THE CtTY OF SAN OtEGO REPORT TO THE HEARING OFFICER HEARING DATE: March 19,2014 REPORT NO. HO 14-019 ATTENTION: SUBJECT: LOCATION: APPLICANT: SUMMARY Hearing Officer Sprint - South Bay Expressway PTS PROJECT NUMBER: 296409 1127 La Media Road Sprint (Permittee)/ San Diego Association of Governments [SANDAG] (Owner) Issue: Should the Hearing Officer approve a Site Development Permit (SDP) for a Wireless Communication Facility (WCF) in the Otay Mesa community plan area? Staff Recommendation: APPROVE Site Development Permit No. 1260817. Community Planning Group Recommendation: The Otay Mesa Planning Group voted 12-0-0 to approve this project at their April 17 , 2013 meeting. (Attachment 8) Environmental Review: The project was determined to be exempt pursuant to California Environmental Quality Act (CEQA) Guidelines, Section 15303 (New Construction). This project is not pending an appeal of the environmental determination. The environmental exemption determination for this project was made on February 11 , 2014, and the opportunity to appeal that determination ended March 4, 2014. (Attachment 7) BACKGROUND & DISCUSSION Sprint- South Bay Expressway is an application for a Site Development Pennit (SDP) for a Wireless Communication Facility (WCF). The project is located in the Otay Mesa community plan area in the Otay Mesa Development District- Industrial Subdistrict zone. The project is located at 1127 La Media Road. (Attachments 1, 2, and 3) WCFs are permitted in industrial zones with a limited use approval. In this case, the Otay Mesa Development District- Industrial Subdistrict requires that, "Any building using other than concrete tilt-up, precast concrete, concrete block, wood or similar materials as the basic type of

Upload: others

Post on 12-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REPORT TO THE HEARING OFFICER - San Diego

THE CtTY OF SAN OtEGO

REPORT TO THE HEARING OFFICER

HEARING DATE: March 19,2014 REPORT NO. HO 14-019

ATTENTION:

SUBJECT:

LOCATION:

APPLICANT:

SUMMARY

Hearing Officer

Sprint - South Bay Expressway PTS PROJECT NUMBER: 296409

1127 La Media Road

Sprint (Permittee)/ San Diego Association of Governments [SANDAG] (Owner)

Issue: Should the Hearing Officer approve a Site Development Permit (SDP) for a Wireless Communication Facility (WCF) in the Otay Mesa community plan area?

Staff Recommendation: APPROVE Site Development Permit No. 1260817.

Community Planning Group Recommendation: The Otay Mesa Planning Group voted 12-0-0 to approve this project at their April 17, 2013 meeting. (Attachment 8)

Environmental Review: The project was determined to be exempt pursuant to California Environmental Quality Act (CEQA) Guidelines, Section 15303 (New Construction). This project is not pending an appeal of the environmental determination. The environmental exemption determination for this project was made on February 11 , 2014, and the opportunity to appeal that determination ended March 4, 2014. (Attachment 7)

BACKGROUND & DISCUSSION

Sprint- South Bay Expressway is an application for a Site Development Pennit (SDP) for a Wireless Communication Facility (WCF). The project is located in the Otay Mesa community plan area in the Otay Mesa Development District- Industrial Subdistrict zone. The project is located at 1127 La Media Road. (Attachments 1, 2, and 3)

WCFs are permitted in industrial zones with a limited use approval. In this case, the Otay Mesa Development District- Industrial Subdistrict requires that, "Any building using other than concrete tilt-up, precast concrete, concrete block, wood or similar materials as the basic type of

Page 2: REPORT TO THE HEARING OFFICER - San Diego

construction for 75% of the exterior walls shall require an Otay Mesa Development District Permit." [LDC §1517.0306(a)(l)] In addition, the monoeucalyptus and equipment enclosure are located within the setback. An Otay Mesa Development District Permit, processed as an SDP, is required to allow the monoeucalyptus and the setback deviation. [LDC § 1517.0202(b)(3)]

The WCF Design Requirements, LDC section 141.0420, identify that the applicant "shall use all reasonable means to conceal or minimize the visual impacts ofWCFs through integration." The WCF regulations allow faux landscaping where natural vegetation similar in size and species exist, or where landscaping similar in size and species is proposed as part of the development. With this project, Sprint proposes to construct a 55' tall faux eucalyptus tree ("monoeucalyptus"), supporting 9 panel antennas. Equipment would be located in an enclosure also surrounding the monoeucalyptus. Since an adequate amount of natural vegetation does not exist to effectively integrate the faux tree, 5 live eucalyptus trees are proposed in order to comply with the regulations.

The City's General Plan addresses Wireless Facilities in UD-A.l5. The visual impact ofWCF should be minimized by concealing WCF in existing structures, or utilizing camouflage and screening techniques to hide or blend them into the surrounding area. Facilities should be designed to be aesthetically pleasing and respectful of the neighborhood context. Equipment associated with the WCF should be located in underground vaults or unobtrusive structures. This project complies. with-the-Geneml Flan reGommenElations by locatingthe-antennas-on-a-faux eucalyptus tree, which, with the addition oflive trees, will work to camouflage the antennas with the surroundings. Equipment associated with the antennas will be located at the base of the monoeucalyptus in an unobtrusive enclosure. Therefore, the project will not adversely affect the City's General Plan.

Based on the proposed design, the project complies with the WCF Regulations (LDC § 141.0420). The project has received support from the community planning group, and draft findings have been made in the affirmative to approve the SDP. Therefore, Staff recommends approval ofSDPNo. 1260817.

ALTERNATIVES

1. Approve Site Development Permit No. 1260817, with modifications.

2. Deny Site Development Permit No. 1260817, if the Hearing Officer makes written findings based on substantial evidence that the approval is not authorized by state or local zoning law.

Respectfully submitted,

Alex Hempton, AICP Development Project Manager

- 2-

Page 3: REPORT TO THE HEARING OFFICER - San Diego

Attachments: 1. Aerial Photo 2. Community Plan Land Use Map 3. Project Location Map 4. Project Data Sheet 5. Draft Permit Resolution with Findings 6. Draft Permit with Conditions 7. Notice of Right to Appeal Environmental Exemption 8. Community Planning Group Recommendation 9. Ownership Disclosure Statement (ODS) 10. Photo Simulation 11. Photo Survey 12. Site Justification/Coverage Maps 13. Hearing Officer Hearing Public Notice 14. Project Plans

- 3 -

Page 4: REPORT TO THE HEARING OFFICER - San Diego

0 -_,

Aerial Photo

·--Sprint- South Bay Expressway, Project No. 296409 1127 La Media Road

)> _, ~-- );!

() ~~~-•I

s: m z -,_:....t _,

Page 5: REPORT TO THE HEARING OFFICER - San Diego

0 -~

Community Plan Land Use Map (Proposed Zoning)

OTAY MESA PROPOSED ZONING MAP - Figure General Land Use Catet~ories P~rlta. open Space. aM tutlon:ll

-O~e Spa.:>:

- Park&

stru• nal

Vllfage center~

nrmn ~:~~':~VI ~ canmoony v !F­Jll-35dutac:

Sprint - South Bay Expressway, Project No. 296409 1127 La Media Road

dua11131- R&<&ldentla.1 Prohlll llHI

au~1ne-ss Part- o:!ll:e l'errntled

- ht dllS! I - ilnlemauan Busl!less an~ T!Ode

EuSIIleSS Pm • R~ldcm Pe ' ll2d 15 - .t4 dlll'ac au.s ln~s Pall - R.esf.tterrtlal Pi!rmltt: a CPIOZ

Designated as Right-of­

Way/Industrial

Overlays

1111111 U.S . GO>'i'M\mi'nlfac

' / BIOI Fl d Bound;uy

I:J mmunl!y Ran B()undJry

:l> -I :x; 0 I s: m z -I N

Page 6: REPORT TO THE HEARING OFFICER - San Diego

1127 La Media Road

Map data ©201 d G'Jogl~ 11\.~GI -- Edit m GoGgle Map Mater Report a p

Page 7: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 4

PROJECT DATA SHEET PROJECT NAME: Sprint- South Bay Expressway

PROJECT DESCRIPTION: Site Development Permit (SDP) for a Wireless Communication Facility (WCF) consisting of a 55' tall monoeucalyptus tree supporting 9 panel antennas. Equipment is located atthe base of the mono eucalyptus.

COMMUNITY PLAN: Otay Mesa

DISCRETIONARY Site Development Permit, Process 3 ACTIONS:

COMMUNITY PLAN LAND Commercial USE DESIGNATION:

ZONING INFORMATION:

ZONE: Otay Mesa Development District (OMDD) Industrial Subdistrict

HEIGHT LIMIT: -

FLOOR AREA RATIO: -

FRONT SETBACK: 20'

SIDE SETBACK: 15'

STREETSIDE SETBACK: 20'

REAR SETBACK: 25'

PARKING:-

LAND USE EXISTING LAND USE DESIGNATION &

ADJACENT PROPERTIES: ZONE

NORTH: Agricultural, OMDD- Toll Road

Industrial Subdistrict

SOUTH: Industrial, OMDD- Truck Storage Industrial Subdistrict

EAST: Industrial, OMDD- Toll Road Industrial Subdistrict

WEST: Agricultural, OMDD- Truck Storage Industrial Subdistrict

DEVIATIONS OR WCF is located within the setback. VARIANCES REQUESTED:

COMMUNITY PLANNING The Otay Mesa Planning Group recommended approval of GROUP this project, 12-0-0, at their April17, 2013 meeting. RECOMMENDATION:

Page 1 of 1

Page 8: REPORT TO THE HEARING OFFICER - San Diego

HEARING OFFICER RESOLUTION NO. HO-XXXX SITE DEVELOPMENT PERMIT NO. 1260817

ATTACHMENT 5

SPRINT -SOUTH BAY EXPRESSWAY, PROJECT NO. 296409

WHEREAS, the SAN DIEGO ASSOCIATION OF GOVERNMENTS (SANDA G), Owner, and SPRINT, Permittee, filed an application with the City of San Diego for a permit to construct, operate, and maintain a Wireless Communication Facility (WCF) (as described in and by reference to the approved Exhibits "A" and corresponding conditions of approval for the associated Permit No. 1260817);

WHEREAS, the project site is located at 1127 La Media Road in the Otay Mesa Development District­Industrial Subdistrict zone of the Otay Mesa community plan area;

WHEREAS, the project site is legally described as the southwest comer of the northwest quarter of Section 26, Township 18 South, Range 1 West, San Bernardino Meridian, in the City of San Diego, County of San Diego, State of California, according to the Official Plat Thereof;

WHEREAS, on March 19,2014, the Hearing Officer of the City of San Diego considered SITE DEVELOPMENT PERMIT NO. 1260817 pursuant to the Land Development Code ofthe City of San Diego;

WHEREAS, on February 11,2014, the City of San Diego, as Lead Agency, through the Development Services Department, made and issued an Environmental Determination thatthe project is exempt from the California Environmental Quality Act (CEQA) (Public Resources Code section 21000 et. seq.) under CEQA Guideline Section 15303 (New Construction) and there was no appeal of the Environmental Determination filed within the time period provided by San Diego Municipal Code Section 112.0520;

BE IT RESOLVED by the Hearing Officer of the City of San Diego as follows:

That the Hearing Officer adopts the following written Findings, dated March 19, 2014.

FINDINGS:

Site Development Permit - Section 126.0504

1. The proposed development will not adversely affect the applicable land use plan;

While the Otay Mesa Community Plan does not specifically address Wireless Communication Facilities (WCFs ), the City of San Diego's General Plan (UD-15) requires that the visual impact of wireless facilities be minimized by concealing wireless facilities in existing structures or using screening techniques to hide or blend them into the surrounding area. The plan also calls for these facilities to be designed to be aesthetically pleasing and respectful of the neighborhood context. Furthermore, the plan states that equipment associated with wireless facilities be concealed from view. With this project, Sprint proposes to construct a 55' tall faux eucalyptus tree, referred to as a "monoeucalyptus." The faux tree, along with the addition of 5 live trees, will allow the WCF to be integrated with the area and camouflaged from view. Nine panel antennas will be mounted to the faux tree and equipment associated with the antennas will be located at the base of the monoeucalyptus. Live trees, proposed adjacent to the faux tree, will allow for a more natural setting for the monoeucalyptus, and

Page 1 of5

Page 9: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 5

will provide additional vertical elements to screen views of the monoeucalyptus. Based on the design of this project as described above, the project will not adversely affect the applicable land use plan.

2. The proposed development will not be detrimental to the public health, safety, and welfare; and

The project consists of a 55' tall monoeucalyptus tree and an equipment enclosure surrounding the base ofthe monoeucalyptus. The project includes a deviation to allow the WCF to encroach into the side setback. The project is located at 1127 La Media Road, and is located in the Otay Mesa community plan area.

The project was determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 (New Construction). The conditions of approval forthe project will require compliance with several operational constraints and development controls intended to assure the continued public health, safety and welfare. All proposed improvement plans associated with the project will be reviewed prior to issuance of construction permits and inspected during construction to assure the project will meet or exceed all relevant and applicable building, electrical, mechanical, plumbing and fire codes.

Additionally, the federal Telecommunication Act of 1996 preempts local governments from regulating the "placement, construction and modification of wireless communication facilities on the basis of the environmental effects of Radio Frequency (RF) emission to the extent that such facilities comply with the Federal Communication Commission's (FCC) standards for such emissions." A condition has been added to the permit to require a Radio Frequency Electromagnetic Fields Exposure Report demonstrating that the proposed project would be consistent with the FCC's regulations for wireless facilities. Therefore, the project would not result in any significant health or safety risks to the surrounding area within matters of the City's jurisdiction.

In conclusion, the proposed project will not be detrimental to the public health, safety and welfare of persons working or residing in the area.

3. The proposed development will comply with the applicable regulations of the Land Development Code, including any allowable deviations pursuant to the Land Development Code.

The Wireless Communication Facility (WCF) Regulations, Land Development Code Section 141.0420, require that WCFs utilize the smallest, least visually intrusive antennas, components, and other necessary equipment. The applicant is required to use all reasonable means to conceal or minimize the visual impact of the WCF through integration utilizing architecture, landscape, and siting. The WCF regulations allow faux landscaping where natural vegetation similar in size and species exist, or where landscaping similar in size and species is proposed as part of the development. With this project, Sprint proposes to construct a 55' tall faux eucalyptus tree ("monoeucalyptus"), supporting 9 panel antennas. Equipment would be located in an enclosure also surrounding the monoeucalyptus. Since an adequate amount of natural vegetation does not exist to effectively integrate the faux tree, 5 live eucalyptus trees are proposed in order to comply with the regulations.

Page2of5

Page 10: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 5

WCFs are permitted in industrial zones with the processing of a Limited Use, Process 1 approval. While the project complies with WCF Regulations, the project requests a deviation from the Otay Mesa Development District- Industrial Subdistrict setback requirements. In addition, an Otay Mesa Development District permit is also required, since the monoeucalyptus is a structure other than concrete tilt-up, precast concrete, concrete block, wood, or similar materials. The deviation to the setback is permitted through the processing of this Site Development Permit/Otay Mesa Development District permit. Therefore, the project complies with the regulations of the Land Development Code.

Otay Mesa Development District Permit- Section 1517.0203(c)

1. The application is complete and conforms with all City regulations, policies, guidelines, design standards and density;

While the Otay Mesa Community Plan does not specifically address Wireless Communication Facilities (WCFs), the City of San Diego's General Plan (UD-15) requires that the visual impact of wireless facilities be minimized by concealing wireless facilities in existing structures or using screening techniques to hide or blend them into the surrounding area. The plan also calls for these facilities to be designed to be aesthetically pleasing and respectful of the neighborhood context. Furthermore, the plan states that equipment associated with wireless facilities be concealed from view. With this project, Sprint proposes to construct a 55' tall faux eucalyptus tree, referred to as a "monoeucalyptus." The faux tree, along with the addition of 5 live trees, will allow the WCF to be integrated with the area and camouflaged from view. Nine panel antennas will be mounted to the faux tree and equipment associated with the antennas will be located at the base of the monoeucalyptus. Live trees, proposed adjacent to the faux tree, will allow for a more natural setting for the monoeucalyptus, and will provide additional vertical elements to screen views of the monoeucalyptus. Sprint has submitted the required materials, as identified by the City's Project Submittal Requirements and their application was deemed complete. Based on the design of this project as described above, the application is complete and the project will conform with all City regulations, policies, guidelines, and design standards and does not impact density.

2. The proposed use and project design meet the purpose and intent of this Ordinance and the Otay Mesa Community Plan;

The purpose ofthe Otay Mesa Development District Ordinance is to create and promote the development of the City's largest and potentially most significant industrial area. It is also the purpose of the Otay Mesa Development District Ordinance to control the use, development intensity, and development design of a primarily industrial area which includes a large commercial subdistrict and a border station mixed use subdistrict. The design of this WCF is compatible with the Otay Mesa Development District. The WCF is proposed on a developed parcel and does not preclude other development from occurring on surrounding properties. The design ofthe WCF, as a monoeucalyptus tree, is compatible with the surroundings and will integrate effectively with the surroundings, especially when the proposed live trees grow to their mature size. Based on an analysis of this project, it has been determined that the

Page 3 of5

Page 11: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 5

proposed use and project design meet the purpose and intent of this ordinance and the Otay Mesa Community Plan.

