Report run on: April 4, 2012 10:58 AM RECAPP Facility Evaluation Report Sedgewick Community Health Services B2347A Sedgewick East Central Health

Upload: others

Post on 20-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM

RECAPP Facility Evaluation Report

Sedgewick Community Health ServicesB2347A

Sedgewick

East Central Health

Page 2: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 2 of 20

B2347ABuilding Id:

Sedgewick Community HealtBuilding Name:

SedgewickLocation:4822 - 50 Street Address:

483.00Gross Area (sq. m): $1,835,883Replacement Cost:0Construction Year:

Evaluation Date: November 15 2011

AHS Central Zone, Technical SupportFM&E

Evaluation Company:

Mike HintonEvaluator Name:

This building is built with strip footings and slab on grade floor. Wood frame construction with Stucco exterior walls,painted gyproc interior walls with suspended ceiling tiles. The main usage of this building is offices for communityhealth nurses. This is a single storey building built in 1987 with an area of 483 square meters. Overall this building is in good condition.

General Summary:

Structural Summary:This building is built with strip footings and slab on grade floor. Wood frame construction Overall the building structure is in good condition.

Envelope Summary:Wood frame construction with Stucco exterior walls, painted gyproc interior walls with suspended ceiling tiles.Aluminum framed windows. Overall the building envelope is in good condition.

Interior Summary:Painted gyproc walls with suspended ceiling tiles. Overall the interior of this building is in good condition.

Mechanical Summary:Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot waterheater. Overall the mechanical systems are in acceptable condition.

Electrical Summary:Electrical is is supplied at 200amps 120/240. Overall the electric systems are in acceptable condition.

3.39%5 year Facility Condition Index (FCI):

Facility Details Evaluation Details

Total Maintenance Events Next 5 years: $62,308

Sedgewick - Sedgewick Community Health Services (B2347A)

Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

Rating Guide

5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.

Page 3: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 3 of 20

A1010 Standard Foundations*

A1030 Slab on Grade*

B1010.02 Structural Interior Walls Supporting Floors (or Roof)*

B1010.09 Floor Construction Fireproofing*

B1010.10 Floor Construction Firestopping*

3 - Marginal

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1990

1990

1990

1990

1990

Installed

Installed

Installed

Installed

Installed

100

100

100

50

50

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Foundation Pillar Repair

Repair 2011 $25,000 High

Accelerated asset evaluation. The longer we wait the more itwill cost to repair; the more extensive the damage will be

Concern:

Repair sinking foundation pillarRecommendation:

Sedgewick - Sedgewick Community Health Services (B2347A)S1 STRUCTURAL

Event:

Type Year Cost Priority

Updated: APR-12

Strip footings on grade.

Concrete slab, was jacked up in some areas in 2010 due to sagging and cracking.

Wood framed construction

Not visible, no concerns reported

Not visible, no concerns reported

Consequences of Deferral:Extensive damage to foundation

Page 4: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 4 of 20

B1020.01 Roof Structural Frame*

B1020.06 Roof Construction Fireproofing*

4 - Acceptable

4 - Acceptable

Rating

Rating

1990

1990

Installed

Installed

100

50

Design Life

Design Life

APR-12

APR-12

Updated

Updated

Sedgewick - Sedgewick Community Health Services (B2347A)

Wood framed

Not visible, no concerns reported

Page 5: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 5 of 20

B2010.01.09 Expansion Control: Ext. Wall*

B2010.01.11 Joint Sealers (caulking): Ext. Wall**

B2010.01.13 Paints (& Stains): Ext. Wall**

B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation*

B2010.05 Parapets*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1990

1990

1990

1990

1990

Installed

Installed

Installed

Installed

Installed

75

20

15

100

50

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Replace Joint Sealers (caulking): Ext. Wall (200m)

Replace Paints (& Stains): Ext. Wall (120M2)

Lifecycle Replacement

Lifecycle Replacement

2015

2015

$5,696

$2,260

Unassigned

Unassigned

Sedgewick - Sedgewick Community Health Services (B2347A)S2 ENVELOPE

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Expansion joints on exterior walls, caulked.

