corrosion. Door system needs to be replaced in its entirety.
4. Hinges are corroding and showing signs of wear.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 358/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N13Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Good
Door Glazing: Double-Pane
Sidelites / Transoms: Double-Pane
1. Sealant around door frame is broken or worn and needs to be addressed.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Good
Replacement Cost: $4,000.00*
General Notes:Recommended to inspect, maintain, and clean door
system regularly to prolong the doors life
expectancy.
Image Legend:
Insert Image Insert Image
2. Door sweeps are in good condition and need to be maintained.3. Double-pane window system, when properly sealed, will prevent air infiltration.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 359/560
Exterior Door System Data
Insert Key Plan or
Additional Image
Door Designation: N14Door Material: Aluminum
Weather Stripping: Fair
Door Closers: Good
Door Glazing: Double-Pane
Sidelites / Transoms: Double-Pane
1. Sealant around door frame is broken or worn and needs to be addressed.
Vestibule: N/A
Size: 3'-0" x 7'-0"
Overall Condition: Good
Replacement Cost: $4,000.00*
General Notes:Recommended to inspect, maintain, and clean door
system regularly to prolong the doors life
expectancy. Address the broken brick near the
base of the door system to prevent additional
damage to the building envelope.
Image Legend:
Insert Image Insert Image
2. Door sweeps are in good condition and need to be maintained.3. Double-pane window system, when properly sealed, will prevent air infiltration.
4. Brick has broken apart near door system and may be allowing water to penetrate the building envelope.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 360/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: Poor
Flashing / Trim: Fair
Glazing: Fair
Caulking / Sealant: Poor
1. Recaulk and seal window and brick joint.
Soffit / Canopy: Poor
Overall Condition: Fair
Total Sealant
Replacement Cost: $15,000.00 - $20,000.00*
General Notes:Maintain consistent caulking and sealants
throughout the building envelope to prevent
moisture penetration.
Image Legend:
Insert Image Insert Image
2. Recaulk and seal all joints to prevent moisture from penetrating building envelope.3. Single-pane glass is allowing exterior temperature to influence the interior.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 361/560
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: Poor
Flashing / Trim: Fair
Glazing: Fair
Caulking / Sealant: Poor
1. Recaulk and seal window and brick joint.
Soffit / Canopy: Poor
Overall Condition: Fair
Total Sealant
Replacement Cost: $15,000.00 - $20,000.00*
General Notes:Maintain consistent caulking and sealants
throughout the building envelope to prevent
moisture penetration.
Image Legend:
Insert Image Insert Image
2. Recaulk and seal all joints to prevent moisture from penetrating building envelope.3. Recaulk and seal underside of cladding to prevent moisture from penetrating building envelope.
4. Maintain a regular pest control maintenance plan.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 362/560
Insert Image Insert Image
2. Metal piping has corroded and is causing brick to stain.3. Recaulk and seal underside of cladding to prevent moisture from penetrating building envelope.
1. Corrosion has caused for concrete to be excessively stained.
Soffit / Canopy: Poor
Overall Condition: Fair
Total Sealant
Replacement Cost: $15,000.00 - $20,000.00*
General Notes:Maintain a regular maintenance program to clean,
paint and seal the building envelope.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: Poor
Flashing / Trim: Fair
Glazing: Fair
Caulking / Sealant: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 363/560
Insert Image Insert Image
2. Holes in the building envelope may be allowing water and pests to penetrate the building envelope.3. Recaulk and seal underside of cladding to prevent moisture from penetrating building envelope.
4. Pests are attaching to the building envelope and may be causing damage to the building or the
surrounding environment.
1. Corrosion has caused staining and needs to be addressed.
Soffit / Canopy: Poor
Overall Condition: Fair
Total Sealant
Replacement Cost: $15,000.00 - $20,000.00*
General Notes:Maintain a regular maintenance program to clean,
paint and seal the building envelope.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: Poor
Flashing / Trim: Fair
Glazing: Fair
Caulking / Sealant: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 364/560
Insert Image Insert Image
2. Double-pane window systems, when properly sealed, will prevent air infiltration.3. Recaulk and seal underside of cladding to prevent moisture from penetrating building envelope.
1. Flashing has been damaged and may not be shedding water from the building envelope.
Soffit / Canopy: Poor
Overall Condition: Fair
Total Sealant
Replacement Cost: $15,000.00 - $20,000.00*
General Notes:Maintain a regular maintenance program to clean,
paint and seal the building envelope.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: Poor
Flashing / Trim: Fair
Glazing: Fair
Caulking / Sealant: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 365/560
Insert Image Insert Image
2. Sealant is missing or worn and should be replaced to prevent water from draining near the buildingfoundation.
3. Grade has lowered and may be approaching the insulation level.
1. Brick has broken apart near window and may be allowing water to penetrate the building envelope.
Soffit / Canopy: Poor
Overall Condition: Fair
Total Sealant
Replacement Cost: $15,000.00 - $20,000.00*
General Notes:Maintain a regular maintenance program to clean,
paint and seal the building envelope.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: Poor
Flashing / Trim: Fair
Glazing: Fair
Caulking / Sealant: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 366/560
Insert Image Insert Image
2. Sealant is missing or worn and should be replaced to prevent water from entering the building envelope.3. Recaulk and seal underside of cladding to prevent moisture from penetrating building envelope.
1. Building membrane has been scratched and damaged.
Soffit / Canopy: Poor
Overall Condition: Fair
Canopy and Soffit
Replacement Cost: $4,000.00 - $6,500.00*
General Notes:Maintain a regular maintenance program to clean,
paint and seal the building envelope.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: Poor
Flashing / Trim: Fair
Glazing: Fair
Caulking / Sealant: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 367/560
Insert Image Insert Image
2. Double-pane window systems, when properly sealed, will prevent air infiltration.3. Recaulk and seal underside of cladding to prevent moisture from penetrating building envelope.
1. Brick has broken apart near window and may be allowing water to penetrate the building envelope.
Soffit / Canopy: Poor
Overall Condition: Fair
Total Damaged Brick
Replacement Cost: $1,500.00 - $2,000.00*
General Notes:Recommended to remove and repair broken brick
to prevent further damage.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / CaulkingMasonry: Fair
Cladding: Poor
Flashing / Trim: Fair
Glazing: Fair
Caulking / Sealant: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 368/560
Insert Image Insert Image
2. Double-pane window systems, when properly sealed, will prevent air infiltration.3. Concrete lintel has broken in the corner and needs to be addressed. Water may be entering the building
envelope through the cracks.
1. Brick has broken apart near window and may be allowing water to penetrate the building envelope.
Soffit / Canopy: Poor
Overall Condition: Fair
Total Damaged Brick
Replacement Cost: $1,500.00 - $2,000.00*
General Notes:Recommended to remove and repair broken brick
and concrete to prevent further damage.
Image Legend:
Building Envelope Data
Insert Key Plan or
Additional Image
Condition: Sealant / Caulking (Cont.)Masonry: Fair
Cladding: Poor
Flashing / Trim: Fair
Glazing: Fair
Caulking / Sealant: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 369/560
Insert Image Insert Image
2. Maintain hardwood floor. Clean floor regularly.3. Maintain basketball rims and backboards (10), currently in good condition.
4. Duct work may contain asbestos. See asbestos report for more information.
5. Lighting is inefficient throughout Gymnasium. See lighting data for additional information.
6. Maintain score board and lights, currently in good condition. Replace bulbs as needed.
1. Seating capacity of 552. Clean bleacher regularly.
Size 103'-7" x 60'-0"
Overall Condition: Fair
Replacement Cost: $50,000.00 - $75,000.00*
General Notes:Overall condition of gymnasium is Fair. Existing
lighting systems are inefficient and light levels are
poor. Recommend new high efficiency lighting
system. See lighting Data for additional
information.
Image Legend:
Gymnasium Data
Insert Key Plan or
Additional Image
Gym Location: RMSFloor Material: Hardwood
Seating Capacity 552
Score Board: Good
Equipment: Fair
Lighting: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 370/560
Natatorium Data
Insert Key Plan or
Additional Image
Gym Location: RMSFloor Material: Tile
Seating Capacity 183 Permanent
Score Board: Fair
Equipment: Good
Lighting: Poor
1. Diving board and starting blocks appear to be in good condition.
Size 115'-0" x 77'-0"
Overall Condition: Fair
Total LED Lighting
Replacement Cost: $100,000.00 - $ 250,000.00
General Notes:Overall condition of Natatorium is Fair. Existing
lighting systems are inefficient but light levels are
fair. Recommend new high efficiency lighting
system. See lighting Data for additional
information.
Image Legend:
Insert Image Insert Image
2. Lighting is inefficient throughout Natatorium. See lighting data for additional information.3. Acoustical tile adhesive is loosing its effectiveness and tiles are falling into pool area.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 371/560
Natatorium Data
Insert Key Plan or
Additional Image
Gym Location: RMS (Cont.)Floor Material: Tile
Seating Capacity 183 Permanent
Score Board: Fair
Equipment: Good
Lighting: Poor
1. Maintain score board and lights, currently in good condition.
Size 115'-0" x 77'-0"
Overall Condition: Fair
Total LED Lighting
Replacement Cost: $100,000.00 - $ 250,000.00
General Notes:Overall condition of Natatorium is Fair. Existing
lighting systems are inefficient but light levels are
fair. Recommend new high efficiency lighting
system. See lighting Data for additional
information.
Image Legend:
Insert Image Insert Image
2. Lighting is inefficient throughout Natatorium. See lighting data for additional information.3. Acoustical tile adhesive is loosing its effectiveness and tiles are falling into pool area.
4. Moveable bleachers are showing minimal signs of wear or aging.
5. Hinges are showings signs of aging and corrosion.
6. Stainless steel door and frame is showing no signs of wear or aging.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 372/560
Insert Image Insert Image
2. Office / Storage Room. Insufficient amount of storage.3. Single serving line for students.
1. Moisture resistance acoustical ceiling tile and grid.
Freezer / Cooler: Fair
Overall Condition: Fair
Replacement Cost: $250,000.00-$450,000.00*
General Notes:The serving lines and preparation area is extremely
crowed. The office in the kitchen is also the storage
room.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: KitchenFlooring Material: Tile
Ceiling Material Moisture Resistant ACT
Wall: CMU Block
Storage: Insufficient Storage
Equipment: Fair
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 373/560
Insert Image Insert Image
2. Acoustical ceiling tile is in fair condition and should be replaced as needed.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Carpet is showing signs of deterioration and needs to be addressed with a more durable material.
5. Desks appear to be in fair condition. Desks should be cleaned and maintained to extend their life
expectancy.
1. Rochester Middle School contains approximately 28 Cathode Ray Tube TV's.
Fixtures: Fair
Overall Condition: Fair
Total Carpet
Replacement Cost: $180,000.00-$220,000.00*
General Notes:RMS contains approximately 28 (CRT) TVs that use
more energy than the common modern TVs. The
carpet flooring may have exceeded the life
expectancy and may need replaced.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: ClassroomsTVs: 28 Approximately
Flooring: Carpet
Walls: CMU
Ceiling: Acoustical Tile
Doors: Wood
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 374/560
Insert Image Insert Image
2. Acoustical ceiling tile is in fair condition and should be replaced as needed.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Projector and power lines are in fair condition. See electrical documents for additional information.
1. Carpet is showing signs of deterioration and needs to be addressed with a more durable material.
Fixtures: Fair
Overall Condition: Fair
Total Carpet
Replacement Cost: $180,000.00-$220,000.00*
General Notes:RMS contains approximately 28 (CRT) TVs that use
more energy than the common modern TVs. The
carpet flooring may have exceeded the life
expectancy and may need replaced.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Classrooms (Cont.)TVs: 28 Approximately
Flooring: Carpet
Walls: CMU
Ceiling: Acoustical Tile
Doors: Wood
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 375/560
Insert Image Insert Image
2. Acoustical ceiling tile is in fair condition and should be replaced as needed.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
4. Projector and power lines are in fair condition. See electrical documents for additional information.
1. Carpet is showing signs of aging and wear and needs to be addressed.
Fixtures: Fair
Overall Condition: Fair
Total Carpet
Replacement Cost: $180,000.00-$220,000.00*
General Notes:RMS contains approximately 28 (CRT) TVs that use
more energy than the common modern TVs. The
carpet flooring may have exceeded the life
expectancy and may need replaced.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Classrooms (Cont.)TVs: 28 Approximately
Flooring: Carpet
Walls: CMU
Ceiling: Acoustical Tile
Doors: Wood
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 376/560
Insert Image Insert Image
2. Acoustical ceiling tile is in fair condition and should be replaced as needed.3. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
1. Carpet is showing signs of aging and wear and needs to be addressed.
Fixtures: Fair
Overall Condition: Fair
Total Carpet
Replacement Cost: $180,000.00-$220,000.00*
General Notes:RMS contains approximately 28 (CRT) TVs that use
more energy than the common modern TVs. The
carpet flooring may have exceeded the life
expectancy and may need replaced.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: LibraryTVs: 28 Approximately
Flooring: Carpet
Walls: CMU
Ceiling: Acoustical Tile
Doors: Wood
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 377/560
Building Interior Data
Insert Key Plan or
Additional Image
Location: HallwaysFlooring: Carpet / Vinyl Sheet
Flooring Condition: Fair
Walls: CMU Block
Ceiling: Acoustical Ceiling Tile
Casework: N/A
1. Carpet in hallways are showing signs of aging and wear and needs to be addressed.
Fixtures: Fair
Overall Condition: Fair
Total Sheet Flooring
Replacement Cost: $65,000.00-$80,000.00*
General Notes:The carpet flooring may have exceeded the life
expectancy and may need replaced. The vinyl
hallways are in good condition and should be
maintained to extend the life expectancy of the
flooring.
Image Legend:
Insert Image Insert Image
2. Acoustical ceiling tile is in good condition and should be replaced as needed.3. CMU walls are in fair condition and should be maintained.
4. LED light fixtures are more efficient than existing lighting. See electrical documents for additional
information.
5. Vinyl sheet in hallways appears to be in good condition and should be maintained.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 378/560
Insert Image Insert Image
2. CMU walls are in fair condition and should be maintained.
1. Carpet in hallways are showing signs of aging and wear and needs to be addressed.
Fixtures: Fair
Overall Condition: Fair
Total Carpet
Replacement Cost: $180,000.00-$220,000.00*
General Notes:The carpet flooring may have exceeded the life
expectancy and may need replaced. The vinyl
hallways are in good condition and should be
maintained to extend the life expectancy of the
flooring.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Hallways (Cont.)Flooring: Carpet / Vinyl Sheet
Flooring Condition: Fair
Walls: CMU Block
Ceiling: Acoustical Ceiling Tile
Casework: N/A
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 379/560
Insert Image Insert Image
2. CMU walls are in fair condition and should be maintained.
1. Carpet in hallways are showing signs of aging and wear and needs to be addressed.
Fixtures: Fair
Overall Condition: Fair
Total Carpet
Replacement Cost: $180,000.00-$220,000.00*
General Notes:The carpet flooring may have exceeded the life
expectancy and may need replaced. The vinyl
hallways are in good condition and should be
maintained to extend the life expectancy of the
flooring.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Hallways (Cont.)Flooring: Carpet / Vinyl Sheet
Flooring Condition: Fair
Walls: CMU Block
Ceiling: Acoustical Ceiling Tile
Casework: N/A
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 380/560
Insert Image Insert Image
1. Casework is showing signs of aging and wear and need to be replaced in the near future.
Overall Condition: Poor
Total Casework
Replacement Cost: $115,000.00-$150,000.00*
General Notes:Recommended to replace existing casework in its
entirety.
Image Legend:
Building Interior Data
Insert Key Plan or
Additional Image
Location: Casework
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 381/560
Image Legend:
1. Current RHS chillers serve both the high school and middle school.
2. Chilled water is pumped a long distance to the middle school. A new chiller could use the existing
middle school CHW piping and new VFD pumps to increase control and energy efficiency.
Insert Key Plan or
Additional Image
From High SchoolNone, From RHS
Chilled Water Plant
General Notes:
New Chiller:
New CHW Pumps:
$100,000.00-$150,000.00*
Separating the chilled water systems will allow for
greater control as well as improve energy
monitoring. Separation would also decrease pump
energy required to pump chilled water the distance
between schools.
RMS CHW Pumps:Chilled Water:
New CHW Piping:
Insert Image Insert Image
(2) @ $20,000/Pump
(1) @ $150,000
3. Possible exterior location for new pad mounted scroll chiller for the Middle School.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 382/560
Insert Image Insert Image
IR Sensing
Wall-Hung, Am. Std.
IR Sensing
1.6/1.0 GPF
Fair
$50,000.00 - $75,000.00*
Newer plumbing fixtures are in good condition and
should last several years. Original fixtures are
outdated and leaky and should be replaced where
possible.
1. Recently renovated restrooms have updated ADA, IR sensing plumbing fixtures.
2. Aging fixtures should be replaced and updated as they fail or become obsolete.
Valve Flow Rates:
Insert Key Plan or
Additional Image
1974 and NewerWall-Hung, Am. Std.
Plumbing Fixtures
General Notes:
Actuation:
Urinals:
Actuation:
Water Closets:Installation Date:
Replacement Cost:
Overall Condition:
Image Legend:
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 383/560
Installation Date: 1974
Exposed, Uninsulated
(1) Single Zone
Constant Speed, No VFD
Poor
Ductwork:
Fan Motors:
Image Legend:
Insert Image Insert Image
$100,000.00-$125,000.00*
The pool and gymnasium AHU's are near end of
service life. The pool AHU should be replaced and
possibly relocated to avoid issues with the corrosive
chlorine environment.
1. Corrosive pool environment has severely degraded exposed sheet metal and piping.
2. Constant speed motors should be replaced with new VFD motors to increase control and energy
efficiency.
3. AHU is nearing end of service life and should be replaced.
Replacement Cost:
Insert Key Plan or
Additional Image
(2) Single ZoneConstant Speed, No VFD
Gym/Pool Air Handlers
General Notes:
Fan Motors:
Pool Air Handler:
Gym Air Handlers:
Overall Condition:
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 384/560
pumps and controls will increase energy efficiency and decrease maintenance costs.
Image Legend:
efficiency of the school's heating system.
Insert Key Plan or
Additional Image
(2) Bryan CL300Non-Condensing Hot Water
Hot Water Plant
General Notes:
Pumps:
Overall Condition:
Installation Date:
Type:Boilers:
Replacement Cost:
Overall Condition:
Installation Date:
Insert Image Insert Image
1998
Fair
(2) Primary
ABB Drives
1998, 1974
Controls:
$250,000.00-$300,000.00*
Hot water plant is relatively new and will remain
serviceable for several years. When replaced, new
hot water condensing boilers should be installed to
increase energy efficiency.
1. Hot water boilers have a typical service life of >22 years.
2. Replacing the existing boilers with new modulating/condensing boilers would increase the energy
Fair
3. Base mounted pumps such as these have a service life of approximately 20 years. Replacing aging
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 385/560
Image Legend:
Insert Key Plan or
Additional Image
180 Degree Hot WaterAnsul Wet Chemical
Kitchen
General Notes:
Overall Condition:
Gas Fired Equipment:
$50,000.00 - $75,000.00*
Sanitization:
Replacement Cost:
Insert Image Insert Image
Tilting Skillet
Fair
Fire Suppression:
Kitchen equipment and plumbing is generally in
good shape. Equipment should be added to exhaust
moist air from dishwashing room.
1. Stainless steel fixtures and copper piping are in good condition.
2. Dishwasher room exhibits rust and corrosion due to steam. Exhaust should be added to prevent
further damage.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 386/560
Insert Image Insert Image
Insulated SA/Plenum RA
DDC/ABB drives
1998
Mechanical Mezzanine
Fair
Mezzanine Air Handlers
General Notes:
Installation Date:
Controls:
Ductwork:
$200,000.00-$250,000.00*
Insert Key Plan or
Additional Image
(5) Trane HW/CHW AHUFan Powered VAV
The Middle School air handling equipment is fairly
modern and should be serviceable for several more
years. Replacement may require adding new
ductwork for ducted return to conform to current
board of health standards.
Location:
Air Handlers:
Replacement Cost:
Overall Condition:
Terminal Units:
Image Legend:
1. Relatively new VFD's allow for greater control and energy efficiency.
2. Large mezzanine space allows maintenance accessibility and equipment replacement.
3. Supply ductwork in mostly uninsulated and not sealed which decreases energy efficiency.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 387/560
Image Legend:
2. Honeywell sensors report temperature to the JACE control board which commands the fan-
Insert Key Plan or
Additional Image
JACENiagara AX
Thermostats & Controls
General Notes:
Overall Condition:
Life Expectancy:
Thermostats:
Operating System:Control Board:
Replacement Cost:
Insert Image Insert Image
Honeywell Sensors
15 Years
Fair
$150,000.00-$200,000.00*
Newer JACE board operates DDC system through
Niagara AX framework. Newer valves and actuators
receive digital signals from JACE board to control
existing building HVAC equipment.
1. DDC system uses ABB drives to modulate the pump fan motor speed for the main classroom
air handlers.
powered VAV boxes to turn on or off.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 388/560
Insert Image Insert Image
Diesel
Failed
New And Retrofitted LED
Poor **
Failed ***
Failed
Insert Key Plan or
Additional Image
McGraw-Edison6.0 KW
Emergency Power System
General Notes:
Exit Signs:
Condition:
Fuel:
$50,000.00*
The generator appears to not be functional. A new
generator should be installed as soon as financially
feasible as the generator provides life safety egress
lighting for the building.
Condition:
Size:Generator:
Replacement Cost:
Overall Condition:
Meets Current Code:
** Retrofitted exit signs should be replaced.
*** There is not any exterior egress lighting as required by current code.
Image Legend:
1. Existing 6.0 KW generator.
2. Existing day tank transfer tank. It appears that the fuel lines have been cut. We question if the
generator is operational.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 389/560
Insert Image Intentionally LeftBlank
New/Existing
Fair
Existing
Fair
None Installed
Condition:
Fair
$0.00*
A new paging head end with amplifier was installed
at the end of 2011. Existing speakers and cabling
were reused.
1. Main paging telephone installed with new paging system. Telephone provides two way
between the office and the classroom.