3. The proposed use, because of conditions that have been applied to it, will not be detrimental to the health, safety and general welfare of persons residing or working in the area, and will not adversely affect other property in the vicinity;

The project consists of a 55' tall monoeucalyptus tree and an equipment enclosure surrounding the base of the monoeucalyptus. The project includes a deviation to allow the WCF to encroach into the side setback. The project is located at 1127 La Media Road, and is located in the Otay Mesa community plan area.

The project was determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 (New Construction). The conditions of approval for the project will require compliance with several operational constraints and development controls intended to assure the continued public health, safety and welfare. All proposed improvement plans associated with the project will be reviewed prior to issuance of construction permits and inspected during construction to assure the project will meet or exceed all relevant and applicable building, electrical, mechanical, plumbing and fire codes.

Additionally, the federal Telecommunication Act of 1996 preempts local governments from regulating the "placement, construction and modification of wireless communication facilities on the basis of the environmental effects of Radio Frequency (RF) emission to the extent that such facilities comply with the Federal Communication Commission's (FCC) standards for such emissions." A condition has been added to the permit to require a Radio Frequency Electromagnetic Fields Exposure Report demonstrating that the proposed project would be consistent with the FCC's regulations for wireless facilities. Therefore, the project would not result in any significant health or safety risks to the surrounding area within matters of the City's jurisdiction.

The design of the project, as a monoeucalyptus tree, will integrate effectively with the surroundings and will be compatible with future development. Proposed live trees, surrounding the monoeucalyptus tree, will work to integrate the faux tree with neighboring properties.

In conclusion, the proposed project will not be detrimental to the public health, safety and welfare of persons working or residing in the area, nor will the project adversely affect other properties in the area.

4. The proposed use will comply with the relevant regulations in the Municipal Code; and

The Wireless Communication Facility (WCF) Regulations, Land Development Code Section 141.0420, require that WCFs utilize the smallest, least visually intrusive antennas, components, and other necessary equipment. The applicant is required to use all reasonable means to conceal or minimize the visual impact of the WCF through integration utilizing architecture, landscape, and siting. The WCF regulations allow faux landscaping where natural vegetation similar in size and species exist, or where landscaping similar in size and species is proposed as part of the development. With this project, Sprint proposes to construct

Page 4 of5

Page 12: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 5

a 55' tall faux eucalyptus tree ("monoeucalyptus"), supporting 9 panel antennas. Equipment would be located in an enclosure also surrounding the monoeucalyptus. Since an adequate amount of natural vegetation does not exist to effectively integrate the faux tree, 5 live eucalyptus trees are proposed in order to comply with the regulations.

WCFs are permitted in industrial zones with the processing of a Limited Use, Process 1 approval. While the project complies with WCF Regulations, the project requests a deviation from the Otay Mesa Development District - Industrial Subdistrict setback requirements. In addition, an Otay Mesa Development District permit is also required, since the monoeucalyptus is a structure other than concrete tilt-up, precast concrete, concrete block, wood, or similar materials. The deviation to the setback is permitted through the processing of this Site Development Permit/Otay Mesa Development District permit. Therefore, the project complies with the regulations of the Land Development Code.

5. A plan for the financing of public facilities as provided in Section 1517.0204 (Financing of Public Facilities) of the Otay Mesa Development District has been approved by the City Engineer.

There is a Public Facilities Financing Plan and Facilities Benefit Assessment document for Otay Mesa, which was adopted October 18, 2006.

BE IT FURTHER RESOLVED that, based on the findings hereinbefore adopted by the Hearing Officer, SITE DEVELOPMENT PERMIT NO. 1260817 is hereby GRANTED by the Hearing Officer to the referenced Owner/Permittee, in the form, exhibits, terms and conditions as set forth in Pennit No. 1260817, a copy of which is attached hereto and made a part hereof.

Alex Hempton, AICP Development Project Manager Development Services

Adopted on: March 19, 2014

Internal Order No. 24003269

Page 5 of5

Page 13: REPORT TO THE HEARING OFFICER - San Diego

RECORDING REQUESTED BY CITY OF SAN DIEGO

DEVELOPMENT SERVICES PERMIT INTAKE, MAIL STATION 501

WHEN RECORDED MAIL TO CITY CLERK

PROJECT MANAGEMENT PERMIT CLERK

MAIL STATION 501

INTERNAL ORDER NUMBER: 24003269

This SITE DEVELOPMENTP the City of San Diego to SAN DIEGO Owner, and SPRINT, PP-r"I'Y'I'i1:t"'"'

141.0420, 126.0501, Development Distri project site is legally Township 18 South, of San

The project shall

ATTACHMENT 6

E FOR RECORDER'S USE

set in this Permit, permission is granted to maintain a Wireless Communication Facility (WCF) quantity, type, and location on the approved exhibits in the Development Services Department.

a. Nine (9) panel ""~tL~~g,!-"''"'' with the following dimensions: 72.0" by 11.8" by 7.9", mounted to a new tall monoeucalyptus tree;

b. Equipment, located at the base ofthe monoeucalyptus, in a 14' by 18'8" enclosure;

c. With the processing of this Site Development Permit, the project is allowed to encroach into the setback;

d. Public and private accessory improvements determined by the Development Services Department to be consistent with the land use and development standards for this site in

Page 1 of8

Page 14: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 6

accordance with the adopted community plan, the California Environmental Quality Act [CEQA] and the CEQA Guidelines, the City Engineer's requirements, zoning regulations, conditions of this Permit, and any other applicable regulations of the SDMC.

STANDARD REQUIREMENTS:

1. This permit must be utilized within thirty-six (36) months after the date on which all rights of appeal have expired. If this permit is not utilized in accordance with Chapter 12, Article 6, Division 1 ofthe SDMC within the 36 month period, this pe hall be void unless an Extension of Time has been granted. Any such Extension e must meet all SDMC requirements and applicable guidelines in effect at the ti tension is considered by the appropriate decision maker. This permit must be utiliz. · .. , 2017.

2. This Site Development Permit and f'f"llrr<O>•onr

2024. Upon expiration of this Permit, the removed from this site and the property shall approval of this Permit.

3. No later than ninety (90) days may submit a new application to the by the appropriate decision maker at "'"·"·'•''·'"'"'· cause for enforcement

4.

5. des

a.

all expire on April 3, · cribed herein shall be

permit, the Owner/Permittee vVJ.J~l.l,l"!.!<UHJU with review and a decision

to the deadline will be

the Owner/Permittee to Use of

tion of any facility or improvement authorized by this Permit be conducted

the Permit to the Development Services

b. in the Office of the San Diego County Recorder.

6. While this Permit is in the subject property shall be used only for the purposes and under the terms and conditions set forth in this Permit unless otherwise authorized by the appropriate City decision maker.

7. This Permit is a covenant running with the subject property and all ofthe requirements and conditions of this Permit and related documents shall be binding upon the Owner/Permittee and any successor(s) in interest.

Page 2 of8

Page 15: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 6

8. The continued use of this Permit shall be subject to the regulations ofthis and any other applicable governmental agency.

9. Issuance of this Permit by the City of San Diego does not authorize the Owner/Permittee for this Permit to violate any Federal, State or City laws, ordinances, regulations or policies including, but not limited to, the Endangered Species Act of 1973 [ESA] and any amendments thereto (16 U.S.C. § 1531 et seq.).

10. The Permittee shall secure all necessary building pennits. to secure these permits, substantial building modifications required to comply with applicable building, fire, ·

The Permittee is informed that improvements may be plumbing codes, and State and

Federal disability access laws.

11. Construction plans shall be in substantial cor11Q1gp1ty "A." Changes, modifications, or alterations to the application(s) or amendment(s) to this

12. necessary to make the findings required to comply with each and granted by this Permit.

If any condition of this held by a court of Permit shall be

s appropriate

is HUJUUI.UU the entitlements that are

vULH~W),;::c,)-'Jc this Permit, is found or or unreasonable, this

have the right, by paying permit without the "invalid" conditions(s) · for a determination by that body as to the proposed permit can still be made in shall be a hearing de novo, and the

""'r'"""' disapprove, or modify the proposed

13. , and hold hannless the City, its agents, officers, and employees from actions, proceedings, damages, judgments, or costs, including attorney' , ,, City or its agents, officers, or employees, relating to the issuance of this permi'''''''e" not limited to, any action to attack, set aside, void, challenge, or annul this approval and any environmental document or decision. The City will promptly Permittee of any claim, action, or proceeding and, if the City should fail to cooperate fully in the defense, the Pennittee shall not thereafter be responsible to defend, indemnify, and hold harmless the City or its agents, officers, and employees. The City may elect to conduct its own defense, participate in its own defense, or obtain independent legal counsel in defense of any claim related to this indemnification. In the event of such election, Permittee shall pay all of the costs related thereto, including without limitation reasonable attorney's fees and costs. In the event of a disagreement between the City and Pennittee regarding litigation issues, the City shall have the authority to control the litigation and make litigation related decisions, including, but not limited to, settlement or other disposition of the

Page 3 of8

Page 16: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 6

matter. However, the Permittee shall not be required to pay or perform any settlement unless such settlement is approved by Permittee.

ENGINEERING REQUIREMENTS:

14. The project proposes to export 24 cubic yards of material from the project site. All excavated material listed to be exported, shall be exported to a legal disposal site in accordance with the Standard Specifications for Public Works Construction (the "Green Book"), 2009 edition and Regional Supplement Amendments adopted by Regional Standards Committee.

15. The drainage system proposed for this development, on the site plan, is private and subject to approval by the City Engineer.

16. Prior to the issuance of any construction "'"'1""''"-b­

Maintenance Agreement for the ongoing Engineer.

1 7. Prior to the issuance of any construction construction Best Management Division 1 (Grading Regulations) or specifications.

18. Prior to the,·" ,._, .... , .. u"'

Pollution Control

enter into a · sfactory to the City

submit a Water with the guidelines

Owner/Permittee shall provide a valid by the Federal Aviation Administration

submitted in Manager. All plans shall the office of Development

permit, landscape construction documents shall be _;LUJ''-'-"'"'LL'-'e Standards and to the satisfaction of the City stantial conformance to this Permit and Exhibit "A" on file in

21. Landscape installed as part of the project shall be maintained and irrigated for the life of the permit. All required landscape shall be maintained in a disease, weed and litter free condition at all times.

22. Prior to activation of facility, it shall be the responsibility of the Permittee to install all required landscape and obtain all required landscape inspections.

Page 4 of8

Page 17: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 6

23. If any required landscape (including existing or new plantings, hardscape, landscape features, etc.) indicated on the approved construction document plans is damaged or removed during demolition or construction, it shall be repaired and/ or replaced in kind and equivalent size per the approved documents to the satisfaction of the Development Services Department within 30 days of damage.

PLANNING/DESIGN REQUIREMENTS:

24. A topographical survey conforming to the provisions of the SDMC may be required if it is determined, during construction, that there may be a conflict the building(s) under construction and a condition of this Permit or a regulation ying zone. The cost of any such survey shall be borne by the Owner/Permittee.

25. All proposed hand-holes shall be covered the satisfaction of the Development Services D

26. All coaxial conduits shall be routed up satisfaction of the Development Services "doghouses") are not permitted.

27. Branches shall extend a minim the satisfaction of the Development S

28.

29.

30. any

the faux tree trunk to

the front and back of the antennas (and

prior to the surrounding "·".!'Y.S?'"'""f-''"' color sample and tree color exhibit and

u~~ •. ~.., .. ~u and manufacturer specifications for the faux tree This is ensure that the proposed faux tree integrates with

the City's quality standards. Staff will pre-approve the ,..,a • .., ..... e>v•·•'-' prior to Building Permit issuance. The exact faux

will be used during the FINAL INSPECTION. The Staff must be identical to the as-built faux tree.

32. All private outdoor lighting shall be shaded and adjusted to fall on the same premises where such lights are located and in accordance with the applicable regulations in the SDMC.

33. All facilities and related equipment shall be: maintained in good working order; free from trash, debris, graffiti; and designed to discourage vandalism. Any damaged equipment shall be repaired or replaced within thirty (30) calendar days of notification by the City of San Diego.

Page 5 of8

Page 18: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 6

34. The Owner/Permittee shall notify the City within 30 days of the sale or transfer of this site to any other provider or if the site is no longer operational requiring the removal and the restoration of this site to its original condition.

35. The photosimulation(s) for the proposed project shall be printed (not stapled) on the building plans. This is to ensure the construction team building the project is in compliance with approved the Exhibit "A."

36. No overhead cabling is allowed for this project.

3 7. Exposed mounting apparatus shall be removed and remain on the faux tree absent antennas.

38. The Owner/Permittee shall not cause or different sizes (length, width, or height) than

39. The WCF shall conform to Exhibit "A" approved photosimulations) prior to receiving

40. Prior to the issuance of a a certified cumulative radio freq Communications Commission's Radio ambient RF be vv•J'""'-''-'J

41.

INFORMA

on the faux tree to be plans.

and air conditioners consistent with the City noise

directed away from residential areas. pment enclosures shall be eliminated.

the WCF as required by CAL­Services Department.

use permit alone does not allow the immediate operation of the proposed use on site. The operation allowed

by this · 't may only begin or recommence after all conditions listed on this permit are fully completed and all required ministerial permits have been issued and received final inspection.

• Any party on whom fees, dedications, reservations, or other exactions have been imposed as conditions of approval of this Permit, may protest the imposition within ninety days of the approval of this development permit by filing a written protest with the City Clerk pursuant to California Government Code-section 66020.

Page 6 of8

Page 19: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 6

• A "Telecom Planning Inspection" will be required prior to Final Clearance from the City's Building Inspector to ensure compliance with the approved plans, exhibits, and associated conditions. Prior to calling for your Final Inspection from your building inspection official, please contact the Project Manager listed below at (619) 446-5349 to schedule an inspection of the completed WCF. Please request the telecom inspection at least five working days ahead of the requested Final inspection.

• This development may be subject to impact fees at the time of construction permit issuance.

APPROVED by the Hearing Officer of the City of San :xxxx.

Page 7 of8

19, 2014 and HO-

Page 20: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 6

Permit Type/PTS Approval No.: SDP/1260817 Date of Approval: 3/19/2014

AUTHENTICATED BY THE CITY OF SAN DIEGO DEVELOPMENT SERVICES DEPARTMENT

Alex Hempton, AICP Development Project Manager

NOTE: Notary acknowledgment must be attached per Civil Code section 1189 et seq.

The undersigned Owner/Permittee, by condition of this Permit and promises to perform each and

NOTE: Notary .. ...,.,~u.,';,u:,~·~ .... must be attached per section 1189 et seq.

By __________________________ _ GLORI JAMES-SUAREZ NETWORK MANAGER

Page 8 of8

Page 21: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 7

THE CITY OF SAN OtEGO

Date of Notice: February 18,2014

NOTICE OF RIGHT TO APPEAL ENVIRONMENTAL DETERMINATION

DEVELOPMENT SERVICES DEPARTMENT SAP No.: 24003269

PROJECT NAME/NUMBER: Sprint Southbay Expressway/Project No. 296409 COMMUNITY PLAN AREA: Otay Mesa COUNCIL DISTRICT: 8 LOCATION: 1127 La Media Road, San Diego, CA 92154

PROJECT DESCRIPTION: SITE DEVELOPMENT PERMIT (SDP) for a new wireless communication facility (WCF) consisting of: a 55' -tall mono eucalyptus; nine (9) antennas; nineteen (19) RRHs; four ( 4) outdoor equipment cabinets located on a concrete pad inside a proposed 8' -tall concrete wall enclosure; electrical and telco cable; and five (5) live eucalyptus trees . The project site is zoned Industrial and is within the Otay Mesa Community Plan area of Council District 8.

ENTITY CONSIDERING PROJECT APPROVAL: City of San Diego Hearing Officer (Process 3).

ENVIRONMENTAL DETERMINATION: Categorically exempt from CEQA pursuant to CEQA State Guidelines Section and 15303 (New Construction).

ENTITY MAKING ENVIRONMENTAL DETERMINATION: City of San Diego Development Services Staff.

STATEMENT SUPPORTING REASON FOR ENVIRONMENTAL DETERMINATION: The project has been determined to be exempt from CEQA pursuant to Section 15303. Section 15303 allows for the construction and location of limited numbers of new, small facilities and the installation of small, new equipment and facilities including, but not limited to, accessory structures. None of the exceptions listed in CEQA Guidelines Section 15003.2 apply, therefore these exemptions are applicable to the proposed project.