Caulking in expansion joints and around openings.

Painted stucco

Not viewable, no concerns reported

1 meter parapets around roof perimeter.

Page 6: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 6 of 20

B2010.06 Exterior Louvers, Grilles, and Screens*

B2010.09 Exterior Soffits*

B2020.01.01.02 Aluminum Windows (Glass & Frame)**

B2030.01.01 Aluminum-Framed Storefronts: Doors**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1990

1990

1990

1990

Installed

Installed

Installed

Installed

50

50

40

30

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Replace (22each 1.5Mx1.5M Aluminum WindowsGlass & Frame)

Replace (4 Aluminum-Framed Storefronts: Doors)

Lifecycle Replacement

Lifecycle Replacement

2030

2020

$24,200

$26,730

Unassigned

Unassigned

Sedgewick - Sedgewick Community Health Services (B2347A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Louvers with bird screens.

Aluminum softits.

Average size 1mx1.5m.

Two doors on main entrance

Page 7: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 7 of 20

B2030.02 Exterior Utility Doors**

B3010.01 Deck Vapour Retarder and Insulation*

B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1990

1990

2000

Installed

Installed

Installed

40

25

25

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

Updated

Updated

Updated

Replace (2 Exterior Utility Doors)

Replace BUR roof (483M2)

Lifecycle Replacement

Lifecycle Replacement

2030

2025

$2,200

$63,400

Unassigned

Unassigned

Sedgewick - Sedgewick Community Health Services (B2347A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

One exterior door at rear of building.

Not viewable, no concerns reported.

No concerns reported. Suggested replacement was completed in 2000

Page 8: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 8 of 20

C1010.01 Interior Fixed Partitions*

C1010.07 Interior Partition Firestopping*

C1020.01 Interior Swinging Doors (& Hardware)*

C1020.03 Interior Fire Doors*

C1030.02 Fabricated Compartments (Toilets/Showers)**

C1030.06 Handrails*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

1990

1990

1990

1990

1990

1990

Installed

Installed

Installed

Installed

Installed

Installed

100

50

40

50

30

40

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Updated

Replace (4 Fabricated Compartments (Toilets))

Lifecycle Replacement 2020 $5,100 Unassigned

Sedgewick - Sedgewick Community Health Services (B2347A)S3 INTERIOR

Event:

Type Year Cost Priority

Updated: APR-12

Drywall, painted, wood framed.

Not viewable, no concerns reported.

Wood doors

1.5 hour wooden

Metal clad partitions.

Wooden hand rails.

Page 9: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 9 of 20

C1030.08 Interior Identifying Devices*

C1030.12 Storage Shelving*

C1030.14 Toilet, Bath, and Laundry Accessories*

C3010.06 Tile Wall Finishes**

C3010.11 Interior Wall Painting*

C3010.12 Wall Coverings*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

1990

1990

1990

1990

1990

1990

Installed

Installed

Installed

Installed

Installed

Installed

20

30

20

40

10

15

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Updated

Replace Tile Wall Finishes (6M2)

Lifecycle Replacement 2030 $1,530 Unassigned

Sedgewick - Sedgewick Community Health Services (B2347A)

Event:

Type Year Cost Priority

Updated: APR-12

Room identification on some rooms.

Metal adjustable shelving.

Soap and towel dispensers.

Tile around sinks and in splash areas.

Painted drywall.

Some vinyl wall paper in lobby.

Page 10: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 10 of 20

C3020.02 Tile Floor Finishes**

C3020.08 Carpet Flooring**

C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**

4 - Acceptable

3 - Marginal

4 - Acceptable

Rating

Rating

Rating

1990

1990

1990

Installed

Installed

Installed

50

15

25

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

Updated

Updated

Updated

Replace (200M2 Tile Floor Finishes)

Replace (300M2 Carpet Flooring)

Replace (2500M2 Acoustic Ceiling Treatment(Susp. T-Bar))

Lifecycle Replacement

Failure Replacement

Lifecycle Replacement

2040

2014

2015

$33,600

$24,602

$11,250

Unassigned

Low

Unassigned

Carpet is worn and wrinkling in places Concern:

Remove and replace carpet.Recommendation:

Sedgewick - Sedgewick Community Health Services (B2347A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-12

APR-12

APR-12

Exam rooms have floor tile.