Insert Key Plan or
Additional Image
Bogen Multicom 2000Good
Paging / Intercom System
General Notes:
Cabling:
Condition:
Speakers:
Condition:Head End:
Replacement Cost:
Overall Condition:
Push to Call:
3. Ceiling mounted speaker reused from previous paging system. Speakers are in fair condition and
would only need to be replaced if they fail.
4. Speaker installed in Media Center.
Image Legend:
2. New Bogen Paging System installed the end of 2011. Installed in the main office.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 390/560
Insert Key Plan or
Additional Image
High Pressure SodiumFair
High Pressure Sodium
Fair
Incandescent
Poor
Exterior Lighting
Canopy Lighting:
Condition:
Building Lighting:
Condition:Site Lighting:
2. Incandescent canopy light fixture with missing lamp. Controlled by switch.
3. High pressure sodium pole mounted light fixtures for parking lot and drive.
Insert Image Insert Image
$40,000.00*
General Notes:
LED Canopy:
LED Building:
LED Parking Lot:
Image Legend:
Condition:
$18,000.00*
$10,000.00*
Parking lot lighting is in fair condition. Building lights
should be replace with newer more energy efficient
fixtures and rewired through the building to reduce
the amount of surface conduit on the exterior of the
building.
1. High pressure sodium exterior fixture mounted on building controlled by photocell.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 391/560
** Fire Alarm pull stations do not meet current ADA code.
Image Legend:
Insert Key Plan or
Additional Image
HoneywellGood
Fire Alarm System
General Notes:
Cabling:
Condition:
Devices:
Condition:Head End:
Fix ADA Issue:
Overall Condition:
Meets Current ADA:
Insert Image Insert Image
New/Existing
Fair
New/Existing
Fair
Failed **
Fair
$8,000.00 - $13,000.00*
Need visuals in the classrooms and public spaces.
Pull stations in the building do not meet current ADA
guidelines for access.
1. Fire alarm pull station installed by exterior egress door.
2. Fire alarm visual notification device installed in classroom. Not all classrooms have visual devices.
3. Location of main fire alarm panel in main office.
Condition:
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 392/560
3. Occupancy sensors should be added to classrooms, offices, corridors, and restrooms.
** The ballasts in the fluorescent fixtures would need to be changed to Program Start for Occupancy Sensors.
Image Legend:
1. Layin fluorescent fixtures in the media center without occupancy sensors.
2. Existing metal halide fixtures surrounding the pool. To maintain adequate foot candles on the water
metal halide fixtures would still be needed in this space.
Insert Key Plan or
Additional Image
Metal HalidePoor
The gym lighting is metal halide and is poorly lit.
High bay fluorescence fixtures are more energy
efficient and would provide better, even lighting
levels. Adding occupancy sensors to the building
would provide energy savings.
Condition:
Gym Lighting:
Change Ballast:
Occupancy Sensors:
Fluorescent Fixture:
Condition:
Insert Image Insert Image
Fluorescent **
Fair
Fluorescent **
Fair
$50,000.00*
$19,000.00*
Interior Lighting
General Notes:
Hall Lighting:
Condition:
Classroom Lighting:
$60,000.00*
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 393/560
Insert Image Intentionally LeftBlank
Bogen Time Systems
51
10
Insert Key Plan or
Additional Image
N/AAmerican Time and Signal
Master Clock System
General Notes:
Hallway Clocks:
Classroom Clocks:
$18,000.00*
There is not a master clock system installed at this
school. All clocks are local battery operated or 120V
plug in.
Proposed Clock Systems:Clock System:
For a Clock System:
Estimated Cost
2. Example of a wireless clock controller.
Image Legend:
1. Estimate for a Master Clock System is based on approximately 51 room clocks and 10 hallway
clocks. A wireless transmitter would be installed in the office and transmit to all the clocks in the
building.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 394/560
Insert Image Insert Image
Westinghouse
Fair
Square D
Good
Fair
Insert Key Plan or
Additional Image
277/480V Three Phase3000 A
Power Distribution
General Notes:
New Panels:
Condition:
Original Panels:
$50,000.00 - $60,000.00*
Condition:
Electrical Service:
Replacement Cost:
Overall Condition:
Size:
The original electrical gear and panels are obsolete
and getting circuit breakers will continue to become
a harder task. A full replacement of the original
electrical gear and panels should be done in the next
few years.
1. Existing main 277/480V electrical distribution panels.
2. Existing main 120/208V electrical distribution panels.
3. Electrical distribution is located in the boiler room.
Image Legend:
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 395/560
Insert Key Plan or
Additional Image
N/AIdentiCard
PremiSys
Security Access Control
System:
Manufacture:Type:
2. Example of card access readers.
Insert Image Intentionally LeftBlank
General Notes:
Installation Cost:
* Rekey of exterior doors is not included in this number.
Image Legend:
$20,000.00 - $25,000.00*
A security access control system can be added to the
school with some modifications to the door
hardware for door strike release installation. A
complete rekey of the exterior doors should be done
as people with keys could bypass the card access
system.
1. Potential locations for card access door releases.
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 396/560
Insert ImageIntentionally Left
Blank
Poor
Cisco
Poor
$125,000.00 - 175,000.00
The CCTV head end is CISCO. Support for this system
is hard to find. CISCO cameras are from their
residential line. It is recommended to switch to
another CCTV system that is compatible with more
cameras and that has support readily available.
1. Interior dome POE camera.
Insert Key Plan or
Additional Image
IP Digital Cameras
Cisco
Security Cameras
General Notes:
Condition:
Head End:
Condition:
Manufacture:
Type:
Replacement Cost:
Image Legend:
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 397/560
4. There are multiple locations in the school where an extension cord is ran above ceiling to power a
projector.
5. Category 6 cabling is installed throughout the school and is the current installed cabling standard.
Image Legend:
1. New Cisco wireless access points.
2. Epson ceiling mounted projectors.
3. Power cord entering into plenum space. Code violation.
Overall Condition:
Projector Power: Insert Key Plan or
Additional Image
Category 6Good
Technology
General Notes:
Wireless:
Condition:
Cabling is new and was installed within the last 2
years. Projectors and wireless are new and in good
condition. Power to projectors are fed using an
extension cord ran above the ceiling. This is a code
violation. To add a receptacle at the projector would
be approx. $150 per location.
Insert Image Insert Image
Epson
Good
Cisco
Good
Failed
Good
Condition:
Projectors:
$6,000.00 - $10,000.00*
Condition:
Data:
Replacement Cost:
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 398/560
Insert Image Insert Image
2. Major cracking has been filled with sealant to prevent further deterioration. Continued maintenancewill help prolong the life expectancy of the asphalt.
3. Potholes may have developed from heavy traffic and changing seasons.
4. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Sidewalk
Replacement Cost: $35,000.00-$50,000.00*
Total Paving
Replacement Cost: $210,000.00-$250,000.00*
General Notes:Recommended to replace and resurface the bus
parking lot in its entirety.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: AsphaltParking Condition: Fair
Driveway Condition: Fair
Bus Parking Condition: Poor
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 399/560
Insert Image Insert Image
2. Major cracking has been filled with sealant to prevent further deterioration. Continued maintenancewill help prolong the life expectancy of the asphalt.
3. Potholes may have developed from heavy traffic and changing seasons.
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Sidewalk
Replacement Cost: $35,000.00-$50,000.00*
Total Paving
Replacement Cost: $210,000.00-$250,000.00*
General Notes:Recommended to replace and resurface the bus
parking lot in its entirety.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Fair
Driveway Condition: Fair
Bus Parking Condition: Poor
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 400/560
Insert Image Insert Image
2. Major cracking has been filled with sealant to prevent further deterioration. Continued maintenancewill help prolong the life expectancy of the asphalt.
3. Curb has been displaced and damaged and should be reinstalled to protect the asphalt edge.
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Sidewalk
Replacement Cost: $35,000.00-$50,000.00*
Total Paving
Replacement Cost: $210,000.00-$250,000.00*
General Notes:Recommended to replace asphalt curb to maintain
a consistent curb edging.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Fair
Driveway Condition: Fair
Bus Parking Condition: Poor
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 401/560
Insert Image Insert Image
2. Major cracking has been filled with sealant to prevent further deterioration. Continued maintenancewill help prolong the life expectancy of the asphalt.
3. Sidewalk ramps do not meet ADA requirements and should be updated when replaced.
4. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
5. Concrete curb is showing signs of aging and deterioration.
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Sidewalk
Replacement Cost: $35,000.00-$50,000.00*
Total Paving
Replacement Cost: $210,000.00-$250,000.00*
General Notes:Recommended to remove and replace all sidewalk
that is showing signs of pitting. Replace and update
ADA ramps during renovation.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Fair
Driveway Condition: Fair
Bus Parking Condition: Poor
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 402/560
Insert Image Insert Image
2. Major cracking has been filled with sealant to prevent further deterioration. Continued maintenancewill help prolong the life expectancy of the asphalt.
3. Curb has been displaced and damaged and should be reinstalled to protect the asphalt edge.
4. Edge of asphalt is showing sign of excessive aging and cracking.
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Sidewalk
Replacement Cost: $35,000.00-$50,000.00*
Total Paving
Replacement Cost: $210,000.00-$250,000.00*
General Notes:Recommended to inspect, clean and maintain
parking and service lot regularly.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Fair
Driveway Condition: Fair
Bus Parking Condition: Poor
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 403/560
Insert Image Insert Image
2. Major cracking has been filled with sealant to prevent further deterioration. Continued maintenancewill help prolong the life expectancy of the asphalt.
3. Sidewalk has shifted and has a ridge. Grind down concrete to create a smooth transition.
4. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Sidewalk
Replacement Cost: $35,000.00-$50,000.00*
Total Paving
Replacement Cost: $210,000.00-$250,000.00*
General Notes:Recommended to remove and replace all sidewalk
that is showing signs of pitting. Replace and update
ADA ramps during renovation. Grind concrete to a
smooth transition.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Fair
Driveway Condition: Fair
Bus Parking Condition: Poor
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 404/560
Insert Image Insert Image
2. Major cracking has been filled with sealant to prevent further deterioration. Continued maintenancewill help prolong the life expectancy of the asphalt.
3. Curb has been displaced and should be reinstalled to protect the asphalt edge.
4. Sidewalk is showing signs of cracking and pitting. These issues will cause the sidewalk to deteriorate
over time.
1. Asphalt parking lot is showing the signs of aging and cracking.
Total Sidewalk
Replacement Cost: $35,000.00-$50,000.00*
Total Paving
Replacement Cost: $210,000.00-$250,000.00*
General Notes:Recommended to replace asphalt curb to maintain
a consistent curb edging.
Image Legend:
Parking and Hardscapes
Insert Key Plan or
Additional Image
Parking Material: Asphalt (Cont.)Parking Condition: Fair
Driveway Condition: Fair
Bus Parking Condition: Poor
Sidewalk Material: Concrete
Sidewalk Condition: Poor
Rochester Middle School
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 405/560
Material
ACBM (Yes or
Assumed Quantity
Cost of
Abatement ($) Units
N/A N/A N/A N/A N/A
Total Quantified Abatement Cost -$
Material
ACBM (Yes or
Assumed Quantity
Cost of
Abatement ($) Units
HVAC Fittings Yes 950 LF 20,000.00
Steam & Condensate Pipe Insulation Yes 1,200 LF 22,000.00
Plaster Ceiling Yes 1,500 SF 15,000.00
9" x 9" Floor Tile Assumed 25 31.25 Transite Assumed 2,282 SF 7,000.00
Fire Doors Assumed 8 400.00
AHU Cloth Expansion Joints Assumed 4 9.00
Old Brown Cove Base Assumed 78 97.50
Old Brown Cove Base Mastic Assumed 78 97.50
Total Quantified Abatement Cost 42,635.25$
Mastic (VAT) Assumed Unquantified 1.25 SF
Total Unquantified Abatement Cost Unknown
Administration Building Asbestos Report
Columbia Elementary Asbestos Report
High School Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 406/560
Material
ACBM (Yes or
Assumed Quantity
Cost of
Abatement ($) Units
HVAC Steam & Condensate Piping Yes 800 LF 14,000.00
Domestic Hot & Cold Fittings Yes 150 LF 14,000.00
Fittings Yes 200 LF 4,000.00
Fire Doors Assumed 2 Each 100.00
9" x 9" Floor Tile Assumed 500 SF 2,800.00
Vinyl Floor Sheeting Assumed 400 SF 2,800.00
Transite Assumed 3780 SF 10,395.00
Mastic Under Vinyl Floor Sheeting Assumed 400 SF 1,000.00
Total Quantified Abatement Cost 49,095.00$ +
Mastic Assumed Unquantified 1.25 SFOld Cove Base Assumed Unquantified 1.25 SF
Cove Base Mastic Assumed Unquantified 1.25 SF
12" x 12" Floor Tile Assumed Unquantified 1.65 SF
Floor Tile Mastic Assumed Unquantified 1.65 SF
12" x 12 Floor Tile - Beige Assumed Unquantified 1.65 SF
Floor Tile Mastic Assumed Unquantified 1.65 SF
Total Unquantified Abatement Cost Unknown
Riddle Elementary Asbestos Report
High School Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 407/560
Material
ACBM (Yes or
Assumed Quantity
Cost of
Abatement ($) Units
Fittings (HVAC) Yes 1,000 LF 60,000.00
Domestic Water Fittings Yes 1,000 LF 60,000.00
Stage Light Wiring Assumed 100 LF 2,000.00
9" x 9" Floor Tile Yes 17,000 SF 30,000.00
Plaster Ceiling Yes 400 SF 40,000.00
Acoustical Plaster Yes 3,600 SF 40,000.00
Fireproofing Yes 1,000 SF 20,000.00
Transite Canopy Assumed 1,000 SF 6,000.00
Total Quantified Abatement Cost 258,000.00$
Carpet Mastic Assumed Unquantified 1.25 SFBlack Duct Work Mastic Yes Unquantified 3.75 LF
AHU Shock Joint Material Assumed Unquantified 1.75 LF
Transite Panels Yes Unquantified 2.85 SF
Fire Doors Assumed Unquantified 50.00 each
Cove Base Mastic Assumed Unquantified 1.25 SF
Total Unquantifed Abatement Cost Unknown
Material
ACBM (Yes or
Assumed Quantity
Cost of
Abatement ($) Units
N/A N/A N/A N/A N/A
Total Abatement Cost -$
Material
ACBM (Yes or
Assumed Quantity
Cost Of
Abatement ($) Units
Fittings Yes 1,000 25,000.00
Total Quantified Abatement Cost 25,000.00$
Floor Tile Mastic Assumed Unquantified 1.65 SF
Expansion Material Assumed Unquantified 6.25 SF
Cove Base Assumed Unquantified 1.25 LFCove Base Mastic Assumed Unquantified 1.25 LF
Total Unquantified Abatement Cost Unknown
Rochester Middle School Asbestos Report
Rochester High School Asbestos Report
Rochester Learning Center Asbestos Report
High School Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 408/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 409/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 410/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 411/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 412/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 413/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 414/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 415/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 416/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 417/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 418/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 419/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 420/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 421/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 422/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 423/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 424/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 425/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 426/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 427/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 428/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 429/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 430/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 431/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 432/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 433/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 434/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 435/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 436/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 437/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 438/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 439/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 440/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 441/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 442/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 443/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 444/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 445/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 446/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 447/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 448/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 449/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 450/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 451/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 452/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 453/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 454/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 455/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 456/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 457/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 458/560
Door System Door Repair Cost
S1 3,500.00$
N2 3,500.00$
E3 2,000.00$
E4 2,000.00$
Administration Building Probable Cost
Repair Door
Systems 11,000.00$
Administration Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 459/560
Exterior System
Low High
Sealant and Caulking 1,500.00$ 2,000.00$
Soffit Adjustment 2,000.00$ 3,000.00$
Interior System
Low High
Carpet and Tv 60,000.00$ 75,000.00$
Mechanical System
Low High
Ductwork 3,000.00$ 5,000.00$
Furnace / AC 10,000.00$ 10,000.00$
HVAC Unit 15,000.00$ 15,000.00$
Plumbing Fixtures 5,000.00$ 7,500.00$
Administration Building Probable Cost
Exterior Repair Cost
Repair Exterior Systems 3,500.00$ 5,000.00$
Mechanical Repair Cost
Repair Mechanical Systems 33,000.00$ 37,500.00$
Administration Building School Probable Cost
Interior Repair Cost
Repair Interior Systems 60,000.00$ 75,000.00$
Administration Building School Probable Cost
Administration Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 460/560
Electrical System
Low High
Exterior Lighting 11,000.00$ 11,000.00$
Fire Alarm System 15,000.00$ 15,000.00$
Interior Lighting 6,500.00$ 6,500.00$
Power Distribution -$ -$
Security Access Controls 10,000.00$ 12,000.00$
Security Cameras 6,000.00$ 10,000.00$
Technology -$ -$
Parking System
Low High
Sidewalk 10,000.00$ 15,000.00$
Playground 60,000.00$ 75,000.00$
Administration Building School Probable Cost
Electrical Repair Cost
Repair Mechanical Systems 48,500.00$ 54,500.00$
Administration Building School Probable Cost
Parking Repair Cost
Repair Parking Systems 70,000.00$ 90,000.00$
Administration Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 461/560
Door System Door Repair Cost
W1 12,500.00$
W2 4,500.00$
W3 6,500.00$
W4 6,500.00$
W5 3,500.00$
W6 3,500.00$
W7 3,500.00$
W8 3,500.00$
W9 24,500.00$
S10 4,500.00$
S11 2,500.00$S12 2,500.00$
S13 16,500.00$
S14 16,500.00$
S15 18,500.00$
E16 2,500.00$
E17 2,500.00$
N18 35,000.00$
N19 2,500.00$
N20 4,500.00$
Columbia Elem. School Probable Cost
Repair Door
Systems 176,500.00$
Columbia Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 462/560
Exterior System
Low High
Sealant and Caulking 20,000.00$ 30,000.00$
Brick Damage 2,000.00$ 3,000.00$
Brick Damage Gymnasium 50,000.00$ 70,000.00$
Brick Damage 2,000.00$ 3,000.00$
Canopy and Soffit 5,500.00$ 10,000.00$
Gymnasium
Low High
Gymnasium 65,000.00$ 85,000.00$
Interior System
Low High
Kitchen 250,000.00$ 450,000.00$
Carpet and Tv 150,000.00$ 180,000.00$Casework 120,000.00$ 150,000.00$Hallway 275,000.00$ 350,000.00$
Columbia Elementary School Probable Cost
Exterior Repair Cost
Repair Exterior Systems 79,500.00$ 116,000.00$
Interior Repair Cost
Repair Interior Systems 795,000.00$ 1,130,000.00$
Columbia Elementary School Probable CostGymnasium Repair Cost
Repair Gymnasium Systems 65,000.00$ 85,000.00$
Columbia Elementary School Probable Cost
Columbia Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 463/560
Mechanical System
Low High
Chilled Water Plant 200,000.00$ 225,000.00$
Gymnasium Air Handler 50,000.00$ 75,000.00$
Hot Water Plant 200,000.00$ 250,000.00$
Kitchen 50,000.00$ 75,000.00$
Original Plumbing Fixtures 30,000.00$ 50,000.00$
Reno. Plumbing Fixtures 25,000.00$ 35,000.00$
Thermostats and Controls 100,000.00$ 125,000.00$
Unit Ventilators 250,000.00$ 300,000.00$
Electrical System
Low High
Master Clock System 17,500.00$ 17,500.00$
Emergency Power System 1,500.00$ 1,500.00$
Exterior Lighting 34,000.00$ 34,000.00$
Fire Alarm System 6,000.00$ 9,000.00$