CITY CONTACT: MAILING ADDRESS: PHONE NUMBER:

Alex Hempton, Project Manager 1222 First Avenue, MS 501, San Diego, CA 92101-4153 (619) 446-5349

On February 11, 2014, the City of San Diego made the above-referenced environmental determination pursuant to the California Environmental Quality Act (CEQA). This determination is

Page 1 of 2

Page 22: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 7

appealable to the City of San Diego Planning Commission. If you have any questions about this determination, contact the Project Manager above.

Applications to appeal CEQA determination made by staff (including the City Manager) to the City Council must be filed in the office of the City Clerk within 10 business days from the date of the posting of this Notice (by March 4, 2014). The appeal application can be obtained from the City Clerk, 202 'C' Street, Second Floor, San Diego, CA 92101.

This information will be made available in alternative formats upon request.

Page 2 of 2

Page 23: REPORT TO THE HEARING OFFICER - San Diego

Hempton, Alexander

From: Sent: To:

Caitlyn Kes [[email protected]] Thursday, April18, 2013 4:17PM Hempton, Alexander

ATTACHMENT 8

Subject: RE: Sprint Southbay Expressway at 1127 La Media Rd- SD73XC013- PTS 296409

Hi Alex, This project was unanimously (12- 0) approved yesterday at the Otay Mesa Planning Group. Thanks.

CK 858-527-9938

From: Hixson, Rob @ San Diego Downtown [mailto:[email protected]] Sent: Monday, April 08, 2013 11:51 AM To: [email protected] Subject: RE: Sprint Southbay Expressway at 1127 La Media Rd- SD73XC013- Request for Project Review

No, 3 p.m. on Wednesday the 17r11•

Rob SIOR 1 Senior Vice President 1 Lie. 00944946 CBRE !Industrial Properties I Lie. 00409987 350 Tenth Avenue, Suite 800 1 San Diego, CA 92101 T 619 696 8350 IF 619 232 24621 C 619 954 9520 [email protected] I www.cbre.com

Click Here to View My Current Listings

Please consider the environment before printing this email.

This email only for the

contain information that is confidential or attorney-client privileged and may constitute inside information. The contents of this email are intended listed above. If you are not the ·Intended rec"ipient. you are directed not to read, disclose, distribute or otherwise use this transmission. If you

have received applicable privileges.

in error. please notify the sender immediately and deiete the transmission. Delivery of this message is not intended to waive any ·

From: Caitlyn Kes [mailto:[email protected]] Sent: Monday, April 08, 2013 11:40 AM To: Hixson, Rob @ San Diego Downtown Subject: RE: Sprint Southbay Expressway at 1127 La Media Rd- SD73XC013- Request for Project Review

No problem. Wednesday, 4/17/13, at 6:30pm at the Otay Mesa Branch Library, 3003 Coronado Avenue, correct?

Caitlyn Kes 858-527-9938

From: Hixson, Rob@ San Diego Downtown [mailto:[email protected]] Sent: Monday, April 08, 2013 9:35AM To: [email protected] Cc: 'Hempton, Alexander' Subject: RE: Sprint Southbay Expressway at 1127 La Media Rd- SD73XC013- Request for Project Review

1

Page 1 of 3

Page 24: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 8

Caitlyn, we would prefer color handouts that have a site plan and location map. Full plans are not that important to us, if you can bring one set, if members have specific questions, that would be great. Thank you.

Rob Hixson, SIOR 1 Senior Vice President 1 Lie. 00944946 CBRE I Industrial Properties I Lie. 00409987 350 Tenth Avenue, Suite 800 1 San Diego, CA 92101 T 619 696 8350 IF 619 232 24621 c 619 954 9520 [email protected] I www.cbre.com

Please consider the environment before printing this email.

This email may contain information that is confidential or attorney-client privileged and may constitute inside information. The contents of this email are intended only for the recipient(s) listed above. If you are not the intended recipient, you are directed not to read, disclose, distribute or otherwise use this transmission. If you have received this email in error, please notify the sender immediately and de leta the transmission. Delivery of this message is not intended to waive any applicable privileges.

From: Caitlyn Kes [mailto:[email protected]] Sent: Monday, April 08, 2013 9:31AM To: Hixson, Rob @ San Diego Downtown Cc: 'Hempton, Alexander' Subject: RE: Sprint Southbay Expressway at 1127 La Media Rd- SD73XC013- Request for Project Review

Thank you Rob. How many sets of plans should I bring to meeting?

Thank you much,

Caitlyn Kes [email protected] 858-527-9938

From: Hixson, Rob @ San Diego Downtown [mailto:[email protected]] Sent: Sunday, April 07, 2013 2:58PM To: [email protected] Cc: Hempton, Alexander Subject: RE: Sprint Southbay Expressway at 1127 La Media Rd- SD73XC013- Request for Project Review

Yes, we can put you on for April 17t11• Thanks

Rob Hixson, SIOR 1 Senior Vice President 1 Lie. 00944946 CBRE I Industrial Properties I Lie. 00409987 350 Tenth Avenue, Suite 800 I San Diego, CA 92101 T 619 696 8350 IF 619 232 24621 C 619 954 9520 [email protected] I www.cbre.com

2

Page 2 of 3

Page 25: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 8

Please consider the environment before printing this email.

This email may contain information that is confidential or attorney:client privileged and may constitute inside information. The contents of this email are intended only for the recipient(s) listed above. If you are not the intended recipient, you are directed not to read, disclose, distribute or othenNise use this transmission. If you have received this email in error, please notify the sender immediately and delete the transmission. Delivery of this message is not intended to waive any applicable privileges.

From: Caitlyn Kes [mailto:[email protected]] Sent: Tuesday, March 26, 2013 1:52PM To: Hixson, Rob@ San Diego Downtown Cc: Hempton, Alexander Subject: Sprint Southbay Expressway at 1127 La Media Rd- SD73XC013- Request for Project Review

Hi Rob,

I hope you're well. I was wondering if I can get on the agenda for the next planning group meeting. This is in regards to a new wifeless facility proposed at 1127 La Media Road. I've attached plans and sims for your review. The City PM is Alexander Hempton; he's copied on here as well. Please let me know if you have any questions or when I'm confirmed to be on the agenda. Thank you.

Thank you much,

Caitlyn Kes [email protected] 858-527-9938

3

Page 3 of 3

Page 26: REPORT TO THE HEARING OFFICER - San Diego

City of San Diego Devttlopment Services 1222 First Ave., MS-302 San Diego, CA 92101

THtt Clnv 0' SAN l.>l<oo (619) 446-5000

ATTACHMENT 9

Ownership Disclosure Statement

··~----·--·-··------·-------~---==--=-----~.--. "--·=====--==============-~-~-~-----------

Approval 'rype: Check appropriate box for type of approval (s) requested: J5< Neighborhood Use Permit r Coastal Development Permit

r Neighborhood Development Permit r Site Developm!£111 Permit . r Planned Development Permit r Conditional Use Permit r Variance r Tentative Map r Vesting Tentative Map I Map Waiver r Land Use Plan Amendment • r Other--·--------Project Tille ProJect'No:-f'orCity Use oiiTY-·

SD73XCO 13 South Bay Expressway 2 9 (.; 4 09 Project Addres~------------··----

1129 La Media Road, San Diego, Califomia 92154 -·---------~~---------~-·----·· ----···-·--·-------

Part I ·To be compiefod when property Is held by lndlvlduat(S)~-·--

lilY.Jtl9nll.lg .. lllS!.QWJ1@J£ltllltDll'l!:JJQJl.Ur&~:JS.I!lllll!ll'LfliJ1,.U1\l . .l:i.V1.!l!IM.(t~}J.ll::l!Jl~1.1.'[email protected].®.llo.nJou.llJ)J.rult,.11.1JJ!>.J.lUllllgr.matlilCJ..M . .llliJll(ill!ID @VJa.._w!!Ul.mJIJ.~.d .. Y:Jll.ll . .!LuLCl!yJ:!L6.1l.!l..t2l~,g9.smJbuvb)!iP1 P.Wil!llll/....wl!b~nLJ..rulii!:Qtd an enc_wn!lli\rJ.Q.U~.g.\l.Lnilllm..Jllilnru:IY.· Please list below !he ownar(s) and tenant(s) (If applicable) of the above referenced property. The list must Include the names and addresses of all persons who have an Interest In the property, recorded or otherwise, and stale the type of property Interest (e.r.J.> tenants who will baneflt from the parmi!, all lndlvldllals who own the property). A slgnatyre Is required of at least on& of the propru:!)L.Q'l>!l:!Jilli, Attach additional pages If needed. A signature from the Assistant Executive Director of the San Diego Redevelopment Agency shall be required for all project parcels for which a Disposition and Development Agreement (DDA) has been approved I executed by the City Council. Note: The f1pplioant Is responsible for notifying the Project Manager of any changes In ownership during the time the application Is being processed or considered. Changes in ownership ara to be given to the Project Manager at least thirty days prior to any public hearing on the subject property, Failure to provide accurate and eurrent ownership information could result In a delay In the hearing process.

Additional pages attached 15< Yes "Nam'e"o1'1nafVia'uaT{type Or ptin'{)':"";' _ • .,.,,N_.,.,....,..,..,..,,_, ___ , .... ..,, .... , __

--r oWri;-f"'· Tenant/Lessee ! RedevelopmEint Agonoy-~

~;~:~w;•;~u;u;~;•;·;~;-;*;~&:--:;~;;;;•:::::::~•:•:=:::::~:-:u:u:.M::~~ ... &e oflndlvldual (type or print):

T Own'97~·-rf6iiruli}[ass6a' r Redevelopment Agency

-·s""t,...re-a7t A..-d.,..,d:-re-ss-:·~------·--·-· ------·----·-------

-enyrs~-·--------·---.. ·-~·-· ---·----PhoneNo:

., ¥"1!

·-F-own~-;-.. r;=;~;~·;c;~~aa -F'Red~v;;p;;e-;tA9;~;----~ Street ):\cl(fr98S:---~·-·-· -· .. --- .

·~c~~~/7;!tSt:-.at,..,e/Z""'Ip···,-: ---------··---·--------

""tP""il-or-\m""'N"'o-:-----· -----·-_,_,.ra_x..,.N,_o_: ·----

Signature: ~--··----pare:-~--=---

Prlntea on recycled paper. Visit our we6 slle lit WW!N~.nnr.llr:I.Cl(l,g9VIr,lev~rr.li'JJ11lint,sl<lrvicHs Upon request, this Information is available In alternative formats for parsons with disabilities.

-----~-·--·----~----------~~-~·os.3fa(5.oof ... ~

Page 1 of 7

Page 27: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 9

PfoTec£ Title: ··-····-·····~··--·-··--·~~~---·--·---, .. -~-~.-·-···~--·-~-pr;,Jiict No. (ForcJ'if;UieoiilyJ ___ _

·--~!?72.~-~2.!1_~<:.~~.r.~B?.t.~~!-~Y.. .. _.'""'"•~•·~·--~--··~-••- -·---------·"'-""~-···-·--·"-·----·--~­[~{!~I~ M:T~~~ eo~letod when j,-;perty Is he~~~rp~ra!lon or partnership ---=---==~ Legal Status (please check):

r Corporation r. Limited Liability -or- r General) What State? __ Corporate Identification No.-----­rPartnarshlp X • Public Entity

E}y_!:il~Jnlng_UJ9...0.'1Y.O£\rfi.b.l!1.llt11.01QIU!r&>-S1r.tl~!lW1~1.J!WJl\NH~L($.}.AQKll.Q~~~l.g.iLltlru.!ii!U!RP1li::.IM!QI1JQL.!l./W.t!Jll!..J:o.aD .. Q£.Q!b!;ltLt11i!l.!Str, Attkkl.o.Uflfi(J_ab.QY.~.c-WlliJ,.!!!.llle~Lwllll.llliLQlty..QLSMJ21ngCLQ.oJW1lbJ!lill.flW..!W11Y..W.tfu.lblll .. h~ULl<:!.t!iQ.Q[tt~.IL<illJlY.IUb.ll1llii.\lJ.Wftinat the property .. Please list below the names, titles and addresses of all persona who have an Interest In the property, recorded or otherwise, and state the type of property Interest (e.g., tenants who wlll benefit from the permit, all corporate officers, and all partners in a partnership who own the property). AalgilllJllta.ls..oo.w.!lt:rulo.Uillru!.sl9lle_Qtlll!i&.aJP-QJ.&\lt.'l..o1{lo.~ • [email protected]!.WLU:t1tWJ1Jll'll. fltQP-erty. Attach additional pages If needed. Note: The applicant Ia responsible for notifying the Project Manager of any changes in

. ownership during the time the application Is being processed or considered. Changes In ownership are to be given to the Project Manager at least thirty days prior to any public hearing on the subject property. Failure to provide accurate and current ownership Information cou)d result in a delay In the hearing process. Additional pages attached rYes r No

"corporateiP'artners'h'ip~(type' or print): ···- 'r!orporafa?r.Sartrilrsf1l'p 1\laine'tiY'P'Sorprl'rl!): SANDAG

IR·o;;:;;;--~-""F.Te~ani/Lassea

SireetAddraijs:-----~ 40 1 B Street, Suite 800

-CI\Y!State/Zip: -·-· ~-·· .. ---------·~-

------~~---------·---~ f Owner l Tenant/Lessee ·Street Addres&:'~~~---·-------

City/State/Zip: San Diego, CA 92101 -~trci: f:ix~-·~·--- -Phon& No: _@2) 710-4001 ----- (619) 710-4097 Name of Corporate Officer/Partner (type or print): Samuel Johnson

-iiiia nx~e rprlnl): 7 .. ---~- "fiiiii"(typi:lorprh,t): _Mob1;l' · 0 )ct·at' .. ~tP.J.tector ------------Sigr1 I ~fa : . / Date: Signature : -·-----oai6:-----

,/f.j.._....f:J. . - 02-22-2012 ~~$~ ~'~ 1111''~11~ M :;t ......... :Z .. _.~I: '' lb (WI:Ia!ili!CIJ._,~-I!Qi? UJMt

Corporate/Partnership Name (type or print):

l Tenantllessee l Owner Tenant/Lessee

Street Address: Street Address:-------·----·------·-·----

City/State/Zip:--- -~--~~--···----·- -~Zip;--·--·.,·---·--­

'F>'fioneNo:---~ -·-.. --~--~--.. ---- ~---"-flax~No:-· ~-------

------·------· -·-----·----·--- ---------·-··----~ __ , _______ _ r Owner f TanantiLassea

-Street Address:-~·

City/State/ZiiJT'"-----~-·-~

''Pho'iiGl'IO:----------- Fax No:

r·ownar r Ten ant/Lessee

Phone No:

"liliiTieOf"O'O'iiJcifa!eOfflcar/!5'annef(Iype or prmfJ-: ------·- ·Name OfCOr'Porataofflcer/Partner (type or print):

·Tille (type or print):

Signature: Date: Slgn1:1lure:

Page 2 of 7

Page 28: REPORT TO THE HEARING OFFICER - San Diego

Dan Hesse

Chief Executive Officer

Joseph J. Euteneuer

Chief Financial Officer

Matt Carter

Sprint Executive Team

President, Sprint Enterprise Solutions

Michael Schwartz

Senior Vice President, Corporate and Business Development

Steve Elfman

President of Network, Technology and Operations

Bob Johnson

ATTACHMENT 9

President-Sprint Retail and Chief Service and Information Technology Officer

Bill Malloy

Chief Marketing Officer

Page 3 of 7

Page 29: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 9 Sprint Executive Team

Sandra J. Price

Senior Vice President, Human Resources

Bill White

Senior Vice President, Corporate Communications and Corporate Social Responsibility

Charles Wunsch

Senior Vice President, General Counsel, Corporate Secretary and Chief Ethics Officer

Dow Draper

President, Prepaid

John Saw

Senior Vice President, Technology Architecture

Page 4 of 7

Page 30: REPORT TO THE HEARING OFFICER - San Diego

SANDAG Board of Directors as of January 22, 2014

Chair Hon. Jack Dale

First Vice Chair Hon. Jim Janney

Second Vice Chair Hon. Don Higginson

Executive Director Gary L. Gallegos

of Carlsbad Han. ~1att Hall, Mayor (A) Hon. Farrah Douglas, Councilmember (A) Hon. Lorraine Wood, Councilmember

City of Chula Vista Hon. Cheryl Cox, Mayor (A) Han. Pamela Bensoussan, Deputy Mayor (A) Hon. Rudy Ramirez, Councilmember

City of Coronado Han. Michael Woiwode, Councilmember (A) Hon. AI Ovrom, Councilmember (A) Hon. Casey Tanaka, Mayor

City of Del Mar Hon. Terry Sinnott, Councilmember (A) Hon. Lee Haydu, Mayor (A) Hon. AI Corti, Deputy Mayor

of El Vacant (A) Hon. Bill Wells, ~1ayor

City of Encinitas Han. Lisa Shaffer, Councilmember (A) Hon. Teresa Barth, ~1ayor (A) Han. Tony Kranz, Councilmember

