reporting matter anm 17 offshore man-made structure

15
Reporting Matter ANM 17 Offshore Man-Made Structure

Upload: cherie

Post on 28-Jan-2016

20 views

Category:

Documents


0 download

DESCRIPTION

Reporting Matter ANM 17 Offshore Man-Made Structure. Topic Overview. Short overview about the international development of OREI Other than Winfarms Ofshore Windfarms Raising Questions in Marking of OWF Marking (AIS, RACON, Lights, Numbering) Distance to shipping routes and TSS - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Reporting Matter ANM 17 Offshore Man-Made Structure

Reporting Matter ANM 17

Offshore Man-Made Structure

Page 2: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S2

Topic Overview

Short overview about the international development of OREI

Other than Winfarms

Ofshore Windfarms

Raising Questions in Marking of OWF

Marking (AIS, RACON, Lights, Numbering)

Distance to shipping routes and TSS

Simulations

Spatial Planning in connection with OREI:

Requirements & Process,

Invetigation & Simulations

Page 3: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S3

OREI, other than Windfarms

Datas from: http://en.wikipedia.org/wiki/List_of_offshore_wind_farms

Page 4: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S4

Top 10 largest OWF currently operable

Datas from: http://en.wikipedia.org/wiki/List_of_offshore_wind_farms

Page 5: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S5

TOP 10 OWFs under Construction

Datas from: http://en.wikipedia.org/wiki/List_of_offshore_wind_farms

Page 6: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S6

Proposed OWF

Datas from: http://en.wikipedia.org/wiki/List_of_offshore_wind_farms

Page 7: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S7

Raising Questions for Markig of OWF

The b.m. bullet points are derivated from the memberstate reports 2009 and 2010 and reflects the discussions

with stakeholders and marine experts. The sequence means no ranking.

Requirement of fog signals,

Use of AIS,

Horizontal angel of lights,

Lighting of inner structures,

Unified numerical marking of structures for search and rescue reasons,

Use of inverse illumination for short range marking,

Use of RACON,

Synchronisation and harmonisation of all signal- and warning lights

Use of simulations for different marking modells

Page 8: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S8

Simulation of OWF Marking

OWF BARD 1 (different examples)

Page 9: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S9

Total Night-View BARD 1 (5 miles off/ 200 m hight)

Page 10: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S10

Projects in Southern Baltic Sea

Latvija/ Irben Strait

Page 11: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S11

Projects in European Waters (North Sea/ IS)

Page 12: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S12

Needs for Spatial Planning

Resolve the conflict between the different users of the sea and the marine traffic.

• Traffic

• Marine Environment

• Pipes and Cable

• Mining, Oil and Gas

• Different OREI

Increasing number and Importance

Page 13: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S13

Simplyfied Spacial Planning Process

1. Investigation of ships traffic and routes as basis for the planning process

3. Establish of priority areas

2. Resume of the different requirements

Page 14: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S14

To Considder during the Spatial Planning Process from the mariner‘s view

Indentify a safe distance to TSS and major shipping routes.

Identifying and committing of major shipping routes.

Modifying of existing Routeing Measures (TSS) and establishing of new TSS in conjunction with OWF to improve the safety of navigation.

Investigate and considder safe navigational space between OWF (simulation).

Investigate the risk of collision and pollution.

Investigation of existing and proposed traffic in the area.

Investigation of new conflict points (corners, crossing routes, increase of traffic density.

Infestigation of different measures to improve the safety of navigation.

Page 15: Reporting Matter ANM 17 Offshore Man-Made Structure

Raven Kurtz17.10.2011 S15

Thank you for your Attention!

Captain Raven Kurtz

Waterways and Shippingdirectorate North

Kiel