Interior Lighting 62,500.00$ 62,500.00$
Paging / Intercom System 1,500.00$ 1,500.00$
Power Distribution 50,000.00$ 60,000.00$
Security Access Control 20,000.00$ 25,000.00$
Security Cameras 50,000.00$ 75,000.00$
Technology 3,000.00$ 5,000.00$
Parking SystemLow High
Paving 185,000.00$ 225,000.00$
Sidewalk 45,000.00$ 65,000.00$
Playground 200,000.00$ 300,000.00$
Columbia Elementary School Probable Cost
Mechanical Repair Cost
Repair Mechanical Systems 905,000.00$ 1,135,000.00$
Parking Repair Cost
Repair Parking Systems 430,000.00$ 590,000.00$
Columbia Elementary School Probable Cost
Electrical Repair Cost
Repair Electrical Systems 246,000.00$ 291,000.00$
Columbia Elementary School Probable Cost
Columbia Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 464/560
Door Systems Door Repair Cost
W1 13,500.00$
W2 13,500.00$
S3 4,500.00$
S4 4,500.00$
S5 13,500.00$
S6 3,500.00$
S7 6,500.00$
S8 6,500.00$
E9 28,000.00$
E10 34,000.00$
E11 11,500.00$N12 2,500.00$
N13 4,500.00$
N14 19,500.00$
Riddle Elementary Probable Cost
166,000.00$
Repair Door
Systems
Riddle Elementary Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 465/560
Exterior System
Low High
Clean and Paint 2,500.00$ 3,000.00$
Sealant and Caulking 10,000.00$ 20,000.00$
Brick Damage 12,000.00$ 16,000.00$
Mechanical Cover 1,000.00$ 2,500.00$
Brick Damage 1,000.00$ 1,500.00$
Concrete and Ladder 22,000.00$ 28,000.00$
Canopy 500.00$ 1,000.00$
Canopy and Soffit 5,500.00$ 10,000.00$
Gymnasium
Low High
Main Gymnaium 65,000.00$ 85,000.00$
Auxiliary 65,000.00$ 85,000.00$
Interior System
Low High
Kitchen 250,000.00$ 350,000.00$
Carpet and Tv 175,000.00$ 225,000.00$Casework 120,000.00$ 150,000.00$Acoustical Ceiling Tile 250.00$ 400.00$
Riddle Elementary School Probable Cost
Exterior Repair Cost
Repair Exterior Systems 54,500.00$ 82,000.00$
Interior Repair Cost
Repair Interior Systems 545,250.00$ 725,400.00$
Riddle Elementary School Probable Cost
Gymnasium Repair Cost
Repair Gymnasium Systems 130,000.00$ 170,000.00$
Riddle Elementary School Probable Cost
Riddle Elementary Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 466/560
Mechanical System
Low High
Cafeteria Air Handler 30,000.00$ 40,000.00$
Chilled Water Plant 200,000.00$ 225,000.00$
Gymnasium RTU 50,000.00$ 75,000.00$
Hot Water Plant 200,000.00$ 250,000.00$
Original Plumbing Fixtures 40,000.00$ 60,000.00$
Reno. Plumbing Fixtures 40,000.00$ 60,000.00$
Thermostats and Controls 100,000.00$ 125,000.00$
Unit Ventilators 175,000.00$ 200,000.00$
Electrical System
Low High
Master Clock System 17,500.00$ 17,500.00$
Emergency Power System 2,500.00$ 2,500.00$
Exterior Lighting 41,000.00$ 41,000.00$
Fire Alarm System 25,000.00$ 45,000.00$
Interior Lighting 72,500.00$ 72,500.00$
Paging / Intercom System 1,500.00$ 1,500.00$
Power Distribution 50,000.00$ 60,000.00$
Security Access Control 20,000.00$ 25,000.00$
Security Cameras 75,000.00$ 125,000.00$
Technology 3,000.00$ 5,000.00$
Parking SystemLow High
Paving 175,000.00$ 200,000.00$
Sidewalk 30,000.00$ 65,000.00$
Playground 200,000.00$ 300,000.00$
Riddle Elementary School Probable Cost
Mechanical Repair Cost
Repair Mechanical Systems 835,000.00$ 1,035,000.00$
Parking Repair Cost
Repair Parking Systems 405,000.00$ 565,000.00$
Riddle Elementary School Probable Cost
Electrical Repair Cost
Repair Electrical Systems 308,000.00$ 395,000.00$
Riddle Elementary School Probable Cost
Riddle Elementary Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 467/560
Door System Door Repair Cost
W1 61,000.00$
S2 16,500.00$
S3 2,500.00$
S4 6,500.00$
S5 2,500.00$
S6 4,500.00$
S7 26,500.00$
S8 6,500.00$
S9 6,500.00$
S10 2,500.00$
S11 2,500.00$E12 4,000.00$
E13 61,500.00$
E14 4,500.00$
E15 4,500.00$
E16 $ 3,500.00
E17 $ 3,500.00
E18 2,500.00$
E19 2,500.00$
N20 5,000.00$
N21 5,000.00$
N22 2,500.00$
N23 4,500.00$
N24 4,500.00$
N25 3,000.00$
N26 11,500.00$
N27 5,500.00$
N28 16,500.00$
N29 9,500.00$
1D1 7,500.00$
Rochester High School Probable Cost
Repair Door
Systems 299,500.00$
High School Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 468/560
Exterior Systems
Low High
Concrete Planter 500.00$ 700.00$
Sealant and Caulking 10,000.00$ 15,000.00$
Mechanical Covers 500.00$ 1,000.00$
Broken Window Seal 1,500.00$ 3,000.00$
Drop Off Renovation 2,500.00$ 5,000.00$
Brick Damage 1,000.00$ 1,500.00$
Corrosion Control 500.00$ 1,000.00$
Canopy and Soffits 10,500.00$ 17,000.00$
Gymnasiums
Low High
Gymnasiums 200,000.00$ 250,000.00$
Auxillery Gymnasium 150,000.00$ 200,000.00$
Auditorium
Low High
Auditorium 755,000.00$ 880,000.00$
Rochester High School Probable Cost
Repair Exterior Systems 44,200.00$
Exterior Repair Cost
27,000.00$
Rochester High School Probable Cost
Gymnasium Repair Cost
Repair Gymnasium Systems 350,000.00$ 450,000.00$
Rochester High School Probable Cost
Auditorium Repair Cost
Repair Exterior Systems 755,000.00$ 880,000.00$
High School Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 469/560
Interior Systems
Low High
Kitchen 250,000.00$ 450,000.00$
Carpet and Tv 150,000.00$ 200,000.00$
Casework 250,000.00$ 350,000.00$
Hallway 275,000.00$ 350,000.00$
Mechanical SystemsLow High
Chilled Water Plant 250,000.00$ 500,000.00$
Classroom Terminal Units 250,000.00$ 250,000.00$
Hot Water Plant 500,000.00$ 500,000.00$
Kitchen 75,000.00$ 100,000.00$
Original Mechanical Piping 300,000.00$ 500,000.00$
Original Air Handlers 700,000.00$ 700,000.00$
Addition Air Handlers 250,000.00$ 250,000.00$
Original Plumbing 400,000.00$ 500,000.00$
Addition Plumbing 50,000.00$ 75,000.00$
Rooftop Ventilation 75,000.00$ 75,000.00$
Thermostats and Controls 250,000.00$ 300,000.00$
Rochester High School Probable Cost
Interior Repair Cost
Repair Interior Systems 925,000.00$ 1,350,000.00$
Rochester High School Probable Cost
Mechanical Repair Cost
Repair Mechanical Systems 3,100,000.00$ 3,750,000.00$
High School Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 470/560
Electrical SystemsLow High
Master Clock System 30,000.00$ 40,000.00$
Emergency Power System 50,000.00$ 50,000.00$
Exterior Lighting 97,000.00$ 97,000.00$
Fire Alarm System 8,000.00$ 13,000.00$
Interior Lighting 310,000.00$ 310,000.00$
Paging / Intercom System -$ -$
Power Distribution 50,000.00$ 60,000.00$
Security Access Control 25,000.00$ 30,000.00$
Security Cameras 150,000.00$ 200,000.00$
Technology 6,000.00$ 10,000.00$Auditorium - House Lighting 100,000.00$ 100,000.00$
Auditorium - Sound System 45,000.00$ 45,000.00$
Auditorium - Theatrical Lighting 50,000.00$ 125,000.00$
Athletic Field Lighting -$ -$
Parking Systems Low High
Paving 1,650,000.00$ 1,850,000.00$
Sidewalk 100,000.00$ 125,000.00$
Fence 6,000.00$ 13,000.00$
Rochester High School Probable Cost
Electrical Repair Cost
Repair Electrical Systems 921,000.00$ 1,080,000.00$
Rochester High School Probable Cost
Parking Repair Cost
Repair Parking Systems 1,756,000.00$ 1,988,000.00$
High School Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 471/560
Athletic FieldsLow High
Football and Track 25,000.00$ 50,000.00$
Ticket Booth 7,000.00$ 15,000.00$
Baseball / Softball Field 10,000.00$ 20,000.00$
Restroom / Press Box 8,000.00$ 13,000.00$
Tennis Courts 80,000.00$ 100,000.00$
Rochester High School Probable Cost
Athletic Fields Repair Cost
Repair Electrical Systems 130,000.00$ 198,000.00$
High School Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 472/560
Door System Door Repair Cost
E1 8,500.00$
E2 8,500.00$
W3 8,500.00$
W4 8,500.00$
W5 4,500.00$
N6 4,000.00$
42,500.00$
Rochester Learning Center Probable Cost
Repair Door
Systems
Learning Center Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 473/560
Exterior System
Low High
Sealant and Caulking 5,000.00$ 10,000.00$
Interior System
Low High
Carpet and Tv 50,000.00$ 60,000.00$
Mechanical System
Low High
Energy Recovery Ventilators 20,000.00$ 30,000.00$
Heat Pumps 150,000.00$ 200,000.00$
Pumps 15,000.00$ 20,000.00$
Thermostats and Controls 30,000.00$ 50,000.00$
Learning Center School Probable Cost
Learning Center Probable Cost
Exterior Repair Cost
Repair Exterior Systems 5,000.00$ 10,000.00$
Repair Mechanical Systems 215,000.00$ 300,000.00$
Interior Repair Cost
Repair Interior Systems 50,000.00$ 60,000.00$
Learning Center School Probable Cost
Mechanical Repair Cost
Learning Center Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 474/560
Electrical System
Low High
Master Clock System 8,000.00$ 8,000.00$
Emergency Power System -$ -$
Exterior Lighting -$ -$
Fire Alarm System -$ -$
Interior Lighting 1,000.00$ 1,000.00$
Paging / Intercom System 3,000.00$ 5,000.00$
Power Distribution -$ -$
Security Access Control 20,000.00$ 20,000.00$
Security Cameras 7,000.00$ 10,500.00$
Technology -$ -$
Parking System
Low High
ADA Ramp 2,000.00$ 2,500.00$
Enclosure 6,000.00$ 8,000.00$
Sidewalk 10,000.00$ 15,000.00$
Playground 160,000.00$ 180,000.00$
Learning Center School Probable Cost
Electrical Repair Cost
44,500.00$39,000.00$Repair Electrical Systems
Repair Parking Systems 178,000.00$ 205,500.00$
Learning Center School Probable Cost
Parking Repair Cost
Learning Center Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 475/560
Door System Door Repair Cost
W1 33,500.00$
W2 32,500.00$
S3 4,500.00$
S4 15,000.00$
S5 4,500.00$
S6 2,500.00$
S7 10,500.00$
E8 4,500.00$
N9 2,500.00$
N10 23,500.00$
N11 45,000.00$
N12 2,500.00$
N13 4,000.00$
N14 4,000.00$
Rochester Middle School Probable Cost
Repair Door
Systems 189,000.00$
Middle School Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 476/560
Exterior Systems
Low High
Sealant and Caulking 15,000.00$ 20,000.00$
Brick Damage 1,500.00$ 2,000.00$
Canopy and Soffit 4,000.00$ 6,500.00$
Single-Pane Window System 15,000.00$ 20,000.00$
GymnasiumsLow High
Gymnasiums 100,000.00$ 125,000.00$
Natatorium 100,000.00$ 250,000.00$
Interior Systems
Low High
Kitchen 250,000.00$ 450,000.00$
Carpet and Tv 180,000.00$ 220,000.00$
Sheet Flooring 65,000.00$ 80,000.00$Casework 115,000.00$ 150,000.00$Hallway 275,000.00$ 350,000.00$
Rochester Middle School Probable Cost
Exterior Repair Cost
Repair Exterior Systems 35,500.00$ 48,500.00$
Interior Repair Cost
Repair Interior Systems 885,000.00$ 1,250,000.00$
Rochester Middle School Probable Cost
Gymnasium Repair Cost
Repair Gymnasium Systems 200,000.00$ 375,000.00$
Rochester Middle School Probable Cost
Middle School Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 477/560
Mechanical Systems
Low High
Chilled Water Plant 100,000.00$ 150,000.00$
Gym / Pool Air Handler 100,000.00$ 125,000.00$
Hot Water Plant 250,000.00$ 300,000.00$
Kitchen 50,000.00$ 75,000.00$
Mezzanine Air Handlers 200,000.00$ 250,000.00$
Plumbing Fixtures 50,000.00$ 75,000.00$
Thermostats and Controls 150,000.00$ 200,000.00$
Electrical Systems
Low High
Master Clock System 18,000.00$ 18,000.00$
Emergency Power System 50,000.00$ 50,000.00$
Exterior Lighting 68,000.00$ 68,000.00$
Fire Alarm System 8,000.00$ 13,000.00$
Interior Lighting 129,000.00$ 129,000.00$
Paging / Intercom System -$ -$
Power Distribution 50,000.00$ 60,000.00$
Security Access Control 20,000.00$ 25,000.00$
Security Cameras 125,000.00$ 175,000.00$
Technology 6,000.00$ 10,000.00$
Parking Systems
Low HighPaving 210,000.00$ 250,000.00$
Sidewalk 35,000.00$ 50,000.00$
Rochester Middle School Probable Cost
Mechanical Repair Cost
Repair Mechanical Systems 900,000.00$ 1,175,000.00$
Parking Repair Cost
Repair Parking Systems 245,000.00$ 300,000.00$
Rochester Middle School Probable Cost
Electrical Repair Cost
Repair Electrical Systems 474,000.00$ 548,000.00$
Rochester Middle School Probable Cost
Middle School Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 478/560
Repair Cost Low High
Administration Building Good 107,500.00$ 125,500.00$
Administration Building Fair 92,500.00$ 115,500.00$
Administration Building Poor 10,000.00$ 10,000.00$
Administration Building Failed -$ -$
Administration Building Future 16,000.00$ 22,000.00$
Admin. Building Roof Good 32,200.00$ 37,800.00$
Admin. Building Roof Fair -$ -$
Admin. Building Roof Poor -$ -$
Admin. Building Roof Failed -$ -$
Admin. Building Asbestos -$ -$
Repair Cost Low High
Columbia Good 478,000.00$ 640,000.00$
Columbia Fair 1,042,500.00$ 1,387,500.00$
Columbia Poor 1,657,500.00$ 1,352,500.00$
Columbia Failed 66,000.00$ 91,000.00$
Columbia Future 37,500.00$ 42,500.00$
Columbia Roof Good 130,801.00$ 153,549.00$
Columbia Roof Fair -$ -$
Columbia Roof Poor 630,545.00$ 740,205.00$
Columbia Roof Failed -$ -$
Columbia Asbestos 64,635.25$ Unknown
Repair Cost Low High
Riddle Good 204,500.00$ 306,500.00$
Riddle Fair 1,268,000.00$ 1,544,500.00$
Riddle Poor 877,500.00$ 1,152,500.00$
Riddle Failed 56,250.00$ 92,400.00$
Riddle Future 37,500.00$ 77,500.00$
Riddle Roof Good -$ -$Riddle Roof Fair 474,720.00$ 557,280.00$
Riddle Roof Poor 161,299.00$ 189,351.00$
Riddle Roof Failed 64,124.00$ 75,276.00$
Riddle Asbestos 49,095.00$ Unknown
Administration Building Overall Probable Cost
Columbia Elementary School Overall Probable Cost
Riddle Elementary School Overall Probable Cost
Individual Building Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 479/560
Repair Cost Low High
High School Good 838,500.00$ 940,000.00$
High School Fair 3,123,000.00$ 4,238,500.00$
High School Poor 3,880,000.00$ 4,318,700.00$
High School Failed 386,500.00$ 466,000.00$
High School Future 25,000.00$ 30,000.00$
High School Roof Good -$ -$
High School Roof Fair 129,593.50$ 152,131.50$
High School Roof Poor 1,556,226.00$ 1,826,874.00$
High School Roof Failed -$ -$
High School Asbestos 256,000.00$ Unknown
Repair Cost Low High
Learning Center Good 449,500.00$ 551,500.00$
Learning Center Fair 47,000.00$ 72,500.00$
Learning Center Poor 6,000.00$ 8,000.00$
Learning Center Failed -$ -$
Learning Center Future 27,000.00$ 30,500.00$
Learning Center Roof Good 34,125.00$ 48,750.00$
Learning Center Roof Fair -$ -$
Learning Center Roof Poor -$ -$
Learning Center Roof Failed -$ -$
Learning Center Asbestos -$ -$
Repair Cost Low High
Middle School Good 14,000.00$ 18,000.00$
Middle School Fair 1,640,000.00$ 2,280,000.00$
Middle School Poor 1,076,000.00$ 1,329,000.00$
Middle School Failed 60,500.00$ 65,500.00$
Middle School Future 138,000.00$ 193,000.00$
Middle School Good -$ -$Middle School Fair -$ -$
Middle School Poor 1,053,676.00$ 1,236,924.00$
Middle School Failed -$ -$
Middle School Asbestos 25,000.00$ Unknown
Rochester Middle School Overall Probable Cost
Rochester High School Overall Probable Cost
Learning Center Overall Probable Cost
Individual Building Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 480/560
Repair Cost Low High
Corporation Buildings Good 2,092,000.00$ 2,581,500.00$
Corporation Buildings Fair 7,213,000.00$ 9,638,500.00$
Corporation Buildings Poor 7,507,000.00$ 8,170,700.00$
Corporation Buildings Failed 569,250.00$ 714,900.00$
Corporation Future 377,500.00$ 513,000.00$
Corporation Roofs Good 197,126.00$ 240,099.00$
Corporation Roofs Fair 604,313.50$ 709,411.50$
Corporation Roofs Poor 3,401,746.00$ 3,993,354.00$
Corporation Roofs Failed 64,124.00$ 75,276.00$
Corporation Asbestos 394,730.25$ Unknown
Controlled Vestibule Reno. 160,000.00$ 200,000.00$
Future Building Expansion 3,000,000.00$ 3,250,000.00$
Contingency Fees 10% 10%
A/E Design Fees 6.5%* 7.5%**
* 6.5% Is based on no public bidding being involved in the project.
**7.5% Is based on the inclusion of the public bidding process.
Good Building Condition - A building system that may last another fifteen (15) plus years with fair
maintenance practices. The overall probable cost for all GOOD building conditions (including roof
systems) is between $2,289,126.00 - $2,821,599.00.
Fair Building Condition -A building system that may last another five to seven (5-7) years with good
maintenance practices. The overall probable cost for all FAIR building conditions (including roof
systems) is between $7,817,313.50 - $10,347,911.50.
Poor Building Condition - A building system that needs immediate maintenance attention and may be
harming the surrounding building systems. Poor building systems need to be replaced within the next
two (2) years. The overall probable cost for all POOR building conditions (including roof systems) is
between $9,918,746.00 - $11,422,554.00.
Failed Building Condition - A failed building system may be potentially harming the surrounding
building systems. Failed building systems need immediate maintenance attention and need to be
replaced as soon as possible. The overall probable cost for all FAILED building conditions (including
roof systems) is between $633,374.00 - $790,176.00.
Rochester Community School Corporation Overall Probable Cost
Corporation Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 481/560
Please Note: Probable cost for building conditions based upon spring 2013 pricing. The probable
cost for the roof conditions based upon fall 2012 pricing.
Controlled Vestibule Renovation - Riddle Elementary, Columbia Elementary, and Rochester Middle
School are reasonably capable of incorporating a controlled vestibule renovation to improve security.
The overall probable cost for the controlled vestibule renovation in all three schools is between
$160,000.00 and $200,000.00.
Corporation Future Equipment - A building system that currently does not existing and may need to
be installed in the near future. The overall probable cost for all FUTURE EQUIPMENT is between
$377,500.00 - $513,000.00.
Corporation Asbestos - The school corporation includes four buildings that contain asbestos. The
overall quantifiable probable cost for all asbestos removal is approximately $394,730.25. Many of the
buildings contain an unquantifiable amount of asbestos material and will need to be examined during
construction.
Future Building Expansion - Riddle Elementary and Columbia Elementary are designed to allow for a
building expansion of four (4) classrooms each. The overall probable cost for a four classroom
addition to both Riddle Elementary and Columbia Elementary is between $3,000,000.00 and
$3,250,000.00.
Corporation Probable Cost
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 482/560
B E N C H M A R KH I G H - E F F I C I E N C Y B O I L E R S
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 483/560
AERCO. The benchmark o f h igh-e f f ic iency fo r 25 years .
1988
First high-efficiency, commercial,
condensing, modulating domestic
water heater and hydronic boiler
(KC-1000 family) in the U.S.
1997
Benchmark family of condensing,
modulating boilers introduced setting
a new standard in commercial boilers.
200Bench
ACHR
AERCO introduced condensing firetube designs to
the commercial marketplace 25 years ago, raising the
standard in hydronic heating. While other companies
have attempted to develop similar designs, only
AERCO has decades of experience, making its
condensing, fully modulating boilers the standard
by which all others are measured.
The Benchmark boiler family re-affirms AERCO’s
leadership. Having the longest, proven performance
record of any condensing, modulating boiler,
Benchmark delivers unparalleled cost savings,
efficiency benefits, and design advantages. With the
introduction of re-designed 3 million BTU/hr and
revolutionary 6 million BTU/hr models, AERCO
once again raises the bar.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 484/560
2011
Benchmark 750 and 1000 with
O2 Monitoring introduced.
sign Award.
iler manufacturer to achieve
irmation of performance
2008 2012
Introduction of the
Benchmark 3000 and
6000 with O2 Trim,
patent pending.
• Available in six models ranging from 750,000 BTU/hr to 6 million BTU/hr
• High Efficiency – up to 99%
• Stainless Steel Firetube Heat Exchanger
• Low NOx and CO Emissions
• Small Footprint
• Installation Flexibility
• Serviceability
• Designed and Manufactured in the USA
Benchmark 1.5 Million BTU/hr. boiler
introduced; Benchmark 1.5 Low NOx
condensing boiler selected by Buildings
as a Editors’ Choice Top Product Pick;
Benchmark 2.0 Low NOx boiler earns
Readers’ Choice Award from ED+C and
Sustainable Facility .
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 485/560
LEADER IN HIGH EFFICIENCY
High efficiency has become a buzz term in recent years but it is a philosophy at AERCO. Since the first
Benchmark boiler was installed in 1997, it has set the gold standard for high efficiency.
Benchmark Model Numbers As Approved and
Listed on the AHRI Directory
BMK750
BMK1000
BMK1.5
BMK2.0
BMK3000
BMK6000
Thermal Efficiency, 100% Input • (High Fire)
100°F Temperature Differential • (80°F to 180°F)
95.6 %
96.8 %
95.4 %
91 %
93.5 %
92.5 %
Reliability
First introduced in 1997, the Benchmark boiler is among the oldest high-efficiency products available in the
U.S. The market leader for the last decade, several thousand Benchmark units have been installed throughout
North America and have continued to operate flawlessly season after season.
Their performance proven reliability can be credited to:
• Superior Construction Materials – A new 439 stainless steel heat exchanger offers even longer life and
improves longevity with a simplified design that has only two moving parts.
• Advanced Design and Components – AERCO’s patented air/fuel delivery system and fully modulating burner
reduces cycling losses, as well as wear and tear.
• Warranty – AERCO stands behind its products. The heat exchanger in the Benchmark boilers has a 10-year
full (non-prorated) warranty.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 486/560
Venting Versatility
Benchmark products provides a number of
venting options. Sidewall, through-the-roof,
and sealed combustion capabilities (direct-
vent), approved for venting with PVC,
CPVC, Polypropylene, or AL29-4C
materials, are all available and provide
broad installation flexibility and savings.
Space-saving Design
All Benchmark products are delivered asa single, fully assembled unit. Its small
footprint, doorway size, and quiet operation
make it ideal for both new construction and
retrofit applications. Our new Benchmark
6000 model is the most compactly designed
6 million BTU/hr boiler in the market. No
one is even close. A re-designed Benchmark
3000 model is 22% smaller than earlier
generations.
