response to the restrictions imposed on the integrated … · 2019-04-26 · integrated vaal river...
TRANSCRIPT
RESPONSE TO THE RESTRICTIONS
IMPOSED ON THE INTEGRATED VAAL
RIVER SYSTEM
PRESENTATION FOR EKURHULENI METROPOLITAN MUNICIPALITY:
STAKEHOLDER SESSION HELD AT KEMPTON PARK CIVIC CENTRE
BY: SHUNTELLE GOW AND LONDANI LITHOLE
DATE: 22 AND 23 NOVEMBER 2016
INTRODUCTION
• Rand Water abstracts virtually all of its raw water from the
Integrated Vaal River System (IVRS)
• Supplies bulk potable water to Gauteng, parts of Mpumalanga,
North West and Free State
• 15% curtailments on urban water use – potable water produced
for domestic and non-domestic use
• Rand Water has committed to an on average 650 Mℓ/d
reduction, which will limit the potable water production to 3683
Mℓ/d.
• Rand Water and its clients has to implement water restrictions
for the short term as well as for the medium-term until end of
2024 when the next phase of the Lesotho Highlands Water
Project
IMPLEMENTATION
Received Gazette Notice- Agreed on
reduction targets with DWS
Notified customers on approach – restriction of
bulk meters
Commencement –
5 September 2016
Municipalities provided list of meters with %
restrictions
Bulk meters restricted by Rand Water
Meter readings taken by Rand Water on weekly
basis
Revised approach in October 2016
Provide municipalities with supply quotas
Municipalities to provide list of bulk meters to be
restricted to remain within quota volumes
Bulk meters are restricted by RW,
municipalities to manage and allocate available water to the end-users
MONITORING OF PROGRESS
• Weekly progress meeting was establishedo DWS
o Rand Water
o Municipalities
• Aspects monitored weekly:o Levels of Dams (National and IVRS)
o Volumes abstracted from the IVRS focusing on the abstraction
by Rand Water for potable water production
o Supply volumes to municipalities and progress on the reduction
targets
o Report back by municipalities on water supply challenges or
relevant issues
o Communication campaigns
o Water quality issues
o Water demand management initiatives
• Report to Provincial Water Management JOC Meeting,
held weekly
PROGRESS– VOLUMES ABSTRACTED
0.00
200.00
400.00
600.00
800.00
1000.00
1200.00
1400.00
1600.00
1800.00
Cu
mm
ula
tiv
e w
ate
r re
qu
irem
en
ts i
n m
illio
n c
ub
ic m
ete
rs
Abstraction by Rand Water for potable water production
Projected Requirement 2016 (Grossrequirement)
Restricted Requirement 2016: 15%
Actual abstraction
Projected Requirement 2016 (Gross requirement)
126.39Restricted Requirement
2016: 15%
129.15
0.00
20.00
40.00
60.00
80.00
100.00
120.00
140.00
160.00
Millio
n c
ub
ic m
ete
rs/m
on
th
Abstraction by Rand Water for potable water production
Projected Requirement 2016 (Gross requirement) Restricted Requirement 2016: 15% Actual abstraction
PROGRESS– VOLUMES ABSTRACTED
PROGRESS– OVERALL WEEKLY METER
CONSUMPTION
KL/day KL/day
KL/day 8.0%
KL/day 12.3%
KL/day 12.2%
KL/day 12.5%
KL/day 15.0%
KL/day KL/day
24-Oct-16 4 232 25524-Oct-16 reduced
reduced
reduced
4 100 219
OVERALL WEEKLY METER CONSUMPTION
4 437 238 17-Oct-16
5-Sep-16 4 823 787 target at -15%
reduced
723 568reduced 725 100 15% Required
31-Oct-16 4 236 878 31-Oct-16 reduced
14-Nov-16 4 098 687 14-Nov-16
7-Nov-16 4 221 571 7-Nov-16
17-Oct-16
PROGRESS– EKURHULENI MM
KL/day KL/day
KL/day 4.7%
KL/day 7.3%
KL/day 5.1%
KL/day 7.9%
KL/day 11.4%
KL/day KL/day
24-Oct-16 919 186
target at -15% 842 618
17-Oct-16
