reference project 2007 to 20101
TRANSCRIPT
-
8/4/2019 Reference Project 2007 to 20101
1/26
Project: Menu to ribbon referenceTo view Office 2007 menu and toolbar commands and their Office 2010 equivalents, click a worksheet tab at the bottom of the window.
If you don't see the tab you want, right-click the scrolling buttons next to the tabs to reveal a list of all the worksheets in the workbook. Then click
the worksheet you want to view.
To find additional resources that will help you make the transition to the new user interface in Office 2010 and related products, visit
http://office.com/gettingstarted.
For more tips on using this workbook, press F1 and click More information about this template.
-
8/4/2019 Reference Project 2007 to 20101
2/26
Project 2007 Location Project 2010 LocationCheck In File | Options | Customize Ribbon | All Commands | Check In
Check Out File | Options | Customize Ribbon | All Commands | Check Out
Close File | Close
Close File | Close
Exit File | Exit
Exit File | Options | Customize Ribbon | All Commands | ExitNew File | New
Open File | Open
Open Quick Access Toolbar | Open
Open File | Open
Open Quick Access Toolbar | Open
Page Setup File | Print |Page Setup
Print File | Print
Print Preview File | Print
Print Preview Quick Access Toolbar | Print Preview
Properties File | Info | Project Information | Advanced Properties
Publish File | Info | Publish
Save File | Save
Save Quick Access Toolbar | Save
Save As File | Save AsSave As File | Save & Send | Save As
Save As Quick Access Toolbar | Save As
Save for Sharing File | Save & Send | Save Project as File | Save for Sharing
Save Workspace File | Options | Customize Ribbon | All Commands | Save Workspace
Send To File | Save & Send
Send To | Exchange Folder File | Options | Customize Ribbon | All Commands | Exchange Folder
Send To | Mail Recipient (as Attachment) File | Save & Send | Send as Attachment | Send as Attachment
Send To | Mail Recipient (as Attachment) Quick Access Toolbar | E-mail
Send To | Routing Recipient File | Options | Customize Ribbon | All Commands | Routing Recipient
Version History Removed from Product
Work Offline File | Info | Manage Accounts | Work Offline
Project: File Menu
Page 2 of 26
-
8/4/2019 Reference Project 2007 to 20101
3/26
Project 2007 Location Project 2010 LocationCan't Redo Quick Access Toolbar | Redo
Clear Task | Editing | Clear
Clear | All Task | Editing | Clear | Clear All
Clear | Contents File | Options | Customize Ribbon | All Commands | Clear Contents
Clear | Formats Task | Editing | Clear | Clear Formatting
Clear | Hyperlinks Task | Editing | Clear | Clear HyperlinksClear | Notes Task | Editing | Clear | Notes
Copy Cell Task | Clipboard | Copy
Copy Cell Task | Clipboard | Copy | Copy
Cut Cell Task | Clipboard | Cut
Fill Task | Editing | Fill
Fill | Down Task | Editing | Fill | Down
Fill | Left Task | Editing | Fill | Left
Fill | Right Task | Editing | Fill | Right
Fill | Up Task | Editing | Fill | Up
Find Task | Editing | Find & Select | Find
Find Task | Editing | Find
Go To File | Options | Customize Ribbon | All Commands | Go To
Link Tasks Task | Schedule | Link Tasks
Links File | Options | Customize Ribbon | All Commands | Edit LinksObject Right-click the object
Object | Convert File | Options | Customize Ribbon | All Commands | Convert
Paste Task | Clipboard | Paste
Paste Task | Clipboard | Paste | Paste
Paste as Hyperlink Task | Clipboard | Paste | Paste as Hyperlink
Paste Special Task | Clipboard | Paste | Paste Special
Replace Task | Editing | Find & Select | Replace
Split Task Task | Schedule | Split Task
Undo Quick Access Toolbar | Undo
Unlink Tasks Task | Schedule | Unlink Tasks
Project: Edit Menu
Page 3 of 26
-
8/4/2019 Reference Project 2007 to 20101
4/26
Project 2007 Location Project 2010 LocationCalendar View | Task Views |Calendar
Gantt Chart Task | View | Gantt Chart
Header and Footer File | Print | Page Setup | Header tab
Hide Change Highlighting File | Options | Customize Ribbon | All Commands | Change Highlighting
More Views Task | View | Gantt Chart | More Views
Network Diagram View | Task Views |Network DiagramResource Graph View | Resource Views |Other Views | Resource Graph
Resource Sheet View | Resource Views |Resource Sheet
Resource Usage View | Resource Views |Resource Usage
Table: Entry View | Data | Tables
Task Usage View | Task Views | Task Usage
Toolbars | Collaborate Toolbars have been removed from the product. To find commands on the Collaborate
toolbar, go to the Collaborate Toolbar menu of this workbook.