Zero Side Clearance
The redesigned Benchmark can be serviced
via the front or top of the boiler, as well as
the side. This flexibility allows units to be
configured side-by-side.
INSTALLATION ADVANTAGES
Vertical vent/room air Sidewall vent/room air
Direct-vent Vertical vent/sidewall air
Common vertical vent/ room air
Common vertical vent/ individual vertical air
Common vertical vent/ individual sidewall air
Individual sidewall vent/ common sidewall air
Vent Configurations
BMK 3000
Shown
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 487/560
ENVIRONMENTAL
The Greenspec® Listed Benchmark boilers are perfect for “green” designs. Their small
footprint, flexible venting/piping options, high efficiency, and lower operating costs can
help facilities earn LEED points. Benchmark has been designed with environmentaladvantages:
• O2 monitoring system* – Benchmark units are available with AERCO’s proprietary
O2 monitoring system, which displays the oxygen level directly on the C-More controller
in real time. It can be monitored via Modbus, so customers can measure emission
levels and fuel combustion efficiency to maximize fuel economy.
*Note- Optional on BMK750, BMK1000 and Standard on BMK3000 and BMK6000
• Low NOx burner – Benchmark boilers are fitted with a low NOx burner whose
emissions consistently meet the highest regulatory standards. Ultra low NOx
(9 ppm or less) calibrations are available.**
**See tech data sheets for model specs.
Advanced Controls
C-More
Efficiency and operation is further optimized via the C-More Touch Screen Control System. Intuitive, advanced,
and simple to operate, C-More combines temperature and operating controls, combustion safeguards and fault
enunciator functions – all at your fingertips! Benefits include:
• User-friendly touch screen (optional)
• Simplifies diagnostic troubleshooting
• Full integration with BAS and EMS systems
• Supports remote monitoring and control
Ensures fail-safe boiler operation (if external building controls fail).
Remote Data Collection
AERCO’s remote data collection continually monitors the internal operations of your AERCO equipment,
scanning performance parameters and potential fault risks. This information, transmitted via Internet, is
collected and evaluated at our data center. Our data center has the capability to monitor performance trends
and fault occurrences. Future capabilities include early warnings before faults occur and email alerts to the user.*
*Consult AERCO if you are interested in the benefit of remote monitoring service.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 488/560
AT A GLANCE
Benchmark 750 (BMK750) and Benchmark 1000 (BMK1000)
Features:
6-inch Exhaust ConnectionPVC, CPVC, Polypropyleneor AL29-4C venting
State-of-the-Art Air/FuelDelivery System
Optional Dual High andLow Temperature Zone
Return connections*
Hot Water Supply
Fiber MeshUltra Low NOx Burner
Advanced 439 stainless steelheat exchanger design
• BMK 750 – 15:1 Turndown Ratio (7%)
• BMK 1000 – 20:1 Turndown Ratio (5%)
• Oxygen Level (O2) Monitoring (optional)
• Stainless Steel Firetube Heat Exchanger
• Capable of variable primary flow installations
• NOx Emissions 20 ppm or less at all firing rate
• 9 ppm optional calibration
• Compact Footprint (25"D x 28"W x 78"H)
• High and Low Temperature System Return
Connections
• Sealed Combustion Capable
• Acceptable vent materials AL29-4C, Polypropylene,
CPVC, and PVC
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 489/560
AT A GLANCE
Benchmark 3000 (BMK3000)
Features:
Hot Water SupplyConnection
8-inch ExhaustConnection Polypropylene
or AL29-4C venting
Advanced 439 stainlesssteel heat exchanger design
State-of-the-Art Air/FuelDelivery System
Fiber meshLow NOx Burner
Cold WaterReturn Connection
• Natural Gas
• 15:1 Turndown Ratio (7%)
• Oxygen Level (O2) Monitoring
• Stainless Steel Firetube Heat Exchanger
• Capable of variable primary flow installations
• NOx Emissions 30 ppm or less at all firing rates
• Compact Footprint (78"H x 28"W x 56"D)
• Sealed Combustion Capable
• Acceptable vent materials AL29-4C, Polypropylene
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 490/560
AT A GLANCE
Benchmark 6000 (BMK6000)
Features:
Fiber MeshUltra Low NOX Burner
Advanced439 stainless steelheat exchanger design
Cold WaterReturn Connection
State-of-the-ArtAir/Fuel Delivery
System
Hot Water Supply Connection
14-inch ExhaustConnection orAL29-4C venting
• Natural Gas
• 15:1 Turndown Ratio (7%)
• Oxygen Level (O2) Monitoring
• Stainless Steel Firetube Heat Exchanger
• Capable of variable primary flow installations
• NOx Emissions 20 ppm or less at all firing rates
• Compact Footprint (78"H x 34"W x 88"D)
• Sealed Combustion Capable
• Acceptable vent materials AL29-4C
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 491/560
ACCESSORIES
AERCO Control System (ACS)
Strongly recommended to maximize modular heating plant efficiency, AERCO
Control System (ACS) offers remote access and control of multiple boiler
installations and is compatible with Building Automation Systems via Modbus
open protocol or conventional analog systems.
Boiler Valve Control
Designed for variable flow heating systems, the AERCO Boiler Valve Controller
automatically sequences each motor operated valve* (MOV) – reducing the
system’s minimum flow requirement to a single boiler’s minimum flow. For
example, a four BMK2.0LN installation without MOV requires 4 x 25 = 100 gpm
minimum system flow, while the same installation with MOVs and the AERCO
Boiler Valve Controller will only require 25 gpm minimum system flow. When
system demand is satisfied, the Boiler Valve Controller opens all MOVs,
preventing system pump dead head conditions.
Motorized Valves
The Belimo F6...HDU Series 2-way butterfly valves are designed to meet the
needs of HVAC and commercial application requiring bubble tight shut-off for
liquids. Typical applications include boiler isolation, chiller isolation, cooling
tower isolation, change-over systems, air handler coil control, bypass and process
control applications.
AERCO Protonode/Gateways
AERCO offers a multi-protocol, communications gateway to support integration
with customers’ building control and energy management systems. The plug-n-
play package supports integration with BACnet/IP, BACnet MS/TP, LonWorks, and
Johnson Controls Metasys N2 systems. AERCO’s Communications Gateway is
available for all AERCO boilers, *water heaters and electronically controlled
indirect systems.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 492/560
INSTALLATION
Sample Installation
1. Benchmark 3000
2. AERCO Control System (ACS) and ACS Relay Panel
3. Motorized Valves
4. Buffer Tank
5. SmartPlate
1
2
4
5
3
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 493/560
BENCHMARK SPECIFICATIONS
750 1000 1.5
Adjustable Temperature Control 50°F to 190°F 50°F to 190°F 50°F to 190°F
Ambient Temperature 0°F to 130°F 0°F to 130°F 0°F to 130°F
Accuracy +/-4°F +/-4°F +/-4°F
Input 750,000 BTUH (Natural Gas) 1,000,000 BTUH (Natural Gas) 1,500,000 BTUH (Natural Gas)
Net Output 697,000 BTUH (Natural Gas) 930,000 BTUH (Natural Gas) 1,395,000 BTUH (Natural Gas)
Turndown Ratio 15:1 20:1 20:1
Flue Size 6" Diameter 6" Diameter 6" Diameter
Flue Material (per local code) PVC, CPVC, PP or AL29-4C PVC, CPVC, PP or AL29-4C AL29-4C
Water Inlet and Outlet 3" 150# Flange 3" 150# Flange 3" 150# Flange
Gas Connection 1" NPT Male 1" NPT Male 1.5" NPT Male
Gas Pressure Requirements 14" WC Maximum, 14" WC Maximum, 14" WC Maximum,
4" WC Minimum at Full Load 4" WC Minimum at Full Load 4" WC Minimum at Full Load
Min/Max Water Flow 25-150 GPM 25-150 GPM 25-225 GPM
Condensate Connection 3/4" NPT Female 3/4" NPT Female 3/4" NPT Female
Maximum Condensate Flow 6 GPH 8 GPH 9 GPH
Pressure Rating 160 PSIG at 210°F 160 PSIG at 210°F 160 PSIG at 210°F
NOx Emissions Certifcations SCAQMD, TCEQ SCAQMD, TCEQ SCAQMD, TCEQ
Standard Listing and Approvals UL, CUL, ASME UL, CUL, ASME UL, CUL, ASME
Gas Train Options FM Compliant or Factory Installed, FM Compliant or Factory Installed, FM Compliant or Factory Installed,
Double Block and Bleed (Formerly IRI) Double Block and Bleed (Formerly IRI) Double Block and Bleed (Formerly IRI)
Electrical Requirements 120/1/60 20 AMP (9 AMP FLA) 120/1/60 20 AMP (9 AMP FLA) 120/1/60 20 AMP (13 AMP FLA)
Water Pressure Drop at 20° delta T 1.5 psi 3 psi 4 psi
Water Volume 16.25 gallons 14.25 gallons 27 gallons
Weight, Installed 669 lbs. (dry), 802 lbs. (wet) 700 lbs. (dry), 817 lbs. (wet) 1,533 lbs. (dry), 1,757 lbs. (wet)
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 494/560
2.0 3000 6000
Adjustable Temperature Control 50°F to 190°F 50°F to 190°F 50°F to 190°F
Ambient Temperature 0°F to 130°F 0°F to 130°F 0°F to 130°F
Accuracy +/-4°F +/-4°F +/-4°F
Input 2,000,000 BTUH (Natural Gas) 3,000,000 BTUH (Natural Gas) 6,000,000 BTUH (Natural Gas)
Net Output 1,820,000 BTUH (Natural Gas) 2,790,000 BTUH (Natural Gas) 5,580,000 BTUH (Natural Gas)
Turndown Ratio 20:1 15:1 15:1
Flue Size 8" Diameter 8" Diameter 14" Diameter
Flue Material (per local code) AL29-4C PP or AL29-4C AL29-4C
Water Inlet and Outlet 4" 150# Flange 4" 150# Flange 6" Victaulic with 150# Flange option
Gas Connection 2" NPT Male 2" NPT Male 2" NPT Male
Gas Pressure Requirements 14" WC Maximum, 14" WC Maximum, 2 PSI Maximum,
4" WC Minimum at Full Load 4" WC Minimum at Full Load 20" WC Minimum at Full Load
Min/Max Water Flow 25-350 GPM 25-375 GPM 75-600 GPM
Condensate Connection 3/4" NPT Female 1.5" Male 1.5" Male
Maximum Condensate Flow 10 GPH 20 GPH 40 GPH
Pressure Rating 160 PSIG at 210°F 160 PSIG at 210°F 80 PSIG at 210°F
NOx Emissions Certifcations SCAQMD, TCEQ SCAQMD, TCEQ SCAQMD, TCEQ
Standard Listing and Approvals UL, CUL, ASME UL, CUL, ASME UL, CUL, ASME
Gas Train Options FM Compliant or Factory Installed, FM Compliant or Factory Installed, FM Compliant or Factory Installed,
Double Block and Bleed (Formerly IRI) Double Block and Bleed (Formerly IRI) Double Block and Bleed (Formerly IRI)
Electrical Requirements 120/1/60 20 AMP (15 AMP FLA) 208-230/3/60 20 AMP (10 AMP FLA) 208-230V/3/60 30 AMP (16.3 AMP FLA)
460-230/3/60 15 AMP (5 AMP FLA) 460/3/60 15 AMP (7.3 AMP FLA)
Water Pressure Drop at 20° delta T 1.7 psi 3 psi 4 psi
Water Volume 24 gallons 80 gallons 110 gallons
Weight, Installed 1,450 lbs. (dry), 1,650 lbs. (wet) 1,700 lbs. (dry), 2,364 lbs. (wet) 3,000 lbs. (dry), 3,920 lbs. (wet)
Business/Residential/Hotels
Government
Education
Hospitals
Industrial
Stadiums/Arenas
BENCHMARK SPECIFICATIONS
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 495/560
SALES REPRESENTATIVES THROUGHOUT THE WORLD
HEAT EXCHANGERS • WATER HEATERS • BOILERS • CONTROL VALVES • STEAM GENERATORS
AERCO INTERNATIONAL, INC. • BLAUVELT, NY 10913
845.580.8000 • FAX 845.580.8090 • 1.800.526.0288www.aerco.com • email: [email protected] Doc 04/12
Distributed by:
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 496/560
Application Flexibility Minimizes Installation Time and Reduces Cost
Make-up Air Applications
Up to 100% Outside Air
Dehumidifcation and
Filtration Capabilities
Large Tonnage Rootops
with Small Footprints
Factory Installed or Customer
Specifc Controls Options
S e r i e s
RN/RQ
PACKAGED ROOFTOP UNITS, HEAT PUmPS
& OUTDOOR AIR HANDLING UNITS• Air-cooledcondenserorair-source
heatpumppackagedDXrooftopunits,
2-140tons
• Water-cooledcondenser,water-source
heatpump,orgeothermalheatpump
congurations
• Chilledwaterornon-compressorized
DXairhandlingunits,800-42,000cfm
• R-410Ascrollcompressors-one,two
orfourstagecooling
• Variablecapacityandvariablespeed
R-410Ascrollcompressorsforload
matchingcoolingandimprovedpart
loadefciency.
• Electric,gas,steamorhotwater
heating• Directdrivebackwardcurvedplenum
supplyfans
• Powerexhaustandpowerreturn
options
• FactoryinstalledAAONAIRE®totaland
sensibleenergyrecoverywheels
• Doublewallrigidpolyurethanefoam
panelconstructionwithaminimum
R-valueof13
• Serviceaccessdoorswithfulllength
stainlesssteelpianohingesand
lockablehandles
• Slopedstainlesssteeldrainpans
Features:
2 - 6 ton
6 - 25 & 30 ton
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 497/560
• Cabinet construction consists of rigid polyurethane foam panels with G90 galvanized steel
on both sides and a closed cell polyurethane foam interior core. The inner wall protects the
insulation from moisture damage, prevents microbial growth and is easy to clean.
• Two inch rigid polyurethane foam insulated panels have a thermal resistance R-value of 13
or greater, which exceeds the R-value of a cabinet with four inch thick berglass construc-
tion. They also make the cabinet more rigid and resistant to damage and provide increased
sound dampening.
• Access doors with full length stainless steel piano hinges and quarter turn, lockable handles
provide improved reliability over single point hinges and make the unit easily serviceable.
• Corrosion resistant polyurethane paint exceeds a 2,500 hour salt spray test - over 5 times
the industry standard of 500 hours.
• Compressors and unit controls are contained within a compartment isolated from the air
stream for ease of service and increased sound dampening.
• Direct drive backward curved plenum fans with rubber isolation mounts provide improved
energy eciency and reduced maintenance versus belt driven f ans.
• Sloped stainless steel drain pans eliminate standing water which can support microbialgrowth and stainless steel construction prevents corrosion that could lead to water leaks
and contaminants in the air stream.
• Run test report, wiring diagram and Installation, Operation and Maintenance manual with
startup form provided in control access compartment of every unit.
• 5 year non-prorated compressor warranty, 15 year non-prorated aluminized steel gas heat
exchanger warranty and 25 year non-prorated stainless steel gas heat exchanger warranty.
Superior Features
RN/RQRooftop/Air Handler
AAON RN and RQ Series rooftop units con-tinue to lead the packaged rooftop equip-
ment industry in performance and service-
ability. Double wall rigid polyurethane foam
insulated cabinet construction and direct
drive backward curved plenum fans allow
RN and RQ Series units to have quiet, energy
ecient airow with high static pressure
capabilities. RN and RQ Series units also
feature lockable hinged doors which provide
service access to all sections of the unit.
• Variable capacity and variable speed R-410A scroll compressors for load
matching cooling and improved part load eciency.• Refrigerant-to-water heat exchanger for improved unit eciency.
• Air-source, water-source and geothermal heat pump options for energy
ecient heating.
• Factory installed total or sensible AAONAIRE® energy recovery wheels.
• Humidity control options including: High Capacity Coils, Modulating Humidity
Control, Return Air Bypass and Mixed Air Bypass.
• Chilled water cooling coils allow unit to tie into existing chilled water system.
• Hot water or steam heating coils allow unit to tie into existing boiler system.
• Polymer e-coated coils, copper nned coils and stainless steel coil casings are
available to extend the life of the coils and protect them in corrosive
environments.
• Power exhaust and power return fans with economizer for applicationexibility.
• VFD controlled supply, exhaust and return fans for precise airow control,
building pressure control and reduced power consumption.
• Modulating gas heat with stainless steel heat exchanger provides greater fuel
eciency, longer heater life and improved occupancy comfort.
• SCR (Silicon Controlled Rectier) electric heat control for reduced power
consumption, longer heater life and improved occupant comfort.
• Multiple high eciency air ltration options.
• Unit controls options including factory installed control-by-others.
Premier Options
B Cabinet Air Handling Unit
W L
H
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 498/560
Air-Cooled or Water-Cooled Condensers
RN/RQ
ModelCabinet Air-Cooled EER
Water-Cooled
EERNominal CFM Width Height* Length*
RQ-002
-- Up to 19.2 SEER NA
800
44 43 82
RQ-003 1,200
RQ-004 1,600
RQ-005 2,000
RQ-006 2,400
RN-006
A Up to 14.0 NA
1,800
79 44 82RN-007 2,100
RN-008 2,400
RN-010 3,000
RN-009
B Up to 13.9 NA
2,700
96 50 88RN-011 3,300
RN-013 3,400
RN-015 4,500
RN-016
C Up to 12.7
NA
4,800
101 59 110
RN-018 5,400
RN-020 6,000
RN-025Up to 16
7,500
RN-030 9,000
RN-026
D Up to 12.2 Up to 16.5
7,800
100 97 155
RN-031 9,300
RN-040 12,000
RN-050 15,000
RN-060 18,000
RN-070 21,000
RN-055
E Up to 11.6 Up to 15.2
16,500
142 102 294
RN-065 19,500
RN-075 22,500
RN-090 27,000
RN-105 31,500
RN-120 36,000
RN-130 39,000
RN-140 42,000
*Length and height vary depending on options selected.
All dimensions are in inches.
Design cfm may be 30-50% greater or less than nominal cfm.
R-13 Double Wall RigidPolyurethane Foam PanelConstructionAAON is setting a new standard for performance
with double wall construction using closed cellpolyurethane foam insulation. Not only does it hav
more than twice the insulating R-value, it creates
far more rigid and stronger assembly with less air
leakage than berglass insulated panels.
Dehumidifcation AAON oers many humidity control options. High
capacity cooling coils are available which allow for
more dehumidication versus standard cooling co
Return air bypass and mixed air bypass are availab
on RN Series units for single coil humidity control.
Modulating humidity control is available to provid
energy ecient dehumidication, even with low
sensible heat loads, without the temperature swin
common with on/o reheat systems.
Make Up Air CapabilityAAON RN and RQ Series units have make up air
capability and can be specied with up to 100%
outside air. AAONAIRE® energy recovery wheels
are available on make up air units to increase the
unit’s energy eciency. High capacity cooling
coils are available to handle the higher latentload of outside air. Modulating gas heat and
SCR electric heat are available to provide energy
ecient, consistent supply air temperature heatin
Modulating humidity control is available to provid
dehumidication without over cooling when the
outside air humidity is above setpoint. Variable
capacity scroll compressors are available to provid
energy ecient consistent supply air temperature.
Air Handler OptionAAON RN and RQ Series outdoor air handling units
provide a hydronic cooling and heating option. Gaelectric, steam and hot water heating are available
on an RN and RQ Series air handling units. Cabinet
construction is similar to the packaged rooftop uni
with easily accessible coil connections.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 499/560
It is the intent of AAON to provide accurate and current product information. However, in the interest of product improvement, AAON reserves the right to changepricing, specications, and/or design of its product without notice, obligation, or liability. Copyright © AAON, all rights reserved throughout the world. AAON® andAAONAIRE® are registered trademarks of AAON, Inc., Tulsa, OK.
AAON Environmentally Friendly HVAC Product Family
Auditoriums
Convenience Stores
Health Clubs
Healthcare Facilities
Homes
Lodgings
ManufacturingMuseums & Libraries
Natatoriums
Ofce Buildings
Restaurants
Retail Stores
Schools
Supermarkets
Heating and Cooling for...
Custom & CatalogedAir Handling Units
(800-200,000+ cfm)
Condensers & Condensing Units(2-230 tons)
Chillers (Air-Cooled, Evaporative-Cooled, Heat Pumps)
(5-365 tons)
Rooftop Units(2-240 tons)
Outdoor Equipment Rooms(Chillers, Boilers & Pumps)
Self Contained Units(2-70 tons)
Residential Systems(2-5 tons)
Geothermal & WSHP Units(2-230 tons)
Air-Source Heat Pumps(2-230 tons)
Dening Quality. Building Comfort.
2425 S. Yukon Ave.Tulsa, OK 74107-2728
www.AAON.com
RN/RQ • R69530 • 111024
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 500/560
A Legacy of Training
Willis H. Carrier began training members ofthe heating, ventilation, air conditioning andrefrigeration industry in 1905. Carrier continues
to promote technical expertise in the industrywith the expansion of its sustainable solutions
curriculum and has recently been named a U.S.Green Building Council Education Provider (USGBC EP).
To earn this status, Carrier’s course materials were reviewedby a panel of USBGC peers and deemed to provide the high
level of quality required for training Leadership in Energy andEnvironmental Design (LEED®) professionals. The courses andworkshops supporting LEED-Accredited Professional and Green
Associates credential maintenance are administered throughCarrier University.
election GuideConfiguration Airflow (CFM) Air Inlet Colors Controls
Vertical 500-1,500 Front Return Polar Ice
Draft Stop Return Beige Carrier Unit Vent Open Controls
Gray DDC Ready
Horizontal 750-2,000 Bottom Return White 3rd Party Factory-Installed
Rear Return Charcoal Bronze
Control Type Cooling Coil Heating Coil Motors Valve Packages
Valve Control Cold Water Hot Water PSC 2-Way Valves
Face & Bypass DX Steam ECM 3-Way Valves
Electric
1-800-CARRIER www.carrier.com
© 2011 Carrier Corporation
A member of the United Technologies Corporation family.
