resumen contratos

32
CÓDIGO NÚMERO TIIPO DE CONTRATO SUBCON- DE TRATISTA SUBCONTRATO 21000881 0001 CC Global 21001076 0002 CC Global 24000000 0003 CC Global 21001183 0004 CC Global 21001214 14000160-OK-2014-003 Global 21001213 14000160-OK-2014-004 Global 21000771 14000160-OK-2014-007 Precios Unitarios 14000160-OK-2014-008 Precios Unitarios 14000160-OK-2014-009 Precios Unitarios 14000160-OK-2014-010 Global TOTALES

Upload: carlos

Post on 02-Feb-2016

230 views

Category:

Documents


0 download

DESCRIPTION

Cuadros para control de Contratos

TRANSCRIPT

Page 1: Resumen Contratos

CÓDIGO NÚMERO

TIIPO DE CONTRATOSUBCON- DE

TRATISTA SUBCONTRATO

21000881 0001 CC Global

21001076 0002 CC Global

24000000 0003 CC Global Carlos Mendoza Forrero

21001183 0004 CC Global

21001214 14000160-OK-2014-003 Global Hugo Carvajal Triana

21001213 14000160-OK-2014-004 Global UVU S.A.S.

21000771 14000160-OK-2014-007 Precios Unitarios

14000160-OK-2014-008 Precios Unitarios

14000160-OK-2014-009 Precios Unitarios

14000160-OK-2014-010 Global

TOTALES

NOMBRE SUBCONTRATISTA

Power & Automation Services S.A.S

Building Tecnholoogy Consultant SAS

Carlos Eduardo Rodriguez

Contecon Urbar Ingenieros ConsultoresCARLOS AUGUSTO PINTO

JOSE MANUEL RINCON SILVA

RA EMPRESA DE SERVICIOS PUBLICOS S.A.

Page 2: Resumen Contratos

VR CONTRATO VR MODIFICACION

$ 127,200,000.00

$ 11,600,000.00

$ 22,000,000.00

Especialista en Geotecnia $ 55,680,000.00

Ficha Forestales $ 8,762,500.00 Plan de Manejo de Trafico $ 10,000,000.00

$ 516,615,000.00

Control y Manejo de Fauna $ 24,799,999.00

$ 32,463,688.00

$ 22,000,000.00

TOTALES $ 831,121,187.00

DESCRIPCIÓN GENERAL DEL SUBCONTRATO

Interventor Externo en instalaciones Electricas, voz y datos, etc.