Toolbars | Custom Forms Toolbars have been removed from the product. To find commands on the Custom Forms
toolbar, go to the Custom Forms Toolbar sheet of this workbook.
Toolbars | Customize Removed from Product
Toolbars | Drawing Toolbars have been removed from the product. To find commands on the Drawing toolbar, go
to the Drawing Toolbar sheet of this workbook.
Toolbars | Formatting Toolbars have been removed from the product. To find commands on the Formatting toolbar,
go to the Formatting Toolbar sheet of this workbook.Toolbars | Network Diagram Toolbars have been removed from the product. To find commands on the Network Diagram
toolbar, go to the Network Diagram Toolbar sheet of this workbook.
Toolbars | Resource Management Toolbars have been removed from the product. To find commands on the Resource
Management toolbar, go to the Resource Management Toolbar sheet of this workbook.
Toolbars | Standard Toolbars have been removed from the product. To find commands on the Standard toolbar,
go to the Standard Toolbar sheet of this workbook.
Toolbars | Tracking Toolbars have been removed from the product. To find commands on the Tracking toolbar, go
to the Tracking Toolbar sheet of this workbook.
Toolbars | Visual Basic Toolbars have been removed from the product. To find commands on the Visual Basic
toolbar, go to the Visual Basic Toolbar sheet of this workbook.
Toolbars | Web Toolbars have been removed from the product. To find commands on the Web toolbar, go to
the Web Toolbar sheet of this workbook.Tracking Gantt View | Task Views |Gantt Chart | Tracking Gantt
Turn on Project Guide Removed from Product
View Bar Right-click in the View bar| View Bar
Zoom View | Zoom | Zoom | Zoom
Project: View Menu
Page 4 of 26
-
8/4/2019 Reference Project 2007 to 20101
5/26
Project 2007 Location Project 2010 LocationColumn Gantt Chart Tools | Format | Columns | Insert Column
Drawing Gantt Chart Tools | Format | Drawings | Drawing
Hyperlink Right-click in a task cell and click Hyperlink
Insert Page Break File | Options | Customize Ribbon | All Commands | Insert Page Break
New Resource From Resource | Insert | Add Resources
New Resource From | Active Directory Resource | Insert | Add Resource | Active DirectoryNew Resource From | Address Book Resource | Insert | Add Resources | Address Book
New Resource From | Project Server Resource | Add Resources | Build Team from Enterprise
New Task Task | Insert | Task
Object File | Options | Customize Ribbon | All Commands | Object
Project Project | Insert | Subproject
Recurring Task Task | Insert | Task | Recurring Task
Project: Insert Menu
Page 5 of 26
-
8/4/2019 Reference Project 2007 to 20101
6/26
Project 2007 Location Project 2010 LocationBar Gantt Chart Tools | Format | Bar Styles | Format | Bar
Bar Styles Gantt Chart Tools | Format | Bar Styles | Format | Bar Styles
Box Network Diagram Tools | Format | Format | Box
Box Styles Network Diagram Tools | Format | Format | Box Styles
Detail Styles Task Usage Tools | Format | Details | Add Details
Detail Styles Resource Usage Tools | Format | Add DetailsDetails Resource Usage Tools | Format | Details
Details Task Usage Tools | Format | Details
Details Resource Graph Tools | Format | Graph
Drawing Gantt Chart Tools | Format | Drawings | Drawing
Drawing | Bring to Front Gantt Chart Tools | Format | Drawings | Drawing | Bring to Front
Drawing | Properties Right-click the drawing object and click Properties
Drawing | Send To Back Right-click the drawing object and click Arrange, and then Send to Back
Drawing | Send To Back Gantt Chart Tools | Format | Drawings | Drawing | Send to Back