Stock symbol UTX. Cat. no. 04-811-50006
Manufacturer reserves the right to discontinue, or change at any time,
specifications or designs, without notice and without incurring obligations.
enefits at a Glanceor Building Owners andanagersReliable operationDelivers great occupant comfortReduced operating costsQuiet operationEasy to maintain
or Consulting EngineersSimple to specifyQuiet operationSystem-integrated controlsSingle-source system designETL and AHRI certified products
or ContractorsExtensive factory-installed optionsReduced installation expensesIdeal for replacementEasy to service
The Future of the World Depends on Our Ability…
to Sustain it.
As the world’s leader in high technology
heating, air-conditioning and refrigerationsolutions, we believe that market leadershiprequires environmental leadership. Carrier
sets industry standards for environmentally
sound business practices and a commitment to sustainabilityacross its products, services and operations. We demonstrate
this commitment by creating environmentally responsiblesolutions that consume less energy and incorporate innovations
that improve the world – indoors and out.
AIRSTREAM™ Unit Ventilators
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 501/560
e overall environment in classrooms is vital to the learning process.ithout the discomfort and distraction of high noise levels, damp or
y air, pollutants or temperature variations, students can learn better andster. How do you create such an environment and at the same time,
nimize your investment, energy use and operating costs? By makingrStream™ unit ventilators part of your heating and cooling system.
arrier’s AirStream unit ventilators operate with sensitive controls, soat you can open the room to outside fresh air as needed and the
ntrols will determine the correct blend with conditioned air to providesafe, comfortable learning environment. In either vertical or horizontal
nfigurations, AirStream units are cost-efficient and easy to install and
aintain. AirStream units are designed to provide occupants with theimate in quiet and comfort.
AirStream™ 40UV
AIRSTREAM™ Unit VentilatorsThe Utmost in Product Flexibility
Flexibility
AirStream unit ventilators come in both vertical and horizontalconfigurations to conform to a variety of room layouts, providing optimalcomfort levels with flexible installation alternatives. Vertical units are
typically mounted against an exterior wall or under a window, in either aclassroom or a hall. The horizontal configuration models can be ceiling-
mounted, either fully exposed or recessed.
Efficiency
Carrier’s AirStream unit ventilators have few moving parts, whichhelps to lower operating costs by enhancing reliability and making
service easier. Full-diameter, permanently lubricated ball bearings alignthe blower shaft, reducing sound, and do not require scheduled service.
A one-piece outdoor/return air damper incorporates a dual-blade seal forpositive control of ventilated air and better seals against cold outside air.
Quiet Operation
AirStream units are built to operate unobtrusively, with quiet motors andfans. A rugged, rigid construction also ensures vibration-free operation,
providing leading sound levels as low as 8 dB lower than previousdesigns.
Durability
Carrier’s AirStream unit ventilators have a modular chassis fabricated
from heavy-gage, die-formed galvanized steel, which preventsdeformation and inhibits corrosion. Each unit’s sturdy frame resists
vibration and ensures correct alignment of the fan shaft and bearings.All coils are constructed of copper tubing that is mechanically bondedto corrugated aluminum plate fins. For ease of maintenance, the modular
design allows components to be removed without disassembling the unit.
40UH Horizontal
• 750to2000CubicFeet/Minute(CFM)• BottomorRearReturns
• FrontorBottomSupply• FuredinorExposed
0UV Vertical
500 to 1500 Cubic Feet/Minute (CFM)16-5/8" and 21-7/8" Depths
Front Toe or Draft Stop ReturnsMultiple Colors Available
The Right Level of Control
AirStream unit ventilators achieve their full potential and capability to tie bothtemperature controls and CO2 air-quality sensors together when they operateas part of the Carrier i-Vu Open control system, a fully-integrated BACnet®
building automation system. The unit ventilator plug-and-play controllerinterface provides heating, cooling, ventilation and dehumidification functions
for total environment control. It’s the Carrier total heating, ventilation andair-conditioning (HVAC) air-quality solution.
Two efficient methods of providing air comfort, valve control or face and bypasscontrol can be selected. Unit ventilators can be supplied with factory-mounted
Carrier or third-party controls to meet any application. Controls can complywith ASHRAE® control cycle I, II or III recommendations.
Standard with Carrier unit vent open controls, electronically communicatedmotors (ECMs) have a higher efficiency and are automatically controlled to
adjust their speed to compensate for variable resistance in the air stream, suchas dirty filters. Thus, the unit ventilator will reliably deliver its nominal airflowrate (±5%) at each defined speed.
For all your comfort needs, Carrier has the right level of control.
ASHRAE is a registered trademark of American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
BACnet is a registered trademark of American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
Frame Construction with Modular Design Improved Blower Design for Quieter Performance
Factory-Installed Controls 3 Removable Panels for Easy Serviceability
Factory-Installed Valve Packages
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 502/560
Engineered or fexibility and perormance™
Pathfnder® Air-Cooled Chiller
170 - 550 Tons
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 503/560
Daikin McQuay Pathfnder Chiller
Innovation that Delivers SolutionsDaikin McQuay products oer industry leading results in quality, perormance andsustainability. The Pathnder Air-Cooled Chiller is the epitome o technology and innovation.
• Most ecient ull load and part load operation
• Quietest sound levels published
• Largest capacity air-cooled screw chiller
• Perormance that can contribute to multiple LEED® points
• D-Net® Perormance Services option or enhanced reliability
• Small ootprint to optimize space and reduce installation costs
• RapidRestore® and ast loading option or mission critical acilities
D-Net Perormance Services For Quicker Response and Enhanced Support
D-Net Perormance Services is an advanced service support option availableon all Pathnder Chiller shipped in the U.S. and Canada that allows McQuayService to remotely monitor your chiller or enhanced perormance andtroubleshooting. Ater this innovative, web-based service is enabled, D-Netprovides a direct electronic link to your Pathnder Chiller. Through this linkMcQuay Service can provide enhanced support, quicker response and lowerservice costs.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 504/560
Solutions or Your Toughest HVAC Issues
20
18
16
14
12
10
8
6
4
2
0
P a r t L o a d
I P L V E
E R
Standard High High with VFD Premium Premium with VFDStandard with VFD
14.714.714.014.0
Pathfinder Chiller Part Load Efficiency
ASHRAE Std. 90.1–2010, 12.75 EER
18.918.9
17.717.716.216.2
19.419.4
Three levels o efciency –
Standard, High and Premium.Optional variable requency drives provide evenmore impressive cost savings at part load.
What Energy Cost Savingsare Right for You?
Compact size or replacementprojects – the length o our 300-ton unitis 9.7 eet less than another manuacturer’s300-ton air-cooled screw chiller. And thePathnder Chiller still provides thesame eciency!
How Much Installation CostsCould You Save?
Quietest air-cooled screw chiller –The Pathnder continues our legacy o air-cooledchillers with the quietest perormance published– sound pressure levels as low as 66 dBA, with noattenuation. We’re so condent o our sound levelsthat we publish them. No one else does.
You Will Hear the Difference!
5’ 10’ 15’ 20’ 25’ 30’ 35’ 40
9.7 Feet Less
Our 300-ton unit is 26.3 feet long
Another manufacturer’s 300-ton unit is 36 feet long
300-ton Unit Length Comparison
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 505/560
Daikin McQuay Pathfnder Chiller
1] Compressor ControlsUses precise control logic or excellent operating ecienciesat both ull and part load.
2] Optimized CondenserMaximum heat transer surace area resulting in a smallunit ootprint.
3] EvaporatorsDirect expansion, pure counter-fow or impressive heatexchanger eectiveness.
4] Economizer
Optimizes rerigerant fow or maximum perormanceon High and Premium eciency models, bothwithout optional variable requency drive.
5] Patented One-piece Molded Fan BladeMoves large quantities o air at exceptionally quiet levels.Composite material developed and tested or 10 years toresist UV light damage and corrosion.
6] Unique Single-rotor Screw Compressor Designed specically to operate more quietly than dualscrew compressors.
7] Easy AccessKey components are conveniently located on the peripheryo the unit: compressors, flter-driers, manual liquid-lineshuto valves.
8] Serviceability Enough headroom or a service person to stand upcomortably inside the unit.
58
3
Interior View
Patented Condenser Fan Blade Design
Single Main Rotor - Dual Gaterotor Screw Compressor
5
612
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 506/560
1 2
69
7
5
10
11
14
13
15
16
17
Pathfnder High Efciency Unit with Optional VFD
4
9] Multiple Compressors with Independent CircuitsFor ecient part load operation and unit redundancy.
10] Precise, Proactive ControlsAdjust to changing operating conditions, keeping the unitsaely online while delivering optimum eciency. Unitcontroller is easy or operators to learn and use.
11] Wye-delta or Solid State StartersBoth starter options are available oering smooth,stepless acceleration and deceleration to reduceelectrical and mechanical stress, resulting inlonger compressor and motor l ie.
12] Power Factor Correction Capacitor As a actory-installed option, power actor correctioncapacitors achieve a ull load power actor o 0.95 orpotentially lower utility bills due to the reduction orelimination o utility penalties or low power actor systems.
13] Expanded Electrical Voltages Ideal or new construction or retrot projects; available at60 Hz (208/230/380/460/575V).
14] Open Choices™ Feature For easy integration with your choice o building controlsystem using BACnet®, LonTalk® or Modbus® protocols.
15] Variable Frequency Drive (VFD) Available as an option, oering industry-leadingpart load eciency and reduced in-rush current.
16] RapidRestore® and Fast Loading
The RapidRestore option allows a Pathnder chiller to staras ast as 30 seconds ater power is restored, ollowing atemporary power loss. Fast Loading can restore ull loadcooling capacity in less than 5 minutes or select models.
17] Remote EvaporatorRemote evaporator option or keeping all chilled waterpiping within a building.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 507/560
Solve Your Biggest Power Loss Concerns
• Faster return to necessary cooling levels
• Keep heat-sensitive servers on-line
• Maintain patient comort in critical care areas
• Eliminate downtime in manuacturing processes
Making Your Building More Sustainable
Innovation that Delivers Solutions
The Pathnder Chiller leads the industry in energy eciency, quiet operation andresponsible rerigerant management. For building owners who want to pursueLeadership in Energy and Environmental Design (LEED®) Green Building certication,the perormance o the Pathnder chiller can contribute to the ollowing LEED points.
• EAc1 , Optimize Energy Eciency 1 to 19 possible points
• EAc4, Enhanced Rerigerant Management 2 points
Pathfnder RapidRestore® and Fast Loading Option
Restore cooling and peace of mind in as fast as 30 seconds
A power loss could turn into a critical loss o cooling in mission critical acilities such as data centers, health care buildings or manuacturingprocesses. A short-term power loss can happen during power interruptions, brown-outs or utility switching operations.
The Pathnder Chiller is available with a RapidRestore optionthat allows it to start as ast as 30 seconds ater power is restored.In addition, the Fast Loading option can restore ull load coolingcapacity in less than 5 minutes. So your critical cooling is restoredbeore it’s missed.
Pathfinder Chillers
Other Air Cooled Screw Chillers
Fast Loading Timeline Comparison
Minutes required to reach 100% load capacity
Pathfinder chiller represented is a 2-circuit model unit with a wye-delta starter.
0 5 10
Fast Loading to 100% Cooling Capacity
Once power has been restored and the chilleris back online, the next critical step is reaching100% cooling capacity as ast as possible.
That’s when the Fast Loading ability o aPathnder chiller with RapidRestore proves itsworth. With Fast Loading, the Pathnder chillercan reach 100% cooling capacity in lessthan ve minutes – while other comparableair cooled chillers need 5 to 10 minutes.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 508/560
Which Pathfnder Chiller is Right or Your System?
StandardEfciency
StandardEfciencywith VFD
HighEfciency
HighEfciencywith VFD
PremiumEfciency
PremiumEfciencywith VFD
Capacity (tons) 190 to 550 170 to 200 210 to 530 240 to 400
Sound pressure(dBA) withoutattenuation1
67 to 73 66 to 67 69 to 74 70 to 75 70 to 72 71 to 72
Power 60 Hz 60 Hz 60 Hz 60 Hz
Refrigerant R-134a R-134 R-134a R-134a
Part load(IPLV, EER)
13.2 to 14.0 17.3 to 17.7 14.0 to 14.7 18.0 to 18.9 15.9 to 16.2 18.8 to 19.4
Full load (EER) 9.6 to 10.1 9.9 to 10.4 10.3 to 10.9 9.6 to 10.2 11.4 to 12.2 11.0 to 11.8
Small unitfootprint Best Best Best Better Better Good
First cost Best Good Better Good Better Good
Life cycle cost Good Best Better Better Best Best
Full loadoptimization
Good Good Better Better Best Better
Part loadoptimization
Good Best Better Best Better Best
Integration options BACnet®, LonWorks®, or Modbus® communications
1. per AHRI Standard 370
Applied Development CenterThe perormance and reliability o the Pathnder Chiller was tested and veried in the Daikin McQuay Applied Development Centerin Minneapolis, MN USA. This $50 million, award-winning research and technology acility is proo o our commitment to continuousperormance improvement and innovation.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 509/560
The ollowing are tradenames or registered trademarks o their respective companies: BACnet rom ASHRAE; LEEDrom U.S. Green Building Council; Modbus rom Schneider Electric; Destiny, D-Net, MicroTech, Open Choices, Pathnder,RapidRestore, RooPak, Skyline, and Vision rom McQuay International. LONMARK, LonTalk and LONWORKS are man-aged, granted and used by LONMARK International under a license granted by Echelon Corporation.
©2012 McQuay International
A/SP 31-262 (07/12)
800.432.1342www.DaikinMcQuay.com
Make it a Complete System for Optimum System Performance and Reliability
Fan Coil Units200 to 3,000 cfm
Destiny™ Indoor Air Handler600 to 15,000 cfm
Unit Ventilators750 to 2,000 cfm
Skyline™, Skyline™Plus Air Handler900 to 65,000 cfm
RoofPak™ Outdoor Air Handler4000 to 50,000 cfm
Vision™, Vision™Plus Air Handler900 to 100,000 cfm
190 to 550-ton Pathfnder Chiller170 to 530-ton Pathfnder Chiller
with VFD25 to 190-ton Scroll Chiller
Choose a Daikin McQuay Air Handler or Terminal Unit
Choose a Daikin McQuay Air-Cooled Chiller
STEP 2
STEP 1
GS-07F-0377V
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 510/560
product data
Mli-thlg ciligo Ss wih Isl rl
BaSIc operatIonOccupancy sensors have two tasks: 1) Keeping the
lights ON while the room is occupied, and 2) Savingenergy by keeping the lights OFF while the room isunoccupied.
Leviton’s OSCxx-RMW sensors combine the ben-efits of both PIR and U/S technologies for unrivaledperformance and reliability. Additionally, the sensoris designed with an isolated relay contact; whichenables the sensor to interface with other systems(example: BAS, HVAC or any dry-contact capabledevice or system).
appLIcatIonS• Cafeterias • Classrooms• Computer rooms • Conference rooms• Day care centers • Stairwells• Workspaces • Executive, open,• Restrooms and private offices• Offices with cubicles
FeatureS
• Multi-Technology: By using both PIR and U/S signals,the sensor minimizes false triggering for high reli-ability.
• Isolated Relay: Supports HVAC or other Class 2 lowvoltage signals
• Supports both 24VAC/VDC power supplies• Wide Coverage: Units from 500 to 2000 sq. ft. avail-
able.• Self-Adjusting: Internal microprocessor continually
analyzes, evaluates and adjusts the sensitivity andtime delay. Performance is kept at a maximum anduser complaints are eliminated.
• Custom white color matched for most common day-
light harvesting architecture• Uses OSPxx Series Power Pack: Uses Class 2, 24volt wiring, three wire connection (low voltage).Multiple sensors can control single or multiplepower packs.
• Additional mid-range lens assembly included forapplications with mounting heights between 12’-20’
• Fast, Simple Installation: Easy ceiling mount, twist-lock sensor attachment for 360° rotation and flex-ibility.
• Small Motion Sensitivity: The ultrasonic tech nologyprovides excellent small motion sensitivity.
• Timer Setting Feature: Automatic – 30sec – 30min.
Test mode – 4sec with auto exit programming.• Non-Volatile Memory: Learned and adjusted set-tings saved in protected memory are not lost dur-ing power outages.
• Walk-Through: Provides increased energy savingsby decreasing the time delay to 2.5min when some-one momentarily walks through the monitoredspace.
• Ultrasonic (U/S) Components: One or two U/Stransducers and one or two narrow bandwidthreceivers each 16mm in diameter. Frequency --Crystal controlled to ±.005%.
• Device: Rugged, high-impact, in jection molded plas-tic, white. Color coded leads 7” (17.78 cm).
Li Mfg. c., I. Lighig & eg Slis
201 N. Service Rd. Melville, NY 11747-3138 Tech Line: 1-800-824-3005 Fax: 1-800-832-9538 www.leviton.com/les© 2011 Leviton Manufacturing Co., Inc. All rights reserved. Subject to change without notice.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 511/560
product data
S i d e b a t i l e
G e s H e e o
S c x x r M W
o S c x x - r M W
Timer Left In Test Mode - Thesensor remains in an 4 sec.test mode.
False-On - The sensorincorrectly turns the lights on.
False-O - The sensorincorrectly turns the lights o.
An installer accidentally leavesthe sensor in the 4 sec. timertest mode and the lights may goo or on every 4 sec.
The sensor detects movementin the corridor or hallway and
the room lights turn on.
The sensor does not detectmovement because anoccupant sits virtuallymotionless at a desk and thelights turn o.
The sensor automaticallyresets the timerto the preset time delay after 15 minutes of
test mode
After an initial movement is sensed,if another movement is not sensed within
the timer setting then the delayed o timesetting is automatically reduced.
Condition Example Adaptive Reaction
If motion is sensed within a short period after
the lights go o, then the current delayed
o-time setting is increased.
HoW tHe oScxx-r autoMatIcaLLy adaptS
dIp SWItcH SettInGSSWItcH SWItcH FunctIonS SWItcH SettInGS
Bank a oFF onA1 Single/Multi-tech Multi-Tech Single TechA2 PIR/Ultrasonic PIR** UltrasonicA3 Manual Mode Auto Adapting Enabled Auto Adapting Disabled
A4 Walk-Thru Disable Walk-Thru Enabled Walk-Thru DisabledBank B
B1 Override to On Auto Mode Lights forced OnB2 Override to Off Auto Mode Lights forced Off B3 Test Mode OFF’ON’OFF Enter/Exit Test ModeB4 LED Disable LEDs Enabled LEDs Disabled
*Bold items are factory defaults**This setting is only used if the Single Techonology Option (Switch A1) is selected
0
20
11.5
11.5
8.5
8.5
20
TOP VIEW
SIDE VIEW
0 202317
11 155.6 93
8
0
FIeLd-oF-vIeW
0
20
11.5
11.5
8.5
8.5
20
SIDE VIEW
TOP VIEW
2323 1717
8
0
111115 1520 2099 33 0 5.65.6
0
20
8
16
16
11.5
11.5
20
SIDE VIEW
TOP VIEW
03 35.5 5.59 911 1115 1520 2032 3222.5 22.5
OSC05-R, 500 sq. ft. OSC10-R, 1000 sq. ft.OSC20-R, 2000 sq. ft.
Major Motion, PIR
0
20ft
020ft 20ft15ft 15ft10ft 10ft5ft 5ft
15ft
10ft
30ft 30ft25ft 25ft
SIDE VIEW
Mid-Bay Lens
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 512/560
Li Mfg. c., I. Lighig Mgm Ssms
20497 SW Teton Avenue, Portland, OR 97062 1-800-736-6682 Tech Line: 1-800-959-6004 Fax: 503-404-5594 www.leviton.com/lms© 2010 Leviton Manufacturing Co., Inc. All rights reserved. Subject to change without notice.
SpecIFIcatIonS
eLectrIcaL
Power Requirements 15-28 VAC/VDC from OSPxx Power Pack or other Class 2power supplies
Isolated Relay 1A @ 30VAC/VDC
Power Consumption DC: OSC05: 25mA, OSC10: 30mA, OSC20: 30mAAC: OSC05: 45mA, OSC10: 50mA, OSC20: 50mA
Output 24 VDC active high logic control signal with short circuitprotection
controLS
Ultrasonic Frequency OSC05/OSC10: 40kHzOSC20: 32kHz
Ultrasonic Sensitivity 0-100%; green knob (factory setting: 50%)
Infrared Sensitivity 0-100%; red knob; (factory setting: 75%)
Time Delay 30sec-30min; black knob (factory setting: 10min)
IndIcatorS
Green LED U/S motion technology
Red LED Infrared motion technology
envIronMentaL
OperatingTemperature Range
32°F to 104°F (o°C to 40°C)
Relative Humidity 0% to 95% non-condensing, for indoor use only
otHer
Mouting Height Low-range lens (default) 8-12 feetMid-range lens 12-20 feet
Dimensions 4.2” W x 1.57” D
Listings CUL/US Certified, meets ASHRAE Standard 90.1 and CECTitle 24 requirements
Warranty Limited Five-Year Warranty
orderInG InForMatIon
cat no. deScrIptIon
OSC05-RMW Multi-Technology Ceiling Sensor, 500 sq. feet of coverage
OSC10-RMW Multi-Technology Ceiling Sensor, 1000 sq. feet of coverage
OSC20-RMW Multi-Technology Ceiling Sensor, 2000 sq feet of coverage
Hot (Black)
Neutral (White)
Load
Blue(Control)
Black
Red
Red
Blue
White
Black
White
Black
Red
Blue
Blue
BlueBlack
Black
Line
120-277-347 VAC
60 Hz
SensorOSPxx Series Power Pack
N/C – Brown
N/O – Brown/White
Common – Green
To BAS System
N/C – Brown
N/O– Brown/White
Common – Green
To BAS System
NAFTA compliant and Made in USA models available
pHySIcaL WIrInG
Com - Black
+24v - Red
Common - Green
N/O - Brown/white
N/C - Brown
Control - Blue
Occupancy
Sensor
Bas
(Or Other
Building
Management
System)
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 513/560
product data
o S c x x - r M W
G-8579/E11-cb
Li Mfig c., I. Lighig & eg Slis201 N. Service Rd. Melville, NY 11747-3138 Tech Line: 1-800-824-3005 Fax: 1-800-832-9538 www.leviton.com/les
visi Wbsi : www.li.m/ls© 2011 Leviton Manufacturing Co., Inc. All rights reserved. Subject to change without notice.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 514/560
UNmATCHED PErformANCE. Beautiful Results.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 515/560
www.BetaLED.com/Essentia
BetaLED ® brings you the inside advantage
BetaLED brings its renowned product benefts inside with Essentia® LED interior
lighting that combines a breakthrough in perormance and control with new
possibilities or optimized lighting perormance and value. Commercial spaces can
now be brilliantly illuminated with a sustainable lighting solution oering signifcant
reductions in operating and maintenance costs.