City of Escondido Hon. Sam Abed, Mayor (A) Han. Ed Gallo, Councilmember (A) Hon. John i'lasson, Councilmember

of Beach Hon. Jim Janney, ~layor (A) Hon. Ed Spriggs, Councilmember (A) Hon. Brian Bilbray, Councilmember

City of La Mesa Hon. Kristine Alessio, Vice Mayor (A) Hon. Ruth Sterling, Councilmember (A) Hon. ~lark Arapostathis, Council member

City of Lemon Grove Hon. Mary Teresa Sessom, Mayor (A) Hon. Jerry Jones, ~1ayor ProTem (A) Hon. George Gastil, Council member

Page 5 of 7

ATTACHMENT 9

Page 31: REPORT TO THE HEARING OFFICER - San Diego

City of Nationai City Hon. Ron ~Iarrison, ~layor (A) Han. Luis Natividad, Vice Mayor (A) Hon. Alejandra Sotelo-Solis, Councilmember

City of Oceanside Hon. Jack Feller, Councilmember (A) Han. Gary Felien, Councilmember (A) Hon. Jerry Kern, Councilmember

City of Poway Han. Don Higginson, ~layor (A) Hon. Jim Cunningham, Councilmember (A) Hon. John Mullin, Councilmember

City of San Diego Hon. Todd Gloria, Interim Mayor (A) Hon, Sherri Lightner, Councilmember (A) Hon. Lorie Zapf, Council member

Vacant (A) Han. Marti Emerald, Councilmember (A) Han. Myrtle Cole, Councilmember

City of San Marcos Hon. Chris Orlando, Councilmember (A) Han. Jim Desmond, Mayor (A) Han. Rebecca Jones, Vice ~layor

of Santee Hon. Jack Dale, Councilmember (A) Han. John Minto, Councilmember (A) Hon. Rob ~lcNelis, Vice ~1ayor

City of Solana Beach Hon. Lesa Heebner, Councilmember (A) Hon. ~like Nichols, Mayor (A) Hon. David A. Zito, Councilmember

of Vista Hon. Judy Ritter, Mayor (A) Han. John Aguilera, Councilmember (A) Hon. Amanda Rigby, Councilmember

of San Hon. Ron Roberts, Supervisor (A) Hon. Dave Roberts, Supervisor (A) Hon. Greg Cox, Supervisor

Hon. Dianne Jacob1 Chairwoman (A) Hon. Bill Horn, Vice Chair

California (Advisory Member) Malcolm Dougherty, Director

of

(A) Laurie Berman, District 11 Director

Metropolitan Transit (Advisory ~!ember) Harry Mathis, Chairman (A) Hon. AI Ovrom

North County Transit District (Advisory Member) Hon. Bill Horn, Chairman

ATTACHMENT 9

Page 6 of 7

Page 32: REPORT TO THE HEARING OFFICER - San Diego

(A) Hon. Ed Gallo (A) Hon. ~like Nichols

Imperial County (Advisory Member) Hon. John Renison, Supervisor, District 1 (A) Hon. Bill Hodge, Mayor, City of Calexico

United States Department of Defense (Advisory ~lember) CAPT Darius Banaji, CEC, USN, Commanding Officer Naval Facilities Engineering Command Southwest (A) CAPT Richard L. Whipple, CEC, USN, Executive Officer Naval Facilities Engineering Command Southwest

San Unified Port District (Advisory Member) Hon. Bob Nelson, Chairman (A) Hon. Dan Malcom, Commissioner

San (Advisory ~lember) Tom Wornham, Chairman (A) David Barnum, Director

Water Authority

Southern California Tribal Chairmen's Association (Advisory ~lember) Hon. Allen Lawson, Chairman, San Pasqua! Band of Diegueno Indians Hon. Robert Smith, Chairman, Pala Band of ~lission Indians

Mexico General (Advisory Member) Han. Remedios G6mez-Arnau, Consul General of ~lexica (A) Hon. Francisco Javier Olavarrfa, Deputy C6nsu! General of !v1exico (A) Hon. Alberto Diaz

Page 7 of 7

ATTACHMENT 9

Page 33: REPORT TO THE HEARING OFFICER - San Diego

AERIAL MAP

EXISTING

DCI PACIFIC I IC WORKS

ARCHITECTURE I ENGINEERING I CONSULTING 32 EXECUTIVE PARK I SUITE 110 I IRVINE I CA 92614

T 9"9-475.1000 1949475.1001 F

PROPOSED

'SPRINT' MONO-EUCALYPTUS W/ NINE (9) 1-----~ PANEL ANTENNAS AND RRUs

'SPRINT' LIVE EUCALYPTUS TREES, TYP. r-------~

'SPRINT' EQUIPMENT INSIDE A CONCRETE BlOCK EQUIPMENT ENCLOSURE; CONCRETE BLOCK WALLS TO BE PAINTED TO MATCH EXISTING TRASH ENCLOSURE (BEHIND EXISTJNG CHAIN LINK FENCEJ.

Sprint ~ Together with NEXTEL

Page 1 of 3

SOUTHBAY EXPRESSWAY SD73XC013C

1127 LA MEDIA ROAD SAN DIEGO, CA 92154

ATTACHMENT 10

NOTE: THE PROPOSED LIVE TREES WILL ONLY BE 1 0' TO 12' AT THE TIME OF PLANTING

VIEW SHEET

A 1 I 3

Page 34: REPORT TO THE HEARING OFFICER - San Diego

AERIAL MAP

COPYRIGHT: GOOGLE MAPS, 2013

EXISTING

DCI PACIFIC I I WORKS

ARCHITECTURE I ENGINEERING I CONSUlnNG 32 EXECUTlV£ PARK I SUITE I 10 I IRVINE I CA 92614

T 949 475. 1000 1949 475.1001 F

PROPOSED

,-------; 'SPRINT' LIVE EUCALYPTUS TREES. TYP.

Sprint ), Together with NEXTEl

Page 2 of 3

'SPRINT' MONO-EUCALYPTUS WJ NINE (9J PANEL ANTENNAS AND RRUs

'SPRINT' EQUIPMENT INSIDE A CONCRETE BLOCK EQUIPMENT ENCLOSURE; CONCRETE BLOCK WALLS TO BE PAINTED TO MATCH EXISTING TRASH ENCLOSURE (BEHIND EXISTING CHAIN LINK FENCE).

SOUTHBAY EXPRESSWAY SD73XC013C

1127 LA MEDIA ROAD SAN DIEGO, CA 92154

NOTE: THE PROPOSED LIVE TREES WILL ONLY BE 10' TO 12' AT THE TIME OF PLANTING

VIEW SHEET

B 2/3

Page 35: REPORT TO THE HEARING OFFICER - San Diego

AERIAL MAP

COPYRIGHT: GOOGLE MAPS, 2013

EXISTING

DCI PACIFIC lEI WORKS

ARCHITEcnJRE I ENGINEERING I CONSULnNG 32 EXECUTIVE PARK I 5UIIT II 0 !IRVINE I CA 9261.

T 949475.1000 (949475.1001 F

PROPOSED

'SPRINT MONO·EUCAL VPTUS Wf NINE (9) 1-------.. PANEL ANTENNAS AND RRUs

'SPRINT' LIVE EUCALYPTUS TREES, TYP. 1-----,.

' SOUTHBAY EXPRESSWAY

Sprint SD73XC013C I 12 7 LA MEDIA ROAD

Together with NEXTEL SAN DIEGO, CA 92154

Page 3 of 3

NOTE: THE PROPOSED LIVE TREES WILL ONLY BE I 0' TO 12' AT THE TIME OF PLANTING

VIEW SHEET

c 3/3

Page 36: REPORT TO THE HEARING OFFICER - San Diego

0 -(Jl

Sprint South Bay Express way- Photo Survey SD73XC013

)> -I ,; 0 I ~ m z -I ....... .......

Page 37: REPORT TO THE HEARING OFFICER - San Diego

""0 Q)

(Q ([)

N 0 ....... (J1

SD73XC013 - Photo Survey

1. View looking south @

North Elevation 2. View looking west @

East Elevation

)> --i

~ () I

l-~~~--~------~~~~ ~~~~~~~~~~~~~~~~ ~ z -I ~

~

Page 38: REPORT TO THE HEARING OFFICER - San Diego

-o w

(Q

CD VJ 0 -CJ'1

SD73XC013 - Photo Survey

3. View looking north @

South Elevation 4. View looking east @

West Elevation

)> -I

~ 0 I s:: m z -I -" -"