Font Task | Font | Font
Font Timeline Tools | Format | Font | Font
Gantt Chart Wizard File | Options | Customize Ribbon | All Commands | Gantt Chart Wizard
Gridlines Gantt Chart Tools | Format | Format | Gridlines | Gridlines
Layout Gantt Chart Tools | Format | Format | Layout
Layout Now Calendar Tools | Format | Layout | Layout NowLayout Now Network Diagram Tools | Format | Layout | Layout Now
Text Styles Gantt Chart Tools | Format | Format | Text Styles
Timescale View | Zoom | Timescale: | Timescale
Project: Format Menu
Page 6 of 26
-
8/4/2019 Reference Project 2007 to 20101
7/26
Project 2007 Location Project 2010 LocationAssign Resources Resource | Assignments | Assign Resources
AutoCorrect Options File | Options | Proofing | AutoCorrect Options
Build Team from Enterprise Resource | Insert | Add Resources | Build Team from Enterprise
Build Team from Enterprise Resource | Insert | Add Resources | Build Team from Enterprise
Change Working Time Project | Properties | Change Working TimeCustomize | Fields Project | Properties | Custom Fields
Customize | Fields Project | Properties | Custom Fields
Customize | Forms Removed from Product
Customize | Toolbars File | Options | Customize Ribbon
Customize | Toolbars File | Options | Quick Access Toolbar
Document Management Removed from Product
Enterprise Options Moved to various locations on Project tab
Enterprise Options | Import Project to Enterprise File | Save & Send | Publish to Project Server | Save As
Enterprise Options | Import Resources to Enterprise Resource | Insert | Add Resources | Import Resources to Enterprise
Enterprise Options | Microsoft Office Project Server Accounts File | Info | Manage Accounts
Enterprise Options | Open Enterprise Global File | Info | Manage Global Template | Open Enterprise Global
Enterprise Options | Open Enterprise Resource Pool Resource | Assignments | Resource Pool | Enterprise Resource Pool
Hangul Hanja Conversion File | Options | Customize Ribbon | All Commands | Hangul Hanja Conversion
Import Outlook Tasks Task | Insert | Task | Import Outlook Tasks
Level Resources Resource | Level | Leveling Options
Links Between Projects Project | Properties | Links Between Projects
Local Project Cache File | Options | Save | Cache
Local Project Cache | Cache Settings File | Options | Save | Cache
Local Project Cache | Cleanup Cache File | Options | Save | Clean Up Cache
Local Project Cache | View Status File | Options | Save | View Cache Status
Macro View | Macros | Macros
Macro | Macros Developer | Code | View Macros
Macro | Macros View | Macros | Macros | View Macros
Macro | Macros View | Macros | View Macros
Macro | Record New Macro Developer | Code | Record Macro
Macro | Record New Macro View | Macros | Macros | Record Macro
Macro | Security Developer | Code | Macro Security
Macro | Security View | Macros | Macros | Macro Security
Macro | Visual Basic Editor Developer | Code | Visual Basic
Macro | Visual Basic Editor View | Macros | Macros | Visual Basic
Options File | Options
Organizer Developer | Manage | Organizer
Organizer File | Info | Organizer
Resource Sharing Resource | Assignments | Resource Pool
Resource Sharing | Refresh Resource Pool Resource | Assignments | Resource Pool | Refresh Resource Pool
Resource Sharing | Share Resources Resource | Assignments | Resource Pool | Share Resources
Resource Sharing | Update Resource Pool Resource | Assignments | Resource Pool | Update Resource Pool
Spelling Project | Proofing | Spelling
Substitute Resources Resource | Assignments | Substitute Resources
Tracking Moved to various locations on Project tab