5-Sep-16 991 316
17-Oct-16 945 212
EKURHULENI METROPOLITAN MUNICIPALITY
148 697
31-Oct-16 940 597
7-Nov-16 912 777
14-Nov-16 878 175
reduced 113 141 15% Required
7-Nov-16 reduced
14-Nov-16 reduced
reduced
24-Oct-16 reduced
31-Oct-16 reduced
CHALLENGES
• Communication between Rand Water and Municipalities is crucial
- Special meetings are called to address issues as an when it occurs
• Additional staffing requirement (e.g. restricting and reading of meters)
• Stability of municipal systems are affected when reliant on Rand Water
supply pressures
• Fair and equitable allocation of limited/available water to the end-
consumer
• Consumption by end-consumers does not change despite restriction
interventions (physical restrictions, penalties, demand levies)
- For EMM it is particularly the business consumers
• Demand on systems exceed the available supply volumes = water supply
interruptions
11
ADDITIONAL SUPPORT TO MUNICIPALITIES
Potential savings per bulk meter DMAs to achieve 15% reduction
• Identification of priority areas
• Greatest potential for savings
• Design of appropriate interventions
• Monitor and evaluate effectiveness of programmes
© SAP 2008 / Page 12
ASSESSMENT OF DEMAND
RA
ND
WA
TE
R D
IRE
CT
ME
TE
RS
LO
GG
ED
:
SY
ST
EM
IN
PU
T V
OLU
ME
4
10
Ml/
d
AC
TIV
E U
SE
12
3 M
l/d
30
% o
f S
IV
Active use 123 Ml/d
MIN
IMU
M N
IGH
T F
LO
WS
28
7 M
l/d
7
0%
of
SIV
Normal legitimate night use - 4.7Ml/d
or 2% of MNF
Normal Residential night use - 3.2 Ml/d or 1% of MNF
Nig
ht
co
nsu
mp
tio
n -
10
.7 M
l/d
or
4%
of
MN
F Legitimate non-residential night use - 1.5 Ml/d
or 0.5% of MNF
Background leakage (unavoidable) -
6Ml/d or 2% of MNF
domestic background leakage - 1.3 Ml/d or 0.45% of MNF
Background leakage on mains - 0.8 Ml/d or 0.3% of MNF
Background leakage on connections - 3.9 Ml/d or 1.4% of MNF
Night leakage (bursts and losses) - 276.3 Ml/d or 96%
of MNF
Customer night leakage - estimated at 196.4 Ml/d or 68.43% of MNF
Nig
ht
lea
ka
ge
or
loss
es
- 2
76
.3 o
r
96
%
of
MN
F
Distribution system night leakage- 79.90 Ml/d or 27.83% of MNF
80-90%40% of total MNF
70-80%32% of total MNF
(TMNF)
60-70%12% of total MNF
Minimum Night flow analysis for end-consumer patterns
IMPLICATIONS
• The implications for failure to meet restriction targets:
o Non-compliance to the gazette notice issued on 12 August 2016
o Available water/supply quotas being exceeded
o Increase in planned and unplanned water supply interruptions
o Excessive demand on the Vaal River System, beyond its yield
o Effects of drought exacerbated
o Decision by System Operating Forum at next meeting in May 2017-
impose stricter restriction measures – (level 1,2 and 3 restrictions;
next level requires curtailments of 30%)
WAY FORWARD
• Have a holistic approach
o Optimise operations – improved response to bursts and leaks,
pressure management philosophy, integration of capital projects and
budget allocations, etc.
o Implement key initiatives – water shedding schedule, water efficient
devices and/or restrictors, focus on end consumer properties with
high minimum night flows, penalties, spot fines and enforcement, etc.
o Water demand management programme critical for sustained
achievement of reduction targets- identifying and prioritising
appropriate interventions
o Improved efficiency in water use by top ICI consumers (at least top
100) – Compliant industries to share best practices
o Targeted communications and awareness campaigns