Revision Diseño Ventilacion Mecanica

Revision de Diseños y Planos Estructurales

Servicio de Laboratorio Control de Materiales

Obras Preliminares Planta de Concreto e Instalaciones del Laboratorio

Estudio Hidrologico e Hidrogeologico

Page 3: Resumen Contratos

AVANCE DE OBRA

% TOTAL PERIODO

AVANCE DE OBRA AVANCES DE OBRA Oct-15

41.67% $ 53,000,000.00

100.00% $ 11,600,000.00

36.36% $ 8,000,000.00

45.83% $ 25,520,000.00 $ 4,640,000.00

0.00% $ - 0.00% $ -

0.00% $ -

0.00% $ -

0.00% $ -

0.00% $ -

$ 98,120,000.00 $ 4,640,000.00

Page 4: Resumen Contratos

AVANCE DE OBRA

PERIODO PERIODO PERIODO

Sep-15 Aug-15 Jul-15

$ 10,600,000.00 $ 10,600,000.00 $ 10,600,000.00

$ 5,800,000.00

$ 4,000,000.00 $ 4,000,000.00

$ 4,640,000.00 $ 4,640,000.00 $ 4,640,000.00

$ 15,240,000.00 $ 19,240,000.00 $ 25,040,000.00

Page 5: Resumen Contratos

AVANCE DE OBRA

PERIODO PERIODO

Jun-15 May-15

$ 10,600,000.00 $ 10,600,000.00

$ 5,800,000.00

$ 4,640,000.00 $ 2,320,000.00

$ 21,040,000.00 $ 12,920,000.00

Page 6: Resumen Contratos

SOLO HA FACTURADO EL ANTICIPOSOLO HA FACTURADO EL ANTICIPO

EN PROCESO DE LEGALIZACION

EN PROCESO DE LEGALIZACION

Page 7: Resumen Contratos

CÓDIGO NÚMERO

TIIPO DE CONTRATOSUBCON- DE

TRATISTA SUBCONTRATO

21001088 14000160-OK-2014-001 Precios Unitarios DIMEL INGENERIA S.A

21001116 14000160-OK-2014-002 Precios Unitarios Andres Zambrano Muller

21001146 14000160-OK-2014-005 Precios Unitarios

21001182 14000160-OK-2014-006 Global Fundacion F.A.T.A

14000160-OK-2014-011 Precios Unitarios

TOTALES

NOMBRE SUBCONTRATISTA

DG INGENIEROS CONSTRUCTORES SAS

OVIDIO CALA NIÑO S.A.S

Page 8: Resumen Contratos

VR CONTRATO VR MODIFICACION

$ 8,574,226,350.00

$ 76,899,304.00

Mano de obra estructura $ 1,625,506,633.00

Tala de Arboles $ 58,000,000.00

$ 5,864,923,525.00

TOTALES $ 16,199,555,812.00

DESCRIPCIÓN GENERAL DEL SUBCONTRATO

Suministro, Fabricacion, Montaje e Instalacion de la Estructura Metalica

Cerramiento en Lona Verde y Lamina de Zinc

Suministro e Instalacion de Red Hidrosanitaria y Contra Incendio

Page 9: Resumen Contratos

AVANCE DE OBRA

% TOTAL PERIODO

AVANCE DE OBRA AVANCES DE OBRA Oct-15

0.00% $ -

100.00% $ 66,791,273.00

0.00% $ -

0.00% $ -

0.00% $ -

$ 66,791,273.00 $ -

Page 10: Resumen Contratos

AVANCE DE OBRA

PERIODO PERIODO PERIODO

Sep-15 Aug-15 Jul-15

$ 8,159,987.00 $ 38,555,590.00 $ 20,075,696.00

$ 8,159,987.00 $ 38,555,590.00 $ 20,075,696.00

Page 11: Resumen Contratos

AVANCE DE OBRA

PERIODO PERIODO

Jun-15 May-15

$ - $ -

Page 12: Resumen Contratos

SOLO HA FACTURADO EL ANTICIPO

SOLO HA FACTURADO EL ANTICIPO

EL CONTRATO FINALIZO CON MENOS CANTIDAD EJECUTADA DE LA ESTIMADA POR CAMBIOS DURANTE LA EJECUCION

SOLO HA FACTURADO EL ANTICIPO, AUN NO INICIA POR QUE NO LA INTERVENTORIA NO HA DADO ORDEN DE INGRESO EN EL PREDIO

Page 13: Resumen Contratos

CÓDIGO NÚMEROSUBCON- DETRATISTA SUBCONTRATO

21000881 0001 CC

21001076 0002 CC Revision Diseño Ventilacion Mecanica

24000000 0003 CC Carlos Mendoza Forrero

21001183 0004 CC Carlos Eduardo Rodriguez Especialista en Geotecnia

21001088 14000160-OK-2014-001 DIMEL INGENERIA S.A

21001116 14000160-OK-2014-002 Andres Zambrano Muller

21001214 14000160-OK-2014-003 Hugo Carvajal Triana Ficha Forestales

21001213 14000160-OK-2014-004 UVU S.A.S. Plan de Manejo de Trafico

21001146 14000160-OK-2014-005 Mano de obra estructura

21001182 14000160-OK-2014-006 Fundacion F.A.T.A Tala de Arboles

NOMBRE SUBCONTRATISTA

DESCRIPCIÓN GENERAL DEL SUBCONTRATO

Power & Automation Services S.A.S

Interventor Externo en instalaciones Electricas, voz y datos, etc.

Building Tecnholoogy Consultant SAS

Revision de Diseños y Planos Estructurales

Suministro, Fabricacion, Montaje e Instalacion de la Estructura Metalica

Cerramiento en Lona Verde y Lamina de Zinc

DG INGENIEROS CONSTRUCTORES SAS

Page 14: Resumen Contratos

21001182 14000160-OK-2014-006 Fundacion F.A.T.A Tala de Arboles

21000771 14000160-OK-2014-007

14000160-OK-2014-008 CARLOS AUGUSTO PINTO Control y Manejo de Fauna

14000160-OK-2014-009

14000160-OK-2014-010 Estudio Hidrologico e Hidrogeologico

14000160-OK-2014-011 OVIDIO CALA NIÑO S.A.S

TOTALES

Contecon Urbar Ingenieros Consultores

Servicio de Laboratorio Control de Materiales

JOSE MANUEL RINCON SILVA

Obras Preliminares Planta de Concreto e Instalaciones del

Laboratorio

RA EMPRESA DE SERVICIOS PUBLICOS

S.A.