Tracking | Clear Baseline Project | Schedule | Set Baseline | Clear Baseline
Tracking | Clear Baseline Project | Scheduled | Set Baseline | Clear Baseline
Tracking | Progress Lines Gantt Chart Tools | Format | Format | Gridlines | Progress Lines
Tracking | Set Baseline Project | Schedule | Set Baseline | Set Baseline
Tracking | Set Baseline Project | Scheduled | Set Baseline | Set Baseline
Tracking | Sync to Protected Actuals Project | Status | Sync to Protected Actuals
Tracking | Update Project Project | Status | Update Project
Tracking | Update Tasks Task | Schedule | Mark On Track | Update Task
Project: Tools Menu
-
8/4/2019 Reference Project 2007 to 20101
8/26
Project 2007 Location Project 2010 LocationFiltered for: All Tasks View | Data | Filter | Clear Filter
Group by: No Group View | Data | Group by:
Outline View | Data | Outline
Project Information Project | Properties | Project Information
Resource Information Resource | Properties | Information
Resource Notes Resource | Properties | NotesSort View | Data | Sort
Task Drivers Task | Tasks | Inspect
Task Information... Task | Properties | Information
Task Notes... Task | Properties | Notes
WBS Project | Properties | WBS
Group By View | Data | Group by:
Filtered for: All Tasks | AutoFilter View | Data | Filter | Display AutoFilter
Filtered for: All Tasks | More Filters View | Data | Filter | More Filters
Group by: No Group | Customize Group By File | Options | Customize Ribbon | All Commands | Group By
Group by: No Group | More Groups View | Data | Group by | More Groups
Outline | Hide Assignments File | Options | Customize Ribbon | All Commands | Assignments
Outline | Hide Assignments File | Options | Customize Ribbon | All Commands | Assignments
Outl ine | H ide Outline Symbols File | Options | Customize Ribbon | All Commands | Outline Symbols
Outline | Hide Subtasks View | Data | Outline | Hide SubtasksOutline | Indent Task | Schedule | Indent
Outline | Outdent Task | Schedule | Outdent
Outline | Show Subtasks View | Data | Outline | Show Subtasks
Outline | Show | All Subtasks View | Data | Outline | All Subtasks
Outline | Show | Outline Level 1 View | Data | Outline Level 1
Outline | Show | Outline Level 2 View | Data | Outline Level 2
Outline | Show | Outline Level 3 View | Data | Outline Level 3
Outline | Show | Outline Level 4 View | Data | Outline Level 4
Outline | Show | Outline Level 5 View | Data | Outline Level 5
Outline | Show | Outline Level 6 View | Data | Outline Level 6
Outline | Show | Outline Level 7 View | Data | Outline Level 7
Outline | Show | Outline Level 8 View | Data | Outline Level 8
Outline | Show | Outline Level 9 View | Data | Outline Level 9
Sort | Sort by View | Data | Sort | Sort ByWBS | Define Code Project | Properties |WBS | Define Code
WBS | Renumber Project | Properties | WBS | Renumber
Project: Project Menu
Page 8 of 26
-
8/4/2019 Reference Project 2007 to 20101
9/26
Project 2007 Location Project 2010 LocationCollaboration Options File | Info | Project Information
Data Analysis File | Options | Customize Ribbon | All Commands | Data Analysis
Data Analysis File | Options | Customize Ribbon | All Commands | Data Analysis
Documents File | Info | Related Items | Documents
Documents File | Info | Related Items | Documents
Issues File | Info | Related Items | IssuesIssues File | Info | Related Items | Issues
Manage Deliverables Task | Insert | Deliverable | Manage Deliverables
Manage Dependencies on Deliverables Task | Insert | Deliverable | Manage Dependencies
Project Center File | Info | Project Information | View in Project Web App
Project Center File | Info | Project Information | View in Project Web App