Page 39: REPORT TO THE HEARING OFFICER - San Diego

""'0 w

(Q

CD ~

0 -(J"J

SD73XC013 - Photo Survey

5. View looking North from Site 6. View looking East from Site

)> -I );! () I

~~~~ $:: --'-!'"'-..;.o:n.&A.~~-:::~,_.., m

z -I ....... .......

Page 40: REPORT TO THE HEARING OFFICER - San Diego

"'1J 0)

(Q ([)

(J1

0 ....., (J1

SD73XC013 - Photo Survey

7. View looking South from site 8. View looking West from Site

Page 41: REPORT TO THE HEARING OFFICER - San Diego

Site Development Permit Findings:

Sprint SD73XC013 Southbay Expressway

SOP Findings

1. The proposed development will not adversely affect the applicable land use plan Sprint proposes to place a wireless communications faci lity at 1129 La Media . Sprint is proposing to place an architecturally integrated FRP enclosure on the north side of the roof. The enclosure is painted and textured to blend with the roof. The enclosure will house the equipment cabinets and the antennas.

The project was been designed to integrate well with the existing building and the surrounding neighborhood.

Approval of the permit will not adversely affect the City of San Diego Municipal Code or General Plan.

2. The proposed development will not be detrimental to the public health, safety and welfare Sprint been authorized by the Federal Communications Commission (FCC) to construct and operate telecommunication system in the United States. The proposed use of this project will not be detrimental to the health, safety and general welfare of persons residing or working in the area and will not adversely affect other property in the vicinity. The FCC has established safety standards for wireless communication facilities. Wireless telecommunication facilities by their design and operation are low power devices.

An EMF Report demonstrating compliance will be prepared and submitted with this building permit application.

The requested permit renewal will not be detrimental to the public hea lth, safety and we lfare of the site.

3. The proposed development will comply with the applicable regulations of the land Development Code. The project was been designed to integrate well with the existing building and the surrounding neighborhood its use wi ll not have an adverse effect upon either adjacent or abutting properties and the site will comply with all city codes and regulations.

Page 1 of 4

Page 42: REPORT TO THE HEARING OFFICER - San Diego

SD COUNT>

I -~ I .:::=.."::.':',o::::-... "":.:i:::.~ ... .._,_ .. -.r :-::.:.~::.-- ... -·--- ........ .,.. ___ .. __ ,.. ___ __ ·--~-~------ ·--··--

Official Zoning Map

CHULA 1'/STA.

City of San Diego Development Services Department

s.D cmwn

GRID TILE: 7 GRID SCALE: 800

DATE: 6/1 0/2009 4:56:40 PM

Legend City of San Diego Boundary

0 Community Plan Aleas Parcels .....

ZONE_NAM£

• AR-1 -1

• AR-1-2

• CC-1.J CN-1 -2

IL-2-1 OF-1-1

OMOD-COJ.AMERL-SUBD OMDD-INDUST-SUBD OP-2-1 RM-1-1 RM-2-4 RM-2-5

I ' RM-2-6 RM-3-7 RS-1-1-4

UNZONED

Index Map

Page 43: REPORT TO THE HEARING OFFICER - San Diego
Page 44: REPORT TO THE HEARING OFFICER - San Diego
Page 45: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 13

THE CITY OF SAN DIEGO

DATE OF NOTICE: March 5, 2014

NOTICE OF PUBLIC HEARING HEARING OFFICER

DEVELOPMENT SERVICES DEPARTMENT

DATE OF HEARING: TIME OF HEARING: LOCATION OF HEARING:

PROJECT TYPE: PROJECT NO: PROJECT NAME: APPLICANT:

COMMUNITY PLAN AREA: COUNCIL DISTRICT:

CITY PROJECT MANAGER: PHONE NUMBER/E-MAIL:

March 19, 2014 8:30A.M. Council Chambers, 12th Floor, City Administration Building, 202 C Street, San Diego, California 92101 SITE DEVELOPMENT PERMIT, PROCESS 3 296409 SPRINT- SOUTHBAY EXPRESSWAY CAITLYN KES, DEPRATTI, INC., AGENTS REPRESENTING SPRINT OTAYMESA District 8

Alex Hempton, Development Project Manager (619) 446-5349/[email protected]

As a property owner, tenant, or person who has requested notice, please be advised that the Hearing Officer will hold a public hearing to approve, conditionally approve, or deny an application for a Wireless Communication Facility (WCF) consisting of a 55-foot tall monoeucalyptus (faux eucalyptus tree) supporting nine (9) panel antennas, with equipment located in a new building. The project is located at 1127 La Media Road.

The decision of the Hearing Officer is final unless appealed to the Planning Commission. In order to appeal the decision you must be present at the public hearing and file a speaker slip concerning the application or have expressed interest by writing to the Hearing Officer before the close of the public hearing. The appeal must be made within 10 working days of the Hearing Officer's decision. Please do not e-mail appeals as they will not be accepted. See Information Bulletin 505 "Appeal Procedure", available at www.sandiego.gov/development-services or in person at the Development Services Department, located at 1222 First Avenue, 3rd Floor, San Diego, CA 92101

The decision made by the Planning Commission is the final decision by the City.

Page 1 of 2

Page 46: REPORT TO THE HEARING OFFICER - San Diego

ATTACHMENT 13

This project was determined to be categorically exempt from the California Environmental Quality Act on 2111/2014 and the opportunity to appeal that determination ended 3/4/2014.

If you wish to challenge the City's action on the above proceedings in court, you may be limited to addressing only those issues you or someone else have raised at the public hearing described in this notice, or written in correspondence to the City at or before the public hearing. If you have any questions after reviewing this notice, you can call the City Project Manager listed above.

This information will be made available in alternative formats upon request. To request an agenda in alternative format or to request a sign language or oral interpreter for the meeting, call Support Services at (619) 321-3208 at least five working days prior to the meeting to insure availability. Assistive Listening

Devices (ALD's) are also available for the meeting upon request.

Internal Order Number: 24003269

Revised 04/08/10 HRD

Page 2 of 2

Page 47: REPORT TO THE HEARING OFFICER - San Diego

DEVELOPMENT SUMMARY

PROJECT SCOPE OF WORK: ZONING FOR A PROPOSED 'SPRINT' UNMANNED TELECOMMUNICATION FACILITY:

-55'H MONOEUCALYPTUS TREE -(9) NV A' TENNAS TOTAL -18 1900 'RH, TYP. -(4) OUTDOOR EQUIPMENT CABINETS ON CONCRETE PAD INSIDE PROPOSED S'H CMU WALL ENCLOSURE -PROPOSED FIVE (5) LIVE EUCALYPTUS TREES & IRRIGATION INSTALLATION -PRPOSED ELECTRICAL & TELCO RUN

Sprint), Together with NEXTEL

I NETWORK VISION MMBTS LAUNCH I

SOUTH BAY EXPRESSWAY SD73XC013C

1127 LA MEDIA ROAD, SAN DIEGO, CA 92154

VICINITY MAP DRAWING INDEX

SHEET DESCRIPTION

T1 TITLE SHEET

A1 SITE PLAN AND LESSEE'S CERTIFICATE

A2 EQUIPMENT AND ANTENNA LAYOUT PLAN

A3 ELEVATIONS

"1, JOHNOAH D. YU, DO HEREBY CERTIFY THAT THE STRUCTURE(S) OR MODIFICATION TO EXISTING STRUCTURE(S) SHOWN ON THESE PLANS DO NOT REQUIRE FEDERAL AVIATION ADMINISTRATION NOTIFICATION BECAUSE PER SECTION 77.15 (A) OF TITLE 14 OF THE CODE FEDERAL REGULATIONS CFR PART 77, NOTIFICATION IS NOT REQUIRED."

APPLICANT INFORMATION

APPLICANT: SPRINT

310 COMMERCE. #250 IRVINE, CA 92602

CONTACT: STEPHEN DEMARS PHONE: (760) 250-3706 FAX: (858) 650-4202

01 MONOEUCALYPTUS SECTION, ANTENNA SPECS & DETAILS ARCHITECT:

PROPERTY INFORMATION: LEGAL DESCRIPTION: THE SOlJIHWEST QUARTER OF ]ljE NORTHWEST QUARTER OF SECTION 26, TOWNSHIP 18 SOlJIH, RANGE I WEST, SAN BERNARDINO MERIDIAN, IN THE CITY OF SAN DIEGO, COUNTY OF SAN DIEGO STATE OF CALIFORNIA ACCORDING TO THE OFFICIAL FLAT THEREOF

ASSESSOR PARCEL NUMBER: 646-070-54-00

PROPOSED 'SPRINT' LEASE AREA: 200 SQ. FT.

BOXED BELOW IS A LIST OF DEVELOPMENT REGULATION DEVIATIONS, AND THE REQUIRED PERMITS/APPROVALS, N/ A IF LEFT BLANK:

EXISTING WCFs ON SAME PROPERTY: -NO EXISTING TELECOM CARRIERS ON SITE

PROJECT TEAM:

CONSTRUCTION: PAUL HOKENESS PHONE: (858) 231-8889

SITE ACQUISITION: CAITLYN KES PHONE: (858) 527-9938

PLANNING: CAITLYN KES PHONE: (858) 527-9938

ARCHITECT: O.K. DO, RA PHONE: (949) 475-1000

CODE COMPLIANCE 1. 2010 CALIFORNIA ADMINISTRATIVE CODE (CAC) 2. 2010 CALIFORNINA BUILDING CODE (CBC), VOLUMES 1, AND 2 (2009 EDITION INETRENCATION BUILDING CODE WITH 2010 CALIFORNIA AMENDMENTS) 3. 2010 CALIFORNINA ELECTRICAL CODE (2008 EDITION NATIONAL ELECTRICAL CODE WITH 2010 CALIFORNIA AMENDMENTS) 4. 2010 CALIFORNIA MECHANICAL CODE (CMC) (2009 EDITION IAPMO UNIFORM MECHANICAL CODE WITH 2010 CALIFORNIA AMENDMENTS)

OWNER: OWNER: SAN DIEGO ASSOCIATION OF GOVERNMENTS

(SANDAG)

ADDRESS: 1127 LA MEDIA ROAD, SAN DIEGO, CA 92154

CONTACT: MICHAEL SCHWARTING, ROADWAY OPERATIONS MANAGER (SR-125)

PHONE: (619) 710-4028

BUILDING CODE INFORMATION: EXISTING BUILDING/STRUCTURE:

OCCUPANCY ~ N/A CONSTRUCTION TYPE = N/A SPRINKLER SYSTEM ~ N/A

PROPOSED STRUCTURE: OCCUPANCY ~ S-2 CONSTRUCTION TYPE ~ V-B SPRINKLER SYSTEM ~ N/A

ZONING INFORMATION:

JURISDICTION: CITY OF SAN DIEGO ZONING DESIGNATION: INDUSTRIAL EXISTING ZOI;ING NO.: -LATITUDE: 32' 34.38' 52" N LONGITUDE: 116' 57.32' 96" w ELEVATIONS: 517 (FEET) AGL

5. 2010 CALIFORNIA ENERGY CODE (2008 EDITION CALIFORNIA ENERGY COMMISSION BUILDING ENERGY EFFICIENCY STANDARDS) 6. 2010 CALIFORNIA FIRE CODE (CFC) (2009 EDITION OF INTERNATIONAL FIRE CODE WITH 2010 CALIFORNIA AMENDMENTS) 7. 2010 CALIFORNIA GREEN CODE 8. 2010 CALIFORNIA REFERENCES STANDARDS CODE

DRIVING DIRECTIONS DEPART FROM SPRINT IRVINE OFFICE:

1. HEAD NORTHWEST ON COMMERCE 2. TAKE THE 1ST RIGHT TO STAY ON COMMERCE 3. TURN LEFT ONTO EL CAMINO REAL 4. TURN LEFT ONTO JAMBOREE RD 5. TAKE THE RAMP ONTO 1-5 S 6. SLIGHT LEFT ONTO 1-805 S 7. TAKE EXIT 1 B TO MERGE ONTO CA-905 E 8. TAKE EXIT 7 FOR LA MEDIA ROAD 9. TURN LEFT ONTO LA MEDIA RD DESTINATION WILL BE ON THE RIGHT

1127 LA MEDIA RD SAN DIEGO, CA 92154

APPROVAL DATE SIGNATURE

P.M.:

LANDLORD:

CONST:

S/A:

R.F.:

ZONING:

A&E:

R.F.:

REVIEWERS SHALL CLEARLY PLA.CE INITIALS ADJACENT 10 E.ACH REDLINE NOTE AS DRAWINGS ARE BEING REVIEWED

Page 1 of 10

L1 IRRIGATION PLAN DCI PACIFIC

L2 IRRIGATION DETAILS & WATER CALCULATIONS 32 EXECUTIVE PARK, SUITE 110 IRVINE, CA 92614

L3 PLANTING PLAN

LS1 TOPOGRAPHIC SURVEY (1/2)

LS2 TOPOGRAPHIC SURVEY (2/2)

10 TOTAL SHEET

ABBREVIATIONS A/C AIR CONDITIONING GA AGL ABOVE FINISH GRADE GALV APPROX APPROXIMATELY GC

GRND BLDG BUILDING GYP BD BLK BLOCKING

HORZ CI_R CLEAR HR CONC CONCRETE HT CONST CONSTRUCTION HVAC CONT CONTINUOUS

10 DBL DOUBLE IN DIA DIAMETER INFO DIAG DIAGONAL INSUL ON DOWN INT DET DETAIL CBC owe DRAWING

L E EXISTING LBS EA EACH ELEV ELEVATION ELEC ELECTRICAL MTL EQ EQUAL MFR EQUIP EQUIPMENT MGR EXT EXTERIOR MIN

MISC FIN FINISH FLUOR FLUORESCENT NA FLR FLOOR NIC FT FOOT NTS

GAUGE GALVANIZED GENERAL CONTRACTOR GROUND GYPSUM WALL BOARD

HORIZONTAL HOUR HEIGHT

CONTACT: O.K. DO, RA PHONE: (949) 475-1000 FAX: (949) 475-1001 E-MAIL: DK©DCIPACIFIC.COM

CONTACT: JOHNOAH D. YU, RA PHONE: (949) 475-1000 EXT 112 FAX: (949) 475-1001 E-MAIL: [email protected]

SITE ACQUISITION: DEPRATII INC.

13948 CALLE BUENO GANAR JAMUL, CA 91935

CONTACT: SEE PROJECT TEAM FOR INFO. PHONE: (619) 726-8110

oc ON CENTER 00 OUTSIDE DIAMETER

PLYWO PLYWOOD PROJ PROJECT PROP PROPERTY R RADIUS REO REQUIRED RM ROOM

HEATING, VENTILATION, AIR CONDITIONING RO ROUGH OPENING SHT SHEET

INSIDE DIAMETER SIM SIMILAR INCH SPEC SPECIFICATION INFORMATION SF SQUARE FOOT INSULATION ss STAINLESS STEEL INTERIOR STL STEEL CALIFORNIA BUILDING CODE STRUCT STRUCTURAL

SUSP SUSPENDED LENGTH POUNDS THRU THROUGH MAXIMUM T.O. TOP OF MECHANICAL TYP TYPICAL METAL MANUFACTURE UNO UNLESS NOTED OTHERWISE MANAGER MINIMUM VERT VERTICAL MISCELLANEOUS VIF VERIFY IN FIELD

NOT APPLICABLE W/ WITH NOT IN CONTRACT W/0 WITHOUT NOT TO SCALE WP WATER PROOF

ATTACHMENT 14

PACIFIC AJEJCWORKS

ARCHITECTURE I ENGINEERING I CONSULTING 32 EXECUTIVE PARK [SUITE 110 [IRVINE J CA 92614

T 949475.1000 [949475.1001 F

Sprint) Together with NEXTEL

31 0 COMMERCE, SUITE 250 IRVINE, CA 92602

PHONE: (714) 617-9342 FAX: (714) 368-.3501

PROJECT IDENll~CATION:

SOUTH BAY EXPRESSWAY SD73XC013C

1127 LA MEDIA ROAD, SAN DIEGO, CA 92154

CURRENT ISSUE DATE:

01/02/14

ISSUED FOR:

100% ZD

APPROVALS: APPROVED BY: INITIALS: DATE:

LANDLORD

LEASING

ZONING

RF

CM

DRAWN BY: I CHK I APV: JGO BOK DKD

ISSUE STATUS: 6 DATE: DESCRIPTION: BY:

02/08/13 90% ZD JGD

02/18/13 100% ZD JGD

02/25/13 1 DO% ZD: REV PER SANDAG JGD

05/10/13 REVISED PER CYCLE #2 JGD

08/05/13 REVISED PER NEW SURVEY JGD

11/13/13 RELOCATE LEASE AREA JGD

01/02/14 REV PER CYCLCE ISSUE 13 JGD

SHEET TITLE:

TITLE SHEET