Suministro e Instalacion de Red Hidrosanitaria y Contra Incendio

Page 15: Resumen Contratos

VR ACTUAL DEL SUBCONTRATO

$ 127,200,000.00 $ 127,200,000.00

$ 11,600,000.00 $ 11,600,000.00

$ 22,000,000.00 $ 22,000,000.00

$ 55,680,000.00 $ 55,680,000.00

$ 8,574,226,350.00 $ 8,574,226,350.00

$ 76,899,304.00 $ 76,899,304.00

$ 8,762,500.00 $ 8,762,500.00

$ 10,000,000.00 $ 10,000,000.00

$ 1,625,506,633.00 $ 1,625,506,633.00

$ 58,000,000.00 $ 58,000,000.00

VR INICIAL DEL SUBCONTRATO

VR MODIFICACION OTRO SI

Page 16: Resumen Contratos

$ 58,000,000.00 $ 58,000,000.00

$ 516,615,000.00 $ 516,615,000.00

$ 24,799,999.00 $ 24,799,999.00

$ 32,463,688.00 $ 32,463,688.00

$ 22,000,000.00 $ 22,000,000.00

$ 5,864,923,525.00 $ 5,864,923,525.00

TOTALES $ 17,030,676,999.00

Page 17: Resumen Contratos

VR TOTAL EJECUTADO VR FALTANTE POR EJECUTAR

$ 53,000,000.00 $ 74,200,000.00

$ 11,600,000.00 $ -

$ 8,000,000.00 $ 14,000,000.00

$ 25,520,000.00 $ 30,160,000.00

$ - $ 8,574,226,350.00

$ 66,791,273.00 $ 10,108,031.00

$ - $ 8,762,500.00

$ - $ 10,000,000.00

$ - $ 1,625,506,633.00

$ - $ 58,000,000.00

VR RETENIDO EN CALIDAD

Page 18: Resumen Contratos

$ - $ 58,000,000.00

$ - $ 516,615,000.00

$ - $ 24,799,999.00

$ - $ 32,463,688.00

$ - $ 22,000,000.00

$ - $ 5,864,923,525.00

$ 164,911,273.00 $ 16,865,765,726.00 $ -

Page 19: Resumen Contratos

VR TOTAL PAGADOANTICIPO

VR AMORTIZADO% VR ANTICIPO

$ 53,000,000.00 0% $ -

$ 11,600,000.00 50% $ 5,800,000.00 $ 5,800,000.00

$ 8,000,000.00 30% $ 6,000,000.00 $ 2,400,000.00

$ 25,520,000.00 0% $ -

$ - 20% $ 1,714,845,270.00

$ 66,791,273.00 20% $ 15,379,860.80 $ 15,379,860.80

$ - 50% $ 4,381,250.00

$ - 50% $ 5,000,000.00

$ - 20% $ 325,101,326.60

$ - 40% $ 23,200,000.00

Page 20: Resumen Contratos

$ - 40% $ 23,200,000.00

$ - 0% $ -

$ - 40% $ 9,919,999.60

$ - 30% $ 9,739,106.40

$ - 0% $ -

$ - 35% $ 2,052,723,233.75

$ 164,911,273.00 $ 4,172,090,047.15 $ 23,579,860.80

Page 21: Resumen Contratos

VR POR AMORTIZAR

$ - $ -

$ - $ -

$ 3,600,000.00 $ -

$ - $ -

$ 1,714,845,270.00 $ -

$ - $ -

$ 4,381,250.00 $ -

$ 5,000,000.00 $ -

$ 325,101,326.60 $ -

$ 23,200,000.00 $ -

VR RETENCION EN GARANTIA

VR RETEGARANTIA DEVUELTA

VR RETEGARANTIA POR DEVOLVER

Page 22: Resumen Contratos

$ 23,200,000.00 $ -

$ - $ -

$ 9,919,999.60 $ -

$ 9,739,106.40 $ -

$ - $ -

$ 2,052,723,233.75 $ -

$ 4,148,510,186.35 $ - $ - $ -

Page 23: Resumen Contratos

FECHA INICIO FECHA FIN

4/1/2015 3/31/2016 365

5/15/2015 6/14/2015 30

6/16/2015 6/15/2016 365

5/15/2015 5/14/2016 365

0

8/4/2015 10/4/2015 61

8/21/2015 9/15/2015 25

8/18/2015 10/2/2015 45

0

0

DIFERENCIA DE FECHAS

Page 24: Resumen Contratos

0

0

10/20/2015 4/20/2016 183

0

10/20/2015 11/19/2015 30

0

Page 25: Resumen Contratos

POLIZASESTADO

AMPAROVIGENCIA

INICIA TERMINA Cumplimiento N/A N/A

EN EJECUCION

Estabilidad o Calidad N/A N/A

Salarios y Prestaciones Sociales N/A N/A

Anticipo N/A N/A

RCE N/A N/A

Cumplimiento N/A N/A

FINALIZADO

Estabilidad o Calidad N/A N/A

Salarios y Prestaciones Sociales N/A N/A

Anticipo N/A N/A

RCE N/A N/A

Cumplimiento N/A N/A

EN EJECUCION Estabilidad o Calidad N/A N/A Salarios y Prestaciones Sociales N/A N/A Anticipo N/A N/A RCE N/A N/A Cumplimiento N/A N/A