Publish File | Save & Send | Publish to Project Server | Publish
Request Progress Information File | Options | Customize Ribbon | All Commands | Request Progress Information
Resource Center Removed from Product
Resource Center Removed from Product
Risks File | Info | Related Items | Risks
Risks File | Info | Related Items | Risks
Status Reports Removed from Product
Status Reports Removed from ProductUpdate Project Progress File | Info | Check for Updates
Update Project Progress File | Info | Check for Updates
Project: Collaborate Menu
Page 9 of 26
-
8/4/2019 Reference Project 2007 to 20101
10/26
Project 2007 Location Project 2010 LocationArrange All View | Window | Arrange All
Hide View | Window | Hide | Hide
New Window View | Window | New Window
Split View | Split View | Details
Unhide View | Window | Hide | Unhide
Project: Window Menu
Page 10 of 26
-
8/4/2019 Reference Project 2007 to 20101
11/26
Project 2007 Location Project 2010 LocationAbout Microsoft Office Project File | Help | About Microsoft Project
Microsoft Office Diagnostics Removed from Product
Microsoft Office Online File | Help | Getting Started
Microsoft Office Project Help Upper Ribbon | Help
Project: Help Menu
Page 11 of 26
-
8/4/2019 Reference Project 2007 to 20101
12/26
Project 2007 Location Project 2010 LocationAssign Resources Resource | Assignments | Assign Resources
Can't Redo Quick Access Toolbar | Redo
Copy Cell Task | Clipboard | Copy
Copy Cell Task | Clipboard | Copy | Copy
Copy Picture Task | Clipboard | Copy | Copy Picture
Cut Cell Task | Clipboard | CutFormat Painter Task | Clipboard | Format Painter
Group By View | Data | Group by
Hyperlink Right-click in a task cell and click Hyperlink
Link Tasks Task | Schedule | Link Tasks
Microsoft Office Project Help Upper Ribbon | Help
New File | New
New Quick Access Toolbar | New
Open File | Open
Open Quick Access Toolbar | Open
Paste Task | Clipboard | Paste
Paste Task | Clipboard | Paste | Paste
Print File | Print
Print Quick Access Toolbar | Quick Print
Print Preview File | PrintPrint Preview Quick Access Toolbar | Print Preview
Save File | Save
Save Quick Access Toolbar | Save
Scroll to Task Task | Editing | Scroll to Task
Spelling Project | Proofing | Spelling
Split Task Task | Schedule | Split Task
Task Drivers Task | Tasks | Inspect
Task Information Task | Properties | Information
Task Notes Task | Properties | Notes
Undo Quick Access Toolbar | Undo
Unlink Tasks Task | Schedule | Unlink Tasks
Zoom In View | Zoom | Zoom | Zoom In
Zoom Out View | Zoom | Zoom | Zoom Out
Project: Standard Toolbar
Page 12 of 26
-
8/4/2019 Reference Project 2007 to 20101
13/26
Project 2007 Location Project 2010 LocationAlign Left Gantt Chart Tools | Format | Columns | Align Left
Align Left Resource Sheet Tools | Format | Columns | Align Left
Align Left Resource Usage Tools | Format | Columns | Align Left
Align Left Task Sheet Tools | Format | Columns | Align Left
Align Left Task Usage Tools | Format | Columns | Align Left
Align Right Gantt Chart Tools | Format | Columns | Align RightAlign Right Resource Sheet Tools | Format | Columns | Align Right
Align Right Resource Usage Tools | Format | Columns | Align Right
Align Right Task Sheet Tools | Format | Columns | Align Right
Align Right Task Usage Tools | Format | Columns | Align Right
AutoFilter View | Data | Filter | Display AutoFilter
Bold Task | Font | Bold
Bold Timeline Tools | Format | Font | Bold
Center Gantt Chart Tools | Format | Columns | Center
Center Resource Sheet Tools | Format | Columns | Center
Center Resource Usage Tools | Format | Columns | Center