SHEET NUMBER: ISSUE LEVEL:

T1 SOJI1< B\Y SD73XC13C

Page 48: REPORT TO THE HEARING OFFICER - San Diego

l...!.l~~;:e·~ Cort.i!l:eJ.l~

$tMtbrd \'viri!k~~foidtiey l?to:'Jj~et [Qr l~ost~~on~>troctioo· n.~.,w:,~

1 lwi,!:.(~~ ·umk~t~~d,. ~ t¢~~1!¢ irf ~~ pottlt)lt(>ti~~ prup...;11.y d~~ri~;J·-a,<;

1127 LA MEDIA RD., SAN DIEGO, CA 92154. (Addrc~.'(. or leg-tlf d~ii>:~p_ti(}n)

CUT

FILL

IMPORT

EXPORT

% OF CUT

GRADING TABLE

0.0

0.0

0.0

23.6 (CAISSON & EQUIPMENT)

P~T 811

Caii2FuiJWorklngDayslnAdvance

CU YO ~r ~~ CU YO ~~-CU YO ~:V~

CU YO

uudm)lbui.4.lhal, _in !lc,:iu"thti-L':<.': \Vith ~ln:'J S!UA·l.)i>1f!-6.,K:f.lmi~.ip<ll C.J.:lii~.J.,:.uul Pi+\~lv·pm:cm·Muuil.llll .. $h~m1 \V-iit4lr S!a~datd"ff~ thj!i pt>Jj~,;t iii· n;:ijMiNd fo'''l~#ntlJ) Pdlai.an~~ ~~ml d.w l)j.oject"i\n.-..l"""·uud ittNlp'~rttte- *Sttc: ~~ign•' nnd ••s~:-u:r~o Cillllhil" 111\.fPs,

I <:-irt!f~: t:cy 1h"'·. b~t <if. my ku~-v~i:dgc~.th# t)l~ l~~U tltant" Jl.nfidp~l~d ~iy U~i>l prov~~~d I!Jllt\: u~ ~It¢ w. thll_owsc

%\~ ~E;X;CA;V;A;TI;ON;;N;O;T;ES;:::="=======~======~ ~·. 1. ALL EXCAVATED MAITRIAL LISTED TO BE EXPORTED, SHALL '\~---";~~---------..:-'-~~----------------------------~ BE EXPORTED TO A LEGAL DISPOSAL SITE IN ACCORDANCE WITH '\.. ~ THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS ',

S~dinll'tJl~ Nntri"""tlL<'; T'm'*b & d~bris Ox~n .. ~~ n~nt~n~inz Suimu_u:i~t OiLil!Qr<ll"i Hait-&dn a Viru\'liol$ ]>e!>t!d.~e~ . ·

CONSTRUCTION (THE 'GREEN BOOK'). 2009 EDITION AND '""-, REGIONAL SUPPLEMENT AMENDMENTS ADOPTED BY REGIONAL STANDARDS COMMilTEE. '"'

""' ', ..... ""-, -?;o. '"' S""S""~J ,~.fo....o

lt\V,., wiH im;:~rp-m:rde; llN f\"'l!kaYinl$ in'Q di!) Site: ~'!i$Jn~

Maininin pre .. d~.,·dopmc.rli runoif d:imtu.:(l:rb:tics: &Unimlte .im,x:n .. im~~ t'oot priu~ by ;(;JI_\~tru-...ting w.-.rk'<V3.J$~ pirtiOO mid ~ri.\:'.,way:\\. ~v.tth.per~ncab-le j~tct\lc~~

NEW 262 SQ. FT. LEASE AREA 'SPRINT' TELECOMMUNICATION FACILITY AT GROUND LEVEL. ·SEE SHEET 1/A2 FOR 'ENLARGED SITE PLAN'

ly "(1'.-j..

""'(q, ~ ',<'

s". ""-,

NOTES:

Con~n;j} rlilWfal-~u-.;-:~1$ · ·

t)se oatu~l d-rruMg-c_ ~st.z·m$ as i1JWotW:d Jo l inc-d _iw;akf.::., qr W'td~r.;rt".<tmd diithi_o~;lg~ "$j'$loC:lll:>" .

Drnih n1C!t"t-op:s, ~~(llkov?}'~+ p<~d~t'l'S an.U dl"lvin'l'>i)'~ .lutu .ur:(jnoo!tt lands.el~pin,~ prior to.dJsehar£:!ng tQ th~ publi0-· -tka:iiu-g~ syt;:kJl).

~:rttit."t!'\:'"<.~-~xb.tlng. 11M~ve tJ'I!.::~ nud l'llumh5-~=rot-e"k1 all .~Jor~·~i>: ~~~WI~ ~t~~~Ml

A~ditkirtatly, L'w.c W'iil : \1!n:ir:n.i~~~· th~ ·~~~;:: ~)f 1;~sH~~~~-Vl>e.:~,t~N~t l1rl'gnti~ti ~y~l~m~ hind i ti.ndi~ulW d~i!fga1 itic<~rt~E~~Iil1S. rslfu *ihUhlff d.:vi(;.<J'$: -;J~i(/ i11..)W r.tdUO:~i::.> m<"lill~l'tl

JAW.'.~vitt m~I~IW!.lil:l ih,;,'! ~h"t:lW $l~m~b.,r.J )i:(tfl.t\lHW-11lfiMP'~ J~t !11~ dmati~m: ~~t}~c 1-C~f:. . , .. .

I. NO EXISTING PARKING SPACE WILL BE USED OR REMOVED BY THIS PROJECT.

2. THE PROJECT PROPOSES NO WORK WITHIN THE PUBLIC RIGHT -OF -WAY.

3. PRIOR TO THE ISSUANCE OF ANY CONTRUCTION PERMIT, THE PERMilTEE SHALL ENTER INTO A MAINTENANCE AGREEMENT FOR THE ONGOING PERMANENT BMP MAINTENANCE, SATISFACTORY TO THE CITY ENGINEER.

4. PRIOR TO THE ISSUANCE OF ANY CONSTRUCTION PERMIT, THE PERMilTEE SHALL INCORPORATE ANY CONSTRUCTION BEST MANAGEMENT PRACTICES NECESSARY TO COMPLY WITH CHAPTER 14, ARTICLE 2, DIVISION 1 (GRADING REGULATION) OF THE SAN DIEGO MUNICIPALITY CODE, INTO THE CONSTRUCTION PLANS OR SPECIFICATIONS.

5. PRIOR TO THE ISSUANCE OF ANY CONSTRUCTION PERMIT THE PERMilTEE SHALL SUBMIT A WATER POLLUTION CONTROL PLAN (WPCP). THE WMCP SHALL BE PREPARED IN ACCORDANCE WITH THE GUIDELINES IN APPENDIX E OF THE CITY'S STORM WATER STANDARDS.

NOTE: NO EXISTING TELECOM CARRIERS ARE ON SITE.

'SPRINT' TRANSMilTER FREQUENCIES AND POWER LEVELS: TRANSMIT -851-860, 935-940, 1990-1995 MHz BAND WIDTH RECEIVE-805-824, 896-901, 1910-1915 MHz BAND WIDTH ERP-100 WAlTS MAX

GENERAl CONSTRUCTION NOTES: 1. THE DRAINAGE SYSTEM PROPOSED FOR THIS DEVELOPMENT, AS SHOWN ON THE SITE PLAN, IS PRIVATE AND SUBJECT TO APPROVAL BY THE CITY ENGINEER.

2. PRIOR TO THE ISSUANCE OF ANY CONSTRUCTION PERMIT, THE PERMilTEE SHALL ENTER INTO A MAINTENANCE AGREEMENT FOR THE ONGOING PERMANENT BMP MAINTENANCE, SATISFACTORY TO THE CITY ENGINEER.

3. PRIOR TO THE ISSUA~CE OF ANY CONSTRUCTION PERMIT, THE PERMilTEE SHALL INCORPORATE ANY CONSTRUCTION BEST MANAGEMENT PRACTICES NECESSARY TO COMPLY WITH CHAPTER 14, ARTICLE 2, DIVISION 1 (GRADING REGULATIONS) OF THE SAN DIEGO MUNICIPALITY CODE, INTO THE CONSTRUCTION PLANS OR SPECIFICATIONS.

SITE PLAN AND LESSEE'S CERTIFICATE

0 <(

0 cr: <(

0 w ~

<( ....J

I Gfl

I

(N) UNDERGROUND UTILITY TRENCH (APPROX LENGHT 90')

(N) 'SPRINT' METER/MAIN ON PEDESTAL (FINAL LOCATION TO BE DETERMINED BY SERVICE PROVIDER) ---........_

Page 2 of 10

?-?· '" s-?·· ', ly

' (E) CHAIN LINK FENCE

(E) TELCO MANHOLE; 'SPRINT' NEW TELCO P.O.C,

'------ (P) 'SPRINT' TELCO UNDERGROUND UTILITY TRENCH (APPROX LENGHT 256')

~

I I I I I

~SCALE; I I"""-

' ~

I 11 80'

ATTACHMENT 14

I

I

I

II

DCI PACIFIC A!E!C WORKS

ARCHITECTURE [ ENGINEERING [ CONSULTING 32 EXECUTIVE PARI( I SUITE 110 J IRVINE I CA 92614

T 949475.1000 [949475.1001 F

Sprint) Together with NEXTEL

310 COMMERCE, SUITE 250 IRVINE, CA 92602

PHONE: (714) 617-9342 FAX: (714) 368-3501

PROJECT IDENTIFICATION:

SOUTH BAY EXPRESSWAY SD73XC013C

1127 LA MEDIA ROAD, SAN DIEGO, CA 92154

CURRENT ISSUE OATE:

01/02/14

ISSUED FCR:

100% ZD

APPROVALS: APPROVED BY: INJT!ALS: DATE:

LANDLORD

LEASING

ZONING

RF

CM

DRAWN BY: I CHK: I APV: JGD BOK DKD

ISSUE STATUS: 6. DATE: DESCRIPTION: BY:

--- 02/08/13 90% ZD JGD

--- 02/18/13 100% ZD JGD

--- 02/25/13 1 00% ZD: REV PER SANOAG JGD

--- 05/10/13 REVISED PER CYCLE #2 JGD

--- 08/D5/13 REVISED PER NEW SURVEY JGD

--- 11/13/13 RELOCATE LEASE AREA JGD

--- 01/02/14 REV PER CYCLCE ISSUE 13 JGD

SHEET TITLE:

SITE PLAN AND LESSEE'S CERTIFICATE

SHEET NUMBER: ISSUE LEVEL:

A1 SOU1H B\Y S073XC1J::

i

I

I

Page 49: REPORT TO THE HEARING OFFICER - San Diego

"' I

""

EQUIPMENT LAYOUT PLAN

ANTENNA LAYOUT PLAN

1' 6" '-4"

3'-6"

' :: 5" [i:;

''~--~ ii A

-)~ ~OPTION 2

(E) CHAINLI~K FENCE x-x-x-x-x-x-x-x-x-x-x-

r (E) PARKING

~

),

r(E) DIRT_/

~ I I 18 w•

0 I

"'

I

I

I

c 1--{

I~ 'lg

--{

lm

I~ D D J

z:l

~~ ~I §I

c.n I

KEYNOTES: /0_ (N) 8'-0"H CMU WALL ENCLOSURE (SPLIT -FACE) V WITH CHAINLINK FENCE LID

0 (N) 9928 MMBTS EQUIPMENT CABINET

0 (N) 60ECv2 BATTERY CABINET

~ (N) POWER PROTECTION CABINET WITH V BUILT-IN EGR MOUNTED ON WALL.

0 (N) TELCO CABINET

0 (N) POWER/FIBER JUNCTION BOX

0 (N) FIBER SPOOL BOX

M (N) U/G COMBINED UTILITY POWER & V TELCO CONDUIT RUN

0 NOT IN USED

<Bl> (N) CONCRETE PAVEMENT

~11 (N) 4'W CORRUGATED METAL GATE, COLOR V TO MATCH CMU WALL

<13> <& <G>

<8> ~ ~ ~

E'il [LI

~I

(N) 55'-0"H MONO-EUCALYPTUS TREE

(N) (2) 1900 RRH PER ANTENNA, 18 RRH TOTAL

(N) 6FT NV ANTENNAS, MOUNTED ON 45' -O"H RAD CENTER, 3 ANTENNAS PER SECTOR, 9 ANTENNAS TOTAL. - TYP.

(N) GPS ANTENNA MOUNTED ON CLEAR TOP CHAINLINK FENCE LID

(N) SERVICE LIGHTS, 3 TOTAL

(N) CONCRETE SLAB

Z•

~l f!:l

(N) FfVE (5) LIVE EUCALYPTUS TREES -SEE LANDSCAPE DWGS NOTES: 1, ALL LIVE EUCALYPTUS TREES WILL ONLY BE ABOUT 10'-12'H AT TIME OF PLANTING. 2. FINAL LOCATION OF ALL LIVE EUCALYPTUS TREES SHALL AVOID ANTENNA'S DIRECT AZIMUTH PATH AND SHALL COORDINATE WITH SPRINT'S CONSTRUCTION MANAGER PRIOR TO PLANTING.

1

DCI PACIFIC AjE!C WORKS

ARCHITECTURE I ENGINEERING I CONSUL TJNG 32 EXECUTIVE PARK I SUITE 110] IRVINE I CA 92614

T 949475.1000 j949475.1001 F

Sprint) Together with NEXTEL

310 COMMERCE, SUITE 250 IRVINE, CA 92602

PHONE' (714) 617-9342 FAX' (714) 368-3501

PROJECT IDENTIFICATION:

SOUTH BAY EXPRESSWAY SD73XC013C

APPROVED BY:

LANDLORD

LEASING

ZONING

RF

CM

DRAWN BY'

JGD

1127 LA MEDIA ROAD, SAN DIEGO, CA 92154

CURRENT ISSUE DATE'

01/02/14

ISSUED FOR:

100% ZD

APPROVALS: INITIALS: DATE:

I CHK: I APV BOK DKD

ISSUE STATUS: /'-, DATE' DESCRIPTION: BY:

02/08/13 90% ZD JGD

02/18/13 100% ZD JGD

02/25/13 100% ZD: REV PER SANDAG JGD

05/10/13 REVISED PER CYCLE #2 JGD

08/05/13 REVISED PER NEW SURVEY JGD

11/13/13 RELOCATE LEASE AREA JGD

01/02/14 REV PER CYCLCE ISSUE 13 JGD

SHEET TITLE:

EQUIPMENT AND ANTENNA LAYOUT PLANS

SHEET NUMBER:

A2 ISSUE LEVEL:

SOJJH BI<Y SD73XC13C

Page 50: REPORT TO THE HEARING OFFICER - San Diego

__{W__A!'llEM_Il.AQJ:E:_NTER ________________ _

'o I

"oo

T.O. CMU WALL

AMSL 509'FT

(E) CHAIN LINK FENCE

SOUTH ELEVATION

'"" n -H

NORTH ELEVATION

(N) LIVE 40'H (60'H MAX) EUCALYPTUS TREES, 5 TOTAL -SEE LANDSCAPE DWG

NEW LOCATION FOR THE (E) TREE

(E) MECHANICAL EQUIPMENT ON ROOFTOP

(E) LIVE PALMS TO REMAIN

(N) (2) 900 RRH PER SECTOR, 18 RRH TOTAL

(N) 6FT NV ANTENNAS MOUNTED ON MONO-EUCALYPTUS, 3 ANTENNAS PER SECTOR, 9 ANTENNAS TOTAL.

(E) TRASH ENCLOSURE

(N) LIVE 40'H (60'H MAX) EUCALYPTUS TREES, 5 TOTAL -SEE LANDSCAPE DWG; NOTE: ALL LIVE EUCALYPTUS TREES WILL ONLY BE ABOUT 1 0' -12'H AT TIME OF PLANTING.

(E) SOG&E TRANSFORMER

(N) 1900 RRH PER ANTENNA, 18 RRH TOTAL ----,

(N) 6FT NV ANTENNAS MOUNTED ON MONO-EUCALYPTUS, 3 ANTENNAS PER SECTOR, 9 ANTENNAS TOTAL.---------.

(N) LIVE 40'H (60'H MAX) EUCALYPTUS TREES, 5 TOTAL -SEE LANDSCAPE DWG; NOTE: ALL LIVE EUCALYPTUS TREES WILL ONLY BE ABOUT 10'-12'H AT TIME OF PLANTING.

(N) LOCATION OF (E) LIGHT POST

(E) MECHANICAL EQUIPMENT ON ROOFTOP

(E) OPERATIONS BUILDING

(E) CHAIN LINK FENCE

0 I

'i;o

""

"oo I

'"" n -H

1

0 I

;,-, m

2

DCI PACIFIC AIEIC WORKS

ARCHITECTURE I ENGINEERING I CONSULTING 32 EXECUTIVE PARK I SUITE 110 ]IRVINE I CA 92614

T 949475.1000 I 949475.1001 F

Sprint) Together with NEXTEL

310 COMMERCE, SUITE 250 IRVINE, CA 92602

PHONE: (714) 617-9342 FAX: (714) 368-3501

PROJECT IDENTIFICATION:

SOUTH BAY EXPRESSWAY SD73XC013C

APPROVED BY:

LANDLORD

LEASING

ZONING

RF

CM

DRAWN BY:

JGD

1127 LA MEDIA ROAD, SAN DIEGO, CA 92154

CURRENT ISSUE DATE:

01/02/14

ISSUED FOR:

100% ZD

APPROVALS: INITIALS: DATE:

I CHK: I APV: BOK DKD

ISSUE STATUS: 6. DATE: DESCRIPTION: BY:

02/08/13 90% ZD JGD

02/18/13 100% ZD JGD

02/25/13 100% ZD: REV PER SANDAG JGD

05/10/13 REVISED PER CYCLE #2 JGD

08/05/13 REVISED PER NEW SURVEY JGD

11/13/13 RELOCATE LEASE AREA JGD

01/02/14 REV PER CYCLCE ISSUE 13 JGD

SHEET TITLE:

ELEVATIONS

SHEET NUMBER: ISSUE LEVEL:

A3 9JJIH B\Y S073XC13C

Page 51: REPORT TO THE HEARING OFFICER - San Diego

*Ymi'ti!Jt!@'ff§i + 1!-t-....;;s~.~~~w t m"1 :fj~')} ~~N-J-~it ~~~ 4rM hl~¢ '''~~* '-'~lo/:<1}1! kr~ 1!J<j-t< J!':.)!ih:: $$~~ :It f.:r:-!'il~W.:-1 J, t::"'~'!"~ l" ~~M,;;~ &'ill .'t tmt~~·:-~ Mflt.

·~~ll!k<ttr:'tc.aldtt;..mt!H~ pr~ !llltJM:~~~.Jllrncl!irl~ ~<»r&twllit19 ~"'rc:olU (!.'1('1!r{~\ll'~ rktltt.H; ff!fk&f~br., .zy./(i~dl!'g<,

•foil~~ ~t:li\'P~etfi o:rf ~ttt~~Jktfite~~fl)'!>kall)'""' li d!S}

KIPd!tJl"flln~ o;~ll~rj:?;I~J-1' ~~~f~rrnfu~ql!':llOOitm! !"(~ ~li

·~-~mfiJ~ f~M ~w·,;"i§.W!Hmfilm

•Q>#<~""'-"'""~""

ANTENNA SPECIFICATIONS

OPTIONAL LOCATION REFER WITH MANUFC SPECSC

DOWNTILT BRACKET

2"</J GJ POLE FOR ANTENNA MOUNTING -----~

NOTE: I. SEE ANTENNA MANUFACTURER SPECS. FOR COMPLETE ANTENNA AND BRACKET SPECIFICATIONSC

ANTENNA MOUNTING

I W=80# ....

0-MOUNTED DISTANCE .• / FROM POLE: 3S'

rrodod: J!Ji)I}MHdtl!!l (<•>~flcl<)

J'lwilo<IV...,Iiptio•" 'fhis Rm~tttc. ka&o. Ocad {kktf} ~Pt'IIJ<i=.-'i lhft r900~=1Ul!:. ~p&ctnMi w~~h •~ O~~M 1l0:~1m:f.llt m Qud kfWt:!hWil~mtipJf.J&~lW!11>~*i~J.g 4i~.5W Q.f ffitt~ Pft\Y.6'in n du~d ~ad c~~n,lig~~

Sl.Jwwt"ll tip t~ & f.!:!:Wim ~f.C[~~A hl ~ tfi.)ot.1H"3p!::dnxm lmd .l~ bat-...-y f~<4x4U'H M!;m!dw11 "'~~) S1lppwt• •P 0> S -rm o(C!~~iAc (si•gl• tMMOI"'\Y) SY~:!t.Al.SO 48V DC ""'Ybo J!<'W'red f•om Aklll<i·L<l- <>bioci :h"':!f{'*~rKli: }{$~if.'!~ fitw:f f ~zy\\'t.r 'I.~Uibk hmllikt

4 REMOTE RADIO HEAD (RRH) SPECS

ANTENNA CLAMP MOUNTING HARDWARE W/ ADJUSTABLE DOWNTILT BRACKET. INSTALL PER MANUFACTURER WRITTEN INSTRUCTIONS

SIDE ELEVATION

800 MHZ REMOTE RADIO UNIT (RRU) W/ EXTERNAL FILTER

__.----PANEL ANTENNA -------1

3" OCDC SCHEDULE 40 ANTENNA MOUNT PIPE ------H

1900 MHZ REMOTE RADIO UNIT (RRU)

tlQIE; RRU'S TO BE ATTACHED TO MOUNTING PIPE W/ CLAMP MOUNTING HARDWAREC INSTALL PER MANUFACTURER INSTRUCTIONS

REAR ELEVATION

5 RRH MOUNTING DETAIL

2 '6 I

';i

'o I

TOP OF TREE TO HAVE A CROWN APPEARANCE

T.O. (P) 'SPRINT' ANTENNAS

(P) FAUX EUCALYPTUS 'TRUNK' WITH HEAVY BARK TEXTURE

PROVIDE (2) 9"x24" HANDHOLE WITH COVERS

CENTER LINE OF HANDHOLE -------------------

'"n (E) NATURAL GRADE

FOUNDATION PER POLE VENDOR

NOTE: ALL EXPOSED CABLES, BRACKETS AND SUPPORT SHALL BE PAINTED TO MATCH MONOEUCALYPTUS

