WelcOMe tO OUr neXt generatiOn data centre.

Our new next generation facility in reading is the blueprint for the future of “energy efficient” technology and equipment. Built to tier 3 standards and with a focus on innovative power usage, cooling, monitoring and maintenance, the data centre is designed to provide reliable, secure and affordable colocation outside of central london and the M25 ring.

HellO reading

gOUndFlOOrgOUndFlOOr

A

A

B

B

C

C

D

D

3 generators with inbuilt resilience, built to tier 3 design guaranteeing 100% power availability.

external vents/grilles - utilising fresh air rather than electricity, in colder months sucking in ambient air from outside the data centre via the window louvers rather than heating with energy hungry chiller units all year round.

power provided from the national grid, UpS and generators giving n+1 backup generation with 2 feeds to every rack.

lV panel – controlling the incoming power supplies, designed to be maintained without disrupting power.

gas cylinder store – the fire detection/suppression system delivers gas directly to affected areas if required.

Schneider cctV door card access , Single person mantrap.

24hr manned security.

Screens showing internal and external cctV shots, monitored both locally and at the intechnology head office.

Swipe access control.internal and external cameras.

racks are contained within a rittal cold aisle containment pod which utilises fresh air cooling.

each pod is monitored by cctV, motion detectors and fire/heat detectors.

each rack is secured by combination key locks.Highly sensitive clymac VeSda fire detection system with detector heads above the racks , underfloor, in the aisles and perimeter smoke and heat detection.

leading edge cooling and energy management technologies with Weatherite air handling units monitoring and maintaining a constant temperature between 24-26 degrees.

pressure release valves - if gas or fire detected all vents automatically close and cooling fans go in to recirculation mode.Building management system (BMS), humidity, temperature & power usage, continually monitored locally & at head office.

generators

Visitor centre

24 / 7 monitoring

gas cylinders

data centre sensorsSecure reception cold aisle containment

this set-up is replicated on the first floor.

InTechnology Head OfficeCentral HouseBeckwith KnowleHarrogateHG3 1UGTel: +44 (0)1423 850 000Fax: +44 (0)1423 850 001

[email protected]

InTechnology ReadingCommensus House3-5 Worton DriveReadingRG2 0TG Tel: +44 (0)870 777 7778Fax: +44 (0)870 777 7779

Certificate No. FS 578568 Certificate No. IS 578569

How to find us:Exit the M4 at Junction 11.

Take the A33 towards Reading.

Follow the A33 for a quarter of a mile, turning right at the roundabout signposted Worton Grange Business Park onto Imperial Way.

Follow Imperial Way and take the 1st left onto Worton Drive.

The InTechnology data centre is approximately half a mile along the road, on the right, opposite Static Control Components Ltd.

SATNAV ref:RG2 0TG

A33

A33

A33

A33

M4

M4

B303

3

WORTON DR

WORTON DR

WORTON DR

IMPERIAL W

AY

IMPERIAL WAY

B3270

B3033READINGDATACENTRE