Our complete interior LED line includes:
Recessed downlights
• 4-, 6-, and 8-inch square and round apertures
• Adjustable and wall-wash confgurations
• Flangeless trim option
Surface cylinder designs
• Surace, pendant, cable or wall-mount options
UNmATCHED PErformANCE. Beautiful Results.
2 | 3
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 516/560
A history o interior lighting success
BetaLED’s expanding line o LED interior lighting products has roots in its
parent company, Ruud Lighting – makers o the successul Kramer Lighting
interior product line. BetaLED’s Essentia innovation is the result o three
decades o experience in providing high perormance lighting solutions or
the most demanding interior lighting applications.
We’ve balanced outstanding perormance with elegance to provide an
extensive palette o lighting options to architects and designers. The result is
industry-leading application success.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 517/560
www.BetaLED.com/Essentia4 | 5
Essentia recessed downlights provide a complete range o products to ll the design requirements o today’s
commercial and high-end residential designs. Unique advantages include:
• High lumen packages in excess o 5,000 initial delivered lumens
• Wide, medium, narrow, wall-wash and adjustable distributions
• Standard dimming (0 to 10 volt)
• Serviceable light engine with replaceable LED array
• Virtually maintenance-ree perormance
• Easy installation design
Impressive lumen packages
A wide variety o downlights, adjustables, and wall-wash luminaires, along with impressive lumen packages in
excess o 5,000 initial delivered lumens, allows designers to meet strict interior lighting perormance requirements
with a complete LED solution. Expect beautiul illumination that meets your design objectives when you choose
Essentia luminaires. R E C E S S E D
D o w n l i g
h t s .
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 518/560
St. Catherine’s High School Auditorium Racine, Wisconsin
One-or-one replacement o 500-watt T4Quartz luminaires with 15 Essentia downlights
•Reduced energy consumption by 84%
• Improved illumination perormance & uniormity
•Dramatically reduced maintenance
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 519/560
www.BetaLED.com/Essentia6 | 7
Essentia interior products oer a compelling alternative when compared to traditional sources. Whether
you’re considering metal halide, ceramic metal halide, fuorescent, quartz halogen or other incandescent sources,
Essentia luminaires bring the advantages o LED technology to interior spaces.
Energy and Maintenance Savings
Essentialuminaires can deliver signicant energy and maintenance savings compared to non-LED sources. You
can eliminate relamping cycles while signicantly cutting energy costs when you choose Essentia LED luminaires.
Lighting Design Integrity
The integrity o any lighting designer’s creation can be compromised the rst time a lamp needs to be replaced.
Essentia luminaires eliminate incorrect beam spreads, varied color temperatures and other re-lamping related
issues that cause the original design intent to suer. Essentia interior luminaires maintain the credibility o your
original design intent and perormance or years to come.
Standard 0-10 volt Dimming
Unlike other light source technologies, LEDs become more ecacious (more lumens per watt) when dimmed.In addition, as LEDs are dimmed, lumen maintenance also improves. All Essentia luminaires are standard with
0-10 volt dimming capability.
Color Quality
The unique blending technique in Essentia luminaires ensures initial color consistency within a 2-step MacAdam
Ellipse rom the initial specied color point. Additionally, we are committed to providing luminaire color
point stability over time, within a 2-step MacAdam Ellipse to the predicted L70point (in hours) or the entire
Essentia product amily.
T H E
E S S E
n T i a
A d v a n t a g e .
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 520/560
University o Houston — Houston, TX
Redesigned lighting system in lecture hall hasa remarkable 67 average oot candles o illumination over the seating area and each row may be individually dimmed. Additionally, one narrow distribution luminaire over the podiumadds to the general illumination and also provides134 oot candles on the podium reading surace.
•28 xtures installed in 8'x8' centers over the seatingarea and one LED luminaire over the teaching podium
•Zoned lighting level control with 0-10 V dimming
•Separate dimming control over podium luminaire
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 521/560
www.BetaLED.com/Essentia8 | 9
Total Systems Approach
The BetaLED Total Systems Approach is our design commitment to achieve excellence. We incorporate
“best-in-class” high power white LED source technology and multiple photometric distributions designed to
provide unsurpassed target illumination perormance. Then, we add industry-leading high eciency drivers and
state-o-the-art thermal management systems to maximize overall luminaire perormance and longevity. The result
is lower total cost o ownership compared to traditional lighting systems.
Optimized Longevity
Essentia recessed luminaires are designed with superior thermal management that maximizes luminous fux and
lumen maintenance o the LED light engine. A unique light-weight, passive thermal management system combines
metal core printed circuit board (MCPCB) technology with a heat sink, heat pipe and thin n assembly to maximize
heat transer rom the LED chip package.
a D V a n C E D
B E T a L E D
D e s i g n .
Thermal Management:the key to Essentia performance and longevity
Managing heat is the core o a high-perorming LED luminaire.BetaLED’s approach maximizes heat transer away rom the LED chip package to keep it cool. Here’s how it works:
• A metal core printed circuit board (MCPCB) rapidly transers heat
rom the LED chip package to the heat sink
• The heat sink provides heat absorption and dissipation
• Heat pipes relocate the heat rom the heat sink to the ns
• The large surace area o the thin n, open-air design maximizes
airfow and thermal dissipation
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 522/560
Exceptional Dimming and Perormance
Essentia luminaires eature standard 0-10 volt dimming. Ideal or all
general lighting and unique applications like high ceilings, Essentia LED
recessed downlights are designed or lasting perormance, ease o service,
and upgradeability as LED technology advances.
The complete product line includes an unbeatable LED perormance packageand is designed with these advantages:
• Standard 0-10 volt dimming
• Optional Lutron Hi-lume® driver available
• 120 or 277V 50/60Hz operation
• Serviceable light engine with replaceable LED array
• Compatibility with a wide variety o lighting controls and systems
Virtually No Maintenance
Essentia luminaires are an ideal choice or hard-to-reach spacesthat are challenging and expensive to maintain. The advantages LED
technology oers are enhanced with BetaLED’s advanced passive thermal
management design and use o high quality components. The combination
results in a highly reliable, near maintenance-ree product, designed or
maximum longevity.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 523/560
www.BetaLED.com/Essentia10 | 11
S U P E R i O R
O P T i C S
F O R
S U P E R i O R
C o n t r
o l .
Superior Optical Control
Essentia luminaires deliver ecient light on target with BetaLED’s patented
NanoOptic® product technology that combines a blend o optics in a single
optical array or optimized control. The results are superior illumination and
energy perormance.
• Precise optical control
• Designed or high lumens per watt on target (target ecacy)
• 45˚ visual cut-o or all recessed downlights
Individually Optimized Optics
Each Essentia LED chip package has its own NanoOptic to optimize light
distributions that include:
• Downlights with wide, medium and narrow distributions
• Wall-wash congurations
• Adjustables with 10˚ narrow pin, 15˚ narrow spot and 25˚ narrow
Distributions
2000
4000
6000
8000
10000
12000
60˚
75˚
45˚
30˚
15˚
Narrow
1000
2000
3000
4000
5000
60˚
75˚
45˚
30˚
15˚
medium
600
1200
1800
2400
3000
60˚
75˚
45˚
30˚
15˚
wide
By combining both axial and tilted axial optics, light exiting the aperture is not obstructed by the lower cone. The result is outstandingeciency and 45˚ visual cut-o.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 524/560
Essentia Flangeless Trim
For the ultimate in design fexibility, our fangeless products allow the most
discerning lighting designers to bypass trim rings in avor o a smooth, fush
nish to the ceiling. Essentia fangeless trim options make a beautiul,
clean look easy to achieve, and are available in all Essentia downlight,
wall-wash and adjustable sizes and congurations.
You’ll achieve the same high-perorming standards and benets rom the
fangeless luminaires that you expect rom our entire Essentia recessed
product line.
Flangeless Trim
Standard Flange
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 525/560
www.BetaLED.com/Essentia12 | 13
a
P a R T n E R
Y O U
C a n
T r u s t .
Your Trusted Partner
BetaLED has earned a reputation as the premiere provider o quality LED luminaires, and a trustworthy provider
o reliable product data. We don’t compromise when it comes to designing, testing, manuacturing, or providing
product data required to make inormed decisions during a luminaire evaluation and selection process.
Essentia luminaires undergo multiple tests during all stages o engineering and manuacturing to comply with
industry requirements and our own strict quality and perormance standards. All published photometric data isderived rom independent DOE-approved laboratories.
In addition, BetaLED’s Lumen Maintenance Factors data (TD-14 document) explains our approach to deriving lumen
maintenance values. This document includes an endorsement letter rom the LED chip package manuacturer and
provides you with the data you need to condently design or sustainable illumination perormance.
Perormance Guaranty
We back our quality products with an industry-leading warranty. Our ve-year warranty covers the Essentia
product, including the driver and LEDs.
Sustainability and Saety Reduce lighting power density with improved illumination perormance compared to traditional sources. Essentia
luminaires oer numerous environmental benets or today’s eco-conscious architecture including potential credits
toward USGBC Leadership in Energy and Environmental Design (LEED) certication.
• Restriction o Hazardous Substances (RoHS) compliant – No mercury or other contaminants are used
compared to traditional light sources that present potentially hazardous disposal and environmental issues.
• Serviceable light engine with replaceable LED array – Unlike other LED luminaires, the Essentia LED array can
be replaced rom below the ceiling, eliminating the need to dispose o an entire fxture at the end o its lie.
• Reduced waste – While traditional lamp sources end up in landlls, there is no periodic lamp disposal
or Essentia.
In addition, Essentia products meet saety certications as regulated by Underwriters Laboratories.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 526/560
M E E T i n g
C O L O R
D e m a n d s .
Color Quality Commitment
The needs and concerns regarding color quality, consistency and
stability as they relate to interior spaces are paramount to a successul
interior lighting design. BetaLED is committed to delivering the
color-quality perormance that meets or exceeds the expectations
o best-in-class traditional light source technologies.
BetaLED’s unique LED blending technique enables each Essentia
luminaire’s initial color consistency to be within a 2-step MacAdam
Ellipse rom the initial specied color point.
Additionally, we are committed to providing luminaire color point stability over time, within a 2-step MacAdam
Ellipse to the predicted L70 point (in hours) or all products. BetaLED’s patented NanoOptic technology enables us to
provide color spatial uniormity that meets the requirements demanded by the most discerning lighting designers.
To ully understand the concept o the MacAdam Ellipse, start withits creator, Kodak scientist David MacAdam. His research in the late 1940’s determined a series o boundaries around several color targetsto illustrate how much one can “stray” rom the target color beore the human eye perceives a dierence. Delivering luminaires with the initial
specied color point and color point stability within a 2-step MacAdamEllipse to the luminaire’s L70
point (in hours) demonstrates excellent color consistency and stability compared to most traditional light source technologies.
The results o Essentia’s impressive luminaire-to-luminaire color consistency and color spatial uniormity is demonstrated at let,ully meeting the application design intent.
Correlated Color
Temperatures (CCT)
Color Rendering
Index (CRI)
R9 Value
2700K +/- 42K 90 min. 50
3000K +/- 50K 90 min. 50
3500K +/- 63K 80 min. 40
4000K +/- 95K 80 min. 40
NOTE: Consult specifcation sheets on website
or most current technical inormation.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 527/560
www.BetaLED.com/Essentia14 | 15
R E C E S S E D
P R O
D U C T S p e c i f i c a t i o n s .
Product SpecicationsProduct
LED Count Distributions Catalog Number
4-inch Downlight
14 LEDs
Narrow
Medium
Wide
ESA-ADR-414*
ESA-ADS-414*
Slideways™ technology provides power/splice access
6-inch Downlight
14 LEDs
28 LEDs
Narrow
Medium
Wide
ESA-ADR-628*
ESA-ADS-628*
8-inch Downlight
28 LEDs
42 LEDs
56 LEDs
Narrow
Medium
Wide
ESA-ADR-856*
ESA-ADS-856*
6-inch Adjustable
14 LEDs
Narrow (25˚)
Narrow Spot (15˚)
Narrow Pin (10˚)
ESA-ADR-614-_-__ADJ*
ESA-ADS-614-_-__ADJ*
358º rotation and 35º vertical adjustment
8-inch Adjustable
28 LEDs
Narrow (25˚)
Narrow Spot (15˚)
Narrow Pin (10˚)
ESA-ADR-828-_-__ADJ*
ESA-ADS-828-_-__ADJ*
358º rotation and 35º vertical adjustment
6-inch Wall-wash
14 LEDs Wall-washESA-ADR-614-_-LWW*
ESA-ADS-614-_-LWW*
Standard with lens
Slideways™ technology provides power/splice access
8-inch Wall-wash
28 LEDs Wall-washESA-ADR-828-_-LWW*
ESA-ADS-828-_-LWW*
Standard with lens
Slideways™ technology provides power/splice access
NOTE: Consult specifcation sheets on website or most current technical inormation.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 528/560
Essentia Recessed Luminaires
Essentia recessed round and square apertures, available
in 4, 6 and 8 inches, oer individually optimized optics
with LED selections that include 14, 28, 42, and 56
counts in wide, medium, narrow, wall wash andadjustable distributions. Exclusive Slideways™ design
or easy power supply/splice access is available on
all wall-wash and 4-inch downlight models.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 529/560
www.BetaLED.com/Essentia16 | 17
Sot Satin Glow Graphite
Sot SatinGlow Clear
Sot Satin Glow Champagne
Gold
Sot Satin Glow Black
Sot Satin Glow Wheat
Sot Satin Glow Pewter
Sot Satin Glow Bronze
White Paint Colors shown are approximate. Samples are available upon request.
Round
Squares & Rectangles
T R i M
S T Y
L E S
&
F i n i s
h e s .
Sot Satin Glow
Champagne Gold
Sot Satin Glow
Wheat
Sot Satin Glow
Pewter
Sot Satin Glow Black
White Paint
Sot Satin
Glow Clear
Sot Satin Glow
Graphite
Sot Satin Glow
Bronze
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 530/560
iCandy Retail candy store – MacCarran International Airport, Las Vegas, NV
David Ayala, corporate manager, iCandy,knew that installing Essentia LED lighting would enhance the shopping experience, illuminate the store using ar ewer luminaires than withtraditional technologies, virtually eliminate maintenance, and reduce energy costs and consumption.
•28 six-inch Essentia round downlights
• Luminaires with 28 LEDs and medium distribution
•3500K color temperature
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 531/560
Product SpecicationsProduct
LED Count Distributions Catalog Number
10-inch Surface Cylinder
28
42
56
Wide
Medium
Narrow
Narrow Spot (15˚)
ESA-C10-*
www.BetaLED.com/Essentia18 | 19
E X P a n D
Y O
U R
D E S i g n
P a l l e t .
Essentia Surace Cylinder
Lighting designers and speciers expand design options with Essentia surace cylinder luminaires that eature
the same high-perorming characteristics as BetaLED’s downlight series.
The stylish cylinder luminaires eature 45˚ visual cut-o to the source. A state-o-the-art fow-through design
includes an integrated heat sink to oer advanced passive thermal management to increase the lie and
perormance o the luminaire.
Other unique eatures include:
• Multiple mounting options: surace; pendant; cable; or wall
• Wide selection o LED counts: 28, 42 and 56
• A variety o optic distributions: Wide, Medium, Narrow, Narrow Spot
• Standard color temperatures: 2700K, 3000K, 3500K, 4000K
• Multiple housing colors: white; black; bronze; silver
• Other options include Lutron Hi-lume® driver; using; and lens media
•
Five-year limited warranty on product, driver, and LEDs
NOTE: Consult specifcation sheets on website or most current technical in ormation.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 532/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 533/560
© 2011 Ruud Lighting, Inc. – A Cree Company. All rights reserved
BetaLED and Essentia are trademarks of Ruud Lighting, Inc
(800) 236-6800 | FG# CAT/BRCH-BES0
This brochure is printed on paper comprised o 10% post-consumer waste and is processchlorine ree (PCF). It has been printed by a Forest Stewardship Council (FSC) certifedsupplier. FSC chain-o-custody certifcation tracks products rom their origin through fnaluse and contributes to responsible environmental practices.
LEDway
Streetlights
FG# CAT/BRCH-BLWY3
MUNICIPAL PRODUCTS BROCHURE
BetaLED Architectural & Commercial/
Industrial Luminaires
FG# CAT/BRCH-BEDG6
PROVENPERFORMANCE
in LEDLIGHTING
™
For additional interior LED luminaire inormation, visit www.BetaLED.com/Essentia
The complete BetaLED product line includes a broad range of luminaires for interior andexterior applications. Get more information about additional BetaLED product lines in thesebrochures:
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 534/560
Join the revolution
Total Access Control and Photo ID Badging from IDenticard
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 535/560
IDenticard ushers in the next era o security management
with PremiSys™ — your total access control solution.
As your technology partner or access control, IDenticard anticipates your security
needs and delivers innovative products that help keep your enterprises and peoplesecure. We developed PremiSys ater conducting extensive ocus group research to
uncover what customers wanted. The system is easy to use and install, reliable and
fexible so it can grow with your needs.
Whether you need access control or a small oce
building or to provide a complex network o acilities
with world-class card access security management,
PremiSys is your total access control solution.
PremiSys integrates with Mercury Security to
provide you innovative and fexible access control
hardware that meets the most demanding security
applications. Mercury’s reliable hardware solutions
give you the ability to precisely develop your access
control system, providing scalable, exacting levels
o security access.
IDenticard also incorporates its Cardholder
Management Module, a ull-eatured ID badging
sotware that produces a limitless range o high-
quality ID badges.
By integrating superior IDenticard security
management sotware with proven reliable hardware
and the Cardholder Management Module, PremiSys
oers easy-to-use access control technology that will
grow with your company’s security needs.
Integrated Solutions for Any Facility
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 536/560
The PremiSys™ access control system is loaded with
exciting third party integrations designed to maximize
operating eciency while elevating the level o security
or your sta and acility.
Third Party Integration
PIV Integration
Add validated FIPS 201 credentials to the PremiSys
system via the ederally compliant, GSA Approved
Codebench PIVCheck Sotware Suite. Available or
desktop and mobile platorms, system will perorm card
validation, authentication and registration o any PIV,
TWIC, FRAC or CAC card.
Schlage® AD-400 Wireless Lock Integration
Gives the installer a wireless integrated door lock
solution that is ecient as well as cost eective by
eliminating the need to run wires to the door.
Video Integration with:
Exacq Technologies®
ExacqVision Video Management Solution
American Dynamics
Victor Unied Video Management Solution
t7JFXMJWFBOESFDPSEFEWJEFPTJNVMUBOFPVTMZ
t8IFOSFWJFXJOHBOBMBSNBDLOPXMFEHNFOU
recorded video and live video will be displayed
side by side, eliminating the need to operate
the two systems independently, as seen in
Figure 1 below.
t-JDFOTFNVMUJQMFOFUXPSLWJEFPTFSWFST
t1PUFOUJBMGPSIVOESFETPGDBNFSBTOPOFFEUP
scale down the existing video network.
In addition, you can access live video rom several
points within monitor and control: the hardware tree,
the dynamic map, and the transaction and alarm
acknowledgment windows, as seen in Figure 2.
PremiSys oers advanced sotware eatures that
provide increased usability or IT, security, and
human resources executives working with your
company’s access control security system.
Feature Rich. Security Enhanced.
Figure 1 – Alarm acknowledgment window
shows live and recorded video side by side.
Figure 2 – Camera icons are
displayed on the dynamic map.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 537/560
Security at Your Fingertips.
System Confguration
Hardware Filters assigned to User Groups
– Filter to a specic device in hardware tree
– Monitor & control screen elements ltered
– Filter access group assignment based on
User Groups
– Cardholders ltered by User Group Rights
– Reports ltered by User Group Rights
PremiSys ID Pro
– $BSE%FTJHO#JUNBQ-PHJD
– #BEHF-PHJD
– Multiple Criteria Search Capability
– Intelli-Chrome
– Photo Rotation
– Print to Queue
– Card Print Queue Management
– 0OTDSFFO#JUNBQ-PHJD
– Card Preview
– Related Tables
Database Engine
– Controllers have on-board Ethernet
Selectable Wiegand Reader Formats
Multiple Intervals in One Time Schedule (6)
Multiple Holiday Schedules (6)
Scheduled Data Import
(MPCBM-JOLT
Global Door, Input, Relay Groups
Context-Sensitive Online Help
-%"1$POOFDUJPOGPS6TFS-PHJO
Doors
– System acknowledges i door was actually
used ater valid card presentation
Monitor & Control (cont.)
– Flexible positioning o screen components
– -BTU9PGUSBOTBDUJPOTSFDBMMFEJOUPUIF
transaction window upon open
– Select columns to display in transaction window
Triggers & Procedures
– ASCII Output
Alarm Acknowledgment
– Pre-dened responses
– Alarm Acknowledgment sounds
– Alarm Acknowledgment sounds per priority
– Alarm Acknowledgment sounds per condition
–
User-selectable columns
Door Monitoring and Control
Alarm Mapping
Multiple Views o Point Status (large icon, list, detail)
Ability to Schedule Door “Unlock” Times Without
Time Zone Modication
"CJMJUZUP4DIFEVMF%PPSi-PDLi5JNFT8JUIPVU
Time Zone Modication
Reports
"CJMJUZUP4BWF-PBE'SFRVFOUMZ6TFE3FQPSUT
– Ability to save multiple report criteria
Emergency Response Team Reports
Inclusion o Custom Cardholder Fields in report
Customizable report ormat
User Journal
– User Journal - Cardholder
– User Journal - Hardware Conguration
– User Journal - Printing
System Confguration (cont.)