NOTE: RF TRANSPARENT SOCK SHALL FULLY CONCEAL THE LENGHT AND WIDTH OF EACH ANTENNA, FRONT & BACK. ANY OF ANTENNA EXPOSED FOR CABLING SHALL BE PAINTED TO MATCH MONOEUCALYPTUS TREE FOLIAGE

3 SECTION

Page 5 of 10

EXTENDED BRANCHES 24" MIN BEYOND ANTENNAS

(6) 6"0 SCH 40 PVC CONDUIT FOR COAX CABLE

1

ATTACHMENT 14

DCI PACIFIC AjEjCWORKS

ARCHITECTURE J ENGINEERING I CONSULTING 32 EXECUTIVE PARK I SUITE I 10 I IRVINE I CA 92614

T 949475.1000 ]949475.1001 F

Sprint) Together with NEXTEL

310 COMMERCE, SUITE 250 IRVINE, CA 92602

PHONE: (714) 617-9342 FAX' (714) 368-3501

PROJECT !OENTIFICATION'

SOUTH BAY EXPRESSWAY SD73XC013C

APPROVED BY:

LANDLORD

LEASING

ZONING

RF

CM

DRAWN BY:

JGD

1127 LA MEDIA ROAD, SAN DIEGO, CA 92154

CURRENT ISSUE DATE:

01/02/14

ISSUED FOR:

100% ZD

APPROVALS: INITIALS:

I CHK SDK

ISSUE STATUS: L DATE: DESCRIPTION:

02/08/13 90% ZD

02/18/13 100% ZD

02/25/13 100% ZD: REV PER SANDAG

05/10/13 REVISED PER CYCLE #2

08/05/13 REVISED PER NEW SURVEY

11/13/13 RELOCATE LEASE AREA

01/02/14 REV PER CYCLCE ISSUE 13

SHEET TITLE:

DATE:

I APV: DKD

BY:

JGD

JGD

JGD

JGD

JGD

JGD

JGO

MONOEUCALYPTUS SECTION, ANTENNA SPECS & DETAILS

SHEET NUMBER: ISSUE LEVEL:

01 SUJ1H IW SD73XC13C

Page 52: REPORT TO THE HEARING OFFICER - San Diego

IRRIGATION NOTES THE DESIGN IS D AGRAMMATIC. ALL EQUIPMENT SHOWN IN PAVED AREAS IS FOR DESIGN CLARIFICATION ONLY AND IS TO BE INSTALLED WITHIN PLANTING AREAS AS NECESSARY.

DO NOT WILLFULLY INSTALL ANY EQUIPMENT AS SHOWN ON PLANS WHEN IT IS OBVIOUS IN THE FIELD THAT UNKNOWN CONDITIONS EXIST THAT WERE NOT EVIDENT liT THE TIME THESE PLANS WCRE PREPARED. ANY SUCH CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNERS REPRESENTATIVES PRIOR TO ANY WORK OR THE IRRIGATION CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR ANY FIELD CHANGES DEEMED NECESSARY BY THE OWNER.

INSTALL ALL EQUIPMENT AS SHOWN IN THE DETAILS AND SPECIFICATIONS. CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY WITH ALL LOCAL CITY AND COUNTY REQUIREMENTS FOR BOTH EQUIPMENT AND INSTALLATION.

THE SYSTEM IS DESIGN FOR A MINIMUM OPERATING PRESSURE OF _6_5 __ PSI. THE MAXIMUM DEMAND OF GALLONS PER MINUTE IS __ 3 _ . THE IRRIGATION CONTRACTOR SHALL VERIFY THE AVAILABLE WATER PRESSURE ON THE SITE PRIOR TO THE START OF INSTALLATION.

THE ACTUAL LOCATION OF THE AUTOMATIC CONTROLLER IS TO BE DETERMINED IN THE FIELD BY THE OWNERS AUTHORIZED REPRESENTATIVE.

110 V. ELECTRICAL POWER SOURCE TO BE PROVIDED BY OTHERS TO THE LOCATION FOR THE AUTOMATIC CONTROLLER. IRRIGATION CONTRACTOR TO BE RESPONSIBLE FOR THE FINAL CONNECTION TO THE EQUIPMENT.

ALL QUICK COUPLERS VALVES ARE TO BE INSTALLED IN SHRUB OR GROUNDCOVER AREAS WHENEVER POSSIBLE AND WITHIN 18" OF H-E HARDSCAPE. ALL QUICK COUPLER VALVES SHALL BE INSTALLED IN A 1 0" DIAM. GREEN PLASTIC VALVE BOX.

ALL VALVE BOX COVERS ARE TO BE LABELED WITH 1" HEAT BRANDED LETTERS: "Q.C." FOR QUICK COUPLERS, "G.V." FOR GATE VALVES AND I.V.C. AND STATION NO. FOR CONTROL VALVES.

CONTRACTOR SHALL INSTALL ANTI-DRAINAGE DEVICES FOR ALL LOW HEADS TO PREVENT LOW HEAD DRAINAGE AND POSSIBLE SOIL EROSION.

THE IRRIGATION CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF POSSIBLE ON-SITE INSPECTIONS.

THE CONTRACTOR SHALL PROVIDE TO THE OWNER'S REP AND/OR CITY REP., UPON THE COMPLETION OF THE JOB A SET OF REPRODUCIBLE AS-BUILT DRAWINGS, WHICH SHALL BE VERIFIED FOR ACCURACY AT THE TIME OF THE FINAL JOB WALK-THROUGH.

THE IRRIGATION SYSTEM SHALL BE FULLY GUARANTIED IN WRITING FOR A PERIOD OF (1) YEAR. ANY DEFECTIVE EQUIPMENT. MATERIALS OR POOR WORKMANSHIP SHALL BE REPLACED OR CORRECTED BY THE IRRIGATION CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

IRRIGATION LEGEND

POINT OF CONNECTION: CONTRACTOR TO TIE THESE (2) NEW VALVES INTO THE EXISTING EXPRESSWAY R.O.W. LANDSCAPE IRRIGATION SYSTEM AND EXTEND MAINLINE TO NEW VALVES AS INDICATED. LOCATE VALVES IN SHRUB AREA.

STATIC PRESSURE: 65 PSI DESIGN PRESSURE: 45 PSI MAXIMUM DEMAND: 3 GPM

X-- X-- X-- X-- X-- X ?rx-- X-- X--X --X --X --:

ill

82 ~ \_UTrees

Ill Ill

-------4i--. . . ~- Ill

~~* \_UTrees

< [ - E/T--E E/T-- --E/T--E/T~E;~~ T-~-T--T--T~

l ' [I! ... " 01 l : ~- V/~ , l ! , [l! l j • I , I

x--

X

I X

I

6) 1 "=8'

\ \

IRRIGATION PLAN SYMBOL MFG. MODEL NO. DESCRIPTION RAD. GPM. PSI DET. REF.

GPM JSTA:'\ PLANT~

-/ """

I \ \ /

'----- __./

RAIN BIRD 1401 FLOOD BUBBLER - 0.25 30 E

RAIN BIRD

HU~ITER

NIB CO

33NP

ICV1 00-R

T-580

3/4" QUICK COUPLING VALVE.

1" RECLAIMED WATER REMOTE CONTROL VALVE WITH HUNTER D-100 OR D-200 DECODER AS NECESSARY

LINE-SIZE BALL VALVE.

PVC SCH 40 FOR PIPES 1-1/2" AND SMALLER, PVC CLASS 315 FOR PIPES 2" AND LARGER. PRESSURE MAINLINE -18" DEEP.

PVC CLASS 200 NON-PRESSURE LATERAL LINE. 12" DEEP. SIZE NOTED.

PVC SCH 40 WIRE AND PIPE SLEEVES.

F

B

c

D

D

H

CALLOUT IRRIGATION LATERAL~~ ~ BUBBLERS, PLACE AT OPPOSITE SIDES

~ OF ROOTBALL 2 PER TREE TREE TRUNK ROOTBALL

NOTE: DISCONNECT THESE TWO EXISTING TREES FROM THE ONSITE POTABLE WATER SOURCE AND RECONNECT AS INDICATED TO THE RECLAIMED WATER SOURCE COMING FROM THE SOUTHBAY EXPRESSWAY ROW IRRIGATION SYSTEM.

Page 6 of 10

Shapton Landscape Architecture 31 Cascade- Irvine, CA 92604

714/955-9325 [email protected]

SEE SHEET L2 FOR IRRIGATION DETAILS & WATER CALCULATIONS

SEE SHEET L3 FOR PLANTING PLAN

ATTACHMENT 14

DCI PACIFIC AJE!C WORKS

ARCHITECTURE ] ENGINEERING J CONSULTING 32 EXECUTIVE PARK ] SUITE 1 I 0 I IRVINE I CA 92614

T 949 475.1000 I 949 475.1001 F

I

Sprint) Together with NEXTEL

310 COMMERCE, SUITE 250 IRVINE, CA 92602

PHONE: (714) 617-9342 FAX: (714) 368-3501

PROJECT IDENTIFICATION:

SOUTH BAY EXPRESSWAY SD73XC013C

1127 tJ\ MEDIA ROAD, SAN DIEGO, CA 92154

I CURRENT ISSUE DATE:

01/02/14

ISSUED FOR:

100% ZD

APPROVALS: APPROVED BY: DATE:

LANDLORD

LEASING

ZONING

RF

CM

II DRAWN BY:

JGD

I CHK: BOK

I APV: DKD

ISSUE STATUS: 6, DATE: DESCRIPTION:

--- 02/08/13 90% ZD JGD

--- 02/18/13 100% ZD JGO

--- 02/25/13 100% ZD: REV PER SANDAG JGD

--- 05/10/13 REVISED PER CYCLE #2 JGD

--- 08/05/13 REVISED PER NEW SURVEY JGD

--- 11/13/13 RELOCATE LEASE AREA JGD

--- 01/02/14 REV PER CYCLCE ISSUE 13 JGD

SHEET TITLE:

IRRIGATION PLAN

SHEET NUMBER: ISSUE LEVEL:

L1 SOU1H ll'\Y SD73XC1X

I

Page 53: REPORT TO THE HEARING OFFICER - San Diego

SECTION A: HYDROZONE INFORMATION TABLE Provide the Square Footage of Landscape Area per Hydrazone

Hydrazone Zone or Valve Irrigation Method Area (s.f.) % of Landscape Area

LW MW

82 83

B B

26 62 38

100

SECTION B: WATER BUDGET CALCULATIONS

SECTION 61: MAXIMUM APPLIED WATER ALLOWANCE (MAWA)

The project's Maximum Applied Water Allowance shall be calculated using this equation:

MAWA ~ ETa (0.62) [(0.7 X LA) + (0.3 X SLA]

MAWA ~ 46.5 (0.62) [(0.7 X 42) + (0.3 X 0)]

MAWA ~ (28.83) (29.4)

MAWA ~ 847 GALLONS PER YEAR

SECTION B2: ESTIMATED TOTAL WATER USE (ETWU)

The project's Estimated Total Water Use is calculated using the following formula:

ETWU ~ ETa (0.62) (PF X HA + SLA)

IE

ETWU ~ 46.5 (0.62) (0.2 X 26 + 0) 0.71

ETWU ~ (28.83) (7.32)

ETWU ~ 211 GALLONS PER YEAR (HYDROZONE 1)

ETWU ~ ETa (0.62) (PF X HA + SLA)

IE

ETWU ~ 46.5 (0.62) (0.6 X 16 + 0) 0.71

ETWU ~ (28.83) (13.52)

ETWU ~ 390 GALL8NS PER YEAR (HYDROZONE 2)

ETWU ~ 601 GALLONS PER YEAR (HYDROZONES 1 & 2)

K I WATER CALCULATIONS

F

G I

H I

18"

~-- 10" ROUND VALVE BOX / "Q.C." BRANDED ON LID

L FINISH GRADE

IIIII

QUICK COUPLING VALVE (INSTALL 2" ABOVE GRADE IN SHRUB AREAS). PURPLE COVER FOR RECLAIMED WATER SOURCE

ONE (I) C.F. 3/4" CRUSHED ROCK

P.V.C SCH. 80 RISER TWO (2) P.V.C. STREET ELLS

P.V.C Sch. 80 NIPPLE

CPV:'. TEE

1111

~ P.V.C. MAIN LINE

0]~ 'I

L_ ___ 2" X 4" BRICK / 2 PER VALVE BOX NOTE: INSTALL 6" FROM NEAREST ADJACENT PAVED AREA.

QUICK COUPLER

NOT USED

SLEEVING

I 0" ROUND PLASTIC VAciE BOX WITH LOCKABLE BOLT -DOWN LID WITH 'GV' CAST ON THE COVER PURPLE COVER

r_ 1/2" IN TURF, 2" IN GROUND COVER AREAS

FINISH GRADE

----4-r---rTT"--r\JU

I~W~ill*

,----- ADAPT TO MAIN LINE '"( ~ ~-.- ~: H :r---w---~~

:~:·~·:· :."lCH----- BALL VALVE PER LEGEND

MAIN LINE

c

c__ _____ 8" PEA GRAVEL

BALL VALVE

LINISH GRADE

1 1~~·.·.· ......... ··.<·~~ ~~ ·····~\Z«' ~.((< ····~0 "~ ... ~

Jr j <sc f'" t :,,

.""r'c'-'l'c-'----'"+ SPRINKLER LATERAL

.... . .... +----+"" .. ~. ~ MAIN SUPPLY LINE

CONTROL AND NEUTRAL CONDUCTORS TAPE & BUNDLE TO MAINLINE @ 20'0.C.

,)J

NOTE: CONTROL AND NEUT1AL CONDUCTORS SHALL BE INSTALLED WITH A MINIMUM OF 18" EARTH COVER

D TRENCHING

4"+/-

E I BUBBLER ON RISER

Page 7 of 10

A

B

NOT USED

NOTE: INSTAll PURPLE COLOR LIDS IN All AREAS

,------------ TAPE & BUNDLE CONTROL WIRE @ 20' 0/C (TYP.)

,------------ "SNAP liTE" CONNECTORS & EXPANSION COILS, 15 WRAPS AROUND 1/2" PIPE (TYP.)

,--------- ADAPT TO LATERAL LINE ,-------- REMOTE CONTROL VALVE (PER LEGEND)

l!i~fl.~=i=l==f~~fl~~ I.D. TAGS INCLUDING RECLAIMED WATER TAG

'11@1 : ~ 111:1Jr=- FINISH GRADE

'ffiifrf': '-......, :.jlllii~[E' Ill! 1/2" IN TURF, 2" IN GROUND COVER

LOCKABLE, COLOR- PURPLE COVER (OR EQUAL) e kRECT. PLASTIC VALVE BOX WITH HINGED

I~. ~~~~ IIIII BRAND STATION I.D. ON LID I IJ :::- ....... ·.·· .·~· PVC Ell I a'l11!f> · • ••. •··· > · ... ·. i"'l J REDWOOD FRAME

PEA GRAVEL

, TO CONTROLLER

I

~~CONTROL WIRE (TYP.)

"G ---1~ I" PVC SCH 80 NIPPLE

~I ---LJ--LJ---" ~t~I~X~~N~X~~H TEE OR Ell

L. ----------- CONTROL WIRE TO OTHER VALVES c__ ___________ COMMON WIRE TO OTHER VALVES

I NOTE: CONNECT DECODER D-100 TO VALVE #82 AND DECODER D-200 TO VALVES #83 AND 84 I

REMOTE CONTROL VALVE

D~G~~~Mlr 1~\~1')~1 BEFORE DAYS BEFORE

YOU DIG YOU DIG TOLL FREE A pUBLIC SEVIC£ BY 1 800 227-2600

UNDERGROUND SERVICE ALERT

~j ~OF --w: '!::7 ~

Shapton Landscape Architecture 31 Cascade - Irvine, CA 92604

714/955-9325 [email protected]

SEE SHEET L 1 FOR IRRIGATION PLAN SEE SHEET L3 FOR PLANTING PLAN I

ATTACHMENT 14

DCI PACIFIC A!ElC WORKS

ARCHITECTURE [ENGINEERING [CONSULTING 32 EXECUTIVE PARK I SUITE 110 ]IRVINE I CA 92614

T 949475.1000 ]949475.1001 F

I I

Sprint) Together with NEXTEL

310 COMMERCE, SUITE 250 IRVINE, CA 92602

PHONE: (714) 617-9342 FAX: (714) 368-3501

PROJECT IOEN11FICATION:

SOUTH BAY EXPRESSWAY SD73XC013C

1127 lA MEDIA ROAD, SAN DIEGO, CA 92154

I CURRENT ISSUE DATE<

01/02/14

ISSUED FOR:

100% ZD

APPROVALS: APPROVED BY: INITIALS: DATE:

LANDLORD

LEASING

ZONING

RF

CM

Page 54: REPORT TO THE HEARING OFFICER - San Diego

PLANTING NOTES SOIL TEST

AFTER SOIL HAS BEEN SET IN PLACE & PRIOR TO ANY SOIL PREPARATION, THE CONTRACTOR SHALL FURNISH SOIL TESTS OF THE SITE FOR AGRICULTURAL FERTILITY AND TO DETERMINE PROPER SOIL AMMENDMENTS. TEST ARE TO BE PERFORMED BY A MEMBER OF THE CALIFORNIA ASSOCIATION OF AGRICULTURAL LABORITORIES WITH COPIES SENT TO THE OWNER & LANDSCAPE ARCHITECT, PRIOR TO INSTALLATION.

SOIL PREPARATION

THE FOLLOWING IS PROVIDED FOR BID PURPOSES ONLY AND SHALL BE MODIFIED AS NECESSARY GIVEN THE RESULTS OF THE SCILS TEST. THE CONTRACTOR SHALL BE PREPARED TO PROVIDE DELIVERY SLIPS AND EMPTY FERTILIZER BAGS ON SITE FOR VERIFICATION OF MATERIAL.

1. BACKFILL MIX FOR USE OF PLANTING ALL TREES:

6 PARTS BY VOLUME ON SITE SOIL. 4 PARTS BY VOLUME ORGANIC AMMENDMENT. 1 LB. 12-12-12 COMMERCIAL FERTILIZER PER CUBIC YARD. 1 LB. IRON SULFATE PER CU. YD. OF MIX.

2. PLANT TABLET FOR ALL TREES:

1-21 GRAM AGRIFORM FERTILIZER PER 1/2" TREE CALIPER FOR ALL BOX SIZED TREE NEXT TO ROOT BALL

TOP DRESSING

ALL SHRUBS AND GROUNDCOVER AREAS ARE TO BE TOP DRESSED WITH 2" THICK LAYER OF SHREDDED TREE BARK

CITY OF SAN DIEGO STANDARD LANDCAPE NOTES: 1. ALL REQUIRED LANDSCAPE SHALL BE MAINTAINED IN A DISEASE, WEED, AND LITTER FREE CONDITION AT

ALL TIMES. SEVERE PRUNING OR 'lOPPING" OF TREES IS NOT PERMITTED UNLESS SPECIFICALLY NOTED IN THIS PERMIT. THE TREES SHALL BE MAINTAINED IN A SAFE MANNER TO ALLOW EACH TREE TO GROW TO ITS MATURE HEIGHT AND SPREAD.

2. IF ANY REQUIRED LANDSCAPE (INCLUDING EXISTING OR NEW PLANTINGS, HARDSCAPE, LANDSCAPE FEATURES, ETC.) INDICATED ON THE APPROVED CONSTRUCTION DOCUMENT PLANS IS DAMAGED OR REMOVED DURING DEMOLITION OR CONSTRUCTION, IT SHALL BE REPAIRED AND/OR REPLACED IN KIND AND EQUIVALENT SIZE PER THE APPROVED DOCUMENTS TO THE SATISFACTION OF THE DEVELOPMENT SERVICES DEPARTMENT WITHIN 30 DAYS OF DAMAGE OR A FINAL LANDSCAPE INSPECTION.

3. ANY REQUIRED PLANTING THAT DIES WITHIN 3 YEARS OF INSTALLATION SHALL BE REPLACED WITHIN 30 CALENDAR DAYS OF PLANT DEATH WITH THE SAME SIZE AND SPECIES OF PLANT MATERIAL SHOWN ON THE APPROVED PLAN.