EN EJECUCION Estabilidad o Calidad N/A N/A Salarios y Prestaciones Sociales N/A N/A Anticipo N/A N/A RCE N/A N/A Cumplimiento 6/10/2015 6/10/2017 Estabilidad o Calidad 6/10/2015 6/10/2020 Salarios y Prestaciones Sociales 6/10/2015 6/10/2020 Anticipo 6/10/2015 6/10/2017 RCE 6/10/2015 6/10/2017 Cumplimiento 8/4/2015 2/4/2016

FINALIZADO Estabilidad o Calidad 8/4/2015 8/4/2020 Salarios y Prestaciones Sociales 8/4/2015 10/4/2018 Anticipo 8/4/2015 10/4/2015 RCE 8/4/2015 10/4/2015 Cumplimiento 8/21/2015 1/15/2016

EN EJECUCION Estabilidad o Calidad N/A N/A Salarios y Prestaciones Sociales 8/21/2015 9/15/2018 Anticipo 8/21/2015 9/15/2015 RCE 8/21/2015 9/16/2015 Cumplimiento 8/18/2015 10/3/2015

EN EJECUCION Estabilidad o Calidad N/A N/A Salarios y Prestaciones Sociales 8/18/2015 10/3/2018 Anticipo 8/21/2015 10/30/2015 RCE 8/18/2015 10/3/2001 Cumplimiento 8/21/2015 12/21/2016 Estabilidad o Calidad 8/21/2015 12/21/2021 Salarios y Prestaciones Sociales 8/21/2015 12/21/2019 Anticipo 8/21/2015 12/21/2016 RCE 8/21/2015 12/21/2016 Cumplimiento 8/24/2015 1/23/2016 Estabilidad o Calidad N/A N/A Salarios y Prestaciones Sociales 8/24/2015 9/23/2018

INICIO POR DEFINIR

INICIO POR DEFINIR

INICIO POR DEFINIR

Page 26: Resumen Contratos

Anticipo 8/24/2015 9/23/2015 RCE 8/24/2015 9/23/2015 Cumplimiento 9/16/2015 9/16/2018 Estabilidad o Calidad N/A N/A Salarios y Prestaciones Sociales 9/16/2015 9/16/2021 Anticipo N/A N/A RCE 9/23/2015 9/16/2018 Cumplimiento 10/20/2015 10/20/2016

EN EJECUCION Estabilidad o Calidad N/A N/A Salarios y Prestaciones Sociales 10/20/2015 10/20/2019 Anticipo 10/20/2015 4/20/2016 RCE 10/20/2015 4/20/2016 Cumplimiento Estabilidad o Calidad Salarios y Prestaciones Sociales Anticipo RCE Cumplimiento Estabilidad o Calidad Salarios y Prestaciones Sociales Anticipo RCE Cumplimiento Estabilidad o Calidad Salarios y Prestaciones Sociales Anticipo RCE

INICIO POR DEFINIR

INICIO POR DEFINIR

EN PROCESO DE

LEGALIZACION

EN PROCESO DE

LEGALIZACION

EN PROCESO DE

LEGALIZACION

Page 27: Resumen Contratos

OBSERVACIONES

LA DURACION CONTRACTUAL ES DE 30 DIAS

DURACION 24 MESES A PARTIR DE LA FIRMA ACTA DE

INICIO

SE LE SOLICITO OTRO SI POR AMPLIACION DEL ALCANCE

YA PRESENTO EL INFORME, ESTA A LA ESPERA DE

APROBACION POR PARTE DE LAS ESNTIDADES ESTATALES

DURACION 16 MESES A PARTIR DE LA FIRMA ACTA DE

INICIO

EL CONTRATO AUN NO INICIA POR QUE LA INTERVENTORIA

NO HA DADO LA ORDEN DE INICIO DE LA ACTIVIDAD

Page 28: Resumen Contratos

FALTAN POLIZAS

EL CONTRATO AUN NO INICIA POR QUE LA INTERVENTORIA

NO HA DADO LA ORDEN DE INICIO DE LA ACTIVIDAD

DURACION 31 MESES A PARTIR DE LA FIRMA ACTA DE

INICIO