– ADA setting per door
– Pre-alarm setting or door held per door
– Two card rule per door
– Card use limit counting enabled per door
Customizable Input Types
(1K normal, 2K normal, Open, Closed)
Set Relay Mode to Normal or Inverted
Set Relay Oine State (Active, Inactive, No Change)
-BUDIJOHBOE/PO-BUDIJOH.POJUPS1PJOUT
Access Areas
Automatic Client Update Notications
Archiving/Backup
Immediate History Archiving
Scheduled History Archiving
Immediate System Backup
Scheduled System Backup
Monitor & Control
Auto Photo Recall
– Quick access rights report or cardholder
– Custom data elds with Photo Recall
– Multiple Photo Recall windows
– Quick access to cardholder record
– Photos cached locally or quick recall
– Ability to right-click a door and display Photo
Recall or that specic door
$VTUPNJ[BCMF.POJUPSBOE$POUSPM4DSFFO-BZPVUT
– Transaction colors
F E AT U R E C H A R T
PremiSys Version 2.9
IDenticard has revolutionized the way access control systems are monitored
and managed today. The PremiSys Mobile Application, which is available or
Apple® iPhone 4 and Android™ Smartphones, allows users to manage the
PremiSys access control system with a swipe o a nger.
Mobile Application
PremiSys Version 2.9
From your Smartphone you can: t -PDLVOMPDLPSMPDLPVUBOZJOEJWJEVBMEPPS
or group o doors
t Run history reports on system events
t Acknowledge and clear system alarms
t Take cardholder pictures
t Add a new cardholder record and print the card
t Assign and modiy what doors a cardholder
has access to
t Instantly de-activate a cardholder record so
that it no longer has access to the building(s)
T PremiS s
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 538/560
Cardholder Records
Record Navigator
– Customizable le older tree
–-JTUEFUBJMTBOEQIPUPUIVNCOBJMSFDPSEWJFXT
Completely Customizable Data Entry Screen
– %BUBFOUSZTDSFFO#JUNBQ-PHJD
– Comprehensive screen/card design utilities
6TFS-FWFM"TTJHONFOU
Cardholder Copy Command
Block Add
– Assign Static Cardholder Name
– Manually Enter Cardholder Names
– *NQPSU'JSTU-BTUOBNFGSPNUFYUöMF
– Select existing card as template or access rights
Block Update - Cards
Custom Cardholder Fields
Access Groups
Global Access Groups
Access Groups per Card
Activation Date on Access Group
Deactivation Date on Access Group
Elevator Control included in Access Group with Doors
Assign Time Zones to individual Doors within
the same Access Group
Elevator Control
Elevator Control with foor selection eedback
Cardholder Card
Card Expiration Date
Card Activation Date
Multiple Cards per Cardholder
$BSE6TF-JNJU4FUUJOH
Global Groups
Access Groups
Control Point Groups
Monitor Point Groups
Door Groups
Elevator Groups
Triggers & Procedures
(ability to link global groups to procedures)
Hardware/Installation
Flexible Hardware Architecture
– Add doors in 1-reader or 2-reader increments
–-PDBUFUIFSFBEFSCPBSETDMPTFUPEPPS
or decreased installation cost
– 2-wire RS485 communication between
controllers vs. 4-wire RS485
– PoE Controller
– PoE Reader Board
Congure or Mantrap Operation
Operating System Support
Microsot® Windows®91
Microsot Windows Vista
Microsot Windows 7 64-bit compatible
Microsot Windows 2008 Server 64-bit compatible
Third Party Device Integration
*OUFHSBUJPOXJUI4DIMBHF"%-PDL4FU
Integration with CodeBench
– Perorm card validation, authentication and
registration or validated FIPS 201 credentials.
Video Integration
(with exacqVision® by Exacq® Technologies
and American Dynamics)
– Multiple video servers are congurable
– Cameras are assignable to provide video in
response to door and point transactions
– -JWFBOESFDPSEFEWJEFPJTBDDFTTJCMFGSPNNBOZ
areas o the sotware
– -JWFWJEFPXJOEPXTPòFSSFQMBZGVODUJPOT
and PTZ unctions when PTZ camera is used
– Recorded video windows oer the exporting
o video clips and the saving, replication and
printing o image “stills” taken rom the clip
Door-Point, Monitor-Point and Control-Point Icons
1SPWJEF-JWF7JEFP
– Clicking point icons in Monitor and Control opens
live video windows
– Clicking point icons on maps opens live
video windows
$BNFSB*DPOT1SPWJEF-JWFBOE3FDPSEFE7JEFP
– Icons indicate whether one or more cameras
are linked to point
– Camera icons on maps provide live video
– Camera icons in Monitor and Control provide
live video
– Camera icons in Monitor Transactions windows
provide recorded video
– Options include viewing video rom all associated
cameras at one time
– Camera icons on maps rotate to approximate
the direction the actual camera is pointing
Triggers and Procedures include camera act ions:
– Display live video
– Display video clip
– Create video clip
– Go to preset
– Display live video & Create video clip
Alarm Acknowledgments Show Recorded and-JWF7JEFP
– Clicking icons or cameras linked to alarm points
displays video recorded at time o alarm
– Special Acknowledge Alarm window shows
side-by-side display o recorded and live video
rom primary camera
– Other linked cameras are selectable
to provide video
5SBOTBDUJPO)JTUPSZ3FQPSUXJUI%FWJDF-JOLT
– Shows only transactions generated by points
with linked cameras
– Each transaction entry contains hyperlink to video
recorded at time o transaction
– Report is exportable as Microsot® Excel le
SMTP Mail Server Connection
– Create messages to send to e-mail or to
texting-enabled cell phones
– An action in triggers and procedures sends
messages in response to system events
– Variable placeholders insert transaction details
into messages
ASCII Command
– Create ASCII commands to send to paging
stations or to other ASCII devices
– An action in triggers and procedures sends
commands in response to system events
– Variable placeholders insert transaction details
into commands
PremiSys Version 2.9
F E AT U R E C H A R T (cont .) PremiSys Version 2.9
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 539/560
Hardware Filtering via Permissions
Control which devices an operator can view
in the sotware.
ADA extended door time
Grant specic cardholders additional time to
use a door.
Triggers and Procedures
In case o unauthorized use or other events, the
system can be set to lock all doors, shut down a
zone or cause any other action.
Mantrap Options
Prevent specic doors rom being used while other
doors are open.
Enhanced Elevator Control
Control and track a cardholder’s foor and
elevator access.
Lockdown and Lock Out Capabilities
In the event o an emergency or threat, lock down
and secure your acility with a single click.
Cardholder Management-The Face of Security.
IDenticard’s Cardholder Management Module
is the personal ID badging system designed or
security-minded proessionals. This ID badge
solution provides user-denable badge designs,
screen designs and database elds or unlimited
customization, and it is packed with additional
security eatures to enhance the level o any
security management program (see Figure 3
on the next page).
System User Administration
t.BOBHFQBTTXPSETXJUIBMJOLUP-%"1
t$BSEIPMEFSöMUFSDSFBUJPOBOEBTTJHONFOUt6TFSHSPVQSPMFTBOENFNCFSTIJQ
t%BUBFOUSZTDSFFOBTTJHONFOU
t5JNFQFSJPEBDDFTTSJHIUT
Cardholder Reporting
Easily personalize, customize and save reports
(see Figure 4 on the next page).
Filter Cardholder Access Groups
Restrict and control the access groups that
operators can assign to cardholders.
Data Import Utility with Scheduler
Connect to and import data rom an existing
EBUBCBTF42-.4"DDFTTEFMJNJUFEUFYUöMF
Variety o ID Card Options Highly advanced laminates, oversized cards and
credentials, secure custom printing and multiple
stock options.
Reliable Support. Safety Strong.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 540/560
Figure 3 –
Cardholder details screen
Figure 4 – Custom cardholder report
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 541/560
For almost 40 years, IDenticard Systems has been leading the way with
innovative technologies, providing customers worldwide with integrated
security solutions rom a single, direct source.
Our comprehensive line o integrated security products includes access control,
badge accessories, ID badge sotware, custom ID cards, smart cards, biometricsolutions and visitor management programs. Most important, because we
develop all o our sotware, our customers are assured the highest level o
reliability and support.
Join the revolution
IDenticard Systems
25 Race Avenue, Floor 1
Lancaster, PA 17603
Tel: (800) 233-0298 | (717) 295-8039
www.IDenticard.com
Technical Support: (800) 220-8096
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 542/560
PRODUCT DATA
Leviton Mfg. Co., Inc. Lighting & Energy Solutions
201 N. Service Rd. Melville, NY 11747-3138 Tech Line: 1-800-824-3005 Fax: 1-800-832-9538 www.leviton.com/les© 2011 Leviton Manufacturing Co., Inc. All rights reserved. Subject to change without notice.
Decora® Wall Switch Multi-TechnologyOccupancy Sensor
OSSMT-MD/GD
BASIC OPERATIONOccupancy sensors have two tasks: keeping the lightsON while the space is occupied and turning the lightsOFF when unoccupied.
The PIR sensors provide immunity to false ON througha specialized Fresnel lens which divides the field-of-view into sensor zones. When a person passes into orout of a sensor zone, the sensor detects motion andswitches the lights ON.
The Ultrasonic (U/S) sensors provide maximum sen-sitivity and range in difficult spaces with irregularshaped rooms and partitions that can block the PIRfield-of-view. A pair of U/S sensors will detect Dopplershifts caused by motion in a space preventing falseOFF. These sensors are more sensitive to small move-ments since they do not rely on zones.
APPLICATIONSLeviton’s OSSMT Multi-Technology Decora Wall SwitchOccupancy Sensor is used to provide automatic light-
ing control for energy savings and convenience in avariety of commercial applications:• Retrofit• Private and executive offices• Conference rooms• Storage areas• Restrooms• Classrooms• Lounges• Training areas• Multi-location switching (similar to 3-way)
SELF-ADAPTIVE TECHNOLOGY
Designed for “install and forget” use, the OSSMTautomatically analyzes room conditions and adapts toerrors or changing environment.
HOW THE OSSMT-MD AUTOMATICALLY ADAPTS
CONDITION EXAMPLE ADAPTIVE REACTIONFalse-ON: Sensorincorrectlyturns thelights ON.
False-OFF: Sensorincorrectlyturns thelights OFF.
After an initial movementis sensed, if anothermovement is not sensedwithin the timer setting thedelayed off-time setting isautomatically reduced.
If motion is detected short-ly after the lights go OFF,the current delayed off-time setting is increased.
The sensor detectsmovement in thecorridor or hallwayand the room lightturns ON.
The sensor doesnot detect move-ment because anoccupant is virtu-ally motionless andthe lights turn OFF.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 543/560
PRODUCT DATA
O S S M
T
DIMENSIONAL DIAGRAMS
FEATURES• Fast, simple Installation: Fits in a standard wall box and
replaces a single-pole wall-switch; neutral and no neutraloptions available. Sensor can be ganged together withother units in a multiple-switch wall plate.
• Low-profile design eliminates obtrusive “scanning-device”look. Elegant Decora wallplates complement any interiorfor sleek aesthetics; uses Decora wallplates and coordi-
nates with Leviton’s popular line of Decora wiring devices.• Convenient Pushbutton provides manual-ON/OFF light
switching at any time.• Segmented Fresnel lens provides optimum sensitivity
and performance. Designed with an extensive “minormotion” area where even slight body movements will bedetected.
• Vandal resistant PIR lens.• Patented Blinders: Adjustable horizontal field-of-view (PIR
may be adjusted between 180° and 60° of arc by usingintegral blinders located on either side of the lens). Nomasking required.
• Manual-ON/auto-OFF mode for installations where manu-al-ON switching is required but auto-OFF switching is still
desired for CEC Title 24 energy savings.• To comply with CED Title 24, LED indicator light flashes
when sensor detects motion to verify detection is active.Green flashes for ultrasonic, red flashes for PIR.
• Time: The delayed OFF time is preset at 30 minutes inthe Auto Adapting mode. A choice of four delayed-OFFtime settings are available: 30-seconds (for walking testpurposes only), 10, 20, and 30 minutes for fixed time andauto adapting. The LED will flash when the adjusting knobis set to the indicated time value.
• Ambient Light Recognition: Integrated light sensor pre-vents lights from turning on when the room is adequatelyilluminated by natural light.
• Self-Adaptive Technology: Callbacks for adjustment areeliminated. Time delay and sensitivity settings are con-tinually adjusted to occupant patterns of use in autoadapt mode.
• Exclusive Walk-through Feature provides increasedenergy savings by not leaving the lights ON for anextended period after only momentary occupancy.
• Vacancy Confirmation: When the time out expires andthe relays turn OFF, a 30 second (OSSMT-G) or 40 second(OSSMT-M) vacancy confirmation exists to turn the relaysback on.
• False detection circuitry.• Small Motion Sensitivity (U/S): Ultrasonic technology pro-
vides excellent minor motion sensitivity.• Ability to disable U/S (OSSMT-M). For added flexbility,
OSSMT-G has the ability to disable both PIR and U/S.• Presentation Mode feature: For slide or film presenta-
tions, allows pushbuttons to turn lights OFF and keepthem OFF while the room is occupied.
• Exclusive Leviton H.I.S. Circuitry. Specifically designed tohandle today’s high inrush electronic ballast loads andoffer unmatched durability and service.
• True Zero-Cross Relay switches at the zero crossing pointof the AC power curve to ensure maximum contactor lifeand compatibility with electronic ballasts.
FIELD-OF-VIEWThe OSSMT provides a 180° field-of-view with a maximumcoverage area of approximately 2400 square feet. Themaximum sensing distance in front of the sensor is 40feet, and side to side is 30 feet. The “minor motion” zonedetects relatively small body movements and allows thelights to stay ON even though a person may not be movingor walking around the room. The remainder of the field-of-
view, the “major motion” zone, exhibits a lesser degree of sensitivity and requires larger movements.
1.75in
44.45mm
4.06in
103.12mm
1.85in
46.99mm
.5in/12.62mm
1.35in
34.37mm
2.65in
67.26mm
BOTTOM
TIME RANGE LIGHT
Mounting Yoke
VandalResistantPIR Lens
UltrasonicSensors
Pushbutton
Control Panel,Cover Removed
LED &Light Sensor
PatentedMaskingBlinders
1 2
3 10 10
4 7 4 7
TOP VIEW
30
SIDE VIEW
20 400
0
20
20
30
45
0
l l . i li l i .
Major Motion, PIR Major Motion, U/S
Major Motion, PIR Major Motion, U/S
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 544/560
Leviton Mfg. Co., Inc. Lighting & Energy Solutions
201 N. Service Rd. Melville, NY 11747-3138 Tech Line: 1-800-824-3005 Fax: 1-800-832-9538 www.leviton.com/les© 2011 Leviton Manufacturing Co., Inc. All rights reserved. Subject to change without notice.
INSTALLATIONThe OSSMT is preset to deliver optimum performance in a widevariety of applications without requiring any adjustments dur-ing installation. Exclusive self-adjusting operating features willautomatically compensate for real-time occupancy patternsto provide maximum convenience and energy savings. The unitmay replace a single-pole wall switch mounted in a standardwall box. The OSSMT-MD must have a neutral and be properly
grounded in order to operate. The OSSMT-GD does not require aneutral for installation. The unit’s integral blinders may be usedto restrict the field of view to prevent unwanted detection of traffic. It should be positioned at least 6 feet away from HVACregisters. Note that whenever the unit is powered up, it will takeapproximately 1 minute to begin normal operation.
WIRING DIAGRAM
ENVIRONMENTAL
Operating Temperature Range 32°F to 104°F (0°C to 40°C)
Storage Temperature Range 14°F to 185°F (-10°C to 85°C)
Relative Humidity 20% to 90% non-condensing
OTHER
Listings OSSMT-MD = Ul/cUL OSSMT-GD = ETL/cETL Listed, CSA OSSMT-M3 = cETL Listed, CSA CEC Title 24 Compliant, FCC Compliant
Warranty Limited Five-Year Warranty
ORDERING INFORMATION
CAT. NO. * DESCRIPTION
OSSMT-MDx Multi-Technology Wall Switch Occupancy Sensor
OSSMT-GDx No Neutral, Multi-Technology Wall SwitchOccupancy Sensor
* Replace x with (W) White, (I) Ivory, (T) Light Almond, (G) Gray, Ebony (-E), or Red (-R) NOTE: OSSMT-M3x model available in (W) White and (I) Ivory only.* NAFTA compliant and Made in USA models available.
Line
120-230-277/347VAC50/60Hz
OSSMT-MD Wall Switch Occupancy Sensor Wiring Diagram,Single Location Control
Line
120-230-277VAC
50/60Hz
Note: Ground wire must be connected.
OSSMT-GD Wall Switch Occupancy Sensor Wiring Diagram,Single Location Control
ELECTRICAL
Line Voltage 120-230-277/347 VAC
Power Consumption U/S & PIR PIR only
OSSMT-MD 120V
277V347V
390mW
480mW500mW
190mW
270mW 350mW
OSSMT-GD 120V 277V
110mW 340mW
70mW 310mW
Operational Frequency 50/60Hz
Ultrasonic OperatingFrequency
40kHz
Wire Designation Line-Black Neutral-WhiteLoad-Blue Ground-Green
Load Rating Incandescent/Tungsten: 800W @ 120VFluorescent: 1200VA @ 120V 2700VA @277V , 1500VA @ 347V Motor: 1/4 HP@ 120V,
SPECIFICATIONS
Note: Ground wire must be connected.
OSSMT-GD Wall Switch Occupancy Sensor Wiring Diagram,Two Location Control
Black (Hot)
Neutral (White)
Load
Sensor 2Sensor 1
Black Black
Black
White
Blue Blue
Green
Ground
Green
Ground
Line
120-230-277VAC
50/60Hz
Multi-Technology Wall Switch Occupancy Sensor347V
OSSMT-M3x
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 545/560
PRODUCT DATA
LEVITON SPECIFICATION SUBMITTAL
JOB NAME: CATALOG NUMBERS:
JOB NUMBER:
G-7357D/K11-tbREV NOV 2011
Leviton Manufacturing Co., Inc. Lighting & Energy Solutions201 N. Service Rd. Melville, NY 11747-3138 Tech Line: 1-800-824-3005 Fax: 1-800-832-9538 www.leviton.com/les
Leviton Manufacturing of Canada, Ltd.165 Hymus Boulevard, Pointe Claire, Quebec H9R 1E9 • Telephone: 1-800-469-7890 • FAX: 1-800-563-1853
Leviton S. de R.L. de C.V.Lago Tana 43, Mexico DF, Mexico CP 11290 • Tel. (+52) 55-5082-1040 • FAX: (+52) 5386-1797 • www.leviton.com.mx
Visit our Website at: www.leviton.com/les© 2011 Leviton Manufacturing Co., Inc. All rights reserved. Subject to change without notice
O S S M
T
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 546/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 547/560
TABLE OF CONTENTS
Wireless Systems.............................................................................................Page 3
Wireless System Products..............................................................................Pages 4-5
Wired Systems.................................................................................................Pages 6-7
Wired System Products..................................................................................Pages 8-9
IP System Products..........................................................................................Page 10
IP Web Interface...............................................................................................Page 11
Master Clocks....................................................................................................Page 12
Accessories........................................................................................................Page 13
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 548/560
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 549/560
BCAL-2 Series Wireless Analog Clocks
HIGHLIGHTS
Each clock acts as a repeater and transmitter•
9• 15-928 MHz frequency-hopping technology
Frequent correction•
Receiving and transmission rate every two hours (nor--
mal mode) or every four hours (economy mode) forbattery operation
Receiving and transmission rate of once a minute for-
24V, 110V or 220V
Internal antenna•
Improved sensitivity over BCAL-• 1 Series (previous model)
Enhanced diagnostic mode for informing the user of battery•
level, signal strength and complete testing of the movement
Energy efcient•
5 year battery life (normal mode)**-
8 year battery life (economy mode)**-
20 mA @ 24 VAC-
1- 5 mA @ 110 VAC
Quick correction for time change•
Ideal for renovation projects using existing wiring or for•
new installations
Smooth surface black ABS case and polycarbonate crystal•
Does not require a custom back box•
Automatic calibration•
FCC Compliant, part• 15 Section 15,247
**with good reception
DESCRIPTION
Bogen’s innovative BCAL-2 Series Wireless Clocks incorporatemulti-function software as well as a microprocessor based movement. Every clock is a transceiver, meaning it bothreceives the signal and retransmits it to the surrounding clocks. Since every clock is a transceiver, the clocks can notonly get the time from the main transmitter, but also from thesurrounding clocks.
Bogen wireless clocks transmit a stream of data every two
hours (standard) or four hours (economy) on the battery oper-ated (2 D-Cells) model, and every minute on the 24V, 110V and 220V models. These clocks include automatic calibration,as well as enhanced diagnostic functionality that allows theuser to view the quality of the signal, amount of time since theclock last received a signal, and a comprehensive analysis of the clock itself, as well as remaining battery life.
BCBL 1000 Series Wireless Digital Clocks
HIGHLIGHTS
Receives and transmits the signal once a minute•
Each clock acts as a transceiver•
Counts down between classes or breaks with optional•
BCMA 3000 Series Master Clock software
9• 15-928 MHz frequency-hopping technology
Immediate correction for time change•
Available in different sizes•
2.5” display-
4” display-
Four digit display-
Six digit display-
1• 2 or 24 hour formatTwo levels of adjustable brightness•
Anti-glare display•
Compatible with BCAL Series Analog Clocks•
Dynamic range for input voltages•
1- 2-30 VDC (24 volt model)
1- 2-30 VAC (24 volt model)
78-- 130 VAC (110 volt model)
Loss of communication alert•
Bright LED display•
FCC Compliant, FCC part• 15 Section 15,247
DESCRIPTION
Bogen’s BCBL 1000 Series gives you the answer to your wireless digital clock needs. Working in conjunction with theBogen BCMA Series Wireless Master Clock, the BCBL 1000Series integrates seamlessly with the BCAL-2 Series Wireless
Analog Clocks. Working on Bogen’s 915-928 MHz frequency-hopping technology, the digital clocks will receive and transmitthe signal once a minute.