The majority of the building has carpet.

Suspended t-bar ceiling tiles.

Consequences of Deferral:Possible trip hazzard & infection control issues.

Page 11: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 11 of 20

C3030.07 Interior Ceiling Painting*

4 - AcceptableRating

1990Installed

20Design Life

APR-12Updated

Sedgewick - Sedgewick Community Health Services (B2347A)

Storage room and washrooms have painted drywall ceilings.

Page 12: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 12 of 20

D2010.04 Sinks**

D2010.10 Washroom Fixtures (WC, Lav, Urnl)**

D2020.01.01 Pipes and Tubes: Domestic Water*

D2020.01.02 Valves: Domestic Water**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1990

1990

1990

1990

Installed

Installed

Installed

Installed

30

35

40

40

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Replace Sinks(2)

Replace Washroom Fixtures (4WC, 4Lav,)

Replace Valves: Domestic Water (~10)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2020

2025

2030

$2,880

$12,500

$1,000

Unassigned

Unassigned

Unassigned

Sedgewick - Sedgewick Community Health Services (B2347A)S4 MECHANICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-12

APR-12

APR-12

SS kitchen sinks in clinic rooms.

Toilets and basins

Copper piping.

Globe and gate valves

Page 13: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 13 of 20

D2020.02.06 Domestic Water Heaters**

D2020.03 Water Supply Insulation: Domestic*

D2030.01 Waste and Vent Piping*

D2030.02.04 Floor Drains*

D2040.02.04 Roof Drains*

D3010.02 Gas Supply Systems*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

1990

1990

1990

1990

1990

1990

Installed

Installed

Installed

Installed

Installed

Installed

20

40

50

50

40

60

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Updated

Replace Domestic Water Heater (1)

Lifecycle Replacement 2015 $1,500 Unassigned

Sedgewick - Sedgewick Community Health Services (B2347A)

Event:

Type Year Cost Priority

Updated: APR-12

Gas fired 60 gallon water heater

Fiberglass insulated

Copper piping

Cast iron located in washrooms and mechanical room.

Cast iron

Iron pipe, 1"

Page 14: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 14 of 20

D3040.01.01 Air Handling Units: Air Distribution**

D3040.01.03 Air Cleaning Devices: Air Distribution*

D3040.01.04 Ducts: Air Distribution*

D3040.01.07 Air Outlets & Inlets: Air Distribution*

D3040.03.01 Hot Water Distribution Systems**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1990

1990

1990

1990

1990

Installed

Installed

Installed

Installed

Installed

30

30

50

30

40

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Replace Air Handling Units Roof top units (2)

Replace Hot Water Distribution Systems (480M2)

Lifecycle Replacement

Lifecycle Replacement

2020

2030

$25,200

$26,040

Unassigned

Unassigned

Sedgewick - Sedgewick Community Health Services (B2347A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Roof top units with AC

Standard filter in AHU's

Galvanized ducting

Flush mount diffusers.

Copper piping

Page 15: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 15 of 20

D3040.04.01 Fans: Exhaust**

D3040.04.03 Ducts: Exhaust*

D3040.04.05 Air Outlets and Inlets: Exhaust*

D4030.01 Fire Extinguisher, Cabinets and Accessories*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1990

1990

1990

1990

Installed

Installed

Installed

Installed

30

50

30

30

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Replace Fans: Exhaust (3)

Lifecycle Replacement 2020 $2,502 Unassigned

Sedgewick - Sedgewick Community Health Services (B2347A)

Event:

Type Year Cost Priority

Updated: APR-12

Domestic exhaust fans in washrooms and clinic rooms.

Galvanized ducts.

Louvers with bird screens.

SS enclosures.