4. REQUIRED SHRUBS OR TREES THAT DIE 3 YEARS OR MORE AFTER INSTALLATION SHALL BE REPLACED WITH 15-GALLON SIZE OR 60-INCH BOX SIZE/15 FOOT BTH MATERIAL, RESPECTIVELY. DEVELOPMENT SERVICES MAY AUTHORIZE ADJUSTMENT OF THE SIZE AND QUANITTIY OF REPLACEMENT MATERIAL.

LEGEND: 1. 'V.I.T. Cinch Tie" Tree Tie (4) required. Secure to

stake per manufacturer's recommendation. Place below branching yoke of tree

2. Lodgepole pine stokes; copper napthenate impregnated. 2-1/2" diam. x 12' for 36" box and smaller

3. Set top of rootball 2" above finish wade. Install 1" deep layer of decomposed granite. Hold 2 back from trunk.

4. 3" high water basin. Remove once plant is established. 5. Fertilizer tablets 6. Amended backfill mix 7. Soil mantle - compacted backfill to adjust crown

height, roughen surface

DETAIL

I X

I

I X

I

PLANTING PLAN

PLANT MATERIAL LEGEND SYMBOL CODE QTY BOTANICAL NAME COMMON NAME

(~-\ TREES

I I ;.._,/

I '-

(~: EXISTING PODOCARPOS TREE TO REMAIN

EXISTING PODOCARPOS TREE TO BE RELOCATED

5 EUCALYPTUS SILVER DOLLAR POLYANTHEMOS GUM

SIZING LEGEND ~

24, BOX Lj\- PLANT QUANTITY

~ 'CEJ._ PLANT SPECIES

Page 8 of 10

MATURE HGT CONTAINER PLANT & SPRD SIZE SPACING

40'-60' X 35'-40'

24" BOX AS SHOWN

PLNTG DETAIL

P1

FACTOR WUCOLS REGION

3 REMARKS

PROTECT IN PLACE

01 X

l]! I

1'' 8'

SEE ARCHITECT'S DRAWING, SHEET A 1

10'-12' TALL X 4'-5' SPRD AT TIME OF PLANTING SEE PLANTING NOTES & DETAIL ON SHEET L4

Shapton Landscape Architecture 714/955-9325

[email protected]

SEE SHEET L-1 FOR IRRIGATION PLAN

SEE SHEET L-2 FOR IRRIGATION DETAILS & WATER CALCULATIONS

ATTACHMENT 14

DCI PACIFIC A!E!C WORKS

ARCHITECTURE] ENGINEERING] CONSULTING 32 EXECUTIVE PARK I SUITE 110 ]IRVINE [ CA 92614

T 949475.1000 I 949475.1001 F

Sprint) Together with NEXTEL

310 COMMERCE, SUITE 250 IRVINE, CA 92602

PHONE' (714) 617-9342 FAX' {714) 368-3501

PROJECT IDENTIFICATION:

SOUTH BAY EXPRESSWAY SD73XC013C

1127 LA MEDIA ROAD, SAN DIEGO, CA 92154

CURRENT ISSUE DATE'

01/02/14

ISSUED FOR: -

100% ZD

APPROVALS: APPROVED BY: INITIALS:

LANDLORD

LEASING

ZONING

RF

CM

DRAWN BY'

JGD

ISSUE STATUS: 6 DATE: DESCRIPTION:

02/08/13 90% ZD

02/18/13 100% ZD

DATE:

I APV DKD

BY:

JGD

JGD

02/25/13 100% ZD: REV PER SANDAG JGD

05/10/13 REVISED PER CYCLE #2 JGD

OB/05/13 REVISED PER NEW SURVEY JGD

11/13/13 RELOCATE LEASE AREA JGD

01/02/14 REV PER CYCLCE ISSUE 13 JGD

SHEET TITLE:

PLANTING PLAN

SHEET NUMBER: ISSUE LEVEL:

L3 9J.Jili B\Y ffi73XC13C

Page 55: REPORT TO THE HEARING OFFICER - San Diego

SEE ITEM 15 OF PTR

Yl SEE ITEM f9 OF PTR

STREET APN' 646-070-50-00

S 50"32'+5• E 13.66'

S 20"47'37• E 4S.45'

\

ltk-~ ks~

I~SEE ITEM lfl _J ~ OF PTR S 7754'19• W CIJ

I 13.20'\

n-_ ~~ w _ _ ----..J-=:::-- N oo-oo'oo• w 223.55' --- T-~ - -

s JT54'2a• w 36.67'

SAN DIEGO ASSOCIATION OF GOVERNMENTS

APN' 848-070-54-00

11"5;!'

I I I I I I I I I I I I I I I I I I I I I I I

SEEilEM/Ifl~~ OF PTR

I

<{

i5 w ::;; <{ _j

.~ I ~:~:: D75"4B'oa•

z - - - 1 ~2%~,·43· w

I I I

i:~ :: . I ~---~~~·~oF!"' LJI ----------~ ~ -- '"N";Os·17· w ~-- ---------- ----- ----- --::::-:::J-------------------------1

II SEE ITEM H18 --

II OF PTR

II II

THAT PORTION OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 26, TOWNSHIP 18 SOUTH, RANGE 1 WEST, SAN BERNARDINO MERIDIAN, IN THE CITY OF SAN DIEGO, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, AS CONVEYED TO THE STATE OF CALIFORNIA BY FINAL ORDER OF CONOEMNA TION AND RECORDED IN THE OFFICE OF THE COUNTY RECORDER ON OCTOBER 15, 2007 AS INSTRUMENT NO. 2007-0661209 OF OFFICIAL RECORDS, L 'r1NG SOUTHWESTERLY OF THE WESTERLY RIGHT OF WAY LINE OF CALIFORNIA STATE HIGHWAY 11-SD125, AS SHOWN ON RECORD OR SURVEY NUMBER 20626, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAID SAN DIEGO COUNTY ON NOVEMBER 20, 2009 AS INSTRUMENT NO. 2009-064967 OF OFFICIAL RECORDS.

PROPERTY LEGAL DESCRIPTION

TITLE REPORT NOTES'

THE FOLL01'.1NG EASEMENTS EFFECT SAID PARCEL AND ARE SHOWN HEREON. SEE PRELIMINARY TITLE REPORT N0.23014401 PREPARED BY FIDELITY NATIONAL TITLE COMPANY AND DATED JULY 18, 2013 FOR OTHER DOCUMENTS {NON-EASEMENTS) EFFECTING SAID PROPERTY.

ITEM #5 - Eosement(s) for the purpose(s) shown below and rights incidental thereto as granted in a document. Granted to: The County of Son Diego Purpose: Public road Recorded: August 22, 1896, Book 257, Page 8, of Deeds Affects: Road Survey No. 59 {EXACT LOCATION IS NOT DISCLOSED OF RECORD)

ITEM #6 - Easement(s) for the purpose(s) shown below and rights incidental thereto as granted in a document. Granted to: San Diego Gas and Electric Company Purpose: Public utilities Recorded: August 3, 1954, Book 5230, Page 413, of Official Records {AS SHOWN HEREON)

ITEM #7 - Easement(s) for the purpose(s) shown below and document. rights incidental thereto as granted in a Granted to: Purpose: Recorded: The City of San Diego Drainage facilities June 29, 1989, Instrument No. 89-344863, of Official Records {DOES NOT APPEAR TO EFFECT LEASE AREA)

ITEM #B - Easement(s) for the purpose(s) shown below and rights incidental thereto as granted in a document. Granted to: City of San Diego, a municipal corporation Purpose: Earth embankment slopes, together with the right to construct and maintain such slopes end embankments and facilities incidental thereto Recorded: April 20, 2001, Instrument No. 2001-0245237, of Official Records {AS SHOWN HEREON)

PRELIMINARY TITLE NOTES:

STREET APN: 646-070-39-00

OVERALL SITE PLAN 60

ITEM #9 - An irrevocable offer to dedicate an easement over a portion of said land for permanent easement and right of way for street and highway purposes. Recorded: April 20, 2001, Instrument No. 2001-0245250, of Official Records Sold offer was accepted by resolution, a certified copy of which was recorded September 28, 2007, Instrument No. 2007-0632860, of Official Records. (AS SHOWN hEREON)

ITEM #11 - The ownership of said land does not include rights of access to or from the street, highway, or freeway abutting said land, such rights having been relinquished by the document, Recording Dote: October 15, 2007 Receding No: 2007-0661209, Official Records {AS SHOWN HEREON)

ITEM #18 - Easement(s) for the purpose(s) shown below and rights incidental thereto, as granted in a document: Granted to: Linda D. Cone & Joe C. Street Purpose: Sewer and water purposes Recording Date: August 16, 2011 Recording No: 2011-0420162, Official Records {AS SHOWN HEREON)

ITEM #1 9 - Easement(s) for the purpose(s) shown below and rights incidental thereto as reserved in a document; Reserved by: State of California, its successors or assigns Purpose: Reasonable ingress and egress purposes across said land in order to Access the Westerly Access controlled Right of way for State Highway 11-50-125 from La Media Road Recording Date: September 20, 2011 Recording No: 2011-0487204, Offfcial Records {NO DOCUMENT PROV1DED)

END OF EASEMENTS

OWNER'S NAME: SAN DIEGO ASSOCIATION OF GOVERNMENTS

ASSESSOR'S PARCEL NUMBER(S) 646-070-54-00

BASIS OF BEARINGS: THE BEARINGS SHOWN HEREON ARE BASED CALIFORNIA STATE PLANE COORDINATE SYSTEM - ZONE 6. AS DETERMINED BY G.P.S. OBSERVATIONS, USING TRIMBLE 5700/5800 RECEIVERS AND TRIMBLE GEODETIC OFFICE 1.60 SOFTWARE.

BASIS OF ELEVATIONS: NAVD 1929 ELEVATIONS ARE BASED ON THE CITY OF SAN DIEGO DATUM. BENCHMARK NO. 14802. LOCATED C/L CONTROL MONUMENT OF OTAY MESA ROAD AND LA MEDIA ROAD. ELEVATION ~ 488.317',

SITE DATA FEMA fLOOD ZONE DESIGNATION: National Flood Insurance Program:

County: Son Diego Effective Date: 5/16/2012

Map/Panel: 06073C2179G The Flood Zone Designation for this site is: ZONE' x

FEMA FLOOD ZONE INFORMATION

Page 9 of 10

8ROWN FIELD MUNICIPAL AIRPORT

Otay Mesa Rd

VICINITY MAP

LEGEND

SITE Lonestar Rd

125

SAN D!EGO

I SCALE:

I N.T.S.

LEGEND These standard symbols will be found In the drawing.

Ill ELECTRICAL BOX ., HANDICAP PARKING ~ LIGHT POLE ):1 LIGHT GROUND

Q--o LIGHT POLE W/ ARM I SIGN ~ PANEL ANTENNA 0 TREE DECIDUOUS • TREE PALM II WATER VALVE .. PROPOSED SECTORS

~- EDGE OF ROCKS

BC BOTTOM OF CURB EC EDGE OF CONCRETE ELCB ELECTRICAL CABINET ELTR ELECTRICAL TRANSFORMER EOR EDGE OF ROCK LANDSCAPING FNCP FENCE TOP LIP LIP OF GUTTER LP LIGHT POLE TOP NG GROUND SPOT ELEVATION PS PAINT STRIPING RTOP ROOF TOP sw SIDEWALK TC TOP OF CURB TRTP2 TREE TOP PALM TW WALL TOP

------ BOUNDARY LINE ------- CENTERLINE

MISC. PROPERTY LINE

--------- MISC. TIE LINE

RIGHT-OF-WAY LINE

----- EASEMENT LINE ---X --- FENCE LINE

1) This is not a boundary survey. This is a specialized topographic map. The property lines and easements shown hereon ore from record information as noted hereon. Floyd Surveying translated the topographic survey to record information u:sing the two found monuments shown hereon. No title research was performed by Floyd Survey'1ng.

2) Any changes mode to the information on this plan, without the written consent of Floyd Surveying relieves Floyd Surveying of any and all liability.

3) These drawings & specifications are the property & copyright of Floyd Surveying & shall not be used on any other work except by agreement with the Surveyor. Written dimensions shall take preference over scaled & shall be verified on the job site. Any discrepancy sha!l be brought to the notice of the Surveyor prior to commencement of any work.

4) Field survey completed on JUNE 25, 2013.

GENERAL NOTES

ATTACHMENT 14

DCI PACIFIC A IEIC WORKS

ARCHITECTURE· ENGINEERING· CONSULTING 32 EXECUTIVE PARK, SUITE 110, IRVINE, CA 92614

PHONE: (949) 475·1000 FAX: (949) 475-1001

~UCENSURE' ARCHITECT,_

i= UCENSURE'

~CONSULTANT

FLOYD SURVEYING

2621 GREEN RIVER RD. STE 105--202

CORONA, CA 92882 CELL: {949) 200-0626

EMAIL: fsiOfloyd:~urveylng.com

CONSULTANT'

Sprint), Together with NEXTEL

31 0 COMMERCE, SUITE 250 IRV1NE, CA 926D2

PHONE' (714) 617-9342 FAX' {714) 368-3501

PROJECT IDENTIFICATION:

SOUTH BAY EXPRESSWAY SD73XC013C

1127 LA MEDIA ROAD SAN DIEGO, CA 921S4

,-ISSUE' DATE: DESCRIPTION' gy, -

6/28/13 ZONING DRAWING

8/02/13 TITLE REVIEW

11/05/13 REV1SED 1TT1.E REV1EW

':=oSA STAMP'

FrDRAWN BY'

~ OAF

SHEET TITLE'

CHK.'

OAF

OAF

DAF

OAF

SITE SURVEY GENERAL INFORMATION

LS1 II

Page 56: REPORT TO THE HEARING OFFICER - San Diego

STREET APN: 646-070-50-00

+

I +

I +

I +

I +

I +

I +

I +

I +

I +

I +

I +

I +

V~ 1N311\JH8V.llV

I +

I +

I +

I

I +

I +

I +

FNCP

I +

STATE OF CALIFORNIA NO APN NUMBER

' '

>

'"' 518.60

PROPOSED SECTORS LA T: 32'34'39.54" LON:116'57'35.70"

EL TR-D197240 519.35

ELCB2 526.50 /

+

RTDP 554,06

DETAIL SITE PLAN

RIGHT-OF-WAY ACCESS RIGHTS REUNGUEST PER ITEM #11 OF PlR

10

LEGEND These standard symbols will be found in the drawing.

BC

o--o t

EC ELCB ELTR EOR FNCP LIP LP NG PS RTOP sw TC TRTPZ TW

ELECTRICAL BOX HANDICAP PARKING LIGHT POLE LIGHT GROUND LIGHT POLE W/ARM SIGN PANEL ANTENNA TREE DECIDUOUS TREE PALM WATER VALVE PROPOSED SECTORS EDGE OF ROCKS

BOTTOM OF CURB EDGE OF CONCRETE ELECTRICAL CABINET ELECTRICAL TRANSFORMER ~~~6E 0.f0~0CK LANDSCAPING

LIP OF GUTTER LIGHT POLE TOP

~:~~¥N~T~~~TG ELEVATION

ROOF TOP SIDEWALK TOP OF CURB TREE TOP PALM WALL TOP

BOUNDARY LINE

CENTERLINE

MISC. PROPERTY LINE

MISC. TIE LINE

RIGHT-OF-WAY LINE

EASEMENT LINE --- X --- FENCE LINE

LEGEND

1) This is not a boundary su , . }he property lines and easeme~i· h ThiS hs a specialized topographic map mformation as noted hereon Fl s own ereon are from record · ~urv~y to record information' usin~dth;u~eg'i~g translated the topographic

o btle research was performed by Floyd Su~;y~n;.10numents shown hereon.

2) Any changes made to the 'nf , consent of Floyd Surveying relie~e~r~~t~n Son t~is plan, without the written y urveymg of any and a!! liability.

3) Th~se drawings & specifications or h S~rveymg & shall not be used on e t e property & copyright of Flo d With the Surveyor. Written dimens' any other work except by agreemenf sho.ll be verified on the job site 10~5 5~~ 11 take preference over scaled & nobce of the Surveyor prior to ~om~en~:~:~f"~f ;~;Jlw~~k. brought to the

4) Field survey completed on JUNE 25, 2013.

GENERAL NOTES

DCI PACIFIC A I Ei C WORKS

ARCHITECTURE. ENGINEERING. CONSULTING 32 ~X~CUTIVE PARK, SUITE 110, IRVINE CA 92614

H NE: (949) 475·1000 FAX: (949) 475·1001

LICENSURE:

LICENSURE:

CONSULTANT

Sprint> Together with NEXTEL

310 COMMERCE, SUITE 250 IRVINE, CA 92602

PHONE: (714) 617-934Z FAX: (714) 368-3501

PROJECT IDENTIFICATION:

SOUTH BAY EXPRESSWAY SD73XC013C

1127 LA MEDIA ROAD SAN DIEGO, CA 92154

ISSUE:-DATE: ---DESCRIPTION:----- BY:

0 6/28/13 ZONING DRAWING OAF

8/ 02/13 TITLE REVIEW OAF

11/05/13 ·REVISED TITLE REVIEW OAF

DSA STAMP:

GENERAL INFORMATION