Center Task Sheet Tools | Format | Columns | Center
Center Task Usage Tools | Format | Columns | Center
Filter View | Data | Filter
Font Size Task | Font | Font SizeFont Size Timeline Tools | Format | Font | Font Size
Font Task | Font | Font
Font Timeline Tools | Format | Font | Font
Gantt Chart Wizard File | Options | Customize Ribbon | All Commands | Gantt Chart Wizard
Hide Assignments File | Options | Customize Ribbon | All Commands | Assignments
Hide Subtasks View | Data | Outline | Hide Subtasks
Indent Task | Schedule | Indent
Italic Task | Font | Italic
Italic Timeline Tools | Format | Font | Italic
Outdent Task | Schedule | Outdent
Show | All Subtasks View | Data | Outline | All Subtasks
Show | Outline Level 1 View | Data | Outline Level 1
Show | Outline Level 2 View | Data | Outline Level 2
Show | Outline Level 3 View | Data | Outline Level 3Show | Outline Level 4 View | Data | Outline Level 4
Show | Outline Level 5 View | Data | Outline Level 5
Show | Outline Level 6 View | Data | Outline Level 6
Show | Outline Level 7 View | Data | Outline Level 7
Show | Outline Level 8 View | Data | Outline Level 8
Show | Outline Level 9 View | Data | Outline Level 9
Show Subtasks View | Data | Outline | Show Subtasks
Underline Task | Font | Underline
Underline Timeline Tools | Format | Font | Underline
Project Formatting Toolbar
Page 13 of 26
-
8/4/2019 Reference Project 2007 to 20101
14/26
Project 2007 Location Project 2010 LocationAdjust Dates Project | Schedule | Move Project
Copy Picture to Office Wizard Task | Clipboard | Copy | Copy Picture
PERT Analysis Removed from Product
Project: Analysis Toolbar
Page 14 of 26
-
8/4/2019 Reference Project 2007 to 20101
15/26
Project 2007 Location Project 2010 LocationCompare Project Versions Project | Reports | Compare Projects
Go to Task/Resource in Project Versions Compare Projects | Compare | Go to Item
More Information Compare Projects | Show | Legend
Select Columns to Show in the Comparison Report Compare Projects | Show | Columns
Select Tasks/Resources to Show in the ComparisonReport
Compare Projects | Show | Items
Project: Compare Project Versions Toolbar
Page 15 of 26
-
8/4/2019 Reference Project 2007 to 20101
16/26
Project 2007 Location Project 2010 LocationCost Tracking Removed from Product
Entry Removed from Product
Forms Removed from Product
Schedule Tracking Removed from Product
Task Earned Value Removed from Product
Task Relationships Removed from ProductTracking Removed from Product
Work Tracking Removed from Product
Project: Custom Forms Toolbar
Page 16 of 26
-
8/4/2019 Reference Project 2007 to 20101
17/26
Project 2007 Location Project 2010 LocationArc Gantt Chart Tools | Format | Drawings | Drawing | Arc
Arrow Gantt Chart Tools | Format | Drawings | Drawing | Arrow
Attach to Task File | Options | Customize Ribbon | All Commands | Attach to Task
Cycle Fill Color Gantt Chart Tools | Format | Drawings | Drawing | Cycle Fill Color
Draw | Bring Forward Right-click the drawing object and click Arrange, Bring Forward
Draw | Bring Forward Gantt Chart Tools | Format | Drawings | Drawing | Bring ForwardDraw | Bring to Front Right-click the drawing object and click Arrange, Bring to Front
Draw | Bring to Front Gantt Chart Tools | Format | Drawings | Drawing | Bring to Front
Draw | Edit Points Gantt Chart Tools | Format | Drawings | Drawing | Edit Points
Draw | Send Backward Right-click the drawing object and click Arrange Send Backward
Draw | Send Backward Gantt Chart Tools | Format | Drawings | Drawing | Send Backward
Draw | Send To Back Right-click the drawing object and click Arrange Send to Back