Page 16: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 16 of 20

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

D5020.01 Electrical Branch Wiring*

D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*

D5020.02.02.01 Interior Incandescent Fixtures*

D5020.02.02.02 Interior Fluorescent Fixtures**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1990

1990

1990

1990

1990

Installed

Installed

Installed

Installed

Installed

30

50

30

30

30

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Replace (2 panels) Electrical Branch CircuitPanelboards

Replace Interior Fluorescent Fixtures (480M2)

Lifecycle Replacement

Lifecycle Replacement

2020

2020

$9,280

$42,000

Unassigned

Unassigned

Sedgewick - Sedgewick Community Health Services (B2347A)S5 ELECTRICAL

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Two square D panels

Copper wiring

Line voltage switching.

Most using compact fluorescents.

Upgraded to T-8

Page 17: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 17 of 20

D5020.02.03.02 Emergency Lighting Battery Packs**

D5020.02.03.03 Exit Signs*

D5020.03.01.04 Exterior H.P. Sodium Fixtures*

D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*

D5030.02.02 Intrusion Detection**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1990

1990

1990

1990

1990

Installed

Installed

Installed

Installed

Installed

20

30

30

30

25

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Replace Wall packs (4)

Replace Intrusion Detection (483m2/gfa)

Lifecycle Replacement

Lifecycle Replacement

2015

2015

$4,400

$12,600

Unassigned

Unassigned

Sedgewick - Sedgewick Community Health Services (B2347A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

4 Wall packs

LED lit

Wall pack on rear exterior

Photo cell in wall pack. Photo cell for other exterior lights.

Door monitoring and motion detection

Page 18: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 18 of 20

D5030.04.01 Telephone Systems*

D5030.04.05 Local Area Network Systems*

E2010.02 Fixed Casework**

E2010.03.01 Blinds**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1990

1990

1990

1990

Installed

Installed

Installed

Installed

25

15

35

30

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Replace (60M Fixed Casework)

Replace (22 Blinds 1.5x1.5M)

Lifecycle Replacement

Lifecycle Replacement

2025

2020

$45,390

$5,100

Unassigned

Unassigned

Sedgewick - Sedgewick Community Health Services (B2347A)

S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-12

APR-12

Nortel switch

AHS network on supernet.

Laminated cupboards and counter tops.

Vertical blinds.

Page 19: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 19 of 20

K4010.01 Barrier Free Route: Parking to Entrance*

K4010.02 Barrier Free Entrances*

K4010.03 Barrier Free Interior Circulation*

K4010.04 Barrier Free Washrooms*

K4020 Alberta Building Codes

K4030.04 Mould*

K4030.09 Other Hazardous Materials*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

Rating

1990

1990

1990

1990

1990

1990

1990

Installed

Installed

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

APR-12

APR-12

APR-12

APR-12

APR-12

APR-12

APR-12

Updated

Updated

Updated

Updated

Updated

Updated

Updated

Sedgewick - Sedgewick Community Health Services (B2347A)S8 SPECIAL ASSESSMENT

Street parking and gravel parking in rear.

Auto doors at main entrance.

Halls are designed for wheel chairs.

Washrooms are designed for wheel chairs.

No code concerns

No mould reported

No hazardous materials found.

Page 20: RECAPP Facility Evaluation Report - AlbertaMechanical Summary: Building is heated and cooled using roof top units (2). Domestic water is heated with a gas fired domestic hot water

Report run on: April 4, 2012 10:58 AM Page 20 of 20

K5010.01 Site Documentation*

K5010.02 Building Documentation*

4 - Acceptable

4 - Acceptable

Rating

Rating

1987

1987

Installed

Installed

0

0

Design Life

Design Life

APR-12

APR-12

Updated

Updated

Sedgewick - Sedgewick Community Health Services (B2347A)

Prime Consultant - AHS Central Zone FM&E Technical support - Mike Hinton Evaluated 2011. Gravel parking rear, grass on sides and front with tress at front and side.

Prime Consultant - AHS Central Zone FM&E Technical support - Mike Hinton Entire building Evaluated 2011.