The innovative 915-928 MHz frequency-hopping technolgoy allows for a better and clearer signal even if there is inter-ference in one of the frequencies. Not only can each clockreceive the wireless signal, it also transmits the signal whicheliminates the need for many repeaters. The digital clocks areoffered in a wide array of models featuring 2.5” or 4” highcharacters, as well as four or six digit displays.
4
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 550/560
BCMA Series Wireless Master Clock
HIGHLIGHTSLED display for a clear, accurate readout•
Two line, backlit LCD display with 20 characters per line•
(3000 only)
Improved 2x8 rubber pushbutton keyboard (3000 only)•
Crisp, bright LED display with two push buttons for•
programming (2000 only)(S)NTP Input Capability•
Up to- 10 server addresses can be pre-programmed
into the unit for continuous, accurate synchronization
(with web interface software upgrade)
DHCP Capable•
Interfaces with other systems•
Interfaces with 59 and 58 minute correction, National-
Time and Rauland, as well as Dukane digital
1• 2 or 24 hour mode
Automatic bi–annual daylight savings time changes•
(when used as a primary master clock)
Bias seconds output•
Adjust the time plus or minus a few seconds or minutes-
to t your application, while still receiving an input fromanother source
Microprocessor based•
RS485 input and output for time correction and•
synchronization
Two (2) relays for simultaneous correction of two•
synchronous-wired clock systems
Field programmable•
Ten (• 10) year battery backup for timekeeping
Available in rack mount or wall mount•
BCMA Series OptionsFour or eight congurable auxiliary relays (3000 only)•
800 event capability-
255 pre-programmed schedule changes-
GPS input•
SNTP/NTP Server *NEW*•
With this software upgrade, the new BCMA Master-
Clock can be used as a SNTP server to interface with
other devices
Web Interface software upgrade *NEW*•
Extremely intuitive graphical user interface that allows-
the user to congure all of the settings of the BCMA
through a simple web browser
Easy programming of the master clock’s four or eight-
auxiliary relays for scheduling. (3000 only)
Control of all of the IP settings-
View complete lists of all the pre-programmed events-
and schedules (3000 only)
Count down feature (3000 only)•
Digital clocks will countdown a preset amount of time-
when the relay is activated
BCMA 1000 Series Wireless Repeater
HIGHLIGHTSReceives the signal from any Bogen wireless clock •
and re-transmits it
Perfect for applications with extremely long distances•
Works on Bogen’s 9•
15-928 MHz frequency hoppingtechnology
Transmits up to 2000 meters in open space•
Powerful 30dBm transmission•
Extremely slim design makes the Wireless Repeater•
versatile for mounting
No need for custom back box•
FCC compliant, part• 15, section 15,247
Made in the U.S.A.•
DESCRIPTIONThe repeater is an ideal choice for extending the Bogen wire-less signal when longer distances between clocks are present.Upon receipt of the wireless signal from the main transmitter or any Bogen clock in the eld, the repeater can transmit upto 1000 meters in open space which enables a broad trans-mission range to the subsequent slave c locks in the eld. Thesignal is transmitted once a minute and is capable of sending it to the BCAL series analog wireless clocks and the BCBLseries digital wireless clocks.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 551/560
2-Wire Digital Communication
Bogen’s 2-wire digital communication is one of the most advanced systems in the world. Its simple installation and accurate timekeeping
illustrate why Bogen is the leader in this industry. The system utilizes only 2 wires for installation, one for data/power and the other
as a reference.
Paired with Bogen’s Converter Box for power distribution, the 2-wire system is capable of running many clocks off of only one
converter box unit. Providing immediate correction for time change, the 2-wire system is also capable of running analog and digital
clocks on the same 2 wires. This system is available only on 24V clock models.
This system works with Bogen’s BCAM Analog Clocks and BCBD 1000 and 2000 Series Digital Clocks seamlessly, enabling complete
exibility for almost any application.
6
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 552/560
RS485 Communication
The RS485 system is one of the most advanced timing systems in the world. The Bogen RS485 system sends a string of data once
a second to ensure that all clocks show the same time, all the time. In case of a discrepancy, the slave clocks shall begin correcting
themselves within seconds. The Bogen RS485 system has no need for expensive master clocks because a BCBD 2000 series clock
can act as a master clock and can drive an unlimited number of clocks using the daisy chain conguration. The RS485 system has two
wires for power and two wires for communication.
This system works in conjunction with the BCRM Series Analog RS485 clock, as well as the BCBD 1000 and BCBD 2000. Series DigitalClock. The BCRM series clock has automatic frequency detection and is available in 24V and 110V models. The BCBD 1000 is an ideal
choice for a consistent slave clock with its high visibility and immediate time change. The BCBD 2000 can receive the RS485 signal, and
even act as a master clock to the RS485 slave clocks.
Synchronous (Sync-Wire) Communication
The Synchronous Wire System is the most popular system in the United States. The sync-wired clocks use the running power as a
timebase. The clock receives an hourly correction to synchronize the minute hand and the seconds hand, and a 12 hour correction
to synchronize the hour, minute and second hands. Bogen’s BCAM Series clock line are microprocessor based movements which
minimize moving parts and increase reliability. The Bogen BCBD 2000 Series Digital Clock is capable of receiving the sync-wire signal
and can be run on either 24V or 110V.
Sync-Wire Protocols Supported:
59 Minute Correction•
58 Minute Correction•
National Time or Rauland•
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 553/560
BCAM Series Wired Analog Clock
HIGHLIGHTS
Microprocessor based movement with automatic frequency•
detection
Compatible with 2-Wire Digital Communication and Sync-•
Wire Communication
Automatic communication protocol identication:•
2-Wire Digital Communication-
59 Minute Correction-
58 Minute Correction-
National Time or Rauland Correction-
Diagnostic LEDs for ease of maintenance•
Fully automatic plug and play; No settings required•
Built-in self-test function•
Automatic polarity detection•
Quick correction for time change (max. 5 minutes, digital•
communication only)
Clocks will not deviate from each other (Digital communi-•
cation)
Ideal for renovation projects using existing wiring or new•
installationsEnergy efcient:•
20 mA @ 24VAC-
1- 5 mA @ 110VAC
1- 0 mA correction
Smooth surface metal case and polycarbonate crystal•
Available in 24V,• 110V and 220V
UL, cUL and FCC approved•
DESCRIPTION
Bogen’s BCAM Series analog clocks incorporate multi-functionsoftware which allows the clock itself to identify communi-cation protocols in the eld. The clocks contain built-in testprocedures for protocol type and last received communica-tion time, as well as a comprehensive analysis of the clock.BCAM clocks are fully plug and play; there are no settingsrequired. These clocks contain an automatic polarity detection
feature which protects the system in case data is received withreverse polarity. These features provide signicant exibility and responsiveness. The c locks are available in 12” and 16” round cases. The shallow, low prole metal cases eliminatethe need for custom back boxes. This c lock has UL, cUL and FCC compliances.
BCRM Series RS485 Wired Analog Clock
HIGHLIGHTSUses local power plus two (2) wires for communication•
Designed to work with the RS485 Communication system•
Comparable to the BCAR series•
Diagnostic LEDs for ease of maintenance•
Data LEDs for verifying the transmission and receipt of data•
Unlimited clocks can be run on the same communication•
line in a daisy chain conguration
Doesn’t require an expensive master clock; it can be run•
off the BCBD 2000, as well as the BCMA 2000 and 3000.
Analog and digital clocks can be run on the same commu-•
nication line
Fully automatic plug and play; No settings required•
Built-in self-test function•
Quick correction for time change (max. 5 minutes)•
Clocks will not deviate from each other•
Ideal for renovation projects using existing wiring or new•
installations
Energy efcient:•
20 mA @ 24VAC-
1- 5 mA @ 110VAC
1- 0 mA correction
Smooth surface metal case and polycarbonate crystal•
Available in 24V, 110V and 220V•
UL, cUL and FCC approved•
DESCRIPTION
Bogen’s BCRM Series analog clocks are are an excellent,cost-effective way to have a stable, reliable system. The new
RS485 clocks use optocoupler technology which isolates thecommunication preventing damaging lightning strikes and power surges. The clocks contain built-in test procedures for protocol type and last received communication time, as well asa comprehensive analysis of the clock. The clock movementhas LEDs which shows the user if and when the communica-tion is received and sent from the c lock, making the clock easy to maintain. The BCRM Series incorporates Bogen’s RS485protocol which sends a digital data signal as often as once asecond. The clocks are available in 12” and 16” round casesand come standard with a shatterproof, polycarbonate crystal.The clocks are UL, cUL and FCC compliant.
8
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 554/560
BCBD 1000 Series Wired Digital Clock
HIGHLIGHTS
Immediate correction for time change•
Clocks will not deviate from each other•
Available in 2.5” or 4” displays•
Available in 4 or 6 digit displays•
1• 2 or 24 hour format
“BELL”, “FirE” messaging capabilities•
Choice of using 2-Wire Digital Communication protocol or•
RS485 Communication
Bright LED display•
Two (2) settings for brightness•
Loss of communication alert•
LEDs for visual representation of the receiving and trans-•
mitting of RS485 data
Diagnostic LEDs for visual indication of the 2-Wire signal•
and power
No battery backup required•
Unlimited number of clocks can be run off of the same•
communication line (RS485 only)
Dynamic range for input voltages•
1- 2 - 30VDC (24 volt model)
1- 2 - 30VAC (24 volt model)
85 -- 130VAC (110 volt model)
Plug in Molex connectors•
Available in ush, surface and double mount housings•
UL, cUL listed and FCC approved•
DESCRIPTION
BCBD 1000 Series Digital Clocks are available in either 2.5” or 4” high characters with a 4 or 6 digit display. The BCBD1000 Series Digital Clocks are reliable slave clocks that runon Bogen’s 2-Wire Digital Communication or RS485 Commu-nication. The clock has many options such as 12 or 24 hour mode, “BELL” and “FirE” messaging, as well as two brightnesssettings . The BCBD 1000 can be mounted in either a ush,
surface or double mount housings making it a perfect t for your application. The 1000 Series also have LEDs that givethe user visual notication of the sending and receiving of data. The unique, specially molded anti-glare bezel gives asmooth, clean look with no visible external screws. The BCBD1000 is UL and cUL listed, as well as FCC approved.
BCBD 2000 Series Digital Master Clock
HIGHLIGHTS
Microprocessor based•
Can interface with existing systems•
Available in 2.5” or 4” displays•
Available in 4 or 6 digit displays•
Master, slave and independent clock with chronograph•
capabilities
59 minute, 58 minute, other manufacturers’ clocks,•
midnight reset input, RS485 input and output and 2-Wire
Digital Communication input
Interface capabilities to most other clock systems and•
intercoms
Automatic Daylight Saving Time (when used as a primary•
master clock)
1• 2 or 24 hour mode
“BELL”, “FirE” messaging capabilities•
Choice of using 2-Wire Digital Communication protocol or•
RS485 Communication
Three (3) settings for brightness•
Loss of communication alert•
LEDs for visual representation of the receiving and trans-•
mitting of RS485 data
Diagnostic LEDs for visual indication of the 2-Wire signal•
and power
Ten (• 10) year battery backup
Available in ush, surface and double mount housings•
UL, cUL listed and FCC approved•
DESCRIPTION
BCBD 2000 Series Digital Clocks are available in 2.5” or 4” high characters or 4 or 6 digit displays. This superior line of digital clocks features automatic Daylight Saving Time correc-tion, PM indicator, master, slave or independent clock capabili-
ties. The BCBD 2000 Series clocks have chronograph capa-bilities using the Bogen Control Box. The 2000 Series digital clock has high efciency, bright LED display. Our specially molded, anti-glare front bezel gives a smooth surface whichallows for excellent visibility. The BCBD 2000 can performdiagnostic capabilities to the BCAM and BCRM Series clocks.It also has alternating time and date display in both Americanand European formats, as well as “BELL”, “FirE” and address-able messaging capabilities. The BCBD 2000 is capable of interfacing with many other systems such as sync-wiresystems, once a day inputs and intercom systems. The clock isUL and cUL listed, as well as FCC approved.
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 555/560
IP ANALOG AND DIGITAL CLOCKS
BCAP Series Analog IP Clocks
HIGHLIGHTS
Available in 4 different voltage models•
Power over Ethernet (802.3af)-
24V-
11- 0V
220V-
Internal web interface built-in for adjusting and conguring•
settings and features
Complete control of the entire clock system using Bogen’s•
Monitor software
View the status of the clock system to ensure com--
munication
Edit a specic clock’s settings or apply features system--
wide from one location
Receives time from any NTP/SNTP server•
Automatic bi-annual Daylight Saving Time•
Microprocessor based movement•
Low prole - one (• 1) model for ush and surface mount
No need for custom backbox•
Plug in molex connectors (voltage models only)•
Made in the U.S.A.•
Diagnostic mode allows the user to check the mechanical•
status and last received communication status
Smooth surface case and polycarbonate crystal•
Available in PoE, 24V,• 110V and 220V
UL, cUL and CE pending•
BCBP Series Digital IP Clocks
HIGHLIGHTS
Available in three different voltage models•
Power Over Ethernet (802.3af protocol)-
24 V-
11- 0 V
220V-
Extremely intuitive web interface built in•
Control all of your settings from brightness to daylight-
savings time through an easy-to-use web interface
Monitor your entire clock system!•
View the status of your clock to ensure it’s communi--
cating
Edit a specic clock’s settings or apply settings to the-
entire clock system through one location
Available in different sizes•
2.5” (6.35 cm) display-
4” (10.16 cm) display-
4 digit display-
6 digit display-
Automatic bi-annual Daylight Saving Time•
1• 2 or 24 hour display
Congurable alternating time/date in both American and•
European formats
Two levels of adjustable brightness•
Made in the U.S.A.•
UL, cUL and CE pending•
DESCRIPTION
Bogen’s new BCAP Series IP clock is one of the most techno-logically advanced clocks in the industry. The clock is capableof running on the Power over Ethernet (802.3af) protocol, 24V,110V or 220V for maximum versatility. Each clock has aninternal web browser that contains the clock’s settings and iscongurable by the user. By simply using a Windows-based application, the entire system can be managed enabling administration to view and/or change existing conguration.
The clock will receive its time from a (S)NTP time server for accurate timekeeping, thus eliminating the need of a master clock. The BCAP Series is available in 12” and 16” versions.Offering only the highest quality, Bogen’s BCAP Series comeswith a smooth surface case, as well as a shatterproof, polycar-bonate crystal. The BCAP Series is manufactured in the U.S.A.and has UL, cUL and CE pending.
DESCRIPTION
Bogen’s BCBP Series IP digital clocks are available in 2.5” or 4.0” high characters with a 4 or 6 digit display. The BCBP
series is capable of running off of the Power over Ethernet(PoE) protocol. Each clock has an internal web browser thatcontains the clock’s settings and is easily congurable by theuser. By simply using a Windows-based application, the entiresystem can be managed enabling administration to view and/ or change existing conguration. The clock will receive itstime from a SNTP time server for accurate timekeeping, thuseliminating the need of a master clock. The BCBP Series has avariety of features such as 12 or 24 hour mode, domestic and international Daylight Saving Time, alternating time/date dis-play and adjustable brightness settings. This product is manu-factured in the U.S.A. and is UL, cUL and CE pending.
10
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 556/560
IP WEB INTERFACE
Domestic & International Daylight Saving Time
Set up to 10 Network Server Addresses
Check the Status of Any Clock
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 557/560
MASTER CLOCKS - ALL SYSTEMS
BCMA 2000 Series Master Clock
HIGHLIGHTS
LED display for a clear, accurate readout•
(S)NTP Input Capability•
Up to ten server addresses can be pre-programmed-
into the unit for continuous, accurate synchronization
(with web interface software upgrade)DHCP Capable•
Interfaces with other systems•
Interfaces with 59 and 58 minute correction, National-
Time and Rauland, as well as Dukane digital
1• 2 or 24 hour mode
Automatic bi–annual Daylight Saving Time changes including•
International and Domestic settings
Bias seconds output•
Adjust the time plus or minus a few seconds or minutes-
to t your application, while still receiving an input from
another source
RS485 input and output for time correction and•
synchronization
Two relays for simultaneous correction of two•
synchronous-wired clock systems
Microprocessor based•
Ten year battery backup for timekeeping•
UL and cUL pending•
BCMA 2000 Series Options
• GPS input
• Wireless Transmitter/Repeater for correction of the BCAL-2series analog clocks or BCBL series digital clocks
• SNTP Server
- With this software upgrade, the new BCMA Master Clock can be used as a SNTP server to interface with
other devices• Web interface software upgrade
- Extremely intuitive graphical user interface that allowsthe user to congure all of the settings of the BCMAthrough a simple web interface
- Control of all of the IP settings
HIGHLIGHTS
LED display for a clear, accurate readout•
(S)NTP Input Capability•
Up to ten server addresses can be pre-programmed-
into the unit for continuous, accurate synchronization
(with web interface software upgrade)
DHCP Capable•
Interfaces with other systems•
Interfaces with 59 and 58 minute correction, National-
Time and Rauland, as well as Dukane digital
1• 2 or 24 hour mode
Automatic bi–annual Daylight Saving Time changes including•
International and Domestic settings
Bias seconds output•
Adjust the time plus or minus a few seconds or minutes-
to t your application, while still receiving an input from
another source
RS485 input and output for time correction and•
synchronization
Two relays for simultaneous correction of two•
synchronous-wired clock systems
Microprocessor based•
Ten year battery backup for timekeeping•
UL and cUL pending•
BCMA 3000 Series Master Clock
BCMA 3000 Series Options• Four or eight congurable auxiliary relays (zones)
- 800 event capability
- 255 pre-programmed schedule changes
- Two (2) programmable signal durations per circuit
• GPS input
• Wireless Transmitter/Repeater for correction of the BCAL series analog
clocks or BCBL series digital clocks
• SNTP Server
- With this software upgrade, the new BCMA Master Clock can
be used as a SNTP server to interface with other devices
• Web Interface software upgrade
- Extremely intuitive graphical user interface that allows the
user to congure all of the settings of the BCMA through a
simple web browser
• Countdown feature *NEW*
• Digital clocks will countdown a preset amount of time when the relay is
activated
12
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 558/560
BCMA 1000 Series
Network Repeater HIGHLIGHTSTCP/IP connection for integration with•
the main transmitter
Powerful transmission range - transmits•
up to 2000 meters in open space!
Works on Bogen’s 9• 15 – 928 MHz fre-
quency hopping technology
Transmits the Bogen wireless signal to the•
BCAL series analog wireless clocks and
the BCBL series digital wireless clocks
DESCRIPTIONThe Network Repeater is the perfect solution for wireless
systems in campus or multiple building environments. The
Network Repeater receives its time from the main trans-
mitter in the system via a TCP/IP connection and transmits
the signal out to the BCAL Series analog clocks and the
BCBL Series digital clocks. This feature allows the repeater
to not have to be within the wireless range of the maintransmitter in the building. Boasting a slim prole design,
the Network Repeater is capable of being mounted in a
variety of different locations.
ACCESSORIES
HIGHLIGHTSConverts RS485 signal to a 24 volt, 2-wire•
digital communication signal
Ideal for renovation projects when a lim-•
ited number of wires are available
Protects against overloading and shorts, as•
well as high temperature damage
Provides a powerful 5.5 amp, 24V output•
Can drive both analog and digital clocks•
on the same run
DESCRIPTIONThe Bogen Converter Box takes the RS485 signal input
and converts it to the 2-Wire Digital Communication pro-
tocol, making it ideal for renovation projects. The Convert-
er Box has a 5.5 amp output which allows a large number
of clocks to be run off of one single box. The Converter
Box can also be used as a booster by accepting the 2-Wire
Digital Communication protocol and providing the rest of
the system with additional power. The Converter Box in-
cludes a 22 CFM fan that keeps the Converter Box cool,
but also quiet.
Converter Box
Transformer HIGHLIGHTSAvailable in 6.2,• 10.4, 20.8 and 31.2 amp
sizes
Multiple knockouts for easily accessible•
entries
Ground studs provided for bonding•
compatibility with both metallic and non-
metallic conduit
DESCRIPTIONTransformers are used in master clock and time systems
for reduction of 220VAC 150 Hz or 120VAC 160 Hz to
12 and 24 VAC. Bogen uses double wound, isolation type
transformers which feature copper windings and copper
lead wire terminations throughout. The transformer has
a UL Class 105°C (221°F) insulation system with a 55°C
( 131°F) temperature rise at a maximum ambient of 40°C
( 104°F). This ensures a long life and cool operating tem-
peratures. Multiple knockouts provide convenient conduit
entry and exit locations.
Wire GuardHIGHLIGHTS
6 and 9 gauge steel rods•
Available in 4”,• 12” and 16”
Zinc plated, epoxy nish•
Fixed tabs for mounting to the wall or•
ceiling
DESCRIPTIONWire guards are designed for use with Bogen 12” and
16” round analog clocks , and the 4” digital clock. Each
guard is fabricated from 6 and 9 gauge steel rods which
are welded together and hot dipped in a zinc coating to
protect from corrosion. The wire guards are hinged for con-
venient access to the analog or digital clocks. The heavy
duty wire guards come complete with xed tabs welded
to the guard for mounting directly to the wall or ceiling.
They are hung independently of the clock for maximum
protection.
HIGHLIGHTSUsed for mounting to an existing speaker•
bafe
Used for• 12” clock
Slim design•
DESCRIPTIONThe Surface Mount Ring is a perfect choice for renovations
when wiring cannot be run through the walls. The Surface
Mount Ring has a knockout in order to have conduit run
right into the housing. This accessory is extremely easy to
install, making it an ideal choice for any installation where
conduit is utilized.
Surface Mount Ring
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 559/560
NOTES
7/14/2019 RCSC Facility Assessment Report 2013
http://slidepdf.com/reader/full/rcsc-facility-assessment-report-2013 560/560
NOTES