Draw | Send To Back Gantt Chart Tools | Format | Drawings | Drawing | Send to Back
Line Gantt Chart Tools | Format | Drawings | Drawing | Line
Oval Gantt Chart Tools | Format | Drawings | Drawing | Oval
Polygon Gantt Chart Tools | Format | Drawings | Drawing | Polygon
Rectangle Gantt Chart Tools | Format | Drawings | Drawing | Rectangle
Text Box Gantt Chart Tools | Format | Drawings | Drawing | Text Box
Project: Drawing Toolbar
Page 17 of 26
-
8/4/2019 Reference Project 2007 to 20101
18/26
Project 2007 Location Project 2010 LocationClose Close
Maximize Title Bar | Maximize
Minimize Title Bar | Minimize
Move Title Bar | Move
Restore Title Bar | Restore
Size File | Options | Customize Ribbon | All Commands | Size
Project: Insert Toolbar
Page 18 of 26
-
8/4/2019 Reference Project 2007 to 20101
19/26
Project 2007 Location Project 2010 LocationAlign | Bottoms Network Diagram Tools | Format | Layout | Align | Align Bottom
Align | Centers Network Diagram Tools | Format | Layout | Align | Align Center
Align | Lefts Network Diagram Tools | Format | Layout | Align | Align Left
Align | Middles Network Diagram Tools | Format | Layout | Align | Align Middle
Align | Rights Network Diagram Tools | Format | Layout | Align | Align Right
Align | Tops Network Diagram Tools | Format | Layout | Align | Align TopHide Fields Network Diagram Tools | Format | Display | Collapse Boxes
Hide Summary Tasks Network Diagram Tools | Format | Show/Hide | Summary Tasks
Layout Now Network Diagram Tools | Format |Layout | Layout Now
Layout Selection Now Network Diagram Tools | Format |Layout | Layout Now | Layout Selection Now
Show Link Labels Network Diagram Tools | Format | Show/Hide | Link Labels
Show Page Breaks Network Diagram Tools | Format | Layout
Show Progress Marks Network Diagram Tools | Format | Show/Hide | Progress Marks
Straight Links Network Diagram Tools | Format | Show/Hide | Straight Links
Project: Network Diagram Toolbar
Page 19 of 26
-
8/4/2019 Reference Project 2007 to 20101
20/26
Project 2007 Location Project 2010 LocationAllow Others to Edit Removed from Product
Call Participant Removed from Product
Display Chat Window Removed from Product
Display Whiteboard Removed from Product
End Meeting Removed from Product
Participant List Removed from ProductRemove Participants Removed from Product
Project: Online Meeting Toolbar
Page 20 of 26
-
8/4/2019 Reference Project 2007 to 20101
21/26
Project 2007 Location Project 2010 LocationCalculate PERT Removed from Product
Expected Gantt Removed from Product
Optimistic Gantt Removed from Product
PERT Entry Form Removed from Product
PERT Entry Sheet Removed from Product
Pessimistic Gantt Removed from ProductSet PERT Weights Removed from Product
Project: PERT Analysis Toolbar
Page 21 of 26
-
8/4/2019 Reference Project 2007 to 20101
22/26
Project 2007 Location Project 2010 LocationCopy Picture Task | Clipboard | Copy | Copy Picture
Reports Project | Reports | Reports
Visual Reports Project | Reports | Visual Reports
Project: Report Toolbar
Page 22 of 26
-
8/4/2019 Reference Project 2007 to 20101
23/26
Project 2007 Location Project 2010 LocationAddress Book Resource | Insert | Add Resources | Address Book
Assign Resources Resource | Assignments | Assign Resources
Go To Next Overallocation Resource | Level | Next Overallocation
Leveling Help Upper Ribbon | Help
New Resource From | Active Directory Resource | Insert | Add Resources | Active Directory
New Resource From | Address Book Resource | Insert | Add Resources | Address BookNew Resource From | Project Server Resource | Insert | Add Resources | Build Team from Enterprise
Refresh Resource Pool Resource | Assignments | Resource Pool | Refresh Resource Pool
Resource Allocation View File | Options | Customize Ribbon | All Commands | Resource Allocation View
Resource Details File | Options | Customize Ribbon | All Commands | Resource Details
Resource Substitution Wizard Resource | Assignments | Substitute Resources
Share Resources Resource | Assignments | Resource Pool | Share Resources
Task Entry View File | Options | Customize Ribbon | All Commands | Task Entry View
Update Resource Pool Resource | Assignments | Resource Pool | Update Resource Pool
Using Resource View | Data | Filter | Using Resource
Windows User Account from Address Book Resource | Insert | Add Resources | Address Book
Project: Resource Management Toolbar
Page 23 of 26
-
8/4/2019 Reference Project 2007 to 20101
24/26
Project 2007 Location Project 2010 Location0% Complete Task | Schedule | 0% Complete
100% Complete Task | Schedule | 100% Complete
25% Complete Task | Schedule | 25% Complete
50% Complete Task | Schedule | 50% Complete
75% Complete Task | Schedule | 75% Complete
Add Progress Line Gantt Chart Tools | Format | Format | Gridlines | Progress LinesCollaborate Toolbar Removed from Product
Project Statistics File | Info | Project Information | Project Statistics
Reschedule Work Task | Tasks | Move | Incomplete Parts to Status Date
Set Reminder File | Options | Customize Ribbon | All Commands | Set Reminder
Update as Scheduled Task | Schedule | Mark on Track
Update as Scheduled Task | Schedule | Mark on Track | Mark on Track
Update Tasks Task | Schedule | Mark On Track | Update Task
Project: Tracking Toolbar
Page 24 of 26
-
8/4/2019 Reference Project 2007 to 20101
25/26
Project 2007 Location Project 2010 LocationMacros Developer | Code | View Macros
Macros View | Macros | Macros | View Macros
Macros View | Macros | View Macros
Record New Macro Developer | Code | Record Macro
Record New Macro View | Macros | Macros | Record Macro
Security Developer | Code | Macro SecuritySecurity View | Macros | Macros | Macro Security
Visual Basic Editor Developer | Code | Visual Basic
Visual Basic Editor View | Macros | Macros | Visual Basic
Project: Visual Basic Toolbar
Page 25 of 26
-
8/4/2019 Reference Project 2007 to 20101
26/26
Project 2007 Location Project 2010 LocationAddress File | Info | Address
Back File | Options | Customize Ribbon | All Commands | Back
Favorites File | Options | Customizer Ribbon | All Commands | Open Favorites
Favorites | Add to Favorites File | Options | Customize Ribbon | All Commands | Add to Favorites
Favorites | Open Favorites File | Options | Customize Ribbon | All Commands | Open Favorites
Forward File | Options | Customize Ribbon | All Commands | ForwardGo Removed from Product
Go | Back File | Options | Customize Ribbon | All Commands | Back
Go | Forward File | Options | Customize Ribbon | All Commands | Forward
Go | Open Hyperlink File | Options | Customize Ribbon | All Commands | Open (Hyperlink)
Go | Search the Web File | Options | Customize Ribbon | All Commands | Search the Web
Go | Set Search Page Removed from Product
Go | Set Start Page File | Options | Customize Ribbon | All Commands | Set Start Page
Go | Start Page File | Options | Customize Ribbon | All Commands | Start Page
Refresh Current Page File | Options | Customize Ribbon | All Commands | Refresh
Search the Web File | Options | Customize Ribbon | All Commands | Search the Web
Show Only Web Toolbar Removed from Product
Start Page File | Options | Customize Ribbon | All Commands | Start Page
Stop Current Jump File | Options | Customize Ribbon | All Commands | Stop
Project